Slimhole Coiled Tubing Drilling

Embed Size (px)

Citation preview

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    1/131

    TT00-63 1

    Slim-Hole and Coiled-TubingTechnology

    Dr. William J. McDonaldThomas E. Williams 

    PTTC Technology Seminar

    Lafayette, LA December 5, 2000

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    2/131

    TT00-63 2

    Drilling Engineering Association(DEA)

    Sponsors Joint-Industry R&D Projects

    28 Members (Operating Companies)

    22 Associates (Service Co’s and Consultants) 

     Currently 113 projects

    Typical project: 10-15 participants

    Most successful DEA projects:

    DEA-44 Horizontal Well Technology  

    DEA-67 Slim-Hole and  Coiled-Tubing

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    3/131

    TT00-63 3

    DEA-67Slim-Hole and Coiled Tubing Technology

    Sponsors: Texaco & BP

    Start Date: January 1, 1992

    End Date: December 31, 2000

    Participants: 65

    Tasks: 22

    Budget: $3 Million

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    4/131

    TT00-63 4

    DEA-67 Tasks

    1. Update Software2. New Software

    3. User’s Group 

    4. New Technology

    5. Drill-String Design

    6. Motors and Bits

    7. MWD and Geosteering

    8. Well Control

    9. UB Drilling/Completion

    10. Logging Tools

    11. Perforating Systems

    12. Completion Techniques13. Stimulation Techniques

    14. Production/Workovers

    15. Through-Tubing

    16. Field Tests

    17. Case Histories

    18. Well-Planning Manual

    19. Composite Tubulars

    20. Multibranch CT

    21. Schools

    22. Forums

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    5/131

    TT00-63 5

    DEA-67 Deliverables

    Major reports 6

    Computer programs 9

    Forums 6

    Schools 8

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    6/131

    TT00-63 6

     Advances inSlim-Hole Technology

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    7/131TT00-63 7

    Summary

    Slimholes:

    -Reduce Well Costs 40 to 70%

    -Reduce Environmental Costs & Concerns-Tools and Equipment Exist, and are

     Available and Reliable

    -Safe

    -Do Not Usually Limit Production

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    8/131TT00-63 8

    Overview

    Historical Background

    Types of Slim-Holes

    Slim-hole Cost Savings

    Evolution and Experience

    Concerns and Conclusions

    Outlook

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    9/131TT00-63 9

    Publications on Slim Hole

    0

    10

    20

    30

    40

    50

    60

       3   9   4   2   4   5   4   8    5  1    5  4    5   7    6   0    6   3    6   6    6   9    7   2    7   5    7   8    8  1    8  4    8   7    9   0    9   3    9   6

    YEAR

       N

      u  m   b  e  r  o   f   P  u   b   l   i  c  a   t   i  o  n  s

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    10/131

    TT00-63 10

    Stekoll SlimholePumping System (1960)

    Flow Line

    Rubber Hose

    1” Tee 

    Clamp

    Polished Rod Liner

    2 7/8” Casing 

    1” EUE Pumping String 

    Traveling Barrel Insert Pump

    Slip-Type Hold-Downwith Rubber RemovedScreen

    Blind Cage

    Gas Vent

    ConventionalStuffing Box

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    11/131

    TT00-63 11

    Stekoll Field Well (1960)

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    12/131

    TT00-63 12

    STEKOLL Field Experience (1960)

    Over 1,300 Wells: Kansas, Texas, Canada

    1,000 to 3,000 Foot Wells

    1” EUE Tubing (Hollow Sucker Rod) 

    2-1/2” & 2-7/8” Inch Casing 

    70 BOPD

    40 to 50% Reduction in Tubular Costs

    17% Overall Cost Savings

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    13/131

    TT00-63 13

    STEKOLL SlimholeOperations (2- 7/8”)  

    Drilling & Logging

    Perforating & Squeeze Cementing Acidizing & Fracturing

    Fishing & Washovers

    Sand Bailing

    Dual Completions

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    14/131

    TT00-63 14

    Hollow Sucker Rod Advantage

     “The hollow sucker rod combines the

    function of the sucker rod and the

    tubing, so it is no longer necessary to

    pull both sucker rods and tubing

    when working over wells.”  

