BSD SpecLink-E supports the following Green Building Rating Systems:

• LEED v4 BD+C:

– New Construction and Major Renovations

– Core and Shell Development

– Schools, Healthcare

– Data Centers

– Warehouses and Distribution Centers

– Hospitality, Retail

Rating Systems Supported

Get Started Early

• Achieving a sustainable design certification

will depend heavily on early design

decisions, including site selection

• Waiting until the construction documents

phase to begin making green decisions

may make achieving certification difficult or

impossible

Sustainable Design Criteria

• Designing for sustainability can’t be delegated to a Design-Bid-Build Contractor

• A Design-Builder can be given a target rating with as little or as much direction as desired

• BSD SpecLink-E includes sustainable design criteria in Section DC0 Facility Design Criteria, which can be used for both Design-Build projects and early design documentation on Design-Bid-Build projects

Specifying Strategy Types of Issues

• No matter which rating system is used, all

issues fall into one of these categories:

– Intrinsic to Location

– Design Phase Activity

– Post-Construction Activity

– Embodied in Overall Design

– Explicitly Shown In Contract Documents

Specifying Strategy Intrinsic to Location

• The specification cannot address issues

that are completely dependent on site

location:

– Avoidance of sensitive lands

– Brownfield site

– Surrounding density and diverse uses

– Availability of alternative transportation

Specifying Strategy Design Phase Activities

• The specification cannot address:

– Project planning

– Design process

– Site environmental assessment

– School campus master plan

– Life cycle analysis of design

Specifying Strategy Post-Construction Issues

• The specification cannot address:

– Purchasing Green Power

– Provisions for Recycling

– Prohibition of Smoking

– Operational Issues: cleaning, pest control

– Joint use of facilities

– Tenant guidelines

Specifying Stategy Issues Embodied in the Design

• No particular, immediately identifiable

specification solution:

– Parking capacity, reduced parking footprint

– Design for water and energy conservation

– Optimization of energy performance

– Ventilation design

– Design for flexibility

Specifying Strategy Solutions in Contract Documents

• For each issue, determine where it should

be shown or specified:

– Only shown on the drawings

– Only indicated in the specifications

– Partly shown and partly specified

• Now you know what needs to be included

in the specifications

– 01 5713 - Temporary Erosion & Sediment Control

– 01 5721 - Indoor Air Quality Controls

– 01 7000 - Execution and Closeout Requirements (site

drainage, pollution prevention)

– 01 7419 - Construction Waste Management & Disposal

– 02 6500 - Underground Storage Tank Removal

– 02 8400 - Polychlorinate Biphenyl (PCB) Remediation

– 31 1000 - Site Clearing (limits on site disturbance)

SpecLink-E Provides

Contractor Procedures

– 01 9113 - General Commissioning

Requirements

– 01 9114 - Commissioning Authority

Responsibilities

– 23 0800 - Commissioning of HVAC

SpecLink-E Provides

Commissioning Procedures

– Explanation of project goals

– What the Contractor is required and not required

to do to aid the certification process

– A method for collecting information about “green

materials”

– Procedures to be followed

– List of sections where particular sustainable

design issues are specified

SpecLink-E Provides

01 3329 - Sustainable Design Reporting:

– 01 6000 - Product Requirements (definitions)

– 01 6116 - VOC Content Restrictions

Forms for Submittals

– 01 3329.04 – Material Content Form

– 01 3329.07 – Prohibited Content Installer

Certification

SpecLink-E Provides

Sections related to “Green Materials”

– 02 4100 – Demolition: Removal of existing

pavements and other impervious surfacing;

partial demolition for preserving existing

construction

– 028400 – Polychlorinate Biphenyl (PCB)

Remediation: Abatement of PCBs, mercury, &

other substances regulated under U.S. Toxic

Substances Control Act

SpecLink-E Provides

02 Existing Conditions

– 03 3000 – Cast-in-Place Concrete (and 4 other

Division 3 sections): Option to replace some

Portland cement with recycled content

05 Metals

– 05 5000 – Metal Fabrications: Custom-

fabricated entrance mat frames

– 05 5305 – Metal Gratings and Floor Plates:

