EACH AND EVERY PIECE OF EQUIPMENT IS TESTED IN THEFACTORY BEFORE DESPATCHING TO THE SITE. PRECOMMISSIONING TESTING AT SITE IS DONE TO PROVE THAT
1. TO ENSURE THAT EQUIPMENT WAS NOT SUBJECTED TO ANY
DAMAGE DURING TRANSPORTATION.
2. EACH EQUIPMENT HAS BEEN INSTALLED CORRECTLY.
3.EACH EQUIPMENT IS WORKING IN CO-ORDINATION WITH OTHEREQUIPMENTS AS DESIRED.
. ALL THE PROTECTION AND CONTROL SCHEMES ARE WORKING IN
ACCORDANCE WITH RELEVENT SPECIFICATION AND PROTECTIONREQUIREMENTS.
!. EACH EQUIPMENT HAS BEEN ADJUSTED PROPERLY IN ACCORDANCE
WITH SETTINGS.
NEED FOR TESTS ONELECTRICAL INSTALLATION
8/17/2019 SS Equipment Testing 1
3/51
". THE INSTALLATION IS SAFE FOR PUTTING IN TO SERVICE.
#. THE PREIODICAL TESTING WILL ENSURE THEAVAILABILITY OF THE EQUIPMENT FOR THE RELIABILITY OF THE SYSTEM PERFORMANCE.
$. THE TESTING OF PROTECTIVE SYSTEM FOR COMBINATIONOF CONTINGENCIES THAT CAUSE THE SYSTEM INSTABILITY ANDSEPARATION WILL EVOLVE THE DYNAMICS OF THE SYSTEM.
%. THIS WILL ALSO HELP IN UPDATING THE SYSTEM
DISASTER CONTROL MEASURES IMPLEMENTED.
1&. FINALLY THIS WILL GIVE A RECOGNITION FOR THE
POSSIBILITY TO FACE THE UNFORSEEN MULTIPLECONTINGENCIES AND'OR NATURAL CALAMITY WHICH MAYCAUSE THE COLLAPSE OF THE ENTIRE SYSTEM
8/17/2019 SS Equipment Testing 1
4/51
q
q
a
s
df
Sub Station Layout
8/17/2019 SS Equipment Testing 1
5/51
8/17/2019 SS Equipment Testing 1
6/51
8/17/2019 SS Equipment Testing 1
7/51
8/17/2019 SS Equipment Testing 1
8/51
8/17/2019 SS Equipment Testing 1
9/51
8/17/2019 SS Equipment Testing 1
10/51
8/17/2019 SS Equipment Testing 1
11/51
8/17/2019 SS Equipment Testing 1
12/51
8/17/2019 SS Equipment Testing 1
13/51
8/17/2019 SS Equipment Testing 1
14/51
8/17/2019 SS Equipment Testing 1
15/51
8/17/2019 SS Equipment Testing 1
16/51
8/17/2019 SS Equipment Testing 1
17/51
1. P()*+ T+,/(+0*+ 2. B+*,*+ HV LV F**4*+5 3. I6+70*6 T+,/(+0*+ CT 8 PT 5
. R*9,: !. M*6*+;< I6+70*6 ". E,+6=;< A++,*
8/17/2019 SS Equipment Testing 1
18/51
T=* /(99();< T*6 ,+* ?*>;@*4 ;
IS2&2" P,+6 I5 ?*>;@>,6;( /(+ ?()*+6+,/(+0*+ P,+6-I G**+,9
8/17/2019 SS Equipment Testing 1
19/51
1. M*,7+*0*6 (/ );4;< +*;6,>*
2. M*,7+*0*6 (/ V(96,* (96,
8/17/2019 SS Equipment Testing 1
20/51
1. BUSHING CURRENT TRANSFORMERS (HV &LV)2. RATIO TEST
3. OPEN CIRCUIT TEST
4. SHORT CIRCUIT TEST
5. MAGNETIC BALANCE TEST
6. VECTOR GROUP CONFIRMATION TEST
7. DIFFERENTIAL RELA TEST
!. ON LOAD TAP CHANGER OPERATION CONTINUIT TEST
". D.C.RESISTANCE TEST
1#.BUCHOL$ RELA TEST
11.THERMOMETER CALIBRATION
12.TRANSFORMER OIL TEST13.INSULATION RESISTANCE VALUES
14.ANNOUNCIATION ALARM % TRIP VERIFICATION
15.TRANSFORMER RADIATOR VALVES OPEN CONDITION
8/17/2019 SS Equipment Testing 1
21/51
R*796 (/ R,6;( T*6 (/ 11&'11 K T+,/(+0*+
TAP
NO.
