A.1. The project planning process involves 3 steps The identification process: Steps are: Identifying initial requirements: A company identifies a need for a new or improved product for which a company will acknowledge the necessity of improving the existing product in accordance with the consumer’s demands Validating them against the project objective. Identifying the criteria for assessing the success of both the final product and the processused to create it. Identifying the framework of the solution. Preparing a template of the framework of solution to illustrate the project feasibility. Preparing relevant charts to demonstrate the techniques of executing the project and its different stages. Preparing a proper project schema of achieving the defined business requirements for the project. Identifying training requirement. Making a list of the training programme necessary for the personnel working for project. Identifying the training needs of the individuals in various functions responsible. Preparing a training plan and a training calendar. Assessing the capabilities and skills of all those identified as part of the project organisation.

SMU MBA0049

Embed Size (px)

DESCRIPTION

FALL 2013

Citation preview

Page 1: SMU MBA0049

 

A.1. The project planning process involves 3 steps

The identification process:

Steps are: 

Identifying initial requirements: A company identifies a need for a new or improved product for which a company will acknowledge the necessity of improving the existing product in

accordance with the consumer’s demands

Validating them against the project objective.

Identifying the criteria for assessing the success of both the final product and the processused to create it. 

Identifying the framework of the solution.

Preparing a template of the framework of solution to illustrate the project feasibility.

Preparing relevant charts to demonstrate the techniques of executing the project and its different stages.

Preparing a proper project schema of achieving the defined business requirements for the project.

Identifying training requirement.

Making a list of the training programme necessary for the personnel working for project.

Identifying the training needs of the individuals in various functions responsible.

Preparing a training plan and a training calendar.

Assessing the capabilities and skills of all those identified as part of the project organisation.

The review process

Steps are

Instituting a training plan to explain the project team members with the methodologies, technologies and business areas under study.

Updating the project schedule to accommodate scheduled training activities

Identifying the needs for review and reviewing the project scope

Page 2: SMU MBA0049

Reviewing the project scope, the objective statement, and the non conformances in the project stages and identifying the need to use the project plan

Preparing a proper project plan indicating all the requirements from start to finish of the project and also at every stage of the project

Preparing a checklist of items to be monitored and controlled during the course of execution of the project

The analysis process

Steps are:

Comparing the actual details with that in the plan with reference to project stages

Measuring various components of the project and its stages to control the project from deviating and also monitor the performance

Deciding how the task, the effort, and the defects are to be tracked; what tools to be used; and what reporting structure and frequency will be followed at various stages

Identifying the preventive and corrective steps to be taken in case of any variance

Performing root cause analysis for all problems encountered

A.2. a).Life cycle of a project:

Project origination: In project origination, a project proposal is raised by a client to create a product or develop a service that can solve a problem or satisfy an evolving need in the market. The client then submits the proposal to get it investigated on its viability, evaluation and selection. If the viability tests conducted reveal positive results the proposal gets selected, and management or the client fixes up the budget and time to execute the project.

Project initiation: Soon after receiving a positive report on the proposed project from the project origination team, the client may then proceed to get it initiated. A project manager is assigned to make this project executable. The project manager will coordinate with the project sponsor to identify necessary resources and induct appropriate team members to ensure project begins on the tract within the keyindicators

Cost, Scope, Schedule, and Quality(CSSQ).

Project planning: Project planning builds on the work done in project initiation, through the development of a project plan. The project plan defines CSSQ, and includes plans to involve and communicate with all the parties that are affected by the project, and also attempts to identify risks and threats associated with project. As projects leads to change both within and outside the organisation, managing resistance to change through transitions need to be focused on while drawing project plans.

 

Page 3: SMU MBA0049

Project execution and control: This phase consumes the maximum time of the project life cycle and more than 80% of the resources get consumed in the process. The project management team ensures that all the laid out plans, schedules, procedures, and models were prepared and estimated. Unpredicted situations and overhead costs will be taken care of by the project team to minimise the impact on the project constraints.

