Upload
jeff-yong-kian-hock
View
288
Download
6
Tags:
Embed Size (px)
Citation preview
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
01 PILING (ALL PROVISIONAL) - NOT APPLICABLE PILING (ALL PROVISIONAL) - NOT APPLICABLE
To Collection: CostX Vincent Tan Associates 1/1
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
01 PILING (ALL PROVISIONAL) - NOT APPLICABLE (Continued)
COLLECTION
Page 1/1:
01 PILING (ALL PROVISIONAL) - NOT APPLICABLECarried to Summary:
CostX Vincent Tan Associates 1/2
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
02 WORK BELOW LOWEST FLOOR FINISHES - NOT APPLICABLE
02 WORK BELOW LOWEST FLOOR FINISHES - NOT APPLICABLE
To Collection: CostX Vincent Tan Associates 2/1
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
02 WORK BELOW LOWEST FLOOR FINISHES - NOT APPLICABLE (Continued)
COLLECTION
Page 2/1:
02 WORK BELOW LOWEST FLOOR FINISHES - NOTAPPLICABLECarried to Summary:
CostX Vincent Tan Associates 2/2
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
03 STRUCTURAL FRAME AND UPPER FLOOR - NOT APPLICABLE
03 STRUCTURAL FRAME AND UPPER FLOOR - NOT APPLICABLE
To Collection: CostX Vincent Tan Associates 3/1
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
03 STRUCTURAL FRAME AND UPPER FLOOR - NOT APPLICABLE (Continued)
COLLECTION
Page 3/1:
03 STRUCTURAL FRAME AND UPPER FLOOR - NOTAPPLICABLECarried to Summary:
CostX Vincent Tan Associates 3/2
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
04 ROOF TRUSSES - NOT APPLICABLE
04 ROOF TRUSSES - NOT APPLICABLE
To Collection: CostX Vincent Tan Associates 4/1
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
04 ROOF TRUSSES - NOT APPLICABLE (Continued)
COLLECTION
Page 4/1:
04 ROOF TRUSSES - NOT APPLICABLECarried to Summary:
CostX Vincent Tan Associates 4/2
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
05 EXTERNAL WALLS - NOT APPLICABLE
05 EXTERNAL WALLS - NOT APPLICABLE
To Collection: CostX Vincent Tan Associates 5/1
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
05 EXTERNAL WALLS - NOT APPLICABLE (Continued)
COLLECTION
Page 5/1:
05 EXTERNAL WALLS - NOT APPLICABLECarried to Summary:
CostX Vincent Tan Associates 5/2
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
06 EXTERNAL WALL FINISHES - NOT APPLICABLE
06 EXTERNAL WALL FINISHES - NOT APPLICABLE
To Collection: CostX Vincent Tan Associates 6/1
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
06 EXTERNAL WALL FINISHES - NOT APPLICABLE (Continued)
COLLECTION
Page 6/1:
06 EXTERNAL WALL FINISHES - NOT APPLICABLECarried to Summary:
CostX Vincent Tan Associates 6/2
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
07 WINDOWS - NOT APPLICABLE
07 WINDOWS - NOT APPLICABLE
To Collection: CostX Vincent Tan Associates 7/1
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
07 WINDOWS - NOT APPLICABLE (Continued)
COLLECTION
Page 7/1:
07 WINDOWS - NOT APPLICABLECarried to Summary:
CostX Vincent Tan Associates 7/2
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
08 ROOF COVERING - NOT APPLICABLE
08 ROOF COVERING - NOT APPLICABLE
To Collection: CostX Vincent Tan Associates 8/1
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
08 ROOF COVERING - NOT APPLICABLE (Continued)
COLLECTION
Page 8/1:
08 ROOF COVERING - NOT APPLICABLECarried to Summary:
CostX Vincent Tan Associates 8/2
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
09 RAINWATER INSTALLATION - NOT APPLICABLE
09 RAINWATER INSTALLATION - NOT APPLICABLE
To Collection: CostX Vincent Tan Associates 9/1
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
09 RAINWATER INSTALLATION - NOT APPLICABLE (Continued)
COLLECTION
Page 9/1:
09 RAINWATER INSTALLATION - NOT APPLICABLECarried to Summary:
CostX Vincent Tan Associates 9/2
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
10 INTERNAL WALLS AND PARTITION
BRICK WALLS Common clay brick; in cement mortar ( 1:6 ) with plasticiser; including reinforced concrete stiffeners and extended reinforcement welded back to column/stiffener reinforcement at every second course and bonding ties as shown on the drawing, described in the specification or as otherwise necessary and mesh reinforcement at every fourth course and including damp proof course
A 115mm thick 155 m2
B 300mm thick 23 m2
GYPSUM BOARD PARTITION Design, supply and fix; dry partition complete with 12.5mm thick "Boral" gypsum board complete with 80kg/m3 rock wool insulation including all additional work in ends, angles, intersections and abutment, timber/metal stud and all other necessary support to manufacturer's approval
C 150mm thick 335 m2
Design, supply and fix; dry partition complete with 12.5mm thick "Boral" gypsum board including all additional work in ends, angles, intersections and abutment, timber/metal stud and all other necessary support to manufacturer's approval
D 150mm thick (CEO's room) 39 m2
E ANY OTHER ITEMS i) .................................... ii) ................................... iii) ..................................
To Collection: CostX Vincent Tan Associates 10/1
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
10 INTERNAL WALLS AND PARTITION (Continued)
COLLECTION
Page 10/1:
10 INTERNAL WALLS AND PARTITIONCarried to Summary:
CostX Vincent Tan Associates 10/2
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
11 DOORS
SPECIAL CONTRACTOR'S DESIGNDED ALUMINIUM GLAZING SYSTEM Notes
Prices for Aluminium glazing system (curtain walling, window, door and the like) shall include for the complete installation including all supports, fixing accessories, matching hardware, ironmongeries, sub-frame, glass, louvre, glazing beads, gaskets, silicon, expansion and other joints, fixing back to structure. The Tenderer's design submission must be complete with full specification, type of Aluminium glazing system, thickness and type of glass, thickness of frame, specification for powder coating, drawings for extrusion section, and all necessary details to fulfill the tender.