PRIMARY
VOLTS APPLIED SECONDARY VOLTS OBTAINED
RY YB BR ry yb br rn yn bn
1 420 420 416 41.5 41.2 41.4 24.0 23.8 24.0
2 420 420 416 42.0 41.8 41.8 24.3 24.2 24.2
3 420 420 418 42.5 42.1 42.5 24.5 24.5 24.6
4 420 423 419 43.0 42.8 43.0 25.0 24.9 24.9
5 420 424 424 43.5 43.2 43.4 25.3 25.2 25.2
6 419 424 424 44.1 43. 44.0 25.6 25.4 25.4
420 424 424 44.6 44.2 44.5 26.0 25.8 25.8
8 420 424 424 45.2 44.9 45.2 26.2 26.0 26.0
9 420 424 424 45.8 45.3 45.6 26.4 26.2 26.3
10 424 420 416 46.3 45.9 46.0 26.9 26.6 26.6
11 424 420 416 46. 46.4 46.8 2.2 2.0 26.9
12 424 420 416 4.5 4.0 4.4 2.5 2.4 2.3
13 424 420 416 48.3 4.9 48.2 2.9 2.6 2.
14 424 420 416 49.0 48.5 48.9 28.3 28.0 28.0
15 424 424 420 49.6 49.2 49.5 28.8 28.3 28.3
16 424 424 420 50.2 49.8 50.2 29.2 28.9 28.9
1 424 424 420 50.9 50.5 50.8 29.6 29.3 29.3
8/17/2019 SS Equipment Testing 1
22/51
R*796 (/ S=(+6 C;+>7;6 T*6
T!" Pr#$!ry %&rr'n( #n A$")
IR IY IB
S'%*n+!ry C&rr'n().
,,,,,,,,,,,,,,,,,,,,,,
Ir Iy Ib
N'&(r!-C&rr'n(
In AMP)
IN
1 2.0 2.0 2.68 28.5 28.0 28.0 0.50
2 2.80 2.80 2.5 28. 28.0 28.2 0.52
3 2.80 2.80 2.5 28.5 28.0 28.2 0.50
4 2.85 2.85 2.83 28.5 28.0 28.5 0.53
5 2.90 2.85 2.85 29.0 28.0 28.0 0.50
6 2.95 2.95 2.90 29.0 29.0 28.5 0.50
3.00 3.00 2.95 29.0 28.0 28.5 0.50
8 3.05 3.03 3.00 29.0 28.5 28.5 0.53
9b/ 3.05 3.05 3.05 29.0 28.0 28.5 0.50
10 3.10 3.10 3.10 29.0 28.0 28.5 0.53
11 3.13 3.13 3.10 28.8 28.0 28.5 0.50
12 3.18 3.18 3.20 28.5 28.0 28.5 0.53
13 3.22 3.20 3.20 28.5 28.0 28.5 0.49
14 3.25 3.25 3.22 28.5 2.5 28.0 0.52
15 3.30 3.25 3.25 28.5 2.5 28.0 0.4
16 3.30 3.30 3.30 28.0 2.5 28.0 0.52
1 3.40 3.40 3.40 28.0 2.5 28.0 0.4
8/17/2019 SS Equipment Testing 1
23/51
==================================================================
= TAP NO. RY OHMS YB OHMS BR OHMS
========================================
=============================
1. 4.600 4.61 4.610
! 4."11 4."6! 4.""4
4.4#$ 4."11 4."0"
4 4.444 4.4"6 4.4"
" 4.# 4.404 4.40!
6 4.44 4."4 4."0
$ 4.!#1 4.0! 4.!#4
% 4.!# 4.!" 4.!44
#&b' 4.1%" 4.1#! 4.1#!
10 4.!# 4.!"0 4.!411 4.!#0 4.0 4.!#"
1! 4.41 4.60 4.4"
1 4.#1 4.411 4.#$
14 4.441 4.461 4.44%
1" 4.4#! 4."11 4.4##
16 4."46 4."61 4.""11$ 4."#6 4.610 4.604
8/17/2019 SS Equipment Testing 1
24/51
=====================================================================
Ta( P)i*a)y +o,ts a((,i-d Man-ti/in u))-nt in *i,,i a*(s
No.
