Introduction of SINOPEC Engineering
Outline of SINOPEC Engineering
Engineering and R&D Strength
Procurement Strength
Construction Strength
Project Execution Summary
Ongoing Project Summary
All rights reserved © 2009 SINOPEC3 All rights reserved © 2008, SINOPEC
The parent of SINOPEC Engineering, SINOPEC is the 3rd largest refiner and 4th petrochemicals
producer in the world and the 2nd largest crude producer in China , who ranked the 9th in the
“Fortune Global 500” , Listing with Revenue US$ 207.8 billion in 2008 when it produced 44million
tons of crude and 8.3 billion m3 natural gas; processed 190 million tons of crude and produced 6.3
million tons of ethylene.
Outline of SINOPEC Engineering
All rights reserved © 2009 SINOPEC
SINOPEC Engineering was reorganized by SINOPEC in July 2007 as a wholly owned subsidiary of
SINOPEC. SINOPEC Engineering is authorized on behalf of SINOPEC to organize and integrate the
resources and expertise of refining and petrochemical engineering services under SINOPEC to
develop and execute global refining and petrochemical projects.
Outline of SINOPEC Engineering
All rights reserved © 2009 SINOPEC5 All rights reserved © 2008, SINOPEC
SINOPEC Engineering was first presented in 1953. All through the years, SINOPEC Engineering
successfully completed and delivered hundreds of EPC projects in fields of refining and
petrochemical for both domestic and overseas clients, Participated developing and commercialized
series proprietary technologies of refining and petrochemical industries.
After reorganization, SINOPEC Engineering manages five leading engineering companies and three leading construction companies in China, total employee reaches 20,000, they are:
SINOPEC Engineering -SEI SINOPEC Engineering -LPEC SINOPEC Engineering -SSEC SINOPEC Engineering -SNEC SINOPEC Engineering –SNEISINOPEC Engineering –FCCSINOPEC Engineering –SFCCSINOPEC Engineering -TCC
Outline of SINOPEC Engineering
All rights reserved © 2009 SINOPECAll rights reserved © 2008, SINOPEC
Outline of SINOPEC Engineering
All rights reserved © 2009 SINOPEC7
Outline of SINOPEC Engineering
All rights reserved © 2009 SINOPEC
Main Fields of Business:
RefineryPetrochemical complexFertilizer PlantsPharmaceutical PlantsLNG plantLong-distance pipeline Municipal facilities
Outline of SINOPEC Engineering
All rights reserved © 2009 SINOPEC
Scope of Services:
Project Concept
Master Planning
Technology transfer & licensing
Feasibility study
Environmental Impact Assessment
Geo-technical Engineering & Engineering Surveying
Process Design Package
Basic & Detailed Engineering
Procurement
Construction & Construction Supervision
Commissioning
Manufacturing and Fabrication
Training
Maintenance and Overhaul
Outline of SINOPEC Engineering
All rights reserved © 2009 SINOPEC10
To bring the SINOPEC group advantages to execute the overseas projects ,
SINOPEC Engineering was reorganized in 2007, with four engineering companies ,
four construction companies and an independent engineering technology
institute .SINOPEC Engineering employees 19,000 people of which 6,000 are
technical staff.
Except above human resource, all 100,000 people within SINOPEC for petroleum
refining and petrochemical engineering and construction are available for SINOPEC
Engineering.
General
Human Resources:
Engineering and R&D Strength
All rights reserved © 2009 SINOPEC
191122
695
549 1285
309 427
487
Process
Equipment &MechanicalPiping
Electrical &InstrumentationCivil,Structural &ArchitecturalHealth,Safety &EnvironmentalUtility
Draft Man
Total 4065
Engineering Strength:
Engineering and R&D Strength
All rights reserved © 2009 SINOPEC12
SINOPEC Engineering has experienced engineering team with 6000 person, and has engineering
experience for 10 million t/a refinery complex, 1 million t/a ethylene complex, 150,000 m3 single storage
tank and so on.
Especially, SINOPEC Engineering as PMC or EPC contractor has executed and delivered Nanhai (Joint
Venture by Shell and CNOOC) 800,000t/a ethylene complex; SECCO (Joint Venture by BP and Sinopec)
900,000 t/a ethylene complex; BYC (Joint Venture by BASF and Sinopec) 600,000t/a ethylene complex
since 2000. Fujian refinery and petrochemical integrated project (Joint Venture by Sinopec, Exxon-
Mobile and Saudi Aramco) with 800,000t/a ethylene complex and 1.2 million tons per year refinery has
been finished by SINOPEC Engineering in 2009.