Project closeout: The project team assesses the outcome of the project with performance of the project team and the performing agency. This is accomplished primarily through soliciting and evaluating feedback. The primary purpose of this assessment is to document best practices and lessons learned for use on future projects. Key project metrics are also captured to enable the client organisation to compare and evaluate performance measurements across projects

b.A company is incorporated for the purpose of setting up a project. The promoters obviously have to start with some broad idea about the proposed industrial activity. They make mental picture that gives the demand supply pattern, probable cost of production, etc. It is quite likely that the originators get attracted by the favourable aspects of the project known to them. They may have overlooked the dark side of the picture, which can only be revealed by a detailed objective study. Too many projects have floundered at considerable loss to the investors and indeed to the national economy through waste of scarce resources, because the investment decisions were taken without objective and in-depth techno-economic feasibility studies. In modern times, business operations are complex, requiring carefully prepared plans. This feasibility study helps the promoter to make the investment decisions correctly and to obtain funds without many difficulties.

 

A3.

CPM model was developed for projects which are comparatively risk-free. This approach starts with the development of the network and a focal point on the critical path. CPM approach is 'deterministic'. The main focus of CPM analysis is on variations in activity times as a consequence of changes in resource assignments. These variations are planned plus related to resource assignments as well as are not caused by random factors outside the control of

 o 

Requested changes:The cost estimating process may generate requested changes thatmay affect the cost

management plan, activity resource requirements, and othercomponents of the project management plan, which are further, reviewed anddeposited through integrated change

control process.o 

Page 4: SMU MBA0049

Cost management plan:If approved change requests result from the cost estimatingprocess, then the cost

management plan component of the project management plan isupdated if those approved changes impact the management of costs.

A5. a.Generally, an organisation is divided into various divisions.

Line managers have the primary responsibility of accomplishing the target goals of theorganisation. They have complete decision-making authority. Line organisation is bestsuited where the work is of repetitive type and relationships between departments,

andwithin the department, are relatively stable. In line organisation, the communicationchannels are very well defined.

The line management is not conducive for project management. The matrix organisationis very much conducive for project management. In large organisations where thecapital

expenses are a major part in the annual outlay of the company, it is advisable tohave an in-house project manager for assuring the quality of work and timelyculmination of the projects.

In such cases, the project management should be of line type in which the projectmanager should bear the full line authority and has total control over the departmentshe or she heads.

b. The strategies used to reduce risks are : 

Risk avoidance:It includes not performing an activity that could carry risk. Avoiding activitiesmay seem to a

very easy way of dealing with risks, but it also means losing out on the potentialgain that performing the activities with risk may have allowed.

 

Risk reduction:It involves methods that reduce the severity of loss from occurring. This methodmay cause a

greater loss by water damage and therefore may not be suitable. 

Risk retention:Risk retention is a feasible strategy for small risks where the cost of insuringagainst the risk is

likely to be higher over time than the total losses sustained. Risks which arenot avoided or transferred are retained by default. This comprises risks that are so disastrousthat they either

cannot be insured against or the premiums would not be feasible. Also anyamount of potential loss (risk) over the amount insured is retained risk. This can be accepted if there is a small chance of a very large loss or if the cost to insure for higher coverage amounts isso high

it would hamper the goals of the organisation. 

Risk transfer:

Page 5: SMU MBA0049

It means causing another party to accept the risk, usually by means of contract orby hedging. An example of a risk that uses contracts is insurance.

  

Q6. Discuss the concept of quality and project quality management. 

A6. Quality can be referred to as a state in which value entitlement is realized for thecustomer and supplier in every aspect of the business relationship. Let us discuss these steps indetail:

 

Plan:Establish the objectives and processes essential to deliver results in agreement with

theexpected output (goals). 

Do:Execute the plan, implement the process, and make the product.

 

Check:Study the results achieved and compare against the expected results

 

Act:Request corrective actions on considerable differences between actual and expectedresults.

Project quality managemento 

Project quality management begins by defining the quality standards to be used for theproject.

The knowledge area of project quality management includes the organisationalprocesses that determine the quality policies, objectives, and responsibilities. It consistsof quality planning,

quality assurance, and quality control. 