2RY 2YB 2BR 3R 3Y 3B
===============================================================
1. #6 401.4 400.$ !.%$ !.#! .44
!. !.%% !.#! .44
. !.%% !.#! .44
4. !.%$ !.#! .4!". !.%$ !.#4 .41
6. !.%$ !.#4 .%
$. !.%$ !.#! .%
%. !.%$ !.#! .%
#. !.%% !.#! .%
10. !.%% !.#4 .6
11. !.%$ !.# .4
1!. !.%% !.#! .6
1. !.%% !.# .!14. !.%$ !.#! .4
1". !.%% !.# .!
16. !.%% !.#4 .!
1$. !.%$ !.#4 .!
===============================================================
=
8/17/2019 SS Equipment Testing 1
25/51
V*>6(+ G+(7? T*6;< DY115
8/17/2019 SS Equipment Testing 1
26/51
11011526M2A Po-) T)ansfo)*-)7 8Y117
Ma9- : 2o,t A*(.
8at- t-st-d : 1"!#
Su((,y i+-n to L2 sid-7 H2 9-(t o(-n.
S,. No. 2o,ta- a((,i-d 2o,ta- obtain-d
1. !;N: !!%.4 2 !2N: 1$4.0 2
!
8/17/2019 SS Equipment Testing 1
27/51
8/17/2019 SS Equipment Testing 1
28/51
R,6;( (/ IR ,97* ,6 6=* *4 (/ T*6= 0;76*6( 6=* IR ,97* ,6 F;+6 0;76*
PI ,97* ,+(74 1.! ; G((4 /(+ O;9;00*+*4 W;4;
8/17/2019 SS Equipment Testing 1
29/51
T=* D;*9*>6+;> 6+*(47>6*4 ;L, ,4 6=* ?,+,0*6*+ 6( * );6=; 6=*
6(9*+,9* 9;0;6 , ?*+ IS33!
8/17/2019 SS Equipment Testing 1
30/51
S N'. CHARACTERISTIC PERMISSIBLE
LIMIT
1 E*+, S*+-*/ (BDV) (0V) 5# % 4# (M,-)
2 *+ '-*-* (PPM) 25 % 35 (M)
3 R,*,,* * "# C #.1 1#812 9:; 4 N,*) (;;.0'/%;)
5 F/ ?',-* (C) 125 (M,-)
6 I-*+@, T-,'- (D-%C;) 15.# (M,-)
7 D,*+, D,,?*,'- F*'+ 1.# % #.2 (M)
(T- >*) * "# C! S N'* P+-*
" D,'> G A-, (V+'- M*/- E*/- E*/- A*- C+'->,',>
Key Features of ON Line Monitoring
8/17/2019 SS Equipment Testing 1
31/51
Key Features of ON-Line Monitoring
Automatic remotely managed degassing process
Degases oil sample by vacuum extraction process. As per !" #$%#&' A()M D*#+,-#.
Measure and analyses (even dissolved gases it/ /ig/ accuracy
Acetylene
!t/ylene!t/ane0ydrogenMet/ane"arbon Monoxide"arbon Dioxide
Analysis using 1as c/romatograp/ 2 embedded softare.
Display !vent3)rend based monitoring.
Alarms 4rogrammable to mobile p/ones by(M( or by emails.
8/17/2019 SS Equipment Testing 1
32/51
1A( L!5!L( MON)O6N1 7 ONLN! D1A
No. Alarm 4ossible "auses
+ 0ydrogen 80,9 4artial Disc/arge 2 "orona.
, !t/ane 8",0#9 )/ermal Fault at lo temperature.
*Met/ane 8"0:9 )/ermal Fault at lo temperature.
: !t/ylene 8",0:9 Over/eating 2 (par;ing.
%"arbon monoxide 8"O9 Over/eated "ellulose.
# "arbon di oxide 8"O,9 nsulation 4aper deteriorating.
& Acetylene 8",0,9 Arcing.
OPERATIONS
ND5D
8/17/2019 SS Equipment Testing 1
33/51
ND5D
8/17/2019 SS Equipment Testing 1
34/51
Diagnostics
4O=!6 4A6AM!)!6( online.
6eal time loadability as per
!" #$$
=inding 0ot spottemperature.
8/17/2019 SS Equipment Testing 1
35/51
MIN MAX
8/17/2019 SS Equipment Testing 1
36/51
8/17/2019 SS Equipment Testing 1
37/51
1A( L!5!L( MON)O6N1 7 ONLN! D1A
(l. No. Alarm 4ossible "auses
1 Hydrogen (H2) Partial Discharge & Corona.
2Ethane (C2H6) Thermal Fault at lo tem!erature.
"#ethane (CH$) Thermal Fault at lo tem!erature.
