Page 1: Sinopec Engineering Presentation

www.SINOPECEngineering.com

Page 2: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC2 All rights reserved © 2008, SINOPEC

Introduction of SINOPEC Engineering

Outline of SINOPEC Engineering

Engineering and R&D Strength

Procurement Strength

Construction Strength

Project Execution Summary

Ongoing Project Summary

Page 3: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC3 All rights reserved © 2008, SINOPEC

The parent of SINOPEC Engineering, SINOPEC is the 3rd largest refiner and 4th petrochemicals

producer in the world and the 2nd largest crude producer in China , who ranked the 9th in the

“Fortune Global 500” , Listing with Revenue US$ 207.8 billion in 2008 when it produced 44million

tons of crude and 8.3 billion m3 natural gas; processed 190 million tons of crude and produced 6.3

million tons of ethylene.

Outline of SINOPEC Engineering

Page 4: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

SINOPEC Engineering was reorganized by SINOPEC in July 2007 as a wholly owned subsidiary of

SINOPEC. SINOPEC Engineering is authorized on behalf of SINOPEC to organize and integrate the

resources and expertise of refining and petrochemical engineering services under SINOPEC to

develop and execute global refining and petrochemical projects.

Outline of SINOPEC Engineering

Page 5: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC5 All rights reserved © 2008, SINOPEC

SINOPEC Engineering was first presented in 1953. All through the years, SINOPEC Engineering

successfully completed and delivered hundreds of EPC projects in fields of refining and

petrochemical for both domestic and overseas clients, Participated developing and commercialized

series proprietary technologies of refining and petrochemical industries.

After reorganization, SINOPEC Engineering manages five leading engineering companies and three leading construction companies in China, total employee reaches 20,000, they are:

SINOPEC Engineering -SEI SINOPEC Engineering -LPEC SINOPEC Engineering -SSEC SINOPEC Engineering -SNEC SINOPEC Engineering –SNEISINOPEC Engineering –FCCSINOPEC Engineering –SFCCSINOPEC Engineering -TCC

Outline of SINOPEC Engineering

Page 6: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPECAll rights reserved © 2008, SINOPEC

Outline of SINOPEC Engineering

Page 7: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC7

Outline of SINOPEC Engineering

Page 8: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Main Fields of Business:

RefineryPetrochemical complexFertilizer PlantsPharmaceutical PlantsLNG plantLong-distance pipeline Municipal facilities

Outline of SINOPEC Engineering

Page 9: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Scope of Services:

Project Concept

Master Planning

Technology transfer & licensing

Feasibility study

Environmental Impact Assessment

Geo-technical Engineering & Engineering Surveying

Process Design Package

Basic & Detailed Engineering

Procurement

Construction & Construction Supervision

Commissioning

Manufacturing and Fabrication

Training

Maintenance and Overhaul

Outline of SINOPEC Engineering

Page 10: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC10

To bring the SINOPEC group advantages to execute the overseas projects ,

SINOPEC Engineering was reorganized in 2007, with four engineering companies ,

four construction companies and an independent engineering technology

institute .SINOPEC Engineering employees 19,000 people of which 6,000 are

technical staff.

Except above human resource, all 100,000 people within SINOPEC for petroleum

refining and petrochemical engineering and construction are available for SINOPEC

Engineering.

General

Human Resources:

Engineering and R&D Strength

Page 11: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

191122

695

549 1285

309 427

487

Process

Equipment &MechanicalPiping

Electrical &InstrumentationCivil,Structural &ArchitecturalHealth,Safety &EnvironmentalUtility

Draft Man

Total 4065

Engineering Strength:

Engineering and R&D Strength

Page 12: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC12

SINOPEC Engineering has experienced engineering team with 6000 person, and has engineering

experience for 10 million t/a refinery complex, 1 million t/a ethylene complex, 150,000 m3 single storage

tank and so on.

Especially, SINOPEC Engineering as PMC or EPC contractor has executed and delivered Nanhai (Joint

Venture by Shell and CNOOC) 800,000t/a ethylene complex; SECCO (Joint Venture by BP and Sinopec)

900,000 t/a ethylene complex; BYC (Joint Venture by BASF and Sinopec) 600,000t/a ethylene complex

since 2000. Fujian refinery and petrochemical integrated project (Joint Venture by Sinopec, Exxon-

Mobile and Saudi Aramco) with 800,000t/a ethylene complex and 1.2 million tons per year refinery has

been finished by SINOPEC Engineering in 2009.