Quality planning:Quality planning is the process of identifying the quality standards that arerelated to the project and determining how to these standards can be achieved. A good qualityplanning

process starts with a clear definition of the goals of the project. This includesmeasuring the risks to success, setting high standards, documenting everything, and defining themethods

and tests to attain, control, forecast and validate success.o 

Page 6: SMU MBA0049

Inputs to quality planning 

Quality policy:refers to the overall intentions and direction pertaining to quality.

 

Scope statement:comprises the key objectives of the project.

 

Product description:includes the details of influencing technical issues and other concerns.

 

Standards and regulations o 

Tools and techniques to quality planning  

Benefit/cost analysis 

Benchmarking 

Flowcharting 

Design of experimentso 

Outcomes from quality planning 

Quality management plans:provides input to the overall project plan

 

Operational definitions:explains what something is and how it is measured?

 

Checklists:helps in verifying if a set of required steps has been performed.

 

Page 7: SMU MBA0049

Inputs to other processes:discover a need for further activity in some other area.

 

Quality assurance:Quality assurance means all the systematic and planned activities executedwithin the quality

system give confidence that the project will meet the applicable qualitystandards. It also comprises the examination of data at stations and centres to validate that thedata are in line

with the quality system goals, and to identify errors so that the required actioncould be taken on time. QA Tests make use of a system of metrics to decide whether or not thequality plan is

progressing in an acceptable manner. These tests or quality audits will assist youin forecasting and verifying the accomplishment of goals and identify need

for correctiveactions. 

 o 

Inputs to quality assurance 

Results of quality control measurements:records of quality control testing and measurementfor comparison and analysis.

Tools and techniques for quality assurance 

Quality audit: It is a structured review of other quality management activities and carried out byproperly trained in-house auditors or by third parties.

Outputs from quality assurance 

Quality improvement:It includes all the actions taken for increasing the effectiveness andefficiency of the project to

provide added benefits to the project stakeholders. 

Quality control:Quality control involves scrutinising particular project results to determine if they abide by

relevant quality standards and identifying ways to removing causes of unsatisfactory results. Quality Control (QC) refers to a system of routine technical activities thatassists in measuring

and controlling the quality of the project as it is being developed. Thisincludes identifying, analysing, and correcting problems.

The quality control system:

Page 8: SMU MBA0049

 Provides routine and consistent checks to make sure that data is reliable, correct and

complete; 

Identifies and deals with errors and omissions; 

Documents and collects inventory material, and records all quality control activities.o 

It comprises general methods like accuracy tests on data acquisition and calculationsand the use of accepted standardized procedures for emission calculations,measurements, estimating

uncertainties, recording information and reporting. It alsocomprises technical reviews of source categories, activities and emission factor data,and methods.

Inputs to quality control 

Work results:It includes both process results and product results.

Tools and techniques for quality control 

Inspection  

Control charts:graphic display of the results, over time, of a process.

 

Pareto diagrams:Histogram ordered by frequency of occurrence that shows how many resultswere generated

by type or category of identified cause. 

Statistical sampling:It determines the number of items to sample.

 

Flowcharting:It is used in quality control to help analyse how problems occur.

 

Trend analysis:mathematical techniques to forecast the future outcomes on historical data.

Page 9: SMU MBA0049

Outcomes from quality control 

Acceptance decisions:The items inspected will be either accepted or rejected.

 

Rework:action taken to bring a defective item into compliance.

 

Completed checklists:It should become part of the project’s records.

  

Process adjustments:includes key preventive and corrective actions taken as a project controlmeasure.

Project files: maintaining records of previous project performance that are detailed enough toaid in developing cost estimates.

 

Project team knowledge: members of the project team may recall previous actual costs or costestimates.

 

Lessons learned: lessons learned could include cost estimates obtained from previous projectsthat are similar in scope and size.

Project scope statemento 

The project scope statement provides important information about projectrequirements that is considered during cost estimating. The project scope statementincludes constraints,

assumptions, and requirements. .o 

Work Breakdown Structure(WBS)o 

The project’sWBS provides the relationship among all the components of the projectand the project

deliverables.o 

WBS dictionary

Page 10: SMU MBA0049

The WBS dictionary and related detailed statements of work provide an identification of the deliverables and a description of the work in each WBS.