0
500
1000
1500
2000
2500
Project Month
Tota
l Con
stru
ctio
n M
anpo
wer
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
% C
ompl
ete
Manpower 0 0 0 0 0 0 106 186 292 292 345 451 557 663 822 954 1,087 1,140 1,166 1,405 1,643 1,908 1,961 1,961 1,961 1,961 1,855 1,670 1,246 716 159
% Compltete 0.0% 0.4% 1.1% 2.2% 3.3% 4.6% 6.3% 8.4% 10.9% 14.0% 17.6% 21.7% 26.0% 30.4% 35.7% 41.9% 49.1% 56.5% 63.9% 71.3% 78.7% 85.7% 92.0% 96.7% 99.4% 100.0%
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Engineering and R&D Strength
All rights reserved © 2009 SINOPEC13
3 million t/a catalytic cracker
3.1 million t/a Residual Hydro-finishing
1.5 million t/acatalytic reformer
2 million t/a hydro-cracker
4.1 million t/a diesel hydro-finishing
Maximum capacity Maximum capacity of single unitof single unit
12 million t/a CDU & VDU
450,000 t/a PE 1 million t/a Ethylene
300,000 t/a PP
15 Billion m3/a gas purification
450,000 t/a Ammonia
850,000 t/aMethanol
260,000 t/a AN
2000 t/a Coal Gasification
Engineering and R&D Strength
All rights reserved © 2009 SINOPEC
Engineering
Procurement Construction
Process DB
Engineering DB 3D Model DB
e-Doc.Management
DOCUMENTUM 4i,LOTUS NOTES
PDS 3D, ISOGEN, SPREVIEW,PDMS,REVIEW,
ISketch, STAAD PRO2000
SPOOLGEN, CQCSP3 , STAT, PMCV, PMCF,ACCPAC, Expedition,
MARIAN, PMCS
VANTAGE PE, INTOOLS, CAESAR II,ANSYS, INSTRUCALC, FE/PIPE, Pvelite ,
TANK , EDSA
PRO II ,ASPEN Eng. Suite, FRI,HTFS,HTRI, ZYQAD,CFX,PFR,SP PID,PDS P&ID, ASPECT, Plant Builder/Auto
Router, SP Explorer, ICARUS,IPE
Procurement Management Project Management
Material Control & Construction Management
Integrated IT system
Engineering and R&D Strength
All rights reserved © 2009 SINOPEC15
Hydrocracking Unit For Qingdao Refinery
200,000 t/a Polypropylene Unit In Hainan Refinery
ModelModel
Examples For 3 D Design
Engineering and R&D Strength
All rights reserved © 2009 SINOPEC16
No. Project DescriptionProject Scale(10 thousand
per year)Technology/Licensor Numbers of
Project Service Scope
1 300-1200 SINOPEC 37 EPC
2 60-300 SINOPEC 74 EPC
3 80-250 SINOPEC 33 EPC
4 60-410 SINOPEC 75 EPC
5 80-360 SINOPEC 60 EPC
6 15-240 SINOPEC 49 EPC
CDU/ VDU
Catalytic Cracking
Delayed Coking
Hydrofining
Hydro Cracking
Catalytic Reforming
Major Technology Applications in The Last Ten Years
Engineering and R&D Strength
All rights reserved © 2009 SINOPEC17
No. Project DescriptionProject Scale(10 thousand
per year)Technology/Licensor Numbers of
Project Service Scope
1 60-100 Stone Webster Lummus--SINOPEC 8 EPC
2 20-60 Basell BP InnoveneSINOPEC 10 EPC
3 8-30 Dow Chemical SINOPEC 6 EPC
4 60-100BP-AMOCO、INVISTA
、Mitsubishi、EASTMAN SINOPEC
5 EPC
5acetic acid:
35 Methanol:85
BPShell 2 EPC
6 30~45 KBR 2 EPC
Ethylene
Polyolefin
Synthetic Rubber
Synthetic Fiber
C1 Chemical
Ammonia
Engineering and R&D Strength
Major Technology Applications in The Last Ten Years
All rights reserved © 2009 SINOPEC
Depending on demands of oil refining and petrochemical, Sinopec Engineering has establish
a science & technology innovation system. A set of core technologies and specific technologies
with international competitiveness have been developed, the whole level of science & technology
have stepped into advanced train of the world.