Prices for Aluminium glazing system work shall include for all necessary design work, mock ups, wind load testing and structural integrity testing and Professional Engineer's calculations and endorsement, obtaining all necessary approvals and associated associated cost there of, preparation of shop drawings and subsequent submittal to Architect for approval. No work shall start on site unless the above requirement of wind load testing and structural integrity testing and Professional Engineer's calculations and endorsement have been approved by the Architect/Structural Engineer. Shop drawings submitted by the Contractor for approval must show location, type and size of supporting framework and must clearly indicate method of fixing of supports shown on the Architect's drawings which are indicative only and have no design intent. Shop drawings must be approved by the Architect before commencement of work on site.
The tenderer shall be required to carry out a sample mock-up of Aluminium glazing system at site before acceptance of tender by the Employer. This shall facilitate the Employer for selection of the curtain walling. The tenderer shall bear all cost to comply with this mock-up requirement including the cost of subsequent removal of mock-up from site if the tender is not successful.
To Collection: CostX Vincent Tan Associates 11/1
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
11 DOORS (Continued)
FIXED GLASS PANEL Design, fabricate, supply and install complete in position fixed glass panel, complete with all matching hardware; ironmongeries such as heavy-duty hinges, lockset, stay, handles, fastener, etc, glazing beads and gaskets; and including glass, setting blocks including building frames in waterproof mortar (1:3 ) and pointing frames with approved sealant.
A Epoxy spray painted aluminium framed fixed glass panel ;12mm thick clear tempered glass c/w 3m frosted film todesign
46 m2
ALUMINIUM FRAME GLASS DOOR Design, fabricate, supply and install complete in position aluminium frame door in epoxy spray paint, complete with aluminium subframe, all matching hardware; ironmongeries such as heavy duty hinges,lockset, pull handle, etc; glazing beads and gaskets; and including glass, setting blocks including building frames in waterproof mortar (1:3 ) and pointing frames with approved sealant all to specification; as per schedule and detail drawings.(Ironmongeries and glass shall be measured together):-
B 2150mm x 2600mm aluminium frame double swing glassdoor with 12mm thick clear tempered glass (D1)
2 no
C 900mm x 2600mm aluminium frame single swing glass doorwith 12mm thick clear tempered glass (D2)
5 no
TIMBER DOOR Timber door frame comprising wire ties, packing, grouting and other fixing.; door head, door jamb and door leaf comprising top and bottom frame and stile; laminated door leaf; complete with approved application of gloss paint/ spray paint to all timber surfaces, as per schedule and detail drawings. (Ironmongeries shall be measured separately)
D 900mm x 2400mm single leaf timber door (D3) 2 noE 900mm x 2400mm single leaf timber door complete with
louver (D4)2 no
F 1020mm x 2400mm single leaf hidden timber door with10mm groove line (D5)
1 no
G 900mm x 2400mm single leaf timber door complete withviewing panel (D7)
7 no
To Collection: CostX Vincent Tan Associates 11/2
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
11 DOORS (Continued)
FIRE RATED DOOR One hour rated fire door complete with intumescent strip, timber door frame, sub-frame; door head, door jamb, and architrave and door leaf complete with approved paint ; preparing and apply aluminium wood primer sealer and two coats of gloss paint ; to all timber surfaces, including all ironmongery like lockset, hinges, door closer as schedule and details drawings to Inspectorate Of Fire Services Requirements.
A 900mm x 2400mm single leaf timber door complete withviewing panel (D7a)
1 no
SLIDING TIMBER POCKET DOOR Sliding timber pocket door complete with rail track, floor guide including ironmongeries such as handle, locksets and etc (Ironmongeries and glass shall be measured together):-
B 900mm x 2400mm timber sliding door with laminatedsurface and 10mm groove line (D6)
1 no
FRAMELESS SLIDING GLASS DOOR Design, fabricate, supply and install complete in position frameless glass door, complete with all matching hardware; ironmongeries such as heavy duty hinges, pivot hinges, lockset, heavy duty double action floor spring, stainless steel pull handle, sliding track, patch fitting, etc; all to specification; (Ironmongeries shall be measured together):-
C 900mm x 2400mm sliding glass door with 12mm thick cleartempered glass (D8)
1 no
To Collection: CostX Vincent Tan Associates 11/3
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
11 DOORS (Continued)
FRAMELESS GLASS SCREEN Design, fabricate, supply and install complete in position frameless glass screen complete with all matching hardware; ironmongeries such as heavy duty hinges, pivot hinges, lockset, heavy duty double action floor spring, stainless steel pull handle, stainless steel patch fitting, U-channel, etc; all to specification and as Drawing. (Ironmongeries and glass shall be measured together)
A 2450mm x 2100mm frosted glass shower screen with 10mmthick tempered glass ; CEO Room
1 no
B 1100mm x 2100mm frosted glass shower screen with 12mm thick tempered glass door ; Female and Male Toilet
2 no
ROLLER SHUTTER Design, fabricate, supply and install complete in position "SKB" or approved equivalent roller shutter complete with all matching hardware; ironmongeries such as , lockset, heavy duty , pull handle, roller track, casings, channels, brackets, guide rails, removable mullions, locking device and all other accessories, etc; including building frames in waterproof mortar (1:3 ) and pointing frames with approved sealant all to specification; to suit structural opening (Ironmongeries shall be measured together) :-
C Overall size 2000mm x 3300mm high 1 noD Overall size 2450mm x 3300mm high 1 no
R.C lintel including all necessary formwork and reinforcement bar (Provisional)
E 115mm x 150mm 2 m
EXISTING DOORF To make good of existing doors on ground floor, including
repainting, replacement of damaged sections andaccessories, and removal debris off site.
item
To Collection: CostX Vincent Tan Associates 11/4
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
11 DOORS (Continued)
IRONMONGERY Supply and fix only the following ironmongery including providing matching screws for fixing to hardwood or set in concrete
A Door closer 11 no
B Hinges 48 noC Leaver handle complete with lock 9 noD Handle complete with lockset 1 noE Conseal door closer 1 noF Push plate 2 noG Pull handle 2 no
H ANY OTHER ITEMS i) .................................... ii) ................................... iii) ..................................
