23
Design and Build of Passenger Terminal Building North Extension At Macau International Airport (RFQ-198) Section 6 – Bill of Quantities

Section 6 – Bill of Quantities - Macau International Airport Section... · internal finishes including false ceiling, internal wall and floor finishes. The cut-off line of the demolition

  • Upload
    vankien

  • View
    232

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Section 6 – Bill of Quantities - Macau International Airport Section... · internal finishes including false ceiling, internal wall and floor finishes. The cut-off line of the demolition

Design and Build of Passenger Terminal Building North Extension At Macau International Airport (RFQ-198)

Section 6 –

Bill of Quantities

Page 2: Section 6 – Bill of Quantities - Macau International Airport Section... · internal finishes including false ceiling, internal wall and floor finishes. The cut-off line of the demolition

Design and Build ofPassenger Terminal Building North Extension At Macau International Airport (RFQ - 198)

Item Quantity Unit Rate(MOP$)

Amount(MOP$)

NOTES :

(1) The work shall be done during day timeand night time according to CAM/ADA requirements.

(2) If CAM decides to cancel any items listed in the Bills of Quantities, the Contractor shall not claim any compensation related to the works not executed.

(3) Contractor shall provide the quantitiesaccording to the design, international andMacau regulations and site requirements,and the unit prices for reference. Thecontract is based on lump sum fixed price.

(4) The above items (1) to (3) apply to the whole Bills of Quantities

A Provision of temporary hoardings and/orcovered walkway with temporary lightingwhere necessary, to meet the requirementsof CAM and the Airport Operator; maintain and remove away from site upon completionof the works or as instructed by CAM.Any existing hoarding should bedismantled, kept in good conditions and returned to CAM item

B Provision of project signboards item

C Environmental mitigation measures item

D Safety precautions item

E Site cleaning item

F Contractor's workshops, offices and storage sheds item

G Maintenance of traffic flow includingprovision of temporary traffic arrangement item

H Site survey item

Carried to Collection MOP$

Section 6 - Bill of QuantitiesBill Nr. 1

Preliminaries

Description

Bill Nr. 1PRELIMINARIES

- BQ.1/1 -

Page 3: Section 6 – Bill of Quantities - Macau International Airport Section... · internal finishes including false ceiling, internal wall and floor finishes. The cut-off line of the demolition

Design and Build ofPassenger Terminal Building North Extension At Macau International Airport (RFQ - 198)

Section 6 - Bill of QuantitiesBill Nr. 1

Preliminaries

Item Quantity Unit Rate(MOP$)

Amount(MOP$)

A Contractor's All Risks Insurance item

B Employees' Compensation Insurance item

C Professional Indemnity Insurance forprofessional suppliers and sub-contractorsto meet the requirements of CAM item

D Professional Indemnity Insurance fordesigners and/or design checkers to meetthe requirements of CAM item

E Plant and tools item

F Temporary water supply item

G Temporary lighting and power item

H Temporary site services item

J Temporary site office item

K Application for permit(s) as required by CAM or any otherMacau statutory bodies/government department(s) item

Any other items (to be inserted by the Contractor):-

PRELIMINARIES

Description

Carried to Collection MOP$

Bill Nr. 1

- BQ.1/2 -

Page 4: Section 6 – Bill of Quantities - Macau International Airport Section... · internal finishes including false ceiling, internal wall and floor finishes. The cut-off line of the demolition

Design and Build ofPassenger Terminal Building North Extension At Macau International Airport (RFQ - 198)

Section 6 - Bill of QuantitiesBill Nr. 1

Preliminaries

Amount (MOP$)

Page Nr. BQ.1/1

Page Nr. BQ.1/2

TOTAL - Bill Nr. 1Carried to General Summary MOP$

Description

......................

......................