    STEKOLL, 1960 

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    15/131

    TT00-63 15

    STEKOLL System Limitations (1960)

    Limited Slimhole Logging Tools

    Workover Concerns

    Tubing Failures

    Resistance to Slimholes

    Resistance to New Technology

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    16/131

    TT00-63 16

    Slim-Hole Systems

    Rotary

    Drilling

       C  o   l   l  a  r

    Downhole

    Motor

       M  u   d   M  o

       t  o  r

    Continuous

    Coring

       C  o  r  e   B  a  r  r  e   l

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    17/131

    TT00-63 17

     Amoco SHADS Rig( Continuous Coring)  

    Wireline overshot forcore retrieval

    Top drive (0-2250 rpm)

    Sandline

    Drawworks

    Hydraulic drive

    4-3/8” core bit (0-10,000 lb WOB)

    WellboreSlim annulus

    (

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    18/131

    TT00-63 18

    Slim-Hole Motor Dr i l l ing

    in WyomingAmoco (1995)

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    19/131

    TT00-63 19

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    20/131

    TT00-63 20

    Microdrill Slim-Hole Rig(Rotary Drilling)

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    21/131

    TT00-63 21

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    22/131

    TT00-63 22

    Slim-Hole Drilling Site(BP, 1994)

    Site Reduced by 75%

    Slim-Hole Site

    Conventional Site

    200 ft

    390 ft

       1   6   0   f   t

       3   3   0   f   t

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    23/131

    TT00-63 23

    Material Cost Savings(3” vs. 8”)  

    0

    10

    20

    30

    40

    50

    60

    70

    80

    MUD CASING CEMENT

    80%

    70%

    40%

       %    S  a  v   i  n  g  s

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    24/131

    TT00-63 24

    MICRODRILL COSTS  (1500-5000 ft DEPTH)

     

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    25/131

    TT00-63 25

    Slim -Hole Dri ll ing and Complet ionCost Savings  

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    26/131

    TT00-63 26

    SLIM-HOLE RIG COSTS  

    (McLAUGHLIN, 1959) 

    HOLE SIZE 

       D   A   I   L   Y   C   O   S   T   S   (   $   )

    800 

    625 

    525 

    335 

    9"  6 3/4"  5 5/8"  3 3/4" 0 

    200 

    400 

    600 

    800 

    1,000 

    4 MEN 

    4 MEN 

    3 MEN 

    5 MEN 

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    27/131

    TT00-63 27

    SLIM-HOLE CASING AND TUBING COSTS  

    (McLAUGHLIN, 1959) 7" CASING 

    2 7/8" TUBING 

    5 1/2" CASING 2 3/8" TUBING

     

    4" CASING 1 1/2" TUBING 

    2 3/8" CASING NO TUBING 

       R   E   L

       A   T   I   V   E   C   O   S   T

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    28/131

    TT00-63 28

    40% Saving s Fo r 5000-ft WELLS  (BONSALL, 1960)

     

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    29/131

    TT00-63 29

    SLIM HOLE 

    ( $ ) 

    CONVENTIONAL 

    ( $ ) 

    % OF TOTAL 

    SAVINGS 

     ACID 

    150 

    600 

    LOGGING  850  850  -- 

    PERFORATING 

    450 

    350 

    -1 

    FRACTURING 

    3300 

    4500 

    LOCATION EXPENSE 

    2500 

    2500 

    -- 

    MUD  1000  1000  -- 

    CORE ANALYSIS 

    200 

    200 

    -- 

    TOTAL: 

    52,220 

    100 

    37,470 

    Savings For 5000-ft Wells (con t.)