Engineering and R&D Strength
Technology Research & Development
All rights reserved © 2009 SINOPEC
The Organization Mode of Key Process Technologies Commercialization
Engineering and R&D Strength
All rights reserved © 2009 SINOPEC20
As a wholly owned subsidiary of SINOPEC GROUP, SINOPEC Engineering takes
full advantages of the Group’s integrated resource network, shares the super
Purchasing Capability of the Group. A reliable supply network established with more
than 20,000 qualified suppliers is always a success guarantee to our projects.
General
Procurement Strength
All rights reserved © 2009 SINOPEC
3542
60
69331938
96Procurement managerProcurement coordinatorSenior buyerBuyerPurchasing clerkTraffic clerkExpediterOthers
Total 392
Procurement Strength
All rights reserved © 2009 SINOPEC
•Comm. Group•Comm. Part•Comm.Code•Ident Code•Description Requisitions
•Inquiry•Quote•PO•Supplier Lib•Req Planning•Expedite•Traffic
MRR's
OS&D's
PO's
PO'sMRR'sMIR’s
MLCL E&PI MSCM SITE•BOM by WBS,Version•Req Template
•MRR’s•MIR’s•OS&D’s•MRS’s
BOMS
MTO
3D 3D PlantPlantDesignDesignModelModel
Sinopec Sinopec Eng. Eng. FinanceFinanceSystemSystem
MA
RIA
N
Matl Res.
ISO’s
Sinopec Eng.Reports
Sinopec Eng.Reports
Sinopec Eng.Reports
Other system/ manual take off
Procurement Strength
MARIAN Application Program
All rights reserved © 2009 SINOPEC
Confirmation byRecords Review
WitnessInspection
Requestfor
Inspection
Applicationfor
InspectionSpecification
Requisition
Quality Requirements Notice to Client
Approval ofVendor’s QCDocuments
InspectionRelease
CertificateResident
Inspection
Inspection
MDR Review& Approval
Finding NonConformance
CorrectiveAction byVendor
Inspection
InspectorsAssignment
Procurement Strength
Inspection-Sequence and Execution
All rights reserved © 2009 SINOPEC
ReceivingCargo
ReadinessNotice
MonitoringFabricationProgress
IssuingRelease for
ShippingPreparation
ExpeditingShipping
Preparation
AttendingKick-offMeeting
ExpeditingVendor’s
Documents
MonitoringMaterial
SubordersStatus
Specification
P.O.Copy
Requisition
IssuingInspection
ReleaseCertificate
Inspection
Completed
ExpeditingAs-Built Document
Submission
Shipment
Not
Com
plet
ed
Procurement Strength
Expediting-TYPICAL ACTIVITIES
All rights reserved © 2009 SINOPEC
Procurement Strength
Packing and Shipping
Purchase Order
Readyfor
ShipmentExport
PackingExport
Clearance
Loadingin
Ship
UnloadingfromShip
ImportCustomsClearance
InlandTransport’
to Site
Unloadingat
Plant Site
SpaceBooking
ForwardingContract
Manufacturing
LogisticPlanning
All rights reserved © 2009 SINOPEC26
7.879.14
13.0314.52
16.97
0
2
4
6
8
10
12
14
16
18
2002 2003 2004 2005 2006
Total Purchase Value(Billion US$)
Strong procurement and supply capability for oil & petrochemical relatedequipment and materials
20
2007
22 20.41
Procurement Strength
All rights reserved © 2009 SINOPEC
Procurement Strength
Overseas Procurement Subsidiaries
All rights reserved © 2009 SINOPEC28
YanshanTianjinQiluJiangsuJinlingYizhengNanhuaYangziJinshanEast ShanghaiGaoqiaoZhenhaiFujianGuangzhouMaomingZhongnanChongqing
Procurement Strength
Domestic Offices
All rights reserved © 2009 SINOPEC
Supplier Sourcing Worldwide
♦ Total Qualified: 20,098 Suppliers
(including 1211 offshore suppliers)
♦ A Level: 2,286 Suppliers
33 Strategic suppliers: 23(onshore)+10(offshore)
♦ B Level: 16,601 Suppliers
Procurement Strength
Procurement
All rights reserved © 2009 SINOPEC
Annually Purchasing Volume (Onshore/offshore)
2006 : Total: RMB 131.5 billion
Import/export: USD 3.23 billion
E-Procurement: RMB 113.0 billion
2007 : Total: RMB 158.2 billion
Import/export: USD 4.61 billion
E-Procurement: RMB 145.5 billion
Procurement Strength
Procurement
All rights reserved © 2009 SINOPEC
Operation Platform for Material Control
For EPC Projects:
Intergraph Marian
VPRM
SINOPEC Internal ERP System
SAP
E-Commerce: www.SINOPEC-ec.com.cn
Procurement Strength
Procurement
All rights reserved © 2009 SINOPEC
Procurement Strength
Procurement
Logistics
Rich Experienced Logistics Experts/Engineers,
Professional Management of the Door to Door Service for Projects of
different nature.
