PREFERRED REMEDYFOR SMU 1
NOTESBathymetric contours are at 1-meterintervals based on current bathymetryAll listed depths based on estimated post-remediation bathymetry unless otherwise notedHabitat enhancement would also include placement of large woody debris structures in water depths between 4 and 15 feet to provide cover and increase foraging opportunities for fish.
SMU 1
SMU-7
SMU 8SMU 2
-5
-6
-9
-1
-3-5-7
-9
SMU-6
690
-11
Wastebed B
690S29
S338
S401
S309
S340S341
S402
S342 S310
S344
S403
S343
S345
S346
S347S21 S404
S15
S405
S312S20
S311
S348
S349
S350
S14
S406
Wastebed B
East Flume
-13
SYW-19
Alternative 4.A.4 - Dredging to Remove 25% (2 meter depth average) of the In-Lake Waste Deposit plus Hot Spots / Isolation Capping to Mean PECQ1 plus Mercury PEC
Area Dredged to Maximum Habitat Depth after Capping (to current 13.5' depth, 61.9 ac)Sand - Recreational / Habitat Buffer Area Over Isolation Cap (shoreline to 20' offshore, 1.9 ac)Sand - Submerged Macrophyte / Benthic Area Over Isolation Cap (20' offshore - 6' depth, 5.8 ac)Fine Gravel - Fish Spawning Habitat Over Isolation Cap (6' depth to 15' depth, 57.3 ac)Sand - Benthic Substrate Area Over Isolation Cap (15' depth - 29.5' (9m) depth, 19.8 ac)WetlandBoundary of Theissian Polygon Surrounding Sample LocationWastebed B / Harbor Brook IRM Barrier Wall (part of IRM, location is conceptual. Dashed section is conceptual)Sample Location
0 250 500125Feet