    2209314X  DEA-67 

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    30/131

    TT00-63 30

    Cost Savings with Slim Holes

    OPERATOR LOCATION SAVINGS YEAR

    Hudson's Bay Canada 28% 1959

    Western Mining Australia 75% 1984

    Oryx Texas 50% 1991Elf/Microdrill Paris Basin 65% 1992

    Maraven Venezuela 20% 1994

    Chevron California 66% 1995

    Wilcox Operators Texas 15% 1995GUPCO/Amoco Gulf of Suez 20% 1995

    Shell Madagascar 40% 1996

    ARCO Alaska 26% 1996

    Remote Coring Operations

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    31/131

    TT00-63 31

    SLIM-HOLE COSTS  (WESTERN MINING, 1984)

     

    4.0 

    2.0 

    6.0 

       W   E   L   L   C   O   S   T   (

       $   M   M   )

    LOGISTICS 

    REMOTE LOCAL 

    SLIM HOLE 

    CONVENTIONAL 

    2000m TD 

    DRY HOLE ONSHORE 

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    32/131

    TT00-63 32

    Conoco Indonesia Sl im-Hole Cos ts  

    (MACFADYEN et al., 1986) 

    1980-81 (CONV) 

    1985-86 (SH) 

    NUMBER OF WELLS 

    12 

     AVERAGE WELL COST  7,670,000  4,680,000  2,060,000 

    DRILLING 

    TOTAL FOOTAGE  18,962  11,740  29,179 

     AVERAGE DEPTH  3,792  3,913  2,432 

    DRILLING COST/WELL 

    2,770,000 

    960,000 

    760,000 

    LOGISTICS 

    NO. OF LIFTS  317  187  100 

    NO. OF DAYS  16  9  5 

    HELICOPTER 

    PUMA 

    PUMA 

    S-58T 

    1983 (SH) 

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    33/131

    TT00-63 33

    ORYX

    HORIZONTAL SL IM-HOLE COSTS  

    (HALL AND RAMOS, 1992) 

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    34/131

    TT00-63 34

    DAYS  DEPARTURE  LATERAL COST  TOTAL COST 

    18  1458  3.88 (CT)  0.63 

    38  2018  3.31  0.74 

    24 

    2002 

    1.84 

    0.41 

    21  2692  1.46  0.43 

    20  2242  1.83  0.45 

    18  1927  2.36  0.50 

    14  1600  1.75  0.31 

    22  1900  2.60  0.54 

    1991-92 ORYX SL IM-HOLE RE-ENTRIES  

    (HALL AND RAMOS, 1992) 

    0.50 

    1980 

    2.38 

     AVG 22 

    1991 CONVENTIONAL COST = 1.00 

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    35/131

    TT00-63 35

    ORYX'S CONCLUSION (1992)  

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    36/131

    TT00-63 36

    Domain Energy Slimholes (1995)

    Cased Hole

    5-1/2” Casing 

    4-3/4” Hole 

    2-7/8”  Production Casing

    7-7/8” Hole 

    TD 10926’  

    1518’  

    TD 10909’  

    Open Hole

    7-5/8” Casing 

    4-3/4” Hole 

    2-7/8”  Production Casing

    9-7/8” Hole 

    1520’  

    10697’  

    InflatableCasing Packer

    Cement

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    37/131

    TT00-63 37

    Domain Energy Slim-Hole (1995)

    Location:

    Rig Modification:

    Hole Diameter:

    Casing Diameter:

    Drill Pipe Diameter:Collar Diameter:

    Motor Diameter:

    Drilling Rate:

    Problems:Successes:

    Cost Savings:

    Green River Basin, WYBowen S3.5 Power Swivel

    4-3/4 inches

    2-7/8 inches

    2-7/8 inches3-1/2 inches - 3 stabilizers

    3-3/8 and 3-3/4 inches

    Up to 2x increase

    4 Twist-offs (stabilizer torque)Cementing/Logging/Perforating

    Breakeven (due to twist-offs)

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    38/131

    TT00-63 38

    Domain Energy Slim-Hole Problems (1995)

    Slim-Hole No. 1 Plugged bit nozzles - 1,006 ft

    Motor twist-off (stabilizer torque) - 7,071 ft

    Fishing - 3 trips

    Slim-Hole No. 2 Hole deviation (no stabilizers)

    Low ROP (reduced WOB due to hole deviation) Stuck pipe - 8,085 ft (stabilizer torque)

    Fishing - back-off, spear, 4 trips (7 days)

    Logging - problem running tool

    Slim-Hole No. 3

    Motor twist-off (stabilizer torque) - 1,004 ft Fishing - 3 trips (23 hours)

    Motor twist-off (stabilizer torque) - 5,187 ft

    Fishing - 1 trip (grapple)

