SLIP FORM WORK AR. SAURABH YADAV PROF. ARCHANA SINGH RATHORE

SLIP FORM WORK

Embed Size (px)

DESCRIPTION

how to do slip for work

Citation preview

Page 1: SLIP FORM WORK

SLIP FORM WORK

AR. SAURABH YADAV

PROF. ARCHANA SINGH RATHORE

Page 2: SLIP FORM WORK

TO BE COVERED TODAY• Introduction to formwork• Types• Importance• Slip formwork• Horizontal construction• Vertical construction• Material use• Safety

Page 3: SLIP FORM WORK

FORM WORK

• Temporary boarding or sheeting erected to contain freshly placed and compacted concrete until it has gained sufficient strength to be self-supporting.

Page 4: SLIP FORM WORK

IMPOTANCE OF FORMWORK

• Formwork system is the key factor determining the success of a construction project in terms of

• SPEED• QUALITY• COST• SAFETY OF WORKS

Page 5: SLIP FORM WORK

Classification according to materials of construction

• WOOD• most popular formwork material-low initial cost-high

adaptability to complicated shape-labour intensive and environmental unfriendly

• •

• Steel-• hot-rolled or cold-formed sections-heavy weight-suitable

for large-sized panels• •

• Aluminium-• stiff and light weight-higher material and labour cost-

excellent finish

Page 6: SLIP FORM WORK

WHAT IT IS?

Slip forming, continuous poured, continuously formed, or slip form construction is a construction method in which concrete is poured into a continuously moving form.

AR. SAURABH YADAV

Page 7: SLIP FORM WORK

• Method of vertically extruding a reinforced concrete section and is suitable for construction of core wallsi n high-rise structures – lift shafts, stair shafts,towers.

• The formwork rises continuously, at a rate of about300 mm per hour, supporting itself on the core and not relying on support or access from other parts of the building or permanent works

Page 8: SLIP FORM WORK

In vertical slip forming the concrete form may be surrounded by a platform on which workers stand, placing steel reinforcing rods into the concrete and ensuring a smooth pour

AR. SAURABH YADAV

Page 9: SLIP FORM WORK

In horizontal slip forming for pavement and traffic separation walls concrete is laid down, vibrated, worked, and settled in place while the form itself slowly moves ahead

AR. SAURABH YADAV

Page 10: SLIP FORM WORK
Page 11: SLIP FORM WORK

AR. SAURABH YADAV

Placing Concrete Underwater

n Advantages: Can be used to funnel concrete down through the water into the structure.

n Watch for: Discharge end always has to be buried in fresh concrete to ensure seal between water and concrete mass.

Page 12: SLIP FORM WORK

ONCE UPON A TIME……• The slip forming technique was in use by the early 20th

century for building silos and grain elevators. • In the 1947-1950 period, AT&T Long Lines built 49 concrete

towers up to 191 ft tall for microwave relay stations; most using the slip-form method.

• The technique was introduced to residential and commercial buildings in the late 1960s.

AR. SAURABH YADAV

Page 13: SLIP FORM WORK

AR. SAURABH YADAV

The first notable use of the method in a residential/retail business was the Skylon Tower in Niagara Falls, Ontario, which was completed in 1965

Page 14: SLIP FORM WORK

AR. SAURABH YADAV

Components of vertical slip form:

Page 15: SLIP FORM WORK

HOW DO WE DO IT ?

AR. SAURABH YADAV

Page 16: SLIP FORM WORK

il

Slip form structural detail

Page 17: SLIP FORM WORK

AR. SAURABH YADAV

HOW DO WE DO IT ?

Page 18: SLIP FORM WORK

ADVANTAGESThe main advantages can be listed as:(i) quicker construction;(ii) less formwork;(iii) less scaffolding;(iv) easier working conditions;(v) greater salvage;(vi) better concrete;(vii) a joint less, watertight structure.

AR. SAURABH YADAV

Page 19: SLIP FORM WORK

Slip form wall

made of 1:12 cement andquarry-dust/ sand mixwith 2% of coir fibers.The steel shutter is usedFor slip form wallconstruction.

Some types of soil canalso be used instead ofquarry dust.

Cost-effective Walls

AR. SAURABH YADAV

Page 20: SLIP FORM WORK

Slip form wall construction

AR. SAURABH YADAV

Page 21: SLIP FORM WORK

AR. SAURABH YADAV

Page 22: SLIP FORM WORK

AR. SAURABH YADAV

Page 23: SLIP FORM WORK
Page 24: SLIP FORM WORK

BASIC SEQUENCE• The formwork and the access platform are

assembled on the ground.• The assembly is raised using hydraulic jacks.• As the formwork rises continuously, continuous

concrete and rebar supply are needed until the operation is finished.

• At the end of the operation the formwork is removed using a crane.

• The entire process is thoroughly inspected and highly controlled

Page 25: SLIP FORM WORK

BENEFITS• Careful planning of construction process can achieve high

production rates• Slip form does not require the crane to move upwards,

minimising crane use.• Since the formwork operates independently, formation of

the core in advance of the rest of the structure takes it off the critical path – enhancing main structure stability.

• Availability of the different working platforms in the formwork system allows the exposed concrete at the bottom of the rising formwork to be finished, making it an integral part of the construction process.

AR. SAURABH YADAV

Page 26: SLIP FORM WORK

BENEFITS• Certain formwork systems permit construction of

tapered cores and towers.• Slip form systems require a small but highly skilled

workforce on site

AR. SAURABH YADAV

Page 27: SLIP FORM WORK

• Other considerations• This formwork is more economical for buildings more than

seven storey high.• Little flexibility for change once continuous concreting has

begun therefore extensive planning and special detailing are needed.

• Setting rate of the concrete had to be constantly monitored to ensure that it is matched with the speed at which the forms are raised.

• The structure being slipformed should have significant dimensions in both major axes to ensure stability of the system.

• Standby plant and equipment should be available though cold jointing may occasionally be necessary

AR. SAURABH YADAV

Page 28: SLIP FORM WORK

THANKS!!!