0

500

1000

1500

2000

2500

Project Month

Tota

l Con

stru

ctio

n M

anpo

wer

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

% C

ompl

ete

Manpower 0 0 0 0 0 0 106 186 292 292 345 451 557 663 822 954 1,087 1,140 1,166 1,405 1,643 1,908 1,961 1,961 1,961 1,961 1,855 1,670 1,246 716 159

% Compltete 0.0% 0.4% 1.1% 2.2% 3.3% 4.6% 6.3% 8.4% 10.9% 14.0% 17.6% 21.7% 26.0% 30.4% 35.7% 41.9% 49.1% 56.5% 63.9% 71.3% 78.7% 85.7% 92.0% 96.7% 99.4% 100.0%

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Engineering and R&D Strength

Page 13: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC13

3 million t/a catalytic cracker

3.1 million t/a Residual Hydro-finishing

1.5 million t/acatalytic reformer

2 million t/a hydro-cracker

4.1 million t/a diesel hydro-finishing

Maximum capacity Maximum capacity of single unitof single unit

12 million t/a CDU & VDU

450,000 t/a PE 1 million t/a Ethylene

300,000 t/a PP

15 Billion m3/a gas purification

450,000 t/a Ammonia

850,000 t/aMethanol

260,000 t/a AN

2000 t/a Coal Gasification

Engineering and R&D Strength

Page 14: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Engineering

Procurement Construction

Process DB

Engineering DB 3D Model DB

e-Doc.Management

DOCUMENTUM 4i,LOTUS NOTES

PDS 3D, ISOGEN, SPREVIEW,PDMS,REVIEW,

ISketch, STAAD PRO2000

SPOOLGEN, CQCSP3 , STAT, PMCV, PMCF,ACCPAC, Expedition,

MARIAN, PMCS

VANTAGE PE, INTOOLS, CAESAR II,ANSYS, INSTRUCALC, FE/PIPE, Pvelite ,

TANK , EDSA

PRO II ,ASPEN Eng. Suite, FRI,HTFS,HTRI, ZYQAD,CFX,PFR,SP PID,PDS P&ID, ASPECT, Plant Builder/Auto

Router, SP Explorer, ICARUS,IPE

Procurement Management Project Management

Material Control & Construction Management

Integrated IT system

Engineering and R&D Strength

Page 15: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC15

Hydrocracking Unit For Qingdao Refinery

200,000 t/a Polypropylene Unit In Hainan Refinery

ModelModel

Examples For 3 D Design

Engineering and R&D Strength

Page 16: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC16

No. Project DescriptionProject Scale(10 thousand

per year)Technology/Licensor Numbers of

Project Service Scope

1 300-1200 SINOPEC 37 EPC

2 60-300 SINOPEC 74 EPC

3 80-250 SINOPEC 33 EPC

4 60-410 SINOPEC 75 EPC

5 80-360 SINOPEC 60 EPC

6 15-240 SINOPEC 49 EPC

CDU/ VDU

Catalytic Cracking

Delayed Coking

Hydrofining

Hydro Cracking

Catalytic Reforming

Major Technology Applications in The Last Ten Years

Engineering and R&D Strength

Page 17: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC17

No. Project DescriptionProject Scale(10 thousand

per year)Technology/Licensor Numbers of

Project Service Scope

1 60-100 Stone Webster Lummus--SINOPEC 8 EPC

2 20-60 Basell BP InnoveneSINOPEC 10 EPC

3 8-30 Dow Chemical SINOPEC 6 EPC

4 60-100BP-AMOCO、INVISTA

、Mitsubishi、EASTMAN SINOPEC

5 EPC

5acetic acid:

35 Methanol:85

BPShell 2 EPC

6 30~45 KBR 2 EPC

Ethylene

Polyolefin

Synthetic Rubber

Synthetic Fiber

C1 Chemical

Ammonia

Engineering and R&D Strength

Major Technology Applications in The Last Ten Years

Page 18: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Depending on demands of oil refining and petrochemical, Sinopec Engineering has establish

a science & technology innovation system. A set of core technologies and specific technologies

with international competitiveness have been developed, the whole level of science & technology

have stepped into advanced train of the world.

