20
ATLAS ATLAS ATLAS ATLAS Silicon Strip Detectors for the ATLAS HL-LHC Upgrade Anthony Affolder University of Liverpool On behalf of the ATLAS Upgrade Community

Silicon Strip Detectors for the ATLAS HL-LHC Upgrade

  • Upload
    luka

  • View
    61

  • Download
    0

Embed Size (px)

DESCRIPTION

Silicon Strip Detectors for the ATLAS HL-LHC Upgrade. Anthony Affolder University of Liverpool On behalf of the ATLAS Upgrade Community. ATLAS Inner Tracker Upgrades. PHASE 2. PHASE 1. PHASE 0. 2000-3000. LHC shutdown. 200-400. 100-200. HL-LHC. 5-10. today: ~ 600 pb -1. Phase 0 - PowerPoint PPT Presentation

Citation preview

Page 1: Silicon Strip Detectors for the ATLAS HL-LHC Upgrade

Silicon Strip Detectors for the ATLAS HL-LHC Upgrade

Anthony AffolderUniversity of Liverpool

On behalf of the ATLAS Upgrade Community

Page 2: Silicon Strip Detectors for the ATLAS HL-LHC Upgrade

ATLASATLASATLASATLASATLAS Inner Tracker Upgrades

• Phase 0– New beam pipe w/additional pixel layer (IBL)

• See Philippe Grenier’s presentation

• Phase 1– Possibility of replacement of entire pixel

system

• Phase 2 (HL-LHC, previously sLHC)– Replacement of current transition radiation

tracker (TRT) and strip tracker with an all-silicon tracker

• Focus of this talk

A. Affolder – TIPP 2011, 9th-14th June 2011, Chicago, IL 2

PHA

SE 0

LHC shutdown

PHA

SE 1

PHA

SE 2

5-10

100-200200-400

2000-3000

today: ~ 600 pb-1

HL-LHC

Page 3: Silicon Strip Detectors for the ATLAS HL-LHC Upgrade

ATLASATLASATLASATLAS

A. Affolder – TIPP 2011, 9th-14th June 2011, Chicago, IL 3

0.E+00

2.E+34

4.E+34

6.E+34

8.E+34

1.E+35

0 2 4 6 8 10 12Lu

min

osity

(cm

-2s-1

)

time (hours)

Nominal

1035 - no levelling

Levelling at 5 10

35

34

ATLAS Phase II Tracker Upgrade

Short Strip (2.4 cm) -strips (stereo layers):Long Strip (4.8 cm) -strips (stereo layers):

r = 38, 50, 62 cm Up to 1.2x1015 1MeV neq/cm2

r = 74, 100 cm Up to 5.6x1014 1MeV neq/cm2

Fluence estimates up to few 1016 particles/cm2

Gives Grad (10 MGy) doses to components

Pixels

Short Strips

Long Strips

Challenges facing HL-LHC silicon detector upgrades:• Higher occupancies

⤷ Finer Segmentation• Higher particle fluences

⤷ Increase Radiation Tolerance• Larger Area (~200 m2)

⤷ Cheaper Sensors

400 collisions (1035 cm-2 s-1)

Fluence estimates include a 2x “safety” factor for prediction uncertainties

Page 4: Silicon Strip Detectors for the ATLAS HL-LHC Upgrade

ATLASATLASATLASATLAS Radiation Hard Sensors• n+-strip in p-type substrate (n-in-p)

– Collects electrons like current n-in-n pixels• Faster signal, reduced charge trapping

– Always depletes from the segmented side• Good signal even under-depleted

– Single-sided process • ~50% cheaper than n-in-n• More foundries and available capacity

world-wide– Easier handling/testing due to lack of

patterned back-side implant

• Collaboration of ATLAS with Hamamatsu Photonics (HPK) to develop 9.75x9.75 cm2 devices (6 inch wafers)– 4 segments (2 axial, 2 stereo), 1280 strip each,

74.5 m pitch, ~320 m thick– FZ1 <100> and FZ2 <100> material studied– Miniature sensors (1x1 cm2) for irradiation studies

A. Affolder – TIPP 2011, 9th-14th June 2011, Chicago, IL 4

Axial

Stereo

Miniatures

n+

p- bulk

Al

SiO2

Guard RingBias Ring

p-spray/stop

p+

e-

Un-depleted

See N. Unno, et. al., Nucl. Inst. Meth. A, Vol. 636 (2011) S24-S30 for details

Page 5: Silicon Strip Detectors for the ATLAS HL-LHC Upgrade

ATLASATLASATLASATLAS

0.00

0.02

0.04

0.06

0.08

0.10

0 100 200 300

1/C2

[nF-2

]

-Vbias [V]