COLLECTION

PRELIMINARIESBill Nr. 1

- BQ.1/3 -

Page 5: Section 6 – Bill of Quantities - Macau International Airport Section... · internal finishes including false ceiling, internal wall and floor finishes. The cut-off line of the demolition

Design and Build ofPassenger Terminal Building North Extension At Macau International Airport (RFQ - 198)

Item Quantity Unit Rate(MOP$)

Amount(MOP$)

NOTES :The Contractor's Designer shall prepare all design in full compliance with allrelevant statuory requirements and thespecifications, Design Requirement Brief and the tender document and drawings. subject to Macau Government Authorities' approval. He shallprepare and submit all relevant design reports, calculation and drawings as necessary in good quality to the client for consent.The design document shall be prepared in Chinese and English for submission to relevant Macau Government Authorities for review and approval process.

A Design of Demolition works item

B Design of Foundation works item

C Design of Structural works item

D Design of Architectural works item

E Design of Plumbing & Drainage system item

F Design of Fire Services system item

G Design of Electrical Services system item

H Design of MVAC System item

J Design of ELV Systems and Airport Systems item

Section 6 - Bill of QuantitiesBill Nr. 2

Design of the Works

Description

Bill Nr. 2DESIGN OF THE WORKS

Carried to Collection MOP$

- BQ.2/4 -

Page 6: Section 6 – Bill of Quantities - Macau International Airport Section... · internal finishes including false ceiling, internal wall and floor finishes. The cut-off line of the demolition

Design and Build ofPassenger Terminal Building North Extension At Macau International Airport (RFQ - 198)

Section 6 - Bill of QuantitiesBill Nr. 2

Design of the Works

Item Quantity Unit Rate(MOP$)

Amount(MOP$)

A Contractor's Other Costs

Contractor's other costs for any itemof work or obligation which is necessary for the completion of theDesign of the Works as required by theContract, but not separately itemisedelsewhere in this Bill Nr. 2(Contractor to provide detailed breakdown ofthe Contractor's Other Costs below) item

Carried to Collection MOP$

Description

Bill Nr. 2DESIGN OF THE WORKS

- BQ.2/5 -

Page 7: Section 6 – Bill of Quantities - Macau International Airport Section... · internal finishes including false ceiling, internal wall and floor finishes. The cut-off line of the demolition

Design and Build ofPassenger Terminal Building North Extension At Macau International Airport (RFQ - 198)

Section 6 - Bill of QuantitiesBill Nr. 2

Design of the Works

Amount (MOP$)

Page Nr. BQ.2/1

Page Nr. BQ.2/2

TOTAL - Bill Nr. 2Carried to General Summary MOP$

Description

Bill Nr. 2DESIGN OF THE WORKS

COLLECTION

......................

......................

- BQ.2/6 -

Page 8: Section 6 – Bill of Quantities - Macau International Airport Section... · internal finishes including false ceiling, internal wall and floor finishes. The cut-off line of the demolition

Design and Build ofPassenger Terminal Building North Extension At Macau International Airport (RFQ - 198)

Item Quantity Unit Rate(MOP$)

Amount(MOP$)

A Demolition of existing part of PassengerTerminal Building adjacent to the new extension, including external wall, floorslab, façade, external architectural features, any external light fittings,internal finishes including false ceiling,internal wall and floor finishes. Thecut-off line of the demolition work shallsuit the existing site conditions. The Contractor shall provide temporary finish linings, covers, flashing plate, etc. for the cut-off line to match theexisting finishes of the PTB to the satisfaction of CAM. Provide a temporary weather proof external enclosure during the construction work. Demolition of existing E&M services to suitexisting site conditions and the design of the extension shall be carried out without interruption to the normal operation of the passenger terminal. Disposal of all construction waste and debris. item

B Diversion of existing E&M services for carrying outdemolition works and reinstatement if necessary item

C Take down and set aside of the existingadvertisement frame located at northern side of the existingPassenger Terminal Building item