To Collection: CostX Vincent Tan Associates 11/5
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
11 DOORS (Continued)
COLLECTION
Page 11/1:Page 11/2:Page 11/3:Page 11/4:Page 11/5:
11 DOORSCarried to Summary:
CostX Vincent Tan Associates 11/6
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
12 FLOOR FINISHES
INTERNALLY
IN-SITU FLOOR FINISHES;
WATERPROOFING SYSTEM "Fosroc Brushbond" cementitious waterproofing system or approved equivalent and including additional layer to floor trap, pipe outlet and scupper drain all as per manufacturer's instruction and Engineer's drawings
A To floor of wet areas 32 m2
B To wall of shower area 24 m2
C To floor of wet areas; 300mm high upturn; 34 m
To Collection: CostX Vincent Tan Associates 12/1
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
12 FLOOR FINISHES (Continued)
Pavior
SCREEDS; INTERNALLY
Cement and sand (1:3) To floor; to receive various finishes
A 25mm thick 497 m2
CP1 - SUMINOE Triple Fresh II carpet tiles or approved equivalent ; 500mm x 500mm size; laid to pattern
To floor
B Supply ( including overheads and profit on supply andwastage and breakage)
497 m2
Supply RM Wastage and breakage RM Overheads and profit RM _______ Total RM _______
C Fixing ( breakdown to rate given below ) 497 m2 Insert breakdown to fixing rate below:- Sundry material for bedding, RM adhesive, grouting and the like and cleaning, polishing & protecting after laying Labour, plant, equipment, RM tools and all other cost
Plywood & plastic sheet RM protection Overheads and profit RM ________ Total RM _ ______
To Collection: CostX Vincent Tan Associates 12/2
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
12 FLOOR FINISHES (Continued)
Pavior
SCREEDS; INTERNALLY
Cement and sand (1:3) To floor; to receive various finishes
A 25mm thick 32 m2
CP2 - CARPET IDEAS Raw-Foundry carpet tiles or approved equivalent ; 500mm x 500mm size; laid to pattern
To floor
B Supply ( including overheads and profit on supply andwastage and breakage)
32 m2
Supply RM Wastage and breakage RM Overheads and profit RM _______ Total RM _______
C Fixing ( breakdown to rate given below ) 32 m2 Insert breakdown to fixing rate below:- Sundry material for bedding, RM adhesive, grouting and the like and cleaning, polishing & protecting after laying Labour, plant, equipment, RM tools and all other cost
Plywood & plastic sheet RM protection Overheads and profit RM ________ Total RM _ ______
To Collection: CostX Vincent Tan Associates 12/3
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
12 FLOOR FINISHES (Continued)
Pavior
SCREEDS; INTERNALLY
Cement and sand (1:3) To floor; to receive various finishes
A 25mm thick 8 m2
ST1 - CITATAH AMS Black Forest marble in matt finishes or approved equivalent ; 50mm x 50mm size; laid to pattern
To floor
B Supply ( including overheads and profit on supply andwastage and breakage)
8 m2
Supply RM Wastage and breakage RM Overheads and profit RM _______ Total RM _______
C Fixing ( breakdown to rate given below ) 8 m2 Insert breakdown to fixing rate below:- Sundry material for bedding, RM adhesive, grouting and the like and cleaning, polishing & protecting after laying Labour, plant, equipment, RM tools and all other cost
Plywood & plastic sheet RM protection Overheads and profit RM ________ Total RM _ ______
To Collection: CostX Vincent Tan Associates 12/4
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
12 FLOOR FINISHES (Continued)
Pavior
SCREEDS; INTERNALLY
Cement and sand (1:3) To floor; to receive various finishes
A 25mm thick 1 m
ST2 - CITATAH AMS Black Forest marbles in polish finishes or approved equivalent ; laid to pattern
To floor ; approximate width 150mm
B Supply ( including overheads and profit on supply andwastage and breakage)
1 m
Supply RM Wastage and breakage RM Overheads and profit RM _______ Total RM _______
C Fixing ( breakdown to rate given below ) 1 m Insert breakdown to fixing rate below:- Sundry material for bedding, RM adhesive, grouting and the like and cleaning, polishing & protecting after laying Labour, plant, equipment, RM tools and all other cost
Plywood & plastic sheet RM protection Overheads and profit RM ________ Total RM _ ______
To Collection: CostX Vincent Tan Associates 12/5
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
12 FLOOR FINISHES (Continued)
Pavior
SCREEDS; INTERNALLY
Cement and sand (1:3) To floor; to receive skirting
A 100mm high 2 m
ST2 - CITATAH AMS Black Forest marbles in polish finishes or approved equivalent ; laid to pattern
100mm high to skirtingB Supply ( including overheads and profit on supply and
wastage and breakage)2 m
Supply RM Wastage and breakage RM Overheads and profit RM _______ Total RM _______
C Fixing ( breakdown to rate given below ) 2 m Insert breakdown to fixing rate below:- Sundry material for bedding, RM adhesive, grouting and the like and cleaning, polishing & protecting after laying Labour, plant, equipment, RM tools and all other cost
Plywood & plastic sheet RM protection Overheads and profit RM ________ Total RM _ ______
To Collection: CostX Vincent Tan Associates 12/6
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
12 FLOOR FINISHES (Continued)
Pavior
SCREEDS; INTERNALLY
Cement and sand (1:3) To floor; to receive various finishes
A 25mm thick 93 m2
TL2 - NIRO Lead Grey GMY 06 Matt tiles or approved equivalent ; 300mm x 600mm size; laid to pattern
To floor
B Supply ( including overheads and profit on supply andwastage and breakage)