Depletion Voltage

W32 Vdep=202.5W33 Vdep=202.3W35 Vdep=201.4W37 Vdep=198.8W38 Vdep=200.3W39 Vdep=199.4W15 Vdep=245.5W16 Vdep=234.9

1 kHz with CR in Series

Full-size Sensor Evaluation

5

Specification MeasurementLeakage Current <200 µA at 600 V 200– 370nA

Full Depletion Voltage <500 V 190 – 245VCoupling Capacitance (1kHz) >20 pF/cm 24 – 30pF

Polysilicon Resistance 1.5+/-0.5MΩ 1.3 -1.6MΩCurrent through dielectric Idiel < 10 nA < 5nA

Strip Current No explicit limit < 2nAInterstrip Capacitance (100kHz) <1.1pF/cm (3 probe) 0.7 – 0.8pF

Interstrip Resistance > 10x Rbias~15 MΩ >19 GΩ

All specifications already met!!

A. Affolder – TIPP 2011, 9th-14th June 2011, Chicago, IL

See J. Bohm, et. al., Nucl. Inst. Meth. A, Vol. 636 (2011) S104-S110 for details

0.0

1.0

2.0

3.0

4.0

0 100 200 300

Cin

t [pF

]

-Vbias

Interstrip Capacitance W33-Seg1W33-Seg2W33-Seg3W33-Seg4W35-Seg1W35-Seg2W35-Seg3W35-Seg4W37-Seg1W37-Seg2W37-Seg3W37-Seg4W38-Seg1W38-Seg2W38-Seg3W38-Seg4W39-Seg1W39-Seg2W39-Seg3W39-Seg4W32-Seg1W32-Seg2W32-Seg3W32-Seg4

100kHz test frequency with CpG0

100

200

300

400

500

0 200 400 600 800 1000

-Ilea

k [n

A]

-Vbias [V]

Leakage Currentw32 PRGw33 PRGw35 PRGW37 PRGw38 PRGw39 PRGW19 SBUW21SBUW22 SBUW23 SBUW25 SBUW26 SBUW27 SBUW28 SBUW29 SBUW18 GeUW17 GeUW15 CAMW16 CAM

Ileak normalized to 20 C

Page 6: Silicon Strip Detectors for the ATLAS HL-LHC Upgrade

ATLASATLASATLASATLAS Charge Collection Results

• Miniature devices irradiated to strip barrel fluences with neutrons, pions, protons

• Charge collection measured with 90Sr b-source

– Consistent results between different groups/equipment

• S/N greater than 10:1 for strip sensor types with expected noise performance

– ~600-800 e- short strips, ~800-1000 e- long strips– See H. Sadrozinski, et.al., Nucl. Inst. Meth. A,

doi:10.1016/j.nima.2011.04.0646 for details

A. Affolder – TIPP 2011, 9th-14th June 2011, Chicago, IL 6

70 MeV Protons

Neutrons

Unannealed

Annealed 80 min at 60 C

10:1 Signal-to-Noise

10:1 Signal-to-Noise 10:1 Signal-to-Noise

240 MeV Pions

Annealed 80 min at 60 C

Page 7: Silicon Strip Detectors for the ATLAS HL-LHC Upgrade

ATLASATLASATLASATLAS

7

Stave+Petal Programme

A. Affolder – TIPP 2011, 9th-14th June 2011, Chicago, IL

~ 1.2 metersBus cable

Hybrids Coolant tube structure

Carbon honeycomb or foam

• Designed to reduce radiation length Minimize material by shortening cooling path Glue module directly to a stave core with embedded pipes

• Requirements of large scale assembly considered from the beginning-

Simplify build as much as possible• All components independently testable prior

to construction• Design aims to be low cost-

Minimize specialist components

Petal Hybrid

StaveModule

Glue

Glue

No substrate or connectors

Carbon fiber facing

Pet

al

Readout ICs

Stave

Page 8: Silicon Strip Detectors for the ATLAS HL-LHC Upgrade

ATLASATLASATLASATLAS Hybrid Mass Production

A. Affolder – TIPP 2011, 9th-14th June 2011, Chicago, IL 8

• First pass at industrialization of hybrids: Panelization (8 per panel):

o Flex selectively laminated to FR4 FR4 acts as temporary substrate during assembly,

wire bonding and testing Designed for machine placement and solder

re-flow of passive components Mass attachment/wire bonding of custom ASICs

• Flex uses conservative design rules (~20000 hybrids to be installed):⤷ High yield, large volume, low price

100µm track and gap, blind vias (375µm lands with 150µm drill) and 50µm dielectrics