Engineering and R&D Strength

Technology Research & Development

Page 19: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

The Organization Mode of Key Process Technologies Commercialization

Engineering and R&D Strength

Page 20: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC20

As a wholly owned subsidiary of SINOPEC GROUP, SINOPEC Engineering takes

full advantages of the Group’s integrated resource network, shares the super

Purchasing Capability of the Group. A reliable supply network established with more

than 20,000 qualified suppliers is always a success guarantee to our projects.

General

Procurement Strength

Page 21: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

3542

60

69331938

96Procurement managerProcurement coordinatorSenior buyerBuyerPurchasing clerkTraffic clerkExpediterOthers

Total 392

Procurement Strength

Page 22: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

•Comm. Group•Comm. Part•Comm.Code•Ident Code•Description Requisitions

•Inquiry•Quote•PO•Supplier Lib•Req Planning•Expedite•Traffic

MRR's

OS&D's

PO's

PO'sMRR'sMIR’s

MLCL E&PI MSCM SITE•BOM by WBS,Version•Req Template

•MRR’s•MIR’s•OS&D’s•MRS’s

BOMS

MTO

3D 3D PlantPlantDesignDesignModelModel

Sinopec Sinopec Eng. Eng. FinanceFinanceSystemSystem

MA

RIA

N

Matl Res.

ISO’s

Sinopec Eng.Reports

Sinopec Eng.Reports

Sinopec Eng.Reports

Other system/ manual take off

Procurement Strength

MARIAN Application Program

Page 23: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Confirmation byRecords Review

WitnessInspection

Requestfor

Inspection

Applicationfor

InspectionSpecification

Requisition

Quality Requirements Notice to Client

Approval ofVendor’s QCDocuments

InspectionRelease

CertificateResident

Inspection

Inspection

MDR Review& Approval

Finding NonConformance

CorrectiveAction byVendor

Inspection

InspectorsAssignment

Procurement Strength

Inspection-Sequence and Execution

Page 24: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

ReceivingCargo

ReadinessNotice

MonitoringFabricationProgress

IssuingRelease for

ShippingPreparation

ExpeditingShipping

Preparation

AttendingKick-offMeeting

ExpeditingVendor’s

Documents

MonitoringMaterial

SubordersStatus

Specification

P.O.Copy

Requisition

IssuingInspection

ReleaseCertificate

Inspection

Completed

ExpeditingAs-Built Document

Submission

Shipment

Not

Com

plet

ed

Procurement Strength

Expediting-TYPICAL ACTIVITIES

Page 25: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Procurement Strength

Packing and Shipping

Purchase Order

Readyfor

ShipmentExport

PackingExport

Clearance

Loadingin

Ship

UnloadingfromShip

ImportCustomsClearance

InlandTransport’

to Site

Unloadingat

Plant Site

SpaceBooking

ForwardingContract

Manufacturing

LogisticPlanning

Page 26: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC26

7.879.14

13.0314.52

16.97

0

2

4

6

8

10

12

14

16

18

2002 2003 2004 2005 2006

Total Purchase Value(Billion US$)

Strong procurement and supply capability for oil & petrochemical relatedequipment and materials

20

2007

22 20.41

Procurement Strength

Page 27: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Procurement Strength

Overseas Procurement Subsidiaries

Page 28: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC28

YanshanTianjinQiluJiangsuJinlingYizhengNanhuaYangziJinshanEast ShanghaiGaoqiaoZhenhaiFujianGuangzhouMaomingZhongnanChongqing

Procurement Strength

Domestic Offices

Page 29: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Supplier Sourcing Worldwide

♦ Total Qualified: 20,098 Suppliers

(including 1211 offshore suppliers)

♦ A Level: 2,286 Suppliers

33 Strategic suppliers: 23(onshore)+10(offshore)

♦ B Level: 16,601 Suppliers

Procurement Strength

Procurement

Page 30: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Annually Purchasing Volume (Onshore/offshore)