    Lost cone - 10,871 ft (drilled with rock bit)

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    39/131

    TT00-63 39

    Unocal Thailand Slim-holes (1999)

    Conventional

    2-7/8”  TBG

    Slimhole Ultra Slim

    13-3/8” @ 1000’  

    9-5/8” @ 4500’  

    7” @ 10000’  

    SSSV SSSV SSSV

    9-5/8” @ 850’  

    7” @ 2500’  

    2-7/8” TBG @ 4500’  

    6-1/8” Hole 

    7-5/8” @ 850’  

    5-1/2” @ 2500’  

    2-7/8” TBG @ 4500’  

    4-3/4” Hole 

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    40/131

    TT00-63 40

    Unocal Thailand Slimholes (1999)

    0.75

    1.3

    0

    0.2

    0.4

    0.6

    0.8

    1

    1.2

    1.4

       W  e   l   l

       C  o  s   t   (   $  m   i   l   l   i  o

      n  s   )

    Slimhole Conventional

    (4-3/4”)  (8-1/2”) 

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    41/131

    TT00-63 41

    Unocal Gas Production Rates (1999)

    0.00 500 1000 1500 2000 2500

       C  u  m  u   l  a   t   i  v  e   G  a  s   P  r  o   d  u  c   t   i  o

      n   (   M   M   S   C   F   )

    Time (days)

    Slimhole Wells

    Conventional Wells

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    42/131

    TT00-63 42

    Unocal, 1997

    “Slimhole development has completely  

    Transformed the future of Gulf of Thailand

    Operations and has paved the way for

    Operators to continue providing a long-

    term economic supply of gas to the

    Kingdom of Thailand”  

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    43/131

    TT00-63 43

    Pemex Slimholes (1998)

    Conventional

    13-3/8” Casing 

    12-1/4” Drill Bit 

    7” Casing 

    Packer

    9-5/8” Casing 

    17-1/2 Drill Bit

    2-7/8” Tubing 

    8-1/2” Drill Bit 

    3000 m

    1650 m

    150 m

    Slimhole

    9-5/8” Casing 

    8-1/2” Drill Bit 

    Cement

    7” Casing 

    12-1/4 Drill Bit

    3-1/2” Tubing 

    5-7/8” Drill Bit 

    3000 m

    1650 m

    150 m

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    44/131

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    45/131

    TT00-63 45

    Texaco Dual Completion Slimhole

    13-3/8” Casing 

    12-1/4” Hole 

    2-7/8” Tubing 

    9-5/8” Casing 

    17-1/2 Hole

    2-7/8” Tubing 

    8-1/2” Hole 

    10,500’  

    8,000’  

    2,500’  

    Cement

    12,500’  

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    46/131

    TT00-63 46

    Slim-hole Well Concerns

    Casing Program

    Drillstring Torsional Strength

    Fishing & Milling

    Increased ECD (lost circulation)Bit Design and Reliability

    Downhole Motors(cost & reliability)

    Cementing (primary & squeeze)Stimulation

    Workovers

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    47/131

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    48/131

    TT00-63 48

    Conclusions

    Slimholes:

    -Reduce Well Costs 40 to 70%

    -Reduce Environmental Costs & Concerns

    -Tools and Equipment Exist, and are

     Available and Reliable

    -Safe

    -Do Not Usually Limit Production

    Hi h P Sli M t

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    49/131

    TT00-63 49

    High-Power Slim Motors

    Bearing

    PackUniversal Jt

    Long Power Section

    StandardPower

    Sections

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    50/131

    TT00-63 50

    Leniek Pumping System (1999)

    Production Line

    1-1/2” Hydraulic 

    Hose

    Clamp

    Hollow Polish Rod

    3-1/2” Cemented Tubing 

    2” Coiled Tubing 

    Hollow Rod Pump

     AnchorScreen

    Gas Vent

    Stuffing Box

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    51/131

    TT00-63 51

    Leniek CT Pumping System  

    Conventional Surface Equipment1,000 to 5,000 Feet

    2-7/8” or 3-1/2” Casing (CT or

    Tubing)1-1/2” CT (Hollow Sucker Rod) 

