    Solar Project @ Kadugannawa (Project 01)

    About Site

    Site located 120Km east of Colombo in one of the most scenic areas in the hillsof sabaragamuwa. Namely Gadadessa Estate. (50Arcre)

    Building

    2 storied Resort Bungalow.Height : 30ft

    Structure : Wooden

    Rooftop : Wood/MetalSituation : Hill Top

    Usage : Guest Bungalow/2 Luxury rooms, ONLY for the VVIP s

  • 8/7/2019 Solar PV Kadugannawa

    2/14

    Item List

    1.Solar Panel 8 Nos2.UNIRAC Solar Panel Mounting System.3.PV Fuse Box (15 A)4.DC Surge Protector Delta Brand5.Safety Switch 30A 3Pole -Squre D 2 Nos6.Charge Controller Out Back FLEXmax 607.2000VA /24V-230V Outback Inverter8.740Ah Battery Bank 6V/370Ah 8nos- 4X2 Series Parallel combination9.AC Out Distribution Box10.160A Merlin Gerin Breaker Switch11.HRC Fuse 200A-2 Nos12.Wires /Lugs /Conduits/casing/Silicone glue and other fixing accessories

    Used Tools/Equipments for Installation

    1.Drill Machines2.Hacksaw3.Wire Cutters4.Cable Lug Tool5.Digital Multi meter6.Digital Clamp Meter7.Screw Drivers (F/P)8.Com Flier9.Nose Flier10.Tester11.Hammer12.Ratchet /Box spanner set/wrench13.Wire Striper14.Scar Folding 4 sets15.Measurement Tape16.Level17.Compass

  • 8/7/2019 Solar PV Kadugannawa

    3/14

    Item Description

    1. Solar Panel

    Brand Model Watts Volts (Voc) AmpsImp(Isc)

    Grape Solar DJ-220P 220 29.4 (35.87) 7.48 (8.4)

    2. UNIRAC Solar Panel Mounting System.

  • 8/7/2019 Solar PV Kadugannawa

    4/14

    3. PV Fuse Box (15 A)

    Installed in between Solar Panel & Safety

    Switch. 15A Fuses for Positive & Negative

    Lines.

    4. DC Surge Protector Delta Brand

    Surge Protector installed in Fuse Box IN Put side.

    (Main in coming side).Red Wire Positive Terminal

    Black Negative Terminal

    Green Earth Terminal

    Earth Wire 6mm Standard Earth Wire

    5. Safety Switch 2 Nos

    Brand Name : Squre D

    Ampere : 30A

    Pole : 3P

    1.One for 15A Fuse Box to Charge Controller2.Charge Controller to Battery Bank

    Note: Charge Controller Out put Ampere is 60 A. But

    Safety switch 30A. So combine all 3 Pole for Disconnect

    Positive Terminal. Negative wire permanently connectedthrough the Battery bank and

    Charge Controller.

  • 8/7/2019 Solar PV Kadugannawa

    5/14

    6. Charge Controller Out Back FLEXmax 60

    Brand name Outback

    Max Ampere 60AMax I/P Voltage 150V DC

    Programmed for 24V DC system & Battery Bank Absorb Voltage set

    point 29.6V/Float Voltage set point 27.6V

    10.30 Am Data 09 July 2010PV side Voltage 108V

    Out put Ampere 47.5A

    7.2000VA /24V-230V Outback Inverter

    Input Voltage 24V DC

    Out Put Voltage 230V AC/50Hz

    Rated I/P Side Ampere 100AContinuous Power 2000VA

    Continuous AC Current 8.7A

    Efficiency 90%Harmonics 2%

    8.740Ah Battery Bank 6V/370Ah 8nos

    Deka MK Battery, Flooded, 6V, 370Ah, LTP, 8L16-DEKA

  • 8/7/2019 Solar PV Kadugannawa

    6/14

    9.AC Out Distribution BoxMetal Enclosure

    40A Main Switch/Trip Switch

    16A/10A MCB (F&G Brand)

    10.160A Main Breaker SwitchAmpere 160A

    Brand Merlin GerinPole 3P

    Model NS160N

    11.HRC Fuse 200A-2 Nos200A HRC Fuse and Base

  • 8/7/2019 Solar PV Kadugannawa

    7/14

    12. Wires /Lugs /Conduits/casing/Silicone glue and other fixing accessories

    Installation

    1.Rack and panel Installation

    Panels Faced to South Side. Angle 10-15 degrees. For all joints/connections usedStainless Steel / Galvanized Nut & Bolts. Used Waterproof Silicone for Roof Mounting L

    Foot base.

  • 8/7/2019 Solar PV Kadugannawa

    8/14

    Panel Mounting Brackets

    Mounting Surface is very narrow. So anymistake panels can SLIP !

    Suggestion,

    If panels directly mount to AL bar using

    S/S nut and Bolts we can away from thisdoubt.

  • 8/7/2019 Solar PV Kadugannawa

    9/14

    2. Panel Wiring & Down Conductor

    Used 4X2 method. Two sets of 4 panels. This 4 panel connected is Series And

    parallel connected to other 4 panel set.