2006 : Total: RMB 131.5 billion

Import/export: USD 3.23 billion

E-Procurement: RMB 113.0 billion

2007 : Total: RMB 158.2 billion

Import/export: USD 4.61 billion

E-Procurement: RMB 145.5 billion

Procurement Strength

Procurement

Page 31: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Operation Platform for Material Control

For EPC Projects:

Intergraph Marian

VPRM

SINOPEC Internal ERP System

SAP

E-Commerce: www.SINOPEC-ec.com.cn

Procurement Strength

Procurement

Page 32: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Procurement Strength

Procurement

Logistics

Rich Experienced Logistics Experts/Engineers,

Professional Management of the Door to Door Service for Projects of

different nature.

Comprehensive range of sea, air forwarding and land transportation,

combined shipment & Transshipment etc.

Page 33: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC33

Pre-fabrication ShopFor Pipe Spool

Pre-fabrication ShopFor Pipe Spool

Pre-fabrication Shop For Structural Steel

SINOPEC has Advanced Structural Steel And Pipe Spool Pre-fabrication Shop with more than 60% Pre-fabrication capability

Procurement Strength

Page 34: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC34

Manufactured Reactor

Manufactured Reactor

Manufactured Reactor

SINOPEC owns three large equipment manufacturing plants, i.e. Ningbo Mechanical Manufacturing Company, Shanghai Petrochemical Machinery Manufacturing Company and Nanjing Chemical Machinery Manufacturing Factory.

Compared with other petrochemical equipment manufacturers in China, all the three plants have the most advanced process equipments and information management system capable of developing and manufacturing of petrochemical patent and proprietary equipments. The total production capacity of manufacturing more than 200,000 t/a customized equipment.

Procurement Strength

Page 35: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Procurement Strength

Over Size Equipment Handling

Page 36: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

With the most experienced engineers, skilled workers, and equipped with the most

advanced machineries, SINOPEC Engineering is fully capable of constructing,

construction supervision and management for large-scale refinery, petrochemical

and Chemical plants, thermal power plant, and hoisting and erecting oversized and

heavy equipment, large size storage tank and long distance pipeline etc.

General

36

Construction Strength

Page 37: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

2473

497

639

757 2114

3225

751740805

Construction Managers

Construction Supervisors

Welders

Plumbers

Riveters

Locksmithes

Cranemen

Electricians/Instrumentstaffs Others

Total 12001

Construction Strength

Construction Manpower

Page 38: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC38

Technical Advantageof Project Execution

Construction Of Large Storage Tank

Installation Of Large Machinery Train

Lifting And TransportationOf Large Equipments

Shop Pre-fabricationFor Pipe And Structural Steel

Equipment Manufacturing

Construction Experience In Low and High Te

mperature Region

Construction Strength

Construction Strengths

Page 39: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Crane 200-1600Tons 19

Auto Welding Machine 1000

Metal Machining Equipment 460

Transportation Facilities 210

Testing & Inspection Equipment 1260

Construction Strength

Construction Equipment Tools

Page 40: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC40

SINOPEC posses the world top Lifting and Transportation Super-Larger and heavy Equipment

SINOPEC Own the1250T Crane

SINOPEC Own the 1100t crane

SINOPEC Own 6*500t crane SINOPEC Own the 4*1200t trailer

SINOPEC Own 8*500t trailer

10*726t reactor

“A” Type frame lifting Flare

5200mm x 120m Reactor from harbor to job site

Construction Strength

Heavy Lifting

Page 41: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

This is unique software for lifting system in the world so far

Safety First

Hoisting Simulating

Lifting software

Construction Strength

Page 42: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC42

Installation of Large Compressor

Assemblage of Large Compressor

Tuning of Large Compressor

Construction Strength

Page 43: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC43

Tank Farm

Construction Strength

Page 44: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Certification of Safety Performance

Construction Strength

Page 45: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Safety Performance Award

Construction Strength

Page 46: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

On Schedule Award

Construction Strength

Page 47: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC47

SINOPEC Engineering has EPC execution experience for 10 million t/a refinery

complex, 1 million t/a ethylene complex, 150,000 m3 storage tank, 160,000 m3

Cryogenic LNG storage tank.