93 m2
Supply RM Wastage and breakage RM Overheads and profit RM _______ Total RM _______
C Fixing ( breakdown to rate given below ) 93 m2 Insert breakdown to fixing rate below:- Sundry material for bedding, RM adhesive, grouting and the like and cleaning, polishing & protecting after laying Labour, plant, equipment, RM tools and all other cost
Plywood & plastic sheet RM protection Overheads and profit RM ________ Total RM _ ______
To Collection: CostX Vincent Tan Associates 12/7
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
12 FLOOR FINISHES (Continued)
Pavior
SCREEDS; INTERNALLY
Cement and sand (1:3) To floor; to receive skirting
A 100mm high 48 m
TL2 - NIRO Lead Grey GMY 06 Matt tiles or approved equivalent ; 300mm x 600mm size; laid to pattern
100mm high to skirtingB Supply ( including overheads and profit on supply and
wastage and breakage)48 m
Supply RM Wastage and breakage RM Overheads and profit RM _______ Total RM _______
C Fixing ( breakdown to rate given below ) 48 m Insert breakdown to fixing rate below:- Sundry material for bedding, RM adhesive, grouting and the like and cleaning, polishing & protecting after laying Labour, plant, equipment, RM tools and all other cost
Plywood & plastic sheet RM protection Overheads and profit RM ________ Total RM _ ______
To Collection: CostX Vincent Tan Associates 12/8
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
12 FLOOR FINISHES (Continued)
INTERNALLY
TIMBER FLOOR TS1 - Timber ply in NIPPON Puritan Black NP N 1982 spray paint ; including hardwood backing
A To floor ; approximate width 300mm 80 m
B 100mm high to skirting 207 m
LAMINATED FLOOR LM3 - HOMAPAL ; 8222 laminated board or approved equivalent ; laid to pattern : including hardwood backing
C To floor ; approximate width 315mm 7 mD 100mm high to skirting 8 m
RAISE FLOOR SYSTEM Design, supply and install HPL finish brand 'S'Vin SV 1000HPL Raised Floor System comprising of floor panels, panel lock understructure, adjustable ms pedestal, bracketing ; including all necessary openings for passage trunking, power, conduits, all accessories and side enclosure panel ; all as per manufacturer's instruction and Architect's approval.
E 150mm high ; to Server Room 9 m2
To Collection: CostX Vincent Tan Associates 12/9
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
12 FLOOR FINISHES (Continued)
DROP & RISER Extra over for drop to selected cement render
A Generally Item Extra over for drop to selected tiles
B Generally Item Extra over for drop to selected marble
C Generally Item
DIVIDING STRIPS Dividing strips; embedded at junction of different finishes
D Stainless steel dividing strips, to flush with floor finishes 10 m
E ANY OTHER ITEMS i) . ii) iii) ...
To Collection: CostX Vincent Tan Associates 12/10
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
12 FLOOR FINISHES (Continued)
COLLECTION
Page 12/1:Page 12/2:Page 12/3:Page 12/4:Page 12/5:Page 12/6:Page 12/7:Page 12/8:Page 12/9:Page 12/10:
12 FLOOR FINISHESCarried to Summary:
CostX Vincent Tan Associates 12/11
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
13 WALL FINISHES
IN-SITU WALL FINISHES; INTERNALLY
PLASTER FINISH Plaster; cement and sand (1:3) with plasticiser; trowelled finish including galvanised steel edge ruler, corner bead and angle bead at corner/ edge/ angle and M.S. metal lath fixed between different surface of brickwork and concrete
To wall and column
A 19 mm thick 231 m2
INTERNAL PAINTING Emulsion paint; preparing and apply one coat alkali resisting primer and two finishing coats of NIPPON Eggshell NPOW 1012P emulsion paint in accordance with manufacturer's instruction; on ceiling surfaces
B To wall and column 1,168 m2
LAMINATED SURFACEC "LM3" Laminate to dry partition wall comprising 10mm
groove line and including all necessary accessories andfixings as per drawing no. LD/1st/BF/609 (CEO's room)
34 m2
D "LM1" Laminate to dry partition wall including all nescessaryaccessories and fixings as per drawing no. LD/1st/BF/608(CEO's room)
11 m2
EXISTING WALL FINISHESE To make good of existing wall finishes at staircase area,
including chipping off damaged plastering / painting, clean,replastering and repainting to match new wall finishes,including removal off site all debris.
item
To Collection: CostX Vincent Tan Associates 13/1
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
13 WALL FINISHES (Continued)
INTERNAL PLASTER AND WALL TILES Backing; cement and sand (1:3); to receive various finishes: to pattern To wall and column
A 20 mm thick 125 m2
TL 1 - NIRO White GWV 01 Matt or approved equivalent ; 300mm x 600mm size ; laid to pattern
To wall and column
B Supply ( including overheads and profit on supply andwastage and breakage)
125 m2
Supply RM Wastage and breakage RM Overheads and profit RM ____________ Total RM ____________
C Fixing ( breakdown to rate given below ) 125 m2 Insert breakdown to fixing rate below:- Sundry material for bedding, RM adhesive, grouting and the like and cleaning, polishing & protecting after laying Labour, plant, equipment, RM tools and all other cost
Plywood & plastic sheet RM protection Overheads and profit RM ____________ Total RM ____________
To Collection: CostX Vincent Tan Associates 13/2
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
13 WALL FINISHES (Continued)
A ANY OTHER ITEMS i) ................................... ii) ................................... iii) ..................................