D Re-fix the existing advertisement frame item

Any other items (to be inserted by the Contractor):-

TOTAL - Bill Nr. 3Carried to General Summary MOP$

Section 6 - Bill of QuantitiesBill Nr. 3

Demolition

Description

Bill Nr. 3DEMOLITION

- BQ.3/7 -

Page 9: Section 6 – Bill of Quantities - Macau International Airport Section... · internal finishes including false ceiling, internal wall and floor finishes. The cut-off line of the demolition

Design and Build ofPassenger Terminal Building North Extension At Macau International Airport (RFQ - 198)

Item Quantity Unit Rate(MOP$)

Amount(MOP$)

A Site formation works item

B Diversion of underground utilitiesincluding identifying existing underground utilities, removal ofabandoned pipelines, duct, cables, etc.,blank off or sealing up cut-off pipe orduct sections; temporary and permanent diversion of existing utilities to suitthe site conditions; reinstatement of diverted utilities upon completion of the works if necessary item

C Construction of foundation as detailedin the Contractor's design; including all necessary excavation,strutting, supports, earthwork,formwork,in-situ concrete, reinforcement bars, etc. item

Any other items (to be inserted by the Contractor):-

TOTAL - Bill Nr. 4Carried to General Summary MOP$

Section 6 - Bill of QuantitiesBill Nr. 4

Foundation

Description

Bill Nr. 4FOUNDATION

- BQ.4/8 -

Page 10: Section 6 – Bill of Quantities - Macau International Airport Section... · internal finishes including false ceiling, internal wall and floor finishes. The cut-off line of the demolition

Design and Build ofPassenger Terminal Building North Extension At Macau International Airport (RFQ - 198)

Item Quantity Unit Rate(MOP$)

Amount(MOP$)

A Construction of superstructure worksincluding connection and interfacingwith the existing Passenger TerminalBuilding and ground slab item

B Reinstatement of the ground floor slaband provision of all necessary road markings and street furniture upon completion of the works item

Any other items (to be inserted by the Contractor):-

TOTAL - Bill Nr. 5Carried to General Summary MOP$

Section 6 - Bill of QuantitiesBill Nr. 5

Structural Works

Description

Bill Nr. 5STRUCTURAL WORKS

- BQ.5/9 -

Page 11: Section 6 – Bill of Quantities - Macau International Airport Section... · internal finishes including false ceiling, internal wall and floor finishes. The cut-off line of the demolition

Design and Build ofPassenger Terminal Building North Extension At Macau International Airport (RFQ - 198)

Item Quantity Unit Rate(MOP$)

Amount(MOP$)

A Internal Floor Finishes works for area other than Arrival Hall itemand Departure Hall

B Internal Wall Finishes works other than Arrival Hall itemand Departure Hall

C Internal Ceiling Finishes works other than Arrival Hall itemand Department Hall

D Internal Floor Finishes works for Arrival Hall & Departure Hall item

E Internal Wall Finishes works for Arrival Hall & Departure Hall item

F Internal Ceiling Finishes works for Arrival Hall & Departure Hall item

G Roof finishes works including waterproofing system and insulation system item

H Façade works (at curbside), to match newfaçade detail, including canopy item

J Façade works (other than curbside), to match existing façade detail, including canopy item

K Doors, bussing gates and Ironmongeries works item

L Internal Glazing and partitions item

M Provision of fittings and loose furniture required for the operationof the New Extension; quality and standard to match existing item

N Connection and interfacing with the existing Passenger TerminalBuilding; including all internal and external finishes, façade, connection joints, reinstatement of waterproof layer at rooftop, etc. item

O Signage item

Any other items (to be inserted by the Contractor):-

TOTAL - Bill Nr. 6Carried to General Summary MOP$

Section 6 - Bill of QuantitiesBill Nr. 6

Architectural Works

Description

Bill Nr. 6ARCHITECTURAL WORKS

- BQ.6/10 -

Page 12: Section 6 – Bill of Quantities - Macau International Airport Section... · internal finishes including false ceiling, internal wall and floor finishes. The cut-off line of the demolition

Design and Build ofPassenger Terminal Building North Extension At Macau International Airport (RFQ - 198)