General

Project Execution Summary

Page 48: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

185360

420

450

320 180195

410

380

ManagementProject ManagerSHEMS&WelfareQA/QC (Sub)ContractingAdministrativeEstimatingCost ControllersScheduling

Total 2900

Project Execution Strength

Project Execution Summary

Page 49: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC49

•PREMERVIA•GPLAN•PROJECT

Document ControlProject Management Material Control

•MARIAN•PMCS

3-D Design

•PDS•PDMS•SP3D

Process Simulation•PROII•ASPEN•HTRI•TSWEET

•DOCUMENTUM•SHAREPOINT•WISE

Engineering

Application Software

Project Management

Project Management and Engineering Software

Project Execution Summary

Page 50: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Project management

Project Goals

Achievement of Project Targets

Resources

ManpowerEquipment/MachineryMaterial

Integration/Optimization of Objectives

Effective use of management resources

Money/fundTechnology/ MethodsInformation

Quality::high-quality product

Safety :zero lost time incidents

Schedule:On-time

Costs :within budgets

Project Management Objective Definition

Project Execution Summary

Page 51: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Defined Scope Of Work

Establish A Control Baseline

Measures To Be Taken

Defect

CompletionTrace Check

Trend Analysis

Change Log Management

Define MeasureMethod & Std.

Project Control Cycle

Project Execution Summary

Page 52: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Contract

Costs

Schedule

MaterialsControl

ProjectFinance

Procurement

Project control based on Engineering Database

Project Execution Summary

Page 53: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Fujian 10MTA Refinery and 800,000TA Ethylene Project

JV by SINOPEC/ Aramco/Exxon

Achievement

Project Execution Summary

Page 54: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

JV by SINOPEC/bpShanghai SECCO 900,000TA Ethylene Project

Achievement

Project Execution Summary

Page 55: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

YBPC600,000TA Ethylene Project JV by SINOPEC/BASF

Achievement

Project Execution Summary

Page 56: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

CSPC 800,000TA Ethylene Project

JV by CNOOC/SHELL

Achievement

Project Execution Summary

Page 57: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Zhenhai Refinery (Video)Achievement

Project Execution Summary

Page 58: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Oil Receiving Terminal in Caspian Sea, Iran

Rehabilitation of the Unit 1 & 2 of Mehardeh Power Plant, Syria

Achievement

Project Execution Summary

Page 59: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Domestic Major Achievements

Project Execution Summary

Page 60: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

NO

DESCRIPTION WORK SCOPE CONTRACT TYPE APPROXIMATE CONTRACT VALUE

(US $)

CONTRACT DURATION

COUNTRY

1 YANSAB Polyolefin Complex Project EPC Consortium Partner, Lump Sum 750 Million 2005-2008 Saudi Arabia

2 Rabigh Development Project C Subcontractor, Lump Sum 194 Million 2006-2008 Saudi Arabia

3 Hawiyah Gas Plant Expansion Project C Subcontractor, Lump Sum 52 Million 2006-2008 Saudi Arabia

4 SABIC EO/EG Project CM+C Subcontractor, Lump Sum 96 Million 2007-2009 Saudi Arabia

5 Yanbu BBTX Project C Subcontractor, Lump Sum 40 Million 2008-2008 Saudi Arabia

6 Shazand Arak Refinery Expansion And Upgrading Project

EPC Consortium Partner, Lump Sum 3184 Million 2006-2009 Iran

7 Esfahan Refinery Upgrading Project EPC Main Contractor, Lump Sum 700 Million 2007-2010 Iran

8 Tabriz Refinery Upgrading Project EPC Main Contractor, Lump Sum 140 Million 2006-2009 Iran

9 CROS (Caspian-sea Republic Oil Swap) Project

EPC Main Contractor, Lump Sum 140 Million 2002-2003 Iran

10 Khartoum Refinery Expansion to 5,000,000 t/y E Subcontractor, Lump Sum 40 Million 2000-2003 Sudan

11 2,500,000 t/y Khartoum Refinery Project E Subcontractor, Lump Sum 45 Million 1996- 2000 Sudan