• Hybrids+ASICs tested in panel With final ASIC set (ABCn-130nm, HCC, power), all hybrids in

the panel tested with one data I/O and one power connection

Panel dimensions: 300mm x 200mmHybrid dimensions: 24mm x 107.6mm

Fully characterized hybrid cut out of panel ready for module assembly

Page 9: Silicon Strip Detectors for the ATLAS HL-LHC Upgrade

ATLASATLASATLASATLAS

A. Affolder – TIPP 2011, 9th-14th June 2011, Chicago, IL 9

Stave Module Tests

Parallel Serial DC-DCHybrid 62 590 e-

596 e-590 e-

599 e-595 e-

603 e-

Hybrid 61 585 e-

591 e-588 e-

599 e-585 e-

591 e-

598e

DC-DC converters

• Stave modules are tested in PCB frames– Cheap, flexible test bed for different

power/shielding/grounding configurations

• Parallel powering, serial powering, and DC-DC converters have all been evaluated – With proper grounding/shielding, all these

configurations give expected noise performance

Hybrid 61

Hybrid 62

Serial P

ower C

hain

AC

Cou

pled

C

lock

/Com

man

dInput noise: 588e-

Input noise: 599e-

Input noise: 590e-

Input noise: 599e-

Serial Powering

Column 0

Column 1

Column 2

Column 3

Column 0

Column 1

Column 2

Column 3

Page 10: Silicon Strip Detectors for the ATLAS HL-LHC Upgrade

ATLASATLASATLASATLAS

A. Affolder – TIPP 2011, 9th-14th June 2011, Chicago, IL 10

Strip Module Irradiation• Irradiated at CERN-PS irradiation facility

– 24 GeV proton beam scanned over inclined modules

– Module biased, powered, and clocked during irradiation

– Total dose of 1.9x1015 neq cm-2 achieved• Max predicted fluence for barrel modules is 1.2x1015 neq cm-2

• Sensor and module behave as expected– Noise increase consistent with shot noise

expectations

Noise Column 0 Column 1Pre-Irrad 610 e- 589 e-

Post-Irrad 675 e- 650 e-

Difference 65 e- 61 e-

Expected 670 e- 640 e-

AL Foil

AL Foil

Pre-irradiationPost-irradiation Motorized, Cooled

Irradiation Stage

Page 11: Silicon Strip Detectors for the ATLAS HL-LHC Upgrade

ATLASATLASATLASATLAS

A. Affolder – TIPP 2011, 9th-14th June 2011, Chicago, IL 11

Stavelets

BCC PCBs

Serial Power Protection PCBs or DC-DC Converters

Bus Cable

EOS Card

data and hybrid communication

power and power control

• Shortened stave built as electrical test-bed Shielding, grounding, serial and DC-DC powering, …

• First stavelet serial powered Power Protection Board (PPB) has automated

over-voltage protection and slow-controlled (DCS) hybrid bypassing

DC-DC stavelet under construction• Uses Basic Control Chip (BCC) for data I/O

Generates 80MHz data clock from 40MHz BC clock 160Mbit/s multiplexed data per hybrid

DC-DC converter

Slow-controlled bypass

Page 12: Silicon Strip Detectors for the ATLAS HL-LHC Upgrade

ATLASATLASATLASATLAS

A. Affolder – TIPP 2011, 9th-14th June 2011, Chicago, IL 12

Serial Powered Stavelet Electrical Results• Uses on-hybrid shunt control circuit• Stavelet noise approaching single

module tests– Roughly ~20 e- higher– Bypassing hybrids does not affect

noise performance• All technologies necessary for serial

powering of stave have been prototyped and shown to work (and compatible with 130 nm CMOS)– Constant current source, SP protection

and regulation, multi-drop LVDS • Currently optimizing location of

components, size of SP chains• Minimal impact on material budget

– Estimated to be ~0.03% averaged over the stave

Custom Current Source

Serial Power Protection(discrete components)

AC-coupled mLVDS

Stavelet Noise using Serial Power

Serial Power Protection(130 nm prototype)

Col

umn

of c

hips

Modules

Page 13: Silicon Strip Detectors for the ATLAS HL-LHC Upgrade

ATLASATLASATLASATLAS

A. Affolder – TIPP 2011, 9th-14th June 2011, Chicago, IL

Petal Endcaps• The petal concept follows closely the barrel

stave concept• 5 discs on each end cap with 32 petals per disc

– 6 Sensor rings• First petal cores have been produced

– Flat to better than 100 m• First endcap hybrids tested

– Same performance as barrel hybrid• n-in-p sensor prototypes submitted to CNM to

make petal-let using 4” wafers

13

8.60 cm

8.07 cm

Page 14: Silicon Strip Detectors for the ATLAS HL-LHC Upgrade

ATLASATLASATLASATLAS

A. Affolder – TIPP 2011, 9th-14th June 2011, Chicago, IL 14

• Modular concept: cooling, local structure, service bus, power interface are decoupled from the modules