    Hollow Polish Rod

    Hollow Rod Pump

    YPF Installation

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    52/131

    TT00-63 52

     YPF Installation

    Leniek System Advantages

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    53/131

    TT00-63 53

    Leniek System Advantages

    Reduce Well Construction Cost 50

    PercentEliminates Tubing Thread Failures

    Eliminates Tubing Anchors

    Reduce Lifting CostsReduce Paraffin Problems

    Reduce Casing Wear

    Treat Wells Through CTEliminate Rod Failures

     Allows Ultraslim Holes

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    54/131

    TT00-63 54

     Advances inCoiled-Tubing Technology

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    55/131

    TT00-63 55

    Overview

    History & Evolution

    Current Status

    Conventional Operations

    Coiled Tubing Drilling (CTD)

    Outlook

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    56/131

    Evolution

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    57/131

    TT00-63 57

    Evolution

    1944 Allied Invasion Europe1962 Bowen CTU

    1975 - 200 Units - 1-1/4”  

    1980 - Improved Pipe/Welding

    1983 - Continuously Milled 3000’  

    1987 - Bias-Welded Strips1992 - 2-3/8” to 3-1/2” OD CT 

    1999 - 110 ksi CT

    Today

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    58/131

    TT00-63 58

    Today

    750 Units Worldwide

    50% in North America

    Few Pipe Failures

    Multiple Applications

    CT Pipelines

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    59/131

    TT00-63 59

    Common Applications

    Clean outs (50%)

    Stimulations

    Profile Modifications

    Perf/Log

     Artificial Lift

    Sand Control

    Coiled-Tubing Applications

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    60/131

    TT00-63 60

    Coiled-Tubing Applications

    Clean-outDownhole Tools

    Stimulation

    Nitrogen Lift

    Drilling

    Logging/Perf 

    Jetting

    Fishing

    Cementing

    Source: Quality Tubing

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    61/131

    TT00-63 61

    Cost Savings with Coiled Tubing

    OPERATOR JOB SAVINGS YEAR

    ARCO Alaska Cement Squeeze 90% 1987

    Fracmaster Pipeline Cleanout 90% 1988

    BP (North Sea) Barium Scale 80% 1990Chevron Velocity String 59% 1992

    Amoco (GOM) Zinc Sulphide 94% 1993

    BP Alaska Spoolable GL 68% 1993

    Mobil Fracturing 21% 1994Amoco TT Gravel Pack 80% 1996

    Workovers

    Completions 

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    62/131

    TT00-63 62

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    63/131

    TT00-63 63

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    64/131

    TT00-63 64

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    65/131

    TT00-63 65

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    66/131

    TT00-63 66

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    67/131

    TT00-63 67

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    68/131

    TT00-63 68

    Hybrid Coiled Tubing/

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    69/131

    TT00-63 69

    Hybrid Coiled-Tubing/Snubbing Rig

    (Hydrarig)

    CT Injector

    Injector Trolley

    Jack Cylinder

    Quad BOP

    Substructure

    Support Pole

    Oman Large-OD CT Completions

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    70/131

    TT00-63 70

    Oman Large OD CT Completions

    ESP Well

    SlipConnection

    ESP cable

    3-1/2” CT 

    Slip connector

    Landing nipple

    Protector

    Motor

    Centralizer

    7” K55, LTC 

    Pump

    2-7/8” CT 

    4-1/2” 

    Tie back

    Slim ConcentricWater Injector

    4-1/2” Tie back

    2-7/8” EU nipple

    5-1/2” x 2-7/8” production

    packer

    Gas Lift Well

    7” shoe 

    3-1/2” nipple 

    7” packer 

    Slidingsleevecirculatingdevice

    13-3/8” 

    casing

    Gas liftmandrels

    Velocity String

    2-7/8” EU nipple

    Productionpacker

    Hyd. setretrievable

    packer

    Bottom holepress. gauge

    Gas liftmandrel

    Top CT plug

    1-1/2” CT 

    3-1/2” tubing

    Taylor and Conrad (1996)

    ARCO Coiled-Tubing Liner

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    71/131

    TT00-63 71

     ARCO Coiled Tubing Liner

    Production tubing

    Hydraulic set packer

    Open-hole well(possibly drilled with

    coiled tubing)