Custom-fabrications entrance gratings

SpecLink-E Provides

03 Concrete

06 Wood, Plastics, and Composites

– 06 1000 - Rough Carpentry (and 9 other

Division 6 sections): Prohibition on old growth

timber, sustainably harvested wood, salvaged and re-

used wood

07 Thermal and Moisture Protection

• Vegetated roof solutions:

– 07 1300 - Sheet Waterproofing

– 07 1400 - Fluid-Applied Waterproofing

– 07 5050 - Vegetated Roof Components

SpecLink-E Provides

07 Thermal and Moisture Protection

• Rain water collection surfaces:

– 07 4113 – Metal Roof Panels

– 07 6100 – Sheet Metal Roofing

• White or light colored roof membrane:

– 07 5300 – Elastomeric Membrane Roofing:

– 07 5400 – Thermoplastic Membrane Roofing:

• Emissions-compliant sealants:

– 078400 - Firestopping

– 07 9005 - Joint Sealers: Plus sealing

between residential units if not firestopped

SpecLink-E Provides

SpecLink-E Provides

08 Openings – Many sections for daylighting and views

09 Finishes

– 09 2116 – Gypsum Board Assemblies: Deck-

to-deck sealed partitions around rooms where

hazardous gases or chemicals are used

– 09 6800 – Carpeting: GreenLabel Plus certified

– 09 6850 - Carpet Tile: GreenLabel Plus certified

– 09 9000 - Painting and Coating: VOC limits

SpecLink-E Provides

10 Specialties

– 10 5100 – Lockers: For bicycle entrance

– 10 7113.43 – Fixed Sun Screens

11 Equipment

– 11 3100 – Residential Appliances: Energy

Star rated appliances

– 11 8277 – Waste Compactors: For recycling

SpecLink-E Provides

12 Furnishings

– 12 2400 – Window Shades: Motorized

shades

– 12 4813 – Entrance Floor Mats and Frames:

Manufactured grilles and gratings for high

volume entryways

– 12 9313 – Bicycle Racks

– 12 9314 – Bicycle Lockers

14 Conveying Equipment

– 14 9100 – Facility Chutes: For recycling

SpecLink-E Provides

21 Fire Suppression

– 21 2200 – Clean Agent Fire Extinguishing

System: Non-Halon extinguishing agent

22 Plumbing

– 22 0519 – Meters and Gages for Plumbing

Piping: For metering subsystems

– 22 1005 – Plumbing Piping: Documentation

of regulatory lead-content restrictions;

certification of proper soldering of copper

piping

SpecLink-E Provides

22 Plumbing (cont.)

– 22 3000 – Plumbing Equipment: Pumps for

potable and non-potable water

– 22 4000 – Plumbing Fixtures: WaterSense-

labeled fixtures; documentation of regulatory

lead-content restrictions; high-efficiency and

dry toilet fixtures

– 22 4300 – Healthcare Plumbing Fixtures:

WaterSense-labeled fixtures; documentation

of regulatory lead-content restrictions

SpecLink-E Provides

23 HVAC

– 23 0800 - Commissioning of HVAC

– 23 0130.51 – HVAC Air Duct Cleaning

– 23 0913 – Instrumentation and Control

Devices for HVAC

– 23 0923 – Direct-Digital Control System for

HVAC

– 23 2113.33 - Ground-Loop Heat-Pump Piping

– 23 2500 – HVAC Water Treatment: To reduce

cooling tower water usage

SpecLink-E Provides

23 HVAC (cont.)

– 23 3100 – HVAC Ducts and Casings:

Emissions-compliant duct sealers

– 23 4000 – HVAC Air Cleaning Devices: MERV-compliant air filters

– 23 5216 – Condensing Boilers

– 23 6xxx – Chiller and Refrigeration Equipment

sections: Low-GWP refrigerant

– 23 8149 – Water-to-Water Heat Pumps

SpecLink-E Provides 26 Electrical

– 26 0501 – Minor Electrical Demolition: Removal of abandoned cables containing lead; minor

removal of mercury-containing lamps and PCB- and

DEHP-containing ballasts

– 26 0519 – Low-Voltage Electrical Power

Conductors and Cables: Limitations on lead

content of cable insulation

– 26 0923 – Lighting Control Devices

– 26 0943 – Network Lighting Controls: Integrated lighting and window shade controls

– 26 2726 – Wiring Devices: Manual lighting

controls.