    Voltage 29.4 V X 4 = 117.6V

    Current 7 .48 X 2 = 14.96 A

    Down Conductor

    Wire Size :Used 6mm2 two core copper wire and 6mm single core Standard

    copper Earth wire

    Wire Length : 22Meters*

    *No any Joints

    *40 A / 3.08Ohms per 1Km- Kelani Cable Sri Lanka

    3.PV Fuse Box & DC Surge ProtectorDIN Mount type fuse Base with 15A Fuses for Positive and Negative terminals. Items

    are installed in Metal Enclosure. DC Surge Protector also installed in this Enclosureupside.

    4. Used Safety switches for Charge controller input side (6mm2 Wire 1.5Ft) & out put

    Side(18mm2 Copper wire 6Ft).

    Safety Switch rated Ampere is 30A. For the Battery Bank Side interconnectedall 3 Poles for disconnect Positive Terminal. Negative terminal directly

    interconnected(Battery Bank and Charge controller)

    5.Battery Bank6V/370Ah- 8 nos Flooded type Battery. Inverter Input Voltage is 24V so battery bank

    also interconnected 4X2 method. Used 50mm2 wire and 50mm Lugs for interconnect

    battery bank/HRC Fuse/Main Breaker and Inverter.

    6.HRC Fuse & 160A Main BreakerThose items are connected in between battery bank and Inverter. Outback recommend

    Fuse rating is 200A and 125A Vacuum Breaker. (Air Breaker) I couldnt find this

    type of breaker from Sri Lanka at the moment. So I used 160A 3Pole AC/DC Mainbreaker for this thing. (Merlin Gerine).200A HRC fuses installed in Metal Enclosure.

    Used 50mm2 Copper wire and Lugs. Wire Length around 5Ft

  • 8/7/2019 Solar PV Kadugannawa

    10/14

    7.Inverter

    Connected outback Cooling fan wires to Aux out position.

    Inverter Output Used power Distribution Box(Main switch/Trip and MCBs(16A/10A) used 6mm wire

    8. All Items are connected to the Wooden Sheet. And finally double checked allConnections, Polarity, Eathing system (6mm Wire/6ft 1.5Dia GI Pipe) and others.

    Power Up the System

    1.PV input and all battery Breakers are kept off position2.Turn ON the battery Breaker (Safety Switch)

    Programme/set the charge controller System Voltage 24A, Battery Bank Absorb

    Voltage set point 29.6V/Float Voltage set point 27.6V and other Outback recommend

    necessary settings (Both are kept Auto Modes)

    3.Connected Load to AC Out panel4.Switch ON Inverter Main Breaker5.Checked all Ampere rates/Voltages In & Out using Clipon Meter.

    10.30 Am Data 09 July 2010PV side Voltage 108V

    Out put Ampere 47.5A

    Inverter Idling Amp 0.7A (DC)With Load (23W) 1.7A (DC)

  • 8/7/2019 Solar PV Kadugannawa

    11/14

    EQUIPMENT ROOM

  • 8/7/2019 Solar PV Kadugannawa

    12/14

    TIME TABLE

    Date Time Start/Finish Work Attend

    30t

    /06/2010 7.00Pm -8.30Pm Scar folding fixing

    (4sets)

    3Persons

    Janaka

    Dumindu

    Manoj30

    t/06/2010 8.30Pm- 11.00Pm Inverter room

    Arrange

    1Person

    Manoj

    01/07/2010 Rainy/High wind

    Day(Difficult to work

    roof area due to

    rain & Wind)

    --

    --

    02/07/2010 8.00Am - 5.00Pm

    Rainy Day

    Solar Rack

    InstallationSolar PanelInstallation (4

    Panels)

    3Persons

    Dinesh/Manoj-fullday

    Janaka-11Am to

    5.00Pm)

    07/07/2010 8.00AM-1.10PM

    2.00Pm 5.30Pm

    Rack & 4 PanelInstallation

    Panel Wiring

    Lay Down

    conductor and

    Earth Wire

    3PersonsGunawardana

    Amila

    Manoj

    08/07/2010 8.30AM-2.00PM

    2.35PM-8.30PM

    Power room

    Wiring/Equipment

    s Installation

    4Persons

    Gunawardana

    AmilaDumindu

    Manoj

    09/07/2010 8.15AM-9.30AM Double-check allwiring/connections

    & Power up the

    System.

    3PersonsGunawardana

    Amila

    Manoj

  • 8/7/2019 Solar PV Kadugannawa

    13/14

    Wiring Diagram

  • 8/7/2019 Solar PV Kadugannawa

    14/14

    SPECIAL THANKS

    Direct Support

    1.Mr. Bede Cooray CEO Vinseth Group Of Companies2.Mr. Sarath Vijayananda Director Operations (Vinseth Group Of Companies)

    Engineering Support

    3.Mr. Barana Ranaweera Engineering Consultant (Vinseth Group/ Intel USA)

    Financial Support

    1. Mr Nihal Weerawarna Director Admin & Planning (Vinseth Group)

    4.Miss Rozalie Fernando Accountant

    Other Support

    1.Dumindu Thisera2.Dinesh3.Janaka

    Im thankful to all who help me to complete this Solar System successfully.

    Manoj D. GalbadaarachchiEngineer- Maintenance & Energy

    Vinseth Group