To Collection: CostX Vincent Tan Associates 13/3
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
13 WALL FINISHES (Continued)
COLLECTION
Page 13/1:Page 13/2:Page 13/3:
13 WALL FINISHESCarried to Summary:
CostX Vincent Tan Associates 13/4
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
14 CEILING FINISHES
INTERNALLY
FIBROUS PLASTER CEILING Approved fibrous plaster ceiling including design, supply and fix galvanised metal suspension system suspended from slab/purlin and steel wire hanger; all to manufacturer's instructions and setting out symmetrically from centre of room including forming opening and including cutting and fitting around column, air-conditioning diffuser, lights, and the like and additional secondary support beneath air conditioning duct, including vertical cornices, light trough, bulkhead, access panel, u-channel, etc as shown on drawings. To ceiling including bulkhead, light trough, cornice, access panel ;
A not exceeding 3.5m above floor level 571 m2
WATER RESISTANT FIBROUS PLASTER CEILING Approved water resistant ceiling including design, supply and fix galvanised metal suspension system suspended from slab/purlin and steel wire hanger; all to manufacturer's instructions and setting out symmetrically from centre of room including forming opening and including cutting and fitting around column, air-conditioning diffuser, lights, and the like and additional secondary support beneath air conditioning duct, including vertical cornices, light trough, bulkhead, access panel, u-channel, etc as shown on drawings. To ceiling including bulkhead, light trough, cornice, access panel ;
B not exceeding 3.5m above floor level 35 m2
To Collection: CostX Vincent Tan Associates 14/1
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
14 CEILING FINISHES (Continued)
BORAL UNISPAN PLASTER BOARD CEILING Approved 12 mm thick Boral Unispan plaster board ceiling including design, supply and fix galvanised metal suspension system suspended from slab/purlin and steel wire hanger; all to manufacturer's instructions and setting out symmetrically from centre of room including forming opening and including cutting and fitting around column, air-conditioning diffuser, lights, and the like and additional secondary support beneath air conditioning duct, including vertical cornices, light trough, bulkhead, access panel, u-channel, etc as shown on drawings. To ceiling including bulkhead, light trough, cornice, access panel ; CEO's Office
A not exceeding 3.5m above floor level 32 m2
INTERNALLY
SKIM COAT ; SMOOTH FINISH
Approved equivalent skim coat finish and trowelled smooth; all in accordance with manufacturer's instructions
To soffit of ceiling and soffit and sides of beamsB 3 mm thick; not exceeding 3.50m above floor level 39 m2
To Collection: CostX Vincent Tan Associates 14/2
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
14 CEILING FINISHES (Continued)
INTERNAL PAINTING Emulsion paint; preparing and apply one coat alkali resisting primer and two finishing coats of NIPPON Eggshell NPOW 1012P emulsion paint in accordance with manufacturer's instruction; on ceiling surfaces
To fibrous plaster ceilingA not exceeding 3.50m above floor level 571 m2
To water resistant fibrous plaster ceilingB not exceeding 3.50m above floor level 35 m2
To Boral Unispan plaster board ceilingC not exceeding 3.50m above floor level 32 m2
To skim coat ceilingD not exceeding 3.50m above floor level 39 m2
E ANY OTHER ITEMS i) ........................................................ ii) ........................................................ iii) ........................................................
To Collection: CostX Vincent Tan Associates 14/3
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
14 CEILING FINISHES (Continued)
COLLECTION
Page 14/1:Page 14/2:Page 14/3:
14 CEILING FINISHESCarried to Summary:
CostX Vincent Tan Associates 14/4
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
15 STAIRCASE FINISHES AND RAILING
INTERNALLY
PLASTER Skim coat; smooth finish
to soffit of landingA Generally 10 m2
to soffit and sloping surface of staircaseB Generally 25 m2
to edges of staircaseC 300mm wide 23 m
Emulsion paint; preparing and apply one coat alkali resisting primer and two finishing coats of NIPPON eggshell NPOW 1012P emulsion paint in accordance with manufacturer's instruction; on plastered surfaces
to soffit of landingD Generally 10 m2
to soffit and sloping surface of staircaseE Generally 25 m2
to edges of staircaseF 300mm wide 23 m
To Collection: CostX Vincent Tan Associates 15/1
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
15 STAIRCASE FINISHES AND RAILING (Continued)
Pavior
SCREEDS; INTERNALLY
Cement and sand (1:3) To tread; to receive various finishes
A 225mm wide 90 m
TL2 - NIRO Lead Grey GMY 06 Matt tiles or approved equivalent ; 300mm x 600mm size; laid to pattern
225mm wide to tread
B Supply ( including overheads and profit on supply andwastage and breakage)
90 m
Supply RM Wastage and breakage RM Overheads and profit RM _______ Total RM _______
C Fixing ( breakdown to rate given below ) 90 m Insert breakdown to fixing rate below:- Sundry material for bedding, RM adhesive, grouting and the like and cleaning, polishing & protecting after laying Labour, plant, equipment, RM tools and all other cost
Plywood & plastic sheet RM protection Overheads and profit RM ________ Total RM _ ______
To Collection: CostX Vincent Tan Associates 15/2
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
15 STAIRCASE FINISHES AND RAILING (Continued)
Pavior
SCREEDS; INTERNALLY
Cement and sand (1:3) To riser; to receive various finishes
A 165mm high 99 m
TL2 - NIRO Lead Grey GMY 06 Matt tiles or approved equivalent ; 300mm x 600mm size; laid to pattern
165mm high to riserB Supply ( including overheads and profit on supply and
wastage and breakage)99 m
Supply RM Wastage and breakage RM Overheads and profit RM _______ Total RM _______
C Fixing ( breakdown to rate given below ) 99 m Insert breakdown to fixing rate below:- Sundry material for bedding, RM adhesive, grouting and the like and cleaning, polishing & protecting after laying Labour, plant, equipment, RM tools and all other cost