Project management plan 

Schedule management plan: The type and quantity of resources and the amount of time thoseresources are applied to complete the work of the project.

 

Staffing management plan: Project staffing attributes and personnel rates 

Risk register: information on risk responses when producing cost estimates. 

Cost estimating: tools and techniques 

Analogous estimating: It is the actual cost of previous, similar projects as the basis for estimatingthe cost of the current project.

 

Determine resource cost rates: unit cost rates such as staff cost per hour and bulk material costper cubic yard for each resource to estimate schedule activity costs. Gathering quotes

is alsoone method. 

Bottom-up estimating: This technique involves estimating the cost of individual scheduleactivities with the lowest level of detail.

 

Parametric estimating: This technique makes use of a statistical relationship between historicaldata and other variables (e.g., requisite labour hours) to compute a cost estimate.

 

Project management software: This includes cost estimating software applications,computerized spreadsheets, and simulation and statistical tools.

 

Vendor bid analysis: It is the analysis of what the project should cost. 

Cost of quality: used prepare the schedule activity cost estimate. 

Page 11: SMU MBA0049

Reserve Analysis: Various cost estimators include reserves as costs in many schedule activitycost estimates. Contingency reserves are estimated costs to be employed at the

discretion of the project manager to deal with probable, but not certain, events. 

Cost estimating: outputso 

Activity cost estimates:An activity cost estimate is a quantitative assessment of thelikely costs of the resources

required to complete schedule activities.o 

Activity cost estimate supporting detail:The amount and type of additional detailssupporting the schedule activity cost estimate vary by application area. Regardless of the level of detail, the supporting documentation should provide a clear, professional,and complete picture by which the cost estimate was derived

Requested changes:The cost estimating process may generate requested changes thatmay affect the cost

management plan, activity resource requirements, and othercomponents of the project management plan, which are further, reviewed anddeposited through integrated change

control process.o 

Cost management plan:If approved change requests result from the cost estimatingprocess, then the cost

management plan component of the project management plan isupdated if those approved changes impact the management of costs.

A5. a.Generally, an organisation is divided into various divisions.

Line managers have the primary responsibility of accomplishing the target goals of theorganisation. They have complete decision-making authority. Line organisation is bestsuited where the work is of repetitive type and relationships between departments,

andwithin the department, are relatively stable. In line organisation, the communicationchannels are very well defined.

The line management is not conducive for project management. The matrix organisationis very much conducive for project management. In large organisations where thecapital

expenses are a major part in the annual outlay of the company, it is advisable tohave an in-house project manager for assuring the quality of work and timelyculmination of the projects.

Page 12: SMU MBA0049

In such cases, the project management should be of line type in which the projectmanager should bear the full line authority and has total control over the departmentshe or she heads.

b. The strategies used to reduce risks are : 

Risk avoidance:It includes not performing an activity that could carry risk. Avoiding activitiesmay seem to a

very easy way of dealing with risks, but it also means losing out on the potentialgain that performing the activities with risk may have allowed.

 

Risk reduction:It involves methods that reduce the severity of loss from occurring. This methodmay cause a

greater loss by water damage and therefore may not be suitable. 

Risk retention:Risk retention is a feasible strategy for small risks where the cost of insuringagainst the risk is

likely to be higher over time than the total losses sustained. Risks which arenot avoided or transferred are retained by default. This comprises risks that are so disastrousthat they either

cannot be insured against or the premiums would not be feasible. Also anyamount of potential loss (risk) over the amount insured is retained risk. This can be accepted if there is a small chance of a very large loss or if the cost to insure for higher coverage amounts isso high

it would hamper the goals of the organisation. 

Risk transfer:It means causing another party to accept the risk, usually by means of contract orby hedging.

An example of a risk that uses contracts is insurance

  

Q6. Discuss the concept of quality and project quality management. 

A6. Quality can be referred to as a state in which value entitlement is realized for thecustomer and supplier in every aspect of the business relationship. Let us discuss these steps indetail:

 

Plan:Establish the objectives and processes essential to deliver results in agreement with

theexpected output (goals). 