Item Quantity Unit Rate(MOP$)

Amount(MOP$)

Plumbing & Drainage System

A Supply and install the Plumbing and DrainageSystem item

B Connection and interfacing with existingsystem of the Passenger Terminal Buildingwhere necessary; allow for all cost associated with liaison with existing maintenance contractors and the airport operator item

C Testing and commissioning, including testingand commissioning together with existing system where necessary; allow for all cost for liaison with existing maintenance contractors and the airport operator item

Any other items (to be inserted by the Contractor):-

TOTAL - Bill Nr. 7Carried to General Summary MOP$

Description

Bill Nr. 7PLUMBING & DRAINAGE SYSTEM

Section 6 - Bill of QuantitiesBill Nr. 7

Plumbing & Drainage System

- BQ.7/11 -

Page 13: Section 6 – Bill of Quantities - Macau International Airport Section... · internal finishes including false ceiling, internal wall and floor finishes. The cut-off line of the demolition

Design and Build ofPassenger Terminal Building North Extension At Macau International Airport (RFQ - 198)

Item Quantity Unit Rate(MOP$)

Amount(MOP$)

Fire Services System

A Supply and install the Fire Services System item

B Connection and interfacing with existingsystem of the Passenger Terminal Buildingwhere necessary; allow for all cost associated with liaison with existing maintenance contractors and the airport operator item

C Testing and commissioning, including testingand commissioning together with existing system where necessary; allow for all cost for liaison with existing maintenance contractors and the airport operator item

Any other items (to be inserted by the Contractor):-

TOTAL - Bill Nr. 8Carried to General Summary MOP$

Section 6 - Bill of QuantitiesBill Nr. 8

Fire Services System

Description

Bill Nr. 8FIRE SERVICES SYSTEM

- BQ.8/12 -

Page 14: Section 6 – Bill of Quantities - Macau International Airport Section... · internal finishes including false ceiling, internal wall and floor finishes. The cut-off line of the demolition

Design and Build ofPassenger Terminal Building North Extension At Macau International Airport (RFQ - 198)

Item Quantity Unit Rate(MOP$)

Amount(MOP$)

A Power Supplies System item

B Provide General Lighting and EssentialLighting System item

C Provide Emergency Lighting System item

D Provide the Lifts serving all floors item

E Provide the Escalators serving all floors item

F UPS System Installation item

G Provide the complete Electrical Earthing and Clean Earthing System. item

H Provide Earthing and Lightning Protection SystemFacilities item

J Provide Emergency Diesel Generator System item

K Connection and interfacing with existingsystems of the Passenger Terminal Buildingwhere necessary; allow for all cost associated with liaison with existing maintenance contractors and the airport operator item

L Testing and commissioning, including testingand commissioning together with existing system where necessary; allow for all cost for liaison with existing maintenance contractors and the airport operator item

Any other items (to be inserted by the Contractor):-

TOTAL - Bill Nr. 9Carried to General Summary MOP$

Section 6 - Bill of QuantitiesBill Nr. 9

Electrical Services System

Description

Bill Nr. 9ELECTRICAL SERVICES SYSTEM

- BQ.9/13 -

Page 15: Section 6 – Bill of Quantities - Macau International Airport Section... · internal finishes including false ceiling, internal wall and floor finishes. The cut-off line of the demolition

Design and Build ofPassenger Terminal Building North Extension At Macau International Airport (RFQ - 198)

Item Quantity Unit Rate(MOP$)

Amount(MOP$)

MVAC System

A Supply and install the MVAC System item

B Connection and interfacing with existingsystem of the Passenger Terminal Buildingwhere necessary; allow for all cost associated with liaison with existing maintenance contractors and the airport operator item

C Testing and commissioning, including testingand commissioning together with existing system where necessary; allow for all cost for liaison with existing maintenance contractors and the airport operator item