Comprehensive range of sea, air forwarding and land transportation,
combined shipment & Transshipment etc.
All rights reserved © 2009 SINOPEC33
Pre-fabrication ShopFor Pipe Spool
Pre-fabrication ShopFor Pipe Spool
Pre-fabrication Shop For Structural Steel
SINOPEC has Advanced Structural Steel And Pipe Spool Pre-fabrication Shop with more than 60% Pre-fabrication capability
Procurement Strength
All rights reserved © 2009 SINOPEC34
Manufactured Reactor
Manufactured Reactor
Manufactured Reactor
SINOPEC owns three large equipment manufacturing plants, i.e. Ningbo Mechanical Manufacturing Company, Shanghai Petrochemical Machinery Manufacturing Company and Nanjing Chemical Machinery Manufacturing Factory.
Compared with other petrochemical equipment manufacturers in China, all the three plants have the most advanced process equipments and information management system capable of developing and manufacturing of petrochemical patent and proprietary equipments. The total production capacity of manufacturing more than 200,000 t/a customized equipment.
Procurement Strength
All rights reserved © 2009 SINOPEC
Procurement Strength
Over Size Equipment Handling
All rights reserved © 2009 SINOPEC
With the most experienced engineers, skilled workers, and equipped with the most
advanced machineries, SINOPEC Engineering is fully capable of constructing,
construction supervision and management for large-scale refinery, petrochemical
and Chemical plants, thermal power plant, and hoisting and erecting oversized and
heavy equipment, large size storage tank and long distance pipeline etc.
General
36
Construction Strength
All rights reserved © 2009 SINOPEC
2473
497
639
757 2114
3225
751740805
Construction Managers
Construction Supervisors
Welders
Plumbers
Riveters
Locksmithes
Cranemen
Electricians/Instrumentstaffs Others
Total 12001
Construction Strength
Construction Manpower
All rights reserved © 2009 SINOPEC38
Technical Advantageof Project Execution
Construction Of Large Storage Tank
Installation Of Large Machinery Train
Lifting And TransportationOf Large Equipments
Shop Pre-fabricationFor Pipe And Structural Steel
Equipment Manufacturing
Construction Experience In Low and High Te
mperature Region
Construction Strength
Construction Strengths
All rights reserved © 2009 SINOPEC
Crane 200-1600Tons 19
Auto Welding Machine 1000
Metal Machining Equipment 460
Transportation Facilities 210
Testing & Inspection Equipment 1260
Construction Strength
Construction Equipment Tools
All rights reserved © 2009 SINOPEC40
SINOPEC posses the world top Lifting and Transportation Super-Larger and heavy Equipment
SINOPEC Own the1250T Crane
SINOPEC Own the 1100t crane
SINOPEC Own 6*500t crane SINOPEC Own the 4*1200t trailer
SINOPEC Own 8*500t trailer
10*726t reactor
“A” Type frame lifting Flare
5200mm x 120m Reactor from harbor to job site
Construction Strength
Heavy Lifting
All rights reserved © 2009 SINOPEC
This is unique software for lifting system in the world so far
Safety First
Hoisting Simulating
Lifting software
Construction Strength
All rights reserved © 2009 SINOPEC42
Installation of Large Compressor
Assemblage of Large Compressor
Tuning of Large Compressor
Construction Strength
All rights reserved © 2009 SINOPEC43
Tank Farm
Construction Strength
All rights reserved © 2009 SINOPEC
Certification of Safety Performance
Construction Strength
All rights reserved © 2009 SINOPEC
Safety Performance Award
Construction Strength
All rights reserved © 2009 SINOPEC
On Schedule Award
Construction Strength
All rights reserved © 2009 SINOPEC47
SINOPEC Engineering has EPC execution experience for 10 million t/a refinery
complex, 1 million t/a ethylene complex, 150,000 m3 storage tank, 160,000 m3
Cryogenic LNG storage tank.