SpecLink-E Provides 26 Electrical (cont.)

– 26 2726 – Wiring Devices: Manual lighting

controls

– 26 3100 – Photovoltaic Collectors: With related

equipment and supports

– 26 5100 – Interior Lighting: Limitations on

mercury-content of lamps; minimum lamp life

– 26 5600 – Exterior Lighting: Limitations on

mercury-content of lamps; minimum lamp life; fixtures

selected to reduce light pollution

31 Earthwork

– 31 1000 - Site Clearing: Vegetation protection;

site clearing waste management

– 31 2200 – Grading: For restoring site water flows

– 31 3700 – Rip Rap: For erosion protection

32 Exterior Improvements

– 32 0190 – Operation and Maintenance of

Planting: First year maintenance

– 32 1125 - Turf Surfaced Roadways

– 32 1413 - Precast Concrete Unit Paving: Open-

grid pavers

SpecLink-E Provides

Step-by-Step

01 3329 – Sustainable Design Reporting – Select and open the section

– Choose the Rating System

– Review the automatically activated text, X-out if not

relevant to your project

– Review inactive text, select if relevant

– In PART 3, select all sections having solutions

relevant to your project

Project Tree – Green status box indicates sections activated

– Review each section for further decisions

Section 01 3329

First select Section 01 3329 in

the folder tree, open it and

check the status box at the title.

Section 01 3329

Next, activate the relevant

Rating System and click

on the blue text to see

further choices

Section 01 3329

Each section selected, and each

option below it, automatically

turns on the relevant section and

text elsewhere in the spec.

The PART 3 checklist

may have some items

already highlighted in

green. Activate their

parent heading to

activate them.

Section 01 3329

The final section covers

scope and procedures

and a list of all the

other sections with

an indication of what

the requirements are.

Step-by-Step Submittal Report

– Automatic report lists all sections in project that

require sustainable design documentation submittals

– Properly tagged user-added submittals also show

Specifying for LEED

As of May 2014, BSD SpecLink-E supports the following LEED Rating Systems:

LEED v4 BD+C:

– New Construction and Major Renovations

– Core and Shell Development

– Schools, Healthcare

– Data Centers

– Warehouses and Distribution Centers

– Hospitality, Retail

Specifying for LEED

Review the rating system document to

classify prerequisites and credits into

categories

– Intrinsic to Location

– Design Phase Activity

– Post-Construction Activity

– Embodied in Overall Design

– Shown on the Drawings

– To Be Specified

Specifying for LEED

Identify the Goal

– Certified: 40 points

– Silver: 50 points

– Gold: 60 points

– Platinum: 80 points

– Plus regional priority credits possible

And the Facility Type

– New Construction, Schools, Healthcare, etc.

Specifying for LEED

Decide whether to pursue:

– Building Material Disclosure Credits

– Building Material Optimization Credits

– Low-Emitting Materials Credits

• Make appropriate selections in 01 3329

• If pursuing any of them, include:

– Section 01 3329.04 – Material Content Form

Specifying for LEED

Disclosures, like EPDs

The Material Content

Form is automatically

tailored to the types of

credits being pursued

Content types, such

as recycled, certified

wood, VOCs

Cost information,

for performing the

calculations

Specifying for LEED

Low-Emitting Materials Credits:

• Very possible to write an impossible spec

– The thresholds are very high (90-100%)

– The indoor-emissions test is relatively new

– But this credit is divided into 5 categories of

products that can be pursued separately as long

as at least 2 categories are achieved (3 for

Schools, Healthcare)

• Edit Section 01 6116 – VOC Content

Restrictions, to suit your decisions

Specifying for LEED If desired, use the

Prohibited Content

Installer Certification form

reduce the likelihood that

installers ignore the low-

emitting material

specifications

Assertions that they did

not use any products

with prohibited content,

whether specified or not

Certification signature

Instructions

Coming Soon

In the coming months, the following

additional rating systems will be added:

– LEED v4 ID+C: Interiors Design &

Construction

– LEED v4 Homes

– GreenGlobes for New Construction

– Federal Guiding Principles for New

Construction and Major Renovations

– LEED v4 ND: Neighborhood Development

(with construction)