Plywood & plastic sheet RM protection Overheads and profit RM ________ Total RM _ ______
To Collection: CostX Vincent Tan Associates 15/3
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
15 STAIRCASE FINISHES AND RAILING (Continued)
Pavior
SCREEDS; INTERNALLY
Cement and sand (1:3) To staircase; to receive nosing tiles
A Generally 99 m
TL2 - NIRO Lead Grey GMY 06 Matt tiles or approved equivalent ; 300mm x 600mm size; laid to pattern
To nosingB Supply ( including overheads and profit on supply and
wastage and breakage)99 m
Supply RM Wastage and breakage RM Overheads and profit RM _______ Total RM _______
C Fixing ( breakdown to rate given below ) 99 m Insert breakdown to fixing rate below:- Sundry material for bedding, RM adhesive, grouting and the like and cleaning, polishing & protecting after laying Labour, plant, equipment, RM tools and all other cost
Plywood & plastic sheet RM protection Overheads and profit RM ________ Total RM _ ______
To Collection: CostX Vincent Tan Associates 15/4
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
15 STAIRCASE FINISHES AND RAILING (Continued)
Pavior
SCREEDS; INTERNALLY
Cement and sand (1:3) To skirting profile of tread and riser
A 100mm high generally 52 m
TL2 - NIRO Lead Grey GMY 06 Matt tiles or approved equivalent ; 300mm x 600mm size; laid to pattern
100mm high to skirting profile of tread and riserB Supply ( including overheads and profit on supply and
wastage and breakage)52 m
Supply RM Wastage and breakage RM Overheads and profit RM _______ Total RM _______
C Fixing ( breakdown to rate given below ) 52 m Insert breakdown to fixing rate below:- Sundry material for bedding, RM adhesive, grouting and the like and cleaning, polishing & protecting after laying Labour, plant, equipment, RM tools and all other cost
Plywood & plastic sheet RM protection Overheads and profit RM ________ Total RM _ ______
To Collection: CostX Vincent Tan Associates 15/5
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
15 STAIRCASE FINISHES AND RAILING (Continued)
Pavior
SCREEDS; INTERNALLY
Cement and sand (1:3) To landing slab; to receive various finishes
A Generally 10 m2
TL2 - NIRO Lead Grey GMY 06 Matt tiles or approved equivalent ; 300mm x 600mm size; laid to pattern
To landing slabB Supply ( including overheads and profit on supply and
wastage and breakage)10 m2
Supply RM Wastage and breakage RM Overheads and profit RM _______ Total RM _______
C Fixing ( breakdown to rate given below ) 10 m2 Insert breakdown to fixing rate below:- Sundry material for bedding, RM adhesive, grouting and the like and cleaning, polishing & protecting after laying Labour, plant, equipment, RM tools and all other cost
Plywood & plastic sheet RM protection Overheads and profit RM ________ Total RM _______
To Collection: CostX Vincent Tan Associates 15/6
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
15 STAIRCASE FINISHES AND RAILING (Continued)
MILD STEEL RAILING To make good existing Railing comprising MS hollow handrail; steel post and baluster and bottom rail; and painting to metal surface; top baluster/ post fish tailed & cast into concrete to Architect's specification and approval
A To existing Staircase Item
B ANY OTHER ITEMS i) . ii) iii) ...
To Collection: CostX Vincent Tan Associates 15/7
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
15 STAIRCASE FINISHES AND RAILING (Continued)
COLLECTION
Page 15/1:Page 15/2:Page 15/3:Page 15/4:Page 15/5:Page 15/6:Page 15/7:
15 STAIRCASE FINISHES AND RAILINGCarried to Summary:
CostX Vincent Tan Associates 15/8
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
16 SUNDRIES
SANITARY FITTINGS Supply and fix only the following approved sanitary fittings and accessories including assembling, bedding, plugging and fixing with matching screws, jointing and connecting to services, soil and waste pipe
A Water Closet; TOTO OMNI, Model CW868NJ, Dual Flush(6/3L), SW1
1 no
B Water Closet; TOTO OMNI, ModelCW862NJWS/SW862JP, SW11
4 no
C Hand Bidet; TOTO THX20MCRB hand bidet set in chrome,SW2 and SW12
6 no
D Floor trap; LECO-GRATE LG-16-CS.WA floor drain withcockroach trap, SW3
2 no
E Floor trap; ANFT103SF 150mm x 150mm Stainless steelfloor grating with anti-cockroach, SW13
10 no
F Paper holder; TOTO TX703ARR "Rei R" Paper Holder, SW4 1 no
G Paper holder; ABTA2801 Brass chrome finished wallmounted toilet roll holder, SW14
4 no
H Robe Hook; TOTO TS118WSB Double Robe Hook, SW5 1 no
J Robe Hook; ADP4306 Brass chrome finished wall mounteddouble robe hook, SW15
5 no
K Basin; TOTO Model LW647CJ Semi-Recessed Basin set,SW6
1 no
L Basin; TOTO Model LW642CJ Square Semi-Recessed,SW16
4 no
M Basin mixer; TOTO TX109LRS "Rei S" cold pillar tap, SW7 1 no
N Basin mixer; TOTO DONNA Series TX109LD Single Lever ,SW17
4 no
P Shower head and mixer; TOTO SHOWER TOWER ModelTMC95R, SW9
1 no
Q Shower head and mixer; TOTO DONNA Series TX433SDSingle Lever Shower, SW19
2 no
R Soap holder; TOTO TX2AV1B Corner Soap Dish, SW10 1 no
To Collection: CostX Vincent Tan Associates 16/1
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
16 SUNDRIES (Continued)
SANITARY FITTINGS (CONT'D) Supply and fix only the following approved sanitary fittings and accessories including assembling, bedding, plugging and fixing with matching screws, jointing and connecting to services, soil and waste pipe (Cont'd)
A Soap holder; ABTA2805 Brass chrome finished wallmounted soap basket, SW20
2 no
B Soap Dispenser, SW24 1 noC Tower rack; A&E ANBTA2811 towel shelf with bar in Matt
Finished, SW253 no
D Soap Dispenser, SW26 2 noE Wall Mounted Hand Dryer, SW27 2 noF Urinal; TOTO U57M Urinal Bowl with Moslem Nozzle &
Strainer, SW282 no
G Single bowl drainer; A&E OCKS102/OCK002 Oreco Singlebowl single drainer inset type kitchen sink in stainless steelc/w big waste
2 no
H Sink Tap; A51000/HSS01 E1, Table mounted sink tap c/whigh swivel spout (HSS01), c/w locker 1 1/2 PVC bottle trap
2 no
To Collection: CostX Vincent Tan Associates 16/2
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
16 SUNDRIES (Continued)
MIRROR Supply and fix 6mm thick clear mirror complete with aluminium framing all round including fixing bracket and all accesories.