    CT liner Pre-perforatedCT liner with

    optional screen

    Pay Zone

    CT Steam-Injection System

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    72/131

    TT00-63 72

    j y

    Coiled Tubing

    SteamGenerator

    Injector

    BOP

    Wellhead

            8

            0        0        0        ’

    CasingProduction

    Tubing

    Concentric CT

    SlottedLiner Concentric CT

    Cross Section

    Pearlite

    Oil Reservoir

    OilOil

    Steam

    Steam

    2-7/8” CT 

    1-3/4” CT 

    Coiled Tubing Drilling

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    73/131

    TT00-63 73

    Coiled Tubing Drilling(CTD)

    History of CDT

    Current Status

    Demographics of Current Activity

     Advantages and Limitations

    Where are we headed with CTD? 

    Coiled-Tubing Drilling System

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    74/131

    TT00-63 74

    Coiled-Tubing Drilling System

    Injector ReelPower Supply

    Whipstock orCement Plug

    2” CT with Wireline 

    Connector

    Orienter

    MudMotor

    Bent Sub Bit

    GuidanceSystem

    Why CTD or Why Not ?

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    75/131

    TT00-63 75

    Why CTD or Why Not ?

    Continuous CirculationPressure Control

    Footprint, Environmental

    LWD, Geosteering, Joystick OperationDeepenings, Side-Tracks

    Through-Tubing Capable

    Costs?

     Availability

     Acceptance

    Brief CTD History

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    76/131

    TT00-63 76

    Brief CTD History

    1991 - Elf/Dowell & ORYX/Cudd1992 - Arco first window & MWD

    1994 - First North Sea CTD wells

    1994 - Maersk 3000’ Horizontal well 

    1995 - 200+ CTD Wells Worldwide

    1999 - 1200± CTD Wells

    Schlumberger Electrically-Controlled

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    77/131

    TT00-63 77

    Schlumberger Electrically-ControlledCT Drilling System

    2" CTDrilling

    Head

    Logging/Steering

    Sub

    ElectricOrienter Motor

    7-Conductor

    Wireline

    Bit

    Schlumberger “Viper” BHA 

    Transocean Hydraulically-Controlled

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    78/131

    TT00-63 78

    Transocean Hydraulically ControlledCT Drilling System

    1/4" SS Hydraulic Tubing

    Connector

    Logging/Steering SubHydraulicOrienter Motor

    Monoconductor Wireline

    Bit

    2" CT

    Check Valves/

    Release Sub

    Transocean Dual-Capillary BHA

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    79/131

     Arco CTD History

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    80/131

    TT00-63 80

    y

    1990-Initial interest for PRB ST1991-Initial ST effort unsuccessful

    1992-94 Oklahoma Window Milling Tests

    1992-Successful ST in West Texas

    1993-Prudhoe program started

    1994-95 THUMS Efforts,1997++ Algeria, Indonesia, CA, NM...

    ARCO S (1999)

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    81/131

    TT00-63 81

     ARCO Summary (1999)