Any other items (to be inserted by the Contractor):-

TOTAL - Bill Nr. 10Carried to General Summary MOP$

Section 6 - Bill of QuantitiesBill Nr. 10

MVAC System

Description

Bill Nr. 10MVAC SYSTEM

- BQ.10/14 -

Page 16: Section 6 – Bill of Quantities - Macau International Airport Section... · internal finishes including false ceiling, internal wall and floor finishes. The cut-off line of the demolition

Design and Build ofPassenger Terminal Building North Extension At Macau International Airport (RFQ - 198)

Item Quantity Unit Rate(MOP$)

Amount(MOP$)

BUILDING SERVICES

Allow for Builder's works in connection with building services

A Diversion of existing utility services item

Foundation, sub-structure, superstructure and architectural worksfor the followings:

B Transformer Room item

C Plant Room item

D Equipment Room item

E Communication and IT Room item

Any other items (to be inserted by the Contractor):-

TOTAL - Bill Nr. 11Carried to General Summary MOP$

Section 6 - Bill of QuantitiesBill Nr. 11

Builder's works in connection with Building Services

Description

Bill Nr. 11BUILDER'S WORKS IN CONNECTION WITH

- BQ.11/15 -

Page 17: Section 6 – Bill of Quantities - Macau International Airport Section... · internal finishes including false ceiling, internal wall and floor finishes. The cut-off line of the demolition

Design and Build ofPassenger Terminal Building North Extension At Macau International Airport (RFQ - 198)

Item Amount (MOP$)

A

TOTAL - Bill Nr. 12Carried to General Summary MOP$

CONTINGENCY SUM

Contingency sum

Section 6 - Bill of QuantitiesBill Nr. 12

Contingency Sum

Description

Bill Nr. 12

- BQ.12 /16 -

Page 18: Section 6 – Bill of Quantities - Macau International Airport Section... · internal finishes including false ceiling, internal wall and floor finishes. The cut-off line of the demolition

Design and Build ofPassenger Terminal Building North Extension At Macau International Airport (RFQ - 198)

Item Quantity Unit Rate(MOP$)

Amount(MOP$)

NOTES :

(1) The work in this Bill are OPTIONALand is subject to the exclusion from the Contract.The Contractor shall only carry out this partof the work upon receipt of written instruction from CAM

A Closed Circuit Television (CCTV) System item

B Public Address (PA) System item

C Private Automated Branch Exchange (PABX) System item

D Access Control System (ACS) item

E Wireless Network (WLAN) System item

F Radio Communication System item

G Voice and Data Cabling (VDC) System item

H Building Management System (BMS) item

J Connection and interfacing with existingsystem of the Passenger Terminal Buildingwhere necessary; allow for all cost associated with liaison with existing maintenance contractors and the airport operator item

K Testing and commissioning, including testingand commissioning together with existing system where necessary; allow for all cost for liaison with existing maintenance contractors and the airport operator item

Any other items (to be inserted by the Contractor):-

TOTAL - Bill Nr. 13

Section 6 - Bill of QuantitiesBill Nr. 13

ELV Systems and Airport Systems (OPTIONAL)

Description

Bill Nr. 13ELV SYSTEMS AND AIRPORT SYSTEMS (OPTIONAL)

- BQ.13/17 -

Page 19: Section 6 – Bill of Quantities - Macau International Airport Section... · internal finishes including false ceiling, internal wall and floor finishes. The cut-off line of the demolition

Design and Build ofPassenger Terminal Building North Extension At Macau International Airport (RFQ - 198)

Item Quantity Unit Rate(MOP$)

Amount(MOP$)

NOTES :

(1) The work in this Bill are OPTIONALand is subject to the exclusion from the Contract.The Contractor shall only carry out this partof the work upon receipt of written instruction from CAM

A Provision of Passenger Loading Bridgeincluding all necessary footings, anchors andfoundations; same or higher quality as existingpassenger loading bridge; complete with allfinishes, fittings, cladding, interior decoration,E&M installations connected to Sterile Corridor 1 No.