General
Project Execution Summary
All rights reserved © 2009 SINOPEC
185360
420
450
320 180195
410
380
ManagementProject ManagerSHEMS&WelfareQA/QC (Sub)ContractingAdministrativeEstimatingCost ControllersScheduling
Total 2900
Project Execution Strength
Project Execution Summary
All rights reserved © 2009 SINOPEC49
•PREMERVIA•GPLAN•PROJECT
Document ControlProject Management Material Control
•MARIAN•PMCS
3-D Design
•PDS•PDMS•SP3D
Process Simulation•PROII•ASPEN•HTRI•TSWEET
•DOCUMENTUM•SHAREPOINT•WISE
Engineering
Application Software
Project Management
Project Management and Engineering Software
Project Execution Summary
All rights reserved © 2009 SINOPEC
Project management
Project Goals
Achievement of Project Targets
Resources
ManpowerEquipment/MachineryMaterial
Integration/Optimization of Objectives
Effective use of management resources
Money/fundTechnology/ MethodsInformation
Quality::high-quality product
Safety :zero lost time incidents
Schedule:On-time
Costs :within budgets
Project Management Objective Definition
Project Execution Summary
All rights reserved © 2009 SINOPEC
Defined Scope Of Work
Establish A Control Baseline
Measures To Be Taken
Defect
CompletionTrace Check
Trend Analysis
Change Log Management
Define MeasureMethod & Std.
Project Control Cycle
Project Execution Summary
All rights reserved © 2009 SINOPEC
Contract
Costs
Schedule
MaterialsControl
ProjectFinance
Procurement
Project control based on Engineering Database
Project Execution Summary
All rights reserved © 2009 SINOPEC
Fujian 10MTA Refinery and 800,000TA Ethylene Project
JV by SINOPEC/ Aramco/Exxon
Achievement
Project Execution Summary
All rights reserved © 2009 SINOPEC
JV by SINOPEC/bpShanghai SECCO 900,000TA Ethylene Project
Achievement
Project Execution Summary
All rights reserved © 2009 SINOPEC
YBPC600,000TA Ethylene Project JV by SINOPEC/BASF
Achievement
Project Execution Summary
All rights reserved © 2009 SINOPEC
CSPC 800,000TA Ethylene Project
JV by CNOOC/SHELL
Achievement
Project Execution Summary
All rights reserved © 2009 SINOPEC
Zhenhai Refinery (Video)Achievement
Project Execution Summary
All rights reserved © 2009 SINOPEC
Oil Receiving Terminal in Caspian Sea, Iran
Rehabilitation of the Unit 1 & 2 of Mehardeh Power Plant, Syria
Achievement
Project Execution Summary
All rights reserved © 2009 SINOPEC
Domestic Major Achievements
Project Execution Summary
All rights reserved © 2009 SINOPEC
NO
DESCRIPTION WORK SCOPE CONTRACT TYPE APPROXIMATE CONTRACT VALUE
(US $)
CONTRACT DURATION
COUNTRY
1 YANSAB Polyolefin Complex Project EPC Consortium Partner, Lump Sum 750 Million 2005-2008 Saudi Arabia
2 Rabigh Development Project C Subcontractor, Lump Sum 194 Million 2006-2008 Saudi Arabia
3 Hawiyah Gas Plant Expansion Project C Subcontractor, Lump Sum 52 Million 2006-2008 Saudi Arabia
4 SABIC EO/EG Project CM+C Subcontractor, Lump Sum 96 Million 2007-2009 Saudi Arabia
5 Yanbu BBTX Project C Subcontractor, Lump Sum 40 Million 2008-2008 Saudi Arabia
6 Shazand Arak Refinery Expansion And Upgrading Project
EPC Consortium Partner, Lump Sum 3184 Million 2006-2009 Iran
7 Esfahan Refinery Upgrading Project EPC Main Contractor, Lump Sum 700 Million 2007-2010 Iran
8 Tabriz Refinery Upgrading Project EPC Main Contractor, Lump Sum 140 Million 2006-2009 Iran
9 CROS (Caspian-sea Republic Oil Swap) Project
EPC Main Contractor, Lump Sum 140 Million 2002-2003 Iran
10 Khartoum Refinery Expansion to 5,000,000 t/y E Subcontractor, Lump Sum 40 Million 2000-2003 Sudan
11 2,500,000 t/y Khartoum Refinery Project E Subcontractor, Lump Sum 45 Million 1996- 2000 Sudan
12 Meharden Power Plant Project CM+C Construction Contractor, Lump Sum
50 Million 2004-2006 Syria
13 Fertilizer Project C Construction Contractor, lump Sum
20 Million 2000-2002 Jordan
14 Mina Al-Ahamadi Refinery Restoration Project E, P, C, Unit Price Contract 140 Million 1992-1994 Kuwait
15 Shuaiba Refinery Tankage Project EPC Main Contractor, Lump Sum 9.97 Million 1997-1998 Kuwait
Overseas Achievements
Project Execution Summary
All rights reserved © 2009 SINOPEC61
SINOPEC Engineering has established good relationship with resources which can
provide beneficial financing solutions, includes equipment financing and capital
loans; we can structure financing which will satisfy your specific business
requirements - which can hedge your current and future needs.