A Overall size 1000mm x 1485mm 1 noB Overall size 1760mm x 1135mm 1 noC Overall size 1740mm x 1135mm 1 no
VANITY TOP Reinforced concrete vanity top with ST2 - marble in polished finish, including all necessary RC works, all support and forming all opening as per drawing.
D Overall size 1000mm (L) x 400mm (W) 1 noE Overall size 1740mm (L) x 400mm (W) 1 noF Overall size 1760mm (L) x 400mm (W) 1 no
TOILET CUBICLE Supply and install 'CCG Toilet Cubicle' model CCG M5' toilet cubicle partition and door consist of 12mm finished thickness high pressure laminated with melamine resin impregnated decoration paper on both sides, heavy duty aluminium and all the necessary fittings, ironmongeries such as lock, hook, hinges, door knob and adjustable legs in accordance with manufacturer's detail
G Toilet cubicle partition and door overall size 3145mm (W) x2100mm (H) comprising 3 no. 600mm (W) x 1950mm (H)doors; 2 no. 1370mm (W) x 2000mm (H) intermediate panel
1 no
H Toilet cubicle partition and door overall size 1810mm (W) x2100mm (H) comprising 3 no. 600mm (W) x 1950mm (H)doors; 2 no. 1370mm (W) x 2000mm (H) intermediate paneland end panel
1 no
J Male toilet urinal partition overall size 250mm (W) x 750mm(H)
1 no
To Collection: CostX Vincent Tan Associates 16/3
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
16 SUNDRIES (Continued)
CURTAIN ROLLER BLINDA Supply and install curtain roller blind complete with
concealed heavy duty track, pulley accessories and allassociated works as per drawing
91 m
EXISTING COMPACTORB To demolish /dismantle existing compactor from 14 numbers
to 9 numbers including debris from site, making good allworks disturbed as drawings
item
C ANY OTHER ITEMS i) . ii) iii) ...
To Collection: CostX Vincent Tan Associates 16/4
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
16 SUNDRIES (Continued)
COLLECTION
Page 16/1:Page 16/2:Page 16/3:Page 16/4:
16 SUNDRIESCarried to Summary:
CostX Vincent Tan Associates 16/5
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
17 BUILDER'S WORK IN CONNECTION WITH SERVICES
BUILDER'S WORK IN CONNECTION WITH SERVICES (Please refer to BILL NO 2 - P.C. & Provisional Sum for entitlement of payment)
Concrete formwork; sawn; temporary boxings, including providing extra reinforcment. In walls or slab, 100 to 150mm thick
A for openings not exceeding 0.10m2 rate only noB for openings 0.50 - 1.00m2 rate only no
In beams, not exceeding 100mm diameterC ; not exceeding 300mm thick rate only noD ; 300 - 600mm thick rate only no
Coring openings in concrete; making good
In walls or slab, 100 to 150mm thick
E for openings not exceeding 0.10m2 rate only noF for openings 0.50 - 1.00m2 rate only no
In beams, not exceeding 100mm diameterG ; not exceeding 300mm thick rate only noH ; 300 - 600mm thick rate only no
Sealing openings in concrete structures after services installed; packing and sealing around ducts with fire rated materials
In walls or slab, 100 to 150mm thick
J for openings not exceeding 0.10m2 rate only noK for openings 0.50 - 1.00m2 rate only no
In beams, not exceeding 100mm diameterL ; not exceeding 300mm thick rate only no
M ; 300 - 600mm thick rate only no
To Collection: CostX Vincent Tan Associates 17/1
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
17 BUILDER'S WORK IN CONNECTION WITH SERVICES (Continued)
Cutting and forming openings in brick walls; including providing and inserting precast concrete lintels; making good
In walls; half brick thick
A for openings not exceeding 0.10m2 rate only no
B for openings 0.50 - 1.00m2 rate only no
Sealing openings in brick wallls after services installed; packing and sealing around ducts with fire rated materials
In walls; half brick thick
C for openings not exceeding 0.10m2 rate only no
D for openings 0.50 - 1.00m2 rate only no
Starter barsE Drilling, apply expoxy grout; fix reinforcement bar; make
good all work disturbed 12 mm diameter bar; 450 mm girthrate only no
F Drilling, apply expoxy grout; fix reinforcement bar; makegood all work disturbed 16 mm diameter bar; 450 mm girth
rate only no
G Drilling, apply expoxy grout; fix reinforcement bar; makegood all work disturbed 20 mm diameter bar; 450 mm girth
rate only no
To Collection: CostX Vincent Tan Associates 17/2
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
17 BUILDER'S WORK IN CONNECTION WITH SERVICES (Continued)
R.C. KERB R.C Kerbs including concrete with reinforcement bar and formwork.
A to various size rate only no
Labour to brickwork
B 50mm x 25mm cutting grooves rate only noC 100mm x 100mm cutting recessess rate only no
Labours to reinforce concrete work
D 50mm x 25mm cutting grooves rate only noE 100mm x 100mm cutting recessess rate only no
F ANY OTHER ITEMS i) ................................... ii) ................................... iii) ..................................
