Speaker: Klaus-Dieter Barbknecht Director Gas Transport and Storage VNG – Verbundnetz Gas AG. Download. To get this presentation as pdf-file please send an e-mail to [email protected] with „ GTE storage“ in the subject field and without any further text. To: [email protected]. - PowerPoint PPT Presentation
Citation preview
Role of Storage Facilities
GTE 2nd Annual Conference, 23./24.09.2004 – Copenhagen
© VNG 2004Barbknecht
Speaker:Speaker:
Klaus-Dieter BarbknechtKlaus-Dieter Barbknecht
Director Gas Transport and StorageDirector Gas Transport and Storage
VNG – Verbundnetz Gas AGVNG – Verbundnetz Gas AG
Role of Storage Facilities
GTE 2nd Annual Conference, 23./24.09.2004 – Copenhagen
© VNG 2004Barbknecht
DownloadDownload
To get this presentation as pdf-file please send an e-mail to [email protected] with „ GTE storage“ in the subject field and without any further text.
To: [email protected]@vng.de
subject: GTE storageGTE storage
The presentation will be sent directly to your e-mail address.
Role of Storage Facilities
GTE 2nd Annual Conference, 23./24.09.2004 – Copenhagen
© VNG 2004Barbknecht
Role of storage facilities
Flexibility market
GTE Storage Study Group
Access rules to storage in European countries
Development of GGPSSO
Further steps: GTE Action list
Final Conclusion
AgendaAgenda
Role of Storage Facilities
GTE 2nd Annual Conference, 23./24.09.2004 – Copenhagen
© VNG 2004Barbknecht
Role of natural gas storage Role of natural gas storage facilitiesfacilities
Balancing seasonal variations
in consumption
Securing gas supply in case of
interferences in production, transport or
supply
Covering demand peaks
Enhancing cost effectiveness of gas
transport
Role of Storage Facilities
GTE 2nd Annual Conference, 23./24.09.2004 – Copenhagen
© VNG 2004Barbknecht
Flexibility market I Flexibility market I Storage is not the only relevant market. There are other
tools offering flexibility to network users, traders and consumers.
Flexibility services are for instance:
Interruptible Contracts
Contractual swing
Production swing
Short term contracts
Linepack etc.
Role of Storage Facilities
GTE 2nd Annual Conference, 23./24.09.2004 – Copenhagen
© VNG 2004Barbknecht
Flexibility market IIFlexibility market II
All these products including storage facilities constitute the flexibility market, which is
characterised by a functioning competition.
In principle, a regulatory approach would thus be superfluous and inappropriate.
Role of Storage Facilities
GTE 2nd Annual Conference, 23./24.09.2004 – Copenhagen
© VNG 2004Barbknecht
GTE Storage Study Group (SSG)GTE Storage Study Group (SSG)
Working group of storage operators and owners
Members are most SSOs (e.g. Gasunie, Transgaz, BEB, Fluxys, Wingas, Total, OMV, GdF, Transco, Ruhrgas, Gasum Oy, RWE, Snam Rete gas, VNG) including independent SSOs as for example Essent, RAG and Nafta.
The aim is to facilitate the process of further developing the EU-internal market for natural gas with respect to TPA to gas storage facilities.
Current task:
Cooperation in establishing of GGPSSO in the Madrid process by discussing the important issues with CEER, users, ERGEG and the EU-Commission
Role of Storage Facilities
GTE 2nd Annual Conference, 23./24.09.2004 – Copenhagen
© VNG 2004Barbknecht
Access rules to storage in European Access rules to storage in European countriescountriesCountry Tariffs Conditions Combined Operator
Austria Negotiated Negotiated Yes
Belgium Regulated Regulated Yes
Denmark Negotiated Negotiated No
France Negotiated Under discussion Yes/No
Germany Negotiated Negotiated Yes
Italy Regulated Regulated No
Netherlands Negotiated Negotiated No
Portugal Under discussion Under discussion Yes
Spain Regulated Regulated Yes
UK Negotiated Regulated No
Slovakia Negotiated Negotiated No
Czech Rep. Under discussion Under discussion Yes/No
Role of Storage Facilities
GTE 2nd Annual Conference, 23./24.09.2004 – Copenhagen
© VNG 2004Barbknecht
Development of Guidelines for Good TPA Development of Guidelines for Good TPA Practice for Storage System Operators Practice for Storage System Operators (GGPSSO) I(GGPSSO) I Outcome of the Madrid Forum VIII from 8th – 9th July 2004:
Expressed demand for minimum requirements of non-discriminatory and transparent access to storage facilities.
Key elements should include range of services, capacity allocation and congestion management mechanisms, transparency and confidentiality requirements, tariff structures and tariff derivations.
Application and implementation of the GGPSSO at the latest at the beginning of the next storage year (1st April 2005).
Role of Storage Facilities
GTE 2nd Annual Conference, 23./24.09.2004 – Copenhagen
© VNG 2004Barbknecht
Development of Guidelines for Good TPA Development of Guidelines for Good TPA Practice for Storage System Operators Practice for Storage System Operators (GGPSSO) II(GGPSSO) II Revised CEER/ERGEG Draft of GGPSSO from 6th
September 2004:
Main GTE comments were not taken into account.
New ERGEG consultation procedure imposes time constraint on GTE.
Proposition of GTE to have further consultations between CEER/ERGEG, GTE and other parties involved
e.g. by organising a second storage workshop in October 2004
Role of Storage Facilities
GTE 2nd Annual Conference, 23./24.09.2004 – Copenhagen
© VNG 2004Barbknecht
Development of GGPSSO IIIDevelopment of GGPSSO III
Main points from GTE proposal :
Priority to market based solutions.
Preference for negotiated access where market conditions permit.
GTE supports common set of minimum requirements ensuring transparency and non-discriminatory access.
ERGEG deadline for implementation (April 2005) is not realistic.
Specific deadlines for the implementation of each service along market needs and in consideration of technical and economical constraints.
Role of Storage Facilities
GTE 2nd Annual Conference, 23./24.09.2004 – Copenhagen
© VNG 2004Barbknecht
Further steps: GTE Action ListFurther steps: GTE Action List
Proposition of a concrete timetable with specific deadlines for the implementation of GGPSSO (GTE Implementation plan)
Comments on ERGEG revised GGPSSO
Comments on the Commission and ERGEG positions to common criteria for nTPA and rTPA
Optimisation of lobbying organisation regarding storage
Role of Storage Facilities
GTE 2nd Annual Conference, 23./24.09.2004 – Copenhagen
© VNG 2004Barbknecht
Final ConclusionFinal Conclusion
The aim of the Commission and ERGEG to reach an agreement on GGPSSO at the Madrid Forum IX 3rd
December 2004 and thus the success of Madrid IX is strongly dependent on the progress in the cooperation
between GTE, ERGEG, users, CEER and the Commission.