General
Financing Ability
All rights reserved © 2009 SINOPEC62
SINOPEC Engineering has done refinery and petrochemical projects in Saudi
Arabia. It is partial example for EPC execution.
General
Partial Project Summary
All rights reserved © 2009 SINOPEC
SABIC YANSAN Polyolefin Project
Owner:YANSAB SABIC
EPC Contractor:Consortium of SINOPEC Engineering and Aker Solution
Contract schedule: 2005.7.20 to 2008.3.30,31.5 months
Contract value:750M USD
Peaking manpower: 3000
Partial Project Summary
All rights reserved © 2009 SINOPEC
PP/PE/PHU Design Bird View
Partial Project Summary
All rights reserved © 2009 SINOPEC
PP/PE Site Pictures
Partial Project Summary
All rights reserved © 2009 SINOPEC
PP/PE Site Pictures
Partial Project Summary
All rights reserved © 2009 SINOPEC
RABIGH Refinery Development Project
Owner:PETRORABIGH ARAMCO
EPC Contractor:Tecnicas Reunidas
Contract Scope: Construction
Contract Schedule: 2006.5.4 to 2008.6.15,24 months
Contract Value:192M USD
Peaking Manpower: 3200
Partial Project Summary
All rights reserved © 2009 SINOPEC
Refinery Project Site Picture
Partial Project Summary
All rights reserved © 2009 SINOPEC
Refinery Project Site Pictures
Partial Project Summary
All rights reserved © 2009 SINOPEC
Mechanical Completion
Partial Project Summary
All rights reserved © 2009 SINOPEC
SABIC KAYAN EO/EG Project
Owner:SAUDI KAYAN
EPC Contractor:CTCI and SINOPEC Engineering
Contract Scope: Construction and CM
Contract Schedule: 2006.11 to 2009.7,33 months
Contract value:96M USD
Peaking manpower: 1400
Partial Project Summary
All rights reserved © 2009 SINOPEC
EO/EG 3D Model
Partial Project Summary
All rights reserved © 2009 SINOPEC
EO/EG Project Site Pictures
Partial Project Summary
All rights reserved © 2009 SINOPEC
EO/EG Washing Tower lifting
Partial Project Summary
All rights reserved © 2009 SINOPEC
On going project in Saudi Arabia
Name of the Project: HAWIYAH Gas Plant Expansion Project
Owner: ARAMCO
EPC Contractor: Tecnicas Reunidas
Contract Scope: Construction
Contract Schedule: 2006.10.31 to 2008.6.30, 20 months
Contract value:52M USD
Peaking manpower: 2000
Partial Project Summary
All rights reserved © 2009 SINOPEC
Gas Plant Site Pictures
Partial Project Summary
All rights reserved © 2009 SINOPEC
Heavy lifting
Shop Fabricating
Partial Project Summary
All rights reserved © 2009 SINOPEC
Owner: YANSAB SABIC
EPC Contractor:Stone Webster
Contract Scope: Construction
Contract Schedule: 2008.1.16 to 2008.9.30, 8.5 months
Contract value:39.6M USD
Peaking manpower: 1200
SABIC YANSAB BBTX Project
Partial Project Summary
All rights reserved © 2009 SINOPEC
BBTX Project Site Pictures
Partial Project Summary
All rights reserved © 2009 SINOPEC
JUBAIL:1800
HAWIYAH:2200
YANBU:3000
PETRORABIGH:3200
SINOPEC Engineering Camps in Saudi Arabia
Partial Project Summary
All rights reserved © 2009 SINOPEC
Camps in Saudi Arabia
Partial Project Summary
All rights reserved © 2009 SINOPEC
• Know how to manage and realize safety approaches for gross root and
revamping refinery and petrochemical projects
•Know how to manage and get on schedule for gross root and revamping
refinery and petrochemical projects
•One Project One Team, Team up with both International Engineering
and Local Companies
Concluded