Page 13: SMU MBA0049

Do:Execute the plan, implement the process, and make the product.

 

Check:Study the results achieved and compare against the expected results

 

Act:Request corrective actions on considerable differences between actual and expectedresults.

Project quality managemento 

Project quality management begins by defining the quality standards to be used for theproject.

The knowledge area of project quality management includes the organisationalprocesses that determine the quality policies, objectives, and responsibilities. It consistsof quality planning,

quality assurance, and quality control. 

Quality planning:Quality planning is the process of identifying the quality standards that arerelated to the project and determining how to these standards can be achieved. A good qualityplanning

process starts with a clear definition of the goals of the project. This includesmeasuring the risks to success, setting high standards, documenting everything, and defining themethods

and tests to attain, control, forecast and validate success.o 

Inputs to quality planning 

Quality policy:refers to the overall intentions and direction pertaining to quality.

 

Scope statement:comprises the key objectives of the project.

 

Product description:includes the details of influencing technical issues and other concerns.

 

Standards and regulations o

Page 14: SMU MBA0049

 Tools and techniques to quality planning

  

Benefit/cost analysis 

Benchmarking 

Flowcharting 

Design of experimentso 

Outcomes from quality planning 

Quality management plans:provides input to the overall project plan

 

Operational definitions:explains what something is and how it is measured?

 

Checklists:helps in verifying if a set of required steps has been performed.

 

Inputs to other processes:discover a need for further activity in some other area.

 

Quality assurance:Quality assurance means all the systematic and planned activities executedwithin the quality

system give confidence that the project will meet the applicable qualitystandards. It also comprises the examination of data at stations and centres to validate that thedata are in line

with the quality system goals, and to identify errors so that the required actioncould be taken on time. QA Tests make use of a system of metrics to decide whether or not thequality plan is

progressing in an acceptable manner. These tests or quality audits will assist youin forecasting and verifying the accomplishment of goals and identify need

for correctiveactions. 

 o

Page 15: SMU MBA0049

 Inputs to quality assurance

 

Results of quality control measurements:records of quality control testing and measurementfor comparison and analysis.

Tools and techniques for quality assurance 

Quality audit: It is a structured review of other quality management activities and carried out byproperly trained in-house auditors or by third parties.

Outputs from quality assurance 

Quality improvement:It includes all the actions taken for increasing the effectiveness andefficiency of the project to

provide added benefits to the project stakeholders. 

Quality control:Quality control involves scrutinising particular project results to determine if they abide by

relevant quality standards and identifying ways to removing causes of unsatisfactory results. Quality Control (QC) refers to a system of routine technical activities thatassists in measuring

and controlling the quality of the project as it is being developed. Thisincludes identifying, analysing, and correcting problems.

The quality control system: 

Provides routine and consistent checks to make sure that data is reliable, correct and complete;

 

Identifies and deals with errors and omissions; 

Documents and collects inventory material, and records all quality control activities.o 

It comprises general methods like accuracy tests on data acquisition and calculationsand the use of accepted standardized procedures for emission calculations,measurements, estimating

uncertainties, recording information and reporting. It alsocomprises technical reviews of source categories, activities and emission factor data,and methods.

Page 16: SMU MBA0049

Inputs to quality control 

Work results:It includes both process results and product results.

Tools and techniques for quality control 

Inspection  

Control charts:graphic display of the results, over time, of a process.

 

Pareto diagrams:Histogram ordered by frequency of occurrence that shows how many resultswere generated

by type or category of identified cause. 

Statistical sampling:It determines the number of items to sample.

 

Flowcharting:It is used in quality control to help analyse how problems occur.

 

Trend analysis:mathematical techniques to forecast the future outcomes on historical data.

Outcomes from quality control 

Acceptance decisions:The items inspected will be either accepted or rejected.

 

Rework:action taken to bring a defective item into compliance.

 

Completed checklists:It should become part of the project’s records.

 

Page 17: SMU MBA0049

 Process adjustments:

includes key preventive and corrective actions taken as a project controlmeasure