$ Ethylene (C2H$) %erheating & '!aring.
Car*on mono+ide (C%) %erheated Cellulose.
6
Car*on,di,o+ide (C%2) -nsulation Pa!er deteriorating.
/cetylene (C2H2) /rcing.
Alarms 2 4ossible causes 7 (AM4L!.
)6AN(FO6M!6 "A(! ()
8/17/2019 SS Equipment Testing 1
38/51
)6AN(FO6M!6 "A(! ()
8/17/2019 SS Equipment Testing 1
39/51
8/17/2019 SS Equipment Testing 1
40/51
8/17/2019 SS Equipment Testing 1
41/51
1. >,osin and o(-nin ti*- of ontats!. M--)in of H.2. t-)*ina,s7 &a' To -a)t?
indi+idua,,y &b' B-t--n (o,-s it? b)-a9-)s
o(-n.
. M--)in of A.> 8.>. P.T. and >.T. i)uits
indi+idua,,y and in b-t--n -a? of t?-*.
4. M-asu)in t?- ont)at )-sistan-.
". >?-9in t?- int-),o9s. 6. >?-9in t?- *ini*u* o(-)atin +o,ta-
,-+-, of ,osin &%0@' and t)i( oi,s &$0@'.
8/17/2019 SS Equipment Testing 1
42/51
P*+0;;9* C(6,>6 R*;6,>* /(+
N*) B+*,*+ B*9() 1&& M;>+( O=0 O94 B+*,*+ - B*9() 2&& M;>+( O=0
8/17/2019 SS Equipment Testing 1
43/51
1. M--)in of H2 indins7 s-onda)yindins
!. M-asu)in t?- )-sistan- of s-onda)y
indin . Po,a)ity t-sts.
4. Ratio t-st.
". >?-9in t?- -a)t?in.
6. >?-9in t?- t)ansf-) s?-*-s if *o)- t?an
on- P.T. a)- a+ai,ab,-.
8/17/2019 SS Equipment Testing 1
44/51
1.M--)in b-t--n -a? s-onda)y indin
!. M--)in of H.2.Points
. M--)in b-t--n H.2. and S-onda)y
4. M-asu)in t?- 8.>. )-sistan- of s-onda)y
". Man-tisin t-st u( to 9n-- (oint
6. Ratio t-st at )at-d ()i*a)y u))-nt fo) a,, t?-
ta(s in s-onda)y. $. A,, t?- >.T. s-onda)y i)uits s?a,, b- -a)t?-d
at on,y on- (oint7 ()-f-)ab,y n-a)-) to >.T. -nd.
CT M,
8/17/2019 SS Equipment Testing 1
45/51
CT M,6*+;6;>
1& I>+*,* ; *>(4,+: (96,+*,* ; *>;6;< >7++*6
SECONDARYVOLTAGE
ECITIN CRRENT
8/17/2019 SS Equipment Testing 1
46/51
CT R*7;+*0*6
ECITIN CRRENT
KNEE POINT
SECONDAR
YVOLTAGE
P+(6*>6;* CT C=,+,>6*+;6;>
KNEE POINT
M*6*+;< CT C=,+,>6*+;6;>
T D 96 M 6 /
8/17/2019 SS Equipment Testing 1
47/51
T, D*96, M*,7+*0*6 (/I79,6(+
8/17/2019 SS Equipment Testing 1
48/51
T:?;>,9 T, D*96, V,97*T!n *r r') '7"( T!n *r O-+ '7"( C!"!%#(!n%' r!n'
P*'r C!"!%#(*r 0.0002 A) !r''+ &" *n b'(''n Mr !n+P&r%!)'r
10 &:. 2000 &
P*'r C!b-' LPE/ 0.0005 0.01 A""r*; 250 " (!n +'-(! #) %*n)#+'r'+ 10 n:. 1 &
8/17/2019 SS Equipment Testing 1
49/51
BATTRY SYSTM
STAT3ON BATTRY :
110 KV SS : 30 V/110 V (PREDOMINANTLY – 110 V, OLD SS – 30 V)
230 KV SS : 220 V/110 V ( IMPORTANT SS – 220 V)
( IN 230 KV SS REDUNDANT BATTERY SET IS ALSO MADE
AVAILABLE)
RATING : 100/200/300/400 A 10 A RATING
TYPE : LEAD A!ID
>> BATTRY :
110 KV SS : VERY IMP" 110 KV GRID STN # IN ALL 230 KV SS :$
RATING : 4% V D! IN ALL !ASE