B Connection and interfacing with existingsystem of the Passenger Terminal Buildingwhere necessary; allow for all cost associated with liaison with existing maintenance contractors and the airport operator item

Supply and install the following systems to PassengerLoading Bridge:

C Plumbing and Drainage System item

D Fire Services System item

E Electrical Services System item

F MVAC System item

G ELV Systems and Airport Systems item

Carried to Collection MOP$

Section 6 - Bill of QuantitiesBill Nr.14

Passenger Loading Bridge (OPTIONAL)

Description

Bill Nr. 14PASSENGER LOADING BRIDGE (OPTIONAL)

- BQ.14/18 -

Page 20: Section 6 – Bill of Quantities - Macau International Airport Section... · internal finishes including false ceiling, internal wall and floor finishes. The cut-off line of the demolition

Design and Build ofPassenger Terminal Building North Extension At Macau International Airport (RFQ - 198)

Section 6 - Bill of QuantitiesBill Nr.14

Passenger Loading Bridge (OPTIONAL)

Item Quantity Unit Rate(MOP$)

Amount(MOP$)

NOTES :

(1) The work in this Bill are OPTIONALand is subject to the exclusion from the Contract.The Contractor shall only carry out this partof the work upon receipt of written instruction from CAM (cont'd)

Connection and interfacing with existing system of the Passenger Terminal Building where necessary; allow for all cost associated with liaison with existing maintenance contractors and the airport operator

A Plumbing and Drainage System item

B Fire Services System item

C Electrical System item

D MVAC System item

E ELV Systems and Airport Systems item

Testing and commissioning; including testing and commissiongtogether with existing system where necessary

F Plumbing and Drainage System item

G Fire Services System item

H Electrical System item

J MVAC System item

K ELV Systems and Airport Systems item

Any other items (to be inserted by the Contractor):-

Carried to Collection MOP$

Description

Bill Nr. 14PASSENGER LOADING BRIDGE (OPTIONAL)

- BQ.14/19 -

Page 21: Section 6 – Bill of Quantities - Macau International Airport Section... · internal finishes including false ceiling, internal wall and floor finishes. The cut-off line of the demolition

Design and Build ofPassenger Terminal Building North Extension At Macau International Airport (RFQ - 198)

Section 6 - Bill of QuantitiesBill Nr.14

Passenger Loading Bridge (OPTIONAL)

Amount (MOP$)

Page Nr. BQ.14/1

Page Nr. BQ.14/2

TOTAL - Bill Nr. 14

......................

Description

Bill Nr. 14PASSENGER LOADING BRIDGE (OPTIONAL)

COLLECTION

......................

- BQ.14/20 -

Page 22: Section 6 – Bill of Quantities - Macau International Airport Section... · internal finishes including false ceiling, internal wall and floor finishes. The cut-off line of the demolition

Design and Build ofPassenger Terminal Building North Extension At Macau International Airport (RFQ - 198)

Item Amount (MOP$)

1 Preliminaries

2 Design of the Works

3 Demolition

4 Foundation

5 Structural Works

6 Architectural Works

7 Plumbing & Drainage System

8 Fire Services System

9 Electrical Services System

10 MVAC System

11 Builder's Works in connection with Building Services

12 Contingencies

Total MOP$

Bill Nr.

Section 6 - Bill of QuantitiesGeneral Summary (CORE ITEMS)

Description

GENERAL SUMMARY (CORE ITEMS)

- GS-

Page 23: Section 6 – Bill of Quantities - Macau International Airport Section... · internal finishes including false ceiling, internal wall and floor finishes. The cut-off line of the demolition

Design and Build ofPassenger Terminal Building North Extension General Summary (OPTIONAL ITEM)At Macau International Airport (RFQ - 198)

Item Amount (MOP$)

13 ELV Systems and Airport Systems (OPTIONAL)

14 Passenger Loading Bridge (OPTIONAL)

Total MOP$

Bill Nr.

Section 6 - Bill of Quantities

Description

GENERAL SUMMARY (OPTIONAL ITEMS)