    120

    11

    1 1   3   10

    20

    40

    60

    80

    100

    120

     Alaska California New Mexico Texas Indonesia Algeria

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    82/131

    TT00-63 82

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    83/131

    TT00-63 83

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    84/131

    TT00-63 84

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    85/131

    TT00-63 86

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    86/131

    TT00-63 87

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    87/131

    TT00-63 88

    Running 3 1/2” CTC after CTD  

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    88/131

    TT00-63 90

    g /

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    89/131

    TT00-63 91

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    90/131

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    91/131

    TT00-63 93

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    92/131

    TT00-63 94

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    93/131

    TT00-63 96

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    94/131

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    95/131

    TT00-63 98

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    96/131

    TT00-63 100

    Typical CTD Completion at PRB

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    97/131

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    98/131

    TT00-63 102

    Surface Testing

    17 PPG Fiber F/O PlugPilot HoleCasing Exit

    “One Step” Mill  

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    99/131

    TT00-63 103

    1999-2000 CTD Developments

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    100/131

    TT00-63 104

    Thru - 3-1/2” Tubing Operations Over 30 Slimhole Operations To-date

    Fluid Loss/ECD Concerns

    Lower DensityLower Polymer loading

    Shale Stabilization Additives

    Bi-center Bits

    PRB CTD Average Footage

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    101/131

    TT00-63 105

    817

    1204

    17941685

    1950

    0

    200

    400

    600

    800

    1000

    1200

    1400

    1600

    1800

    2000

       A  v  e  r  a  g  e   F  o  o   t  a  g  e

    1995 1996 1997 1998 1999

    Prudhoe Bay Summary

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    102/131

    TT00-63 106

    100 wells 1993-99

     Average Cost 

    1995 - $990M1996 - $1005M1997 - $1165M1998 - $1200M1999 - $1375M

    •Harder, Longer Reach Targets• Avg. Production 1400 BOPD

    •90% success

    Grissom IslandTHUMS - Arco Project

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    103/131

    TT00-63 108

    THUMS - Arco Project

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    104/131

    TT00-63 109

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    105/131

    TT00-63 110

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    106/131

    TT00-63 111

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    107/131

    TT00-63 113

    California CTD Project

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    108/131

    TT00-63 114

    j

    4/97- Drilled 7 shallow vertical wells

    Fleet Cementers CTU - unique design

    Used 2 7/8” OD CT, 4 3/4” PDMs 

    Hole size 6 to 6 1/2” holes, 1 to 9 1/2”  

    Depths 900-1000’ , Ran 3 1/2” casing 

    Total time 24 hours/well

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    109/131

    TT00-63 115

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    110/131

    TT00-63 116

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    111/131

    TT00-63 118

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    112/131

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    113/131

    Indonesia

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    114/131

    TT00-63 122

    Multiple well program in NW Java SeaOne ST/ window through 9-5/8” csg- 1997

    870’ of 6-1/8” hole drilled w/ 2-3/8” CT 

    Used tinder barge rig as supportCompleted with cemented 3-1/2” liner 

    2nd well discontinued after 500’ - shale

    3rd well April - June 1998- lost hole - shale

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    115/131

    TT00-63 123

    Offshore Indonesia

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    116/131

    TT00-63 124

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    117/131

    TT00-63 125

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    118/131

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    119/131

    TT00-63 127

    Current Status of CTD

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    120/131

    TT00-63 128

    20 CTU’s capable of serious CTD 

    Less than 10 CTU’s actively drilling 

     AK, Oman, Canada, N. Sea, Venezuela

    Currently active; Schl, Baker, BJFleet

    MWD, electric/hydraulic BHA’s 

    Why CTD or Why Not ?

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    121/131

    TT00-63 129

    Continuous CirculationPressure Control

    Footprint, Environmental

    LWD, Geosteering, Joystick OperationDeepenings, Side-Tracks

    Through-Tubing Capable

    Costs? Availability

     Acceptance

    What is the Future ?

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    122/131

    TT00-63 130

    Underbalanced operations All-electric CTD BHA

    Composite CT

    Pre-programmed, self guided BHA

    Smaller BHAs

    Through-tubing rotary drilling

    Fiberspar Composite Coiled Tubing

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    123/131

    TT00-63 131

    e spa Co pos e Co ed u g

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    124/131

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    125/131

    FS CT Field Validation Trails

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    126/131

    TT00-63 134

    FS CT Field Validation Trails

    HalliburtonEnergy Services

    To date, 6 - CO2

    injection wellclean-outs withacid stimulationfor Altura in W.TX and Phillips

    in NM

    FS LP First Commercial Application

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    127/131

    TT00-63 135

    FS LP First Commercial Application

     Altura, Levelland,TX

    40,000’ waterflood installation

    2” ID, 1500-psiWP FibersparLinePipe used

    Pipe shipped in8,000 ftcontinuouslengths

    Mobile Spooling Unit

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    128/131

    TT00-63 136

    Mobile Spooling Unit

    Few Fittings

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    129/131

    TT00-63 138

    Few Fittings

    Long runs wereeasilyaccomplished withfew or no fittings

    to account forturns

    Several long runswith multiple turns

    were successfullycompleted in asingle pull

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    130/131

  • 8/17/2019 Slimhole Coiled Tubing Drilling

    131/131