12 Meharden Power Plant Project CM+C Construction Contractor, Lump Sum

50 Million 2004-2006 Syria

13 Fertilizer Project C Construction Contractor, lump Sum

20 Million 2000-2002 Jordan

14 Mina Al-Ahamadi Refinery Restoration Project E, P, C, Unit Price Contract 140 Million 1992-1994 Kuwait

15 Shuaiba Refinery Tankage Project EPC Main Contractor, Lump Sum 9.97 Million 1997-1998 Kuwait

Overseas Achievements

Project Execution Summary

Page 61: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC61

SINOPEC Engineering has established good relationship with resources which can

provide beneficial financing solutions, includes equipment financing and capital

loans; we can structure financing which will satisfy your specific business

requirements - which can hedge your current and future needs.

General

Financing Ability

Page 62: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC62

SINOPEC Engineering has done refinery and petrochemical projects in Saudi

Arabia. It is partial example for EPC execution.

General

Partial Project Summary

Page 63: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

SABIC YANSAN Polyolefin Project

Owner:YANSAB SABIC

EPC Contractor:Consortium of SINOPEC Engineering and Aker Solution

Contract schedule: 2005.7.20 to 2008.3.30,31.5 months

Contract value:750M USD

Peaking manpower: 3000

Partial Project Summary

Page 64: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

PP/PE/PHU Design Bird View

Partial Project Summary

Page 65: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

PP/PE Site Pictures

Partial Project Summary

Page 66: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

PP/PE Site Pictures

Partial Project Summary

Page 67: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

RABIGH Refinery Development Project

Owner:PETRORABIGH ARAMCO

EPC Contractor:Tecnicas Reunidas

Contract Scope: Construction

Contract Schedule: 2006.5.4 to 2008.6.15,24 months

Contract Value:192M USD

Peaking Manpower: 3200

Partial Project Summary

Page 68: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Refinery Project Site Picture

Partial Project Summary

Page 69: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Refinery Project Site Pictures

Partial Project Summary

Page 70: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Mechanical Completion

Partial Project Summary

Page 71: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

SABIC KAYAN EO/EG Project

Owner:SAUDI KAYAN

EPC Contractor:CTCI and SINOPEC Engineering

Contract Scope: Construction and CM

Contract Schedule: 2006.11 to 2009.7,33 months

Contract value:96M USD

Peaking manpower: 1400

Partial Project Summary

Page 72: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

EO/EG 3D Model

Partial Project Summary

Page 73: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

EO/EG Project Site Pictures

Partial Project Summary

Page 74: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

EO/EG Washing Tower lifting

Partial Project Summary

Page 75: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

On going project in Saudi Arabia

Name of the Project: HAWIYAH Gas Plant Expansion Project

Owner: ARAMCO

EPC Contractor: Tecnicas Reunidas

Contract Scope: Construction

Contract Schedule: 2006.10.31 to 2008.6.30, 20 months

Contract value:52M USD

Peaking manpower: 2000

Partial Project Summary

Page 76: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Gas Plant Site Pictures

Partial Project Summary

Page 77: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Heavy lifting

Shop Fabricating

Partial Project Summary

Page 78: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Owner: YANSAB SABIC

EPC Contractor:Stone Webster

Contract Scope: Construction

Contract Schedule: 2008.1.16 to 2008.9.30, 8.5 months

Contract value:39.6M USD

Peaking manpower: 1200

SABIC YANSAB BBTX Project

Partial Project Summary

Page 79: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

BBTX Project Site Pictures

Partial Project Summary

Page 80: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

JUBAIL:1800

HAWIYAH:2200

YANBU:3000

PETRORABIGH:3200

SINOPEC Engineering Camps in Saudi Arabia

Partial Project Summary

Page 81: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Camps in Saudi Arabia

Partial Project Summary

Page 82: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

• Know how to manage and realize safety approaches for gross root and

revamping refinery and petrochemical projects

•Know how to manage and get on schedule for gross root and revamping

refinery and petrochemical projects

•One Project One Team, Team up with both International Engineering

and Local Companies

Concluded

Page 83: Sinopec Engineering Presentation

All rights reserved © 2009 SINOPEC

Concluded