To Collection: CostX Vincent Tan Associates 17/3
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
17 BUILDER'S WORK IN CONNECTION WITH SERVICES (Continued)
COLLECTION
Page 17/1:Page 17/2:Page 17/3:
17 BUILDER'S WORK IN CONNECTION WITH SERVICES
Carried to Summary:
CostX Vincent Tan Associates 17/4
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
18 BUILT IN FURNITURE
FURNITURE AND ACCESSORIES Supply and fix the following approved built-in furniture and accessories including assembling, bedding, plugging and fixing with matching screws, jointing and connecting in position; including backing piece, all necessary supports; all as per drawings To first floor ;
A BF 1 - Built in cabinet overall size 945mm x 450mm x2600mm high
1 no
B BF 2 - Built in cabinet overall size 1645mm x 450mm x2600mm high
1 no
C BF 3 - Built in cabinet overall size 3755mm x 450mm x2600mm high
1 no
D BF 4 - Built in cabinet overall size 7375mm x 450mm x2600mm high
1 no
E BF 5 - Built in cabinet overall size 3505mm x 450mm x2600mm high
1 no
F BF 6 - Built in cabinet overall size 2700mm x 600mm x750mm high
1 no
G BF 7 - Built in L-shaped cabinet overall size 2710mm x450mm x 2600mm high + 1375mm x 500mm x 2600mmhigh
1 no
H BF 8 - Built in cabinet overall size 1100mm x 450mm x2600mm high
1 no
J BF 9 - Overall size 2360mm x 1500mm high comprising ofcolour glass writing board with aluminium frame all roundand aluminium ledge for marker and duster
1 no
K BF 11 - Built in cabinet overall size 4085mm x 480mm x2600mm high
1 no
L BF 12 - Built in cabinet overall size 1020mm x 600mm x2600mm high
1 no
M BF 14 - Built in cabinet overall size 4000mm x 450mm x1020mm high
1 no
N BF 15 - Built in cabinet overall size 3505mm x 450mm x2600mm high
1 no
P BF 16 -Overall size 3505mm x 150mm x 2600mm highcomprising of colour glass writing board complete withaluminium frame all round and aluminium ledge for markerand duster
1 no
Q BF 17 - Cork board overall size 4770mm x 50mm x 1200mmhigh
1 no
To Collection: CostX Vincent Tan Associates 18/1
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
18 BUILT IN FURNITURE (Continued) Supply and fix the following approved built-in furniture and accessories including assembling, bedding, plugging and fixing with matching screws, jointing and connecting in position; including backing piece, all necessary supports; all as per drawings (Cont'd) To first floor ;
A BF 18 - Built in L-shaped cabinet overall size 4760mm x450mm x 2600mm high + 4050mm x 600mm x 2600mmhigh
1 no
B BF 19 - Built in top cabinet overall size 3355mm x 350mm x600mm high and bottom cabinet overall size 2605mm x600mm x 850mm high
1 no
C Vanity cabinet overall size 1000mm x 400mm x 615mm high(CEO's toilet)
1 no
D Vanity cabinet overall size 1760mm x 400mm x 615mm high(Female's toilet)
1 no
To second floor ;
E BF 1 - Built in cabinet overall size 6570mm x 450mm x2600mm high
1 no
F BF 2 - Built in cabinet overall size 2610mm x 450mm x2600mm high
1 no
G BF 3 - Built in cabinet overall size 2610mm x 450mm x2600mm high
1 no
H BF 4 - Built in cabinet overall size 4190mm x 450mm x2600mm high
1 no
J BF 5 - Built in cabinet overall size 3780mm x 450mm x1020mm high
1 no
K BF 6 - Built in shelve overall size 1500mm x 985mm x900mm high
1 no
L BF 7 - Built in L-shaped cabinet overall size 2815mm x450mm x 2600mm high
1 no
M BF 8 - Built in cabinet overall size 2850mm x 1045mm x1020mm high
1 no
N BF 9 - Built in cabinet overall size 3215mm x 450mm x2600mm high
1 no
To Collection: CostX Vincent Tan Associates 18/2
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
18 BUILT IN FURNITURE (Continued)
Supply and fix the following approved built-in furniture and accessories including assembling, bedding, plugging and fixing with matching screws, jointing and connecting in position; including backing piece, all necessary supports; all as per drawings (Cont'd) To second floor ;
A BF 10 - Built in U-shaped cabinet overall size 2705mm x450mm x 2600mm high + 3370mm x 450mm x 2600mmhigh + 2250mm x 900mm x 2600mm high
1 no
B BF 11 - Cork board overall size 3000mm x 50mm x 1200mmhigh
2 no
C BF 12 - Overall size 3000mm x 1200mm high comprising ofcolour glass writing board complete with aluminium frame allround and aluminium ledge for marker and duster
1 no
D BF 13 - Built in U-shaped cabinet overall size 2500mm x600mm x 1050mm high + 1500mm x 600mm x 1050mmhigh + 2245mm x 600mm x 1050mm high
1 no
E Vanity cabinet overall size 1740mm x 400mm x 615mm high(Male's toilet)
1 no
F ANY OTHER ITEMS i) ................................... ii) ................................... iii) ..................................
To Collection: CostX Vincent Tan Associates 18/3
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
18 BUILT IN FURNITURE (Continued)
COLLECTION
Page 18/1:Page 18/2:Page 18/3:
18 BUILT IN FURNITURECarried to Summary:
CostX Vincent Tan Associates 18/4
Item Description Quantity Unit Rate Total
Project: BELLWORTHBuilding: ID PACKAGE 1
Details: SOP 3 (ADD.1)
COLLECTION SUMMARY PAGE NO
01 PILING (ALL PROVISIONAL) - NOTAPPLICABLE
02 WORK BELOW LOWEST FLOOR FINISHES -NOT APPLICABLE
03 STRUCTURAL FRAME AND UPPER FLOOR -NOT APPLICABLE
04 ROOF TRUSSES - NOT APPLICABLE
05 EXTERNAL WALLS - NOT APPLICABLE
06 EXTERNAL WALL FINISHES - NOTAPPLICABLE
07 WINDOWS - NOT APPLICABLE
08 ROOF COVERING - NOT APPLICABLE
09 RAINWATER INSTALLATION - NOTAPPLICABLE
10 INTERNAL WALLS AND PARTITION
11 DOORS
12 FLOOR FINISHES
13 WALL FINISHES
14 CEILING FINISHES
15 STAIRCASE FINISHES AND RAILING
16 SUNDRIES
17 BUILDER'S WORK IN CONNECTION WITHSERVICES
18 BUILT IN FURNITURE
Total Amount:
18/1 - 18/3
17/1 - 17/3
16/1 - 16/4
15/1 - 15/7
14/1 - 14/3
13/1 - 13/3
12/1 - 12/10
11/1 - 11/5
10/1
9/1
8/1
7/1
6/1
5/1
4/1
3/1
2/1
1/1
CostX Vincent Tan Associates 18/5