• Overlapping coverage in Z• Rework – Possible up to the commissioning after

integration• Design includes carbon-carbon hybrid bridge

Hybrid could be also glued as for stave modules to reduce material

Alternative Solution: Super-Module

Page 15: Silicon Strip Detectors for the ATLAS HL-LHC Upgrade

ATLASATLASATLASATLAS Conclusions• The current ATLAS TRT and silicon strip tracker must be

replaced with an all-silicon tracker for HL-LHC operation (planned to be assembled by 2020)

• The R&D program of components has made significant progress:– Full-size prototype planar strip detectors have already been fabricated at

Hamamatsu Photonics (HPK) which meet the final specifications– Working baseline and alternative module prototypes have been made and

shown to work after irradiation larger than the final expected fluence– Due to time constraints, we couldn’t show the following (see backup slides):

• n-in-p FZ planar devices have also been shown to collect sufficient charge for the pixel region• Thermo-mechanical prototypes perform as expected, meeting the needs of the experiment

• Full-size stave/super-module prototypes are planned to be finished this year with the next generation of the 130 nm ASICs for the strip tracker under design

A. Affolder – TIPP 2011, 9th-14th June 2011, Chicago, IL 15

Page 16: Silicon Strip Detectors for the ATLAS HL-LHC Upgrade

ATLASATLASATLASATLASThank You to Irradiation Sources

A. Affolder – TIPP 2011, 9th-14th June 2011, Chicago, IL 16

Irradiation and dosimetry(24 GeV Protons):CERN PS Irrad1 facility, Geneva Switzerland: M. Glaser, et. al.

Irradiation and dosimetry (Neutrons):Triga Reactor, Jozef Stefan Institute, Ljubljana, Slovenia: V. Cindro, et. al.

Irradiation and dosimetry (26 MeV Protons):Compact Cyclotron, Karlsruhe, Germany: W. de Boer, A. Dierlamm, et. al.

Irradiation and dosimetry (280 MeV/c Pions):Paul Scherrer Institut, Switzerland: M. Glaser, T. Rohe, et. al.

Irradiation and dosimetry (70 MeV Protons):AVF Cyclotron at CYRIC, Sendai, Japan: Y. Unno, T. Shinozuka, et. al.

Page 17: Silicon Strip Detectors for the ATLAS HL-LHC Upgrade

ATLASATLASATLASATLAS

Backup

Page 18: Silicon Strip Detectors for the ATLAS HL-LHC Upgrade

ATLASATLASATLASATLAS Charge Collection Summary

A. Affolder – TIPP 2011, 9th-14th June 2011, Chicago, IL 18

For ATLAS07 miniatures, results from all irradiation sources consistent after non-ionizing energy loss (NIEL) scaling to 1 MeV neutron equivalent fluences

• Annealed measurements corrected to un-annealed state using values derived from I. Mandic, et. al., Nucl. Instr. Meth. A, Vol. 629 (2011) 101-105.

Charge sufficient for pixel layers as long as adequate bias voltage and cooling provided!!!

Unannealed500V

Unannealed900V

Page 19: Silicon Strip Detectors for the ATLAS HL-LHC Upgrade

ATLASATLASATLASATLAS

-40

-35

-30

-25

-20

-15

-10

-5

0

11:10 11:20 11:30 11:40 11:50 12:00 12:10 12:20 12:30

Tem

pera

ture

[deg

C]

Time

Thermo-mechanical Demonstrator

A. Affolder – TIPP 2011, 9th-14th June 2011, Chicago, IL 19

0W 83158

Full-size demonstrator made with realistic mechanical modules, stave cores, bus cables and locking mechanism. It is cooled to -35 C° with a CO2 blow system. During cooling from room temperature to operating temperature, deflections less than 100 m were measured.

Thermal resistance (hybridΔT/total power):Top: 0.0425 ± 0.0024 °C/W

Bottom: 0.0474 ± 0.0030 °C/WAll: 0.0449 ± 0.0037 °C/W

Simulation: 0.043 °C/W

Great agreements between measurement and simulation!!CO2 Cooling

Page 20: Silicon Strip Detectors for the ATLAS HL-LHC Upgrade

ATLASATLASATLASATLAS SP Stave Architecture

20

24 hybrids in series, each atdifferent potential wrt GND

CLK & COM AC coupled at hybrid

DATA AC coupled at end of stave

Common GND at end of stave

(DC-DC powered stave would look similar,apart from the absence of AC coupled IO)

A. Affolder – TIPP 2011, 9th-14th June 2011, Chicago, IL