7/31/2019 St. Louis County Library Facilities Master Plan 2012
1/83
FACILITIESMASTERPLAN
FOR
ST.LOUISCOUNTYLIBRARYDISTRICT
February13,2012
AaronCohenAssociatesLtd159TeatownRoadCrotononHudson,NY10520
Tel:(914)2718170Fax:(914)2712434Email:[email protected]
Homepage:http://www.acohen.com
7/31/2019 St. Louis County Library Facilities Master Plan 2012
2/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 2 02/13/2012
TABLEOFCONTENTS
EXCUTIVESUMMARY.................................................................................................................................. 4Overview...................................................................................................................................................... 5UpdatingtheFacilitiesMasterPlan........................................................................................................ 5HeadquartersLibraryBuilding................................................................................................................ 6Branches
...................................................................................................................................................
6Recommendations.................................................................................................................................. 8
TenyearSystemwideConstructionProgram....................................................................................... 8TenyearSystemwideImprovementPrioritiesList............................................................................. 10
St.LOUISCOUNTYLIBRARYSYSTEMPLANNING.................................................................................... 11MeetingtheNeedsoftheCommunity:.............................................................................................. 11
St.LOUISCOUNTYLIBRARYSYSTEMTENYEARPLANNINGCOSTESTIMATE...................................... 12HIGHLevel...................................................................................................................................................14 HeadquartersLibrary/Operations......................................................................................................... 14
ConditionAssessment........................................................................................................................ 14SeatingandServiceAssessment......................................................................................................... 15History................................................................................................................................................ 16Staff
and
Operations
..........................................................................................................................
16
Conclusion.......................................................................................................................................... 16FacilityPlanningOptionsforHeadquartersLibraryandOperationsCenter ..................................... 17
OptionOne32.5million................................................................................................................... 17OptionTwoLibrary19.5million/Operations 10million.......................................................... 19OptionThree31.0million................................................................................................................ 21
Recommendations................................................................................................................................ 23TessonFerryBranch9920LinFerryDr.St.Louis,Mo63123............................................................ 24Recommendation.................................................................................................................................. 24LewisandClarkBranch9909LewisClarkBlvd.St.Louis,MO,63136............................................. 25Recommendation.................................................................................................................................. 25Meramec
Valley
Branch
625
New
Smizer
Mill
Rd.
Fenton,
MO,
63026
...........................................
26
Recommendation.................................................................................................................................. 26DanielBooneBranch300ClarksonRd.Ellisville,MO,63011............................................................ 27Recommendation.................................................................................................................................. 27GrandGlaizeBranch1010MeramecStationRd.Manchester,MO,63021....................................... 28Recommendations................................................................................................................................ 28
INTERMEDIATELevel................................................................................................................................ 29MidCountyBranch7821MarylandAve.StLouis,MO,63105.......................................................... 29Recommendation.................................................................................................................................. 29ThornhillBranch12863WillowyckDr.St.Louis,MO,63146............................................................. 30Recommendation.................................................................................................................................. 30Rock
Road
Branch
10267
St.
Charles
Rock
Rd.
St.
Ann,
MO,
63074
..................................................
31
Recommendation.................................................................................................................................. 32FlorissantValleyBranch195NewFlorissantRd.,S.Florissant,MO,63031..................................... 33Recommendations................................................................................................................................ 33
UPGRADES................................................................................................................................................. 34BridgetonTrailsBranch3455McKelveyRd.,Bridgeton,MO,63044.............................................. 34Recommendations................................................................................................................................ 34CliffCaveBranch5430TelegraphRd.St.Louis,MO63129.............................................................. 35Recommendations................................................................................................................................ 35
7/31/2019 St. Louis County Library Facilities Master Plan 2012
3/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 3 02/13/2012
IndianTrailsBranch8400DelportDr.,St.Louis,MO,63114............................................................ 36Recommendations................................................................................................................................ 36JamestownBluffsBranch4153N.Highway67,Florissant,MO,63034........................................... 37Recommendations................................................................................................................................ 37NaturalBridgeBranch7606NaturalBridgeRd.,StLouis,MO,63121............................................. 38Recommendations
................................................................................................................................
38OakBendBranch842S.HolmesAve,St.Louis,MO,63122............................................................. 39
Recommendations................................................................................................................................ 39PrairieCommonsBranch915UtzLn.,Hazelwood,MO,63042........................................................ 40Recommendations................................................................................................................................ 40SamuelC.SachsBranch16400BurkhardtPl.,Chesterfield,MO,63017.......................................... 41Recommendations................................................................................................................................ 41WeberRoadBranch4444WeberRd.,St.Louis,MO,63123............................................................ 42Recommendations................................................................................................................................ 42
AppendixA................................................................................................................................................. 43Buildingprogram................................................................................................................................... 43
AppendixB................................................................................................................................................. 44Costs
.......................................................................................................................................................
44
7/31/2019 St. Louis County Library Facilities Master Plan 2012
4/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 4 02/13/2012
EXCUTIVESUMMARY
Thisdocument
outlines
a
proactive
plan
to
improve
the
library
space
throughout
St.
Louis
County. St.LouisCountyLibrary(SLCL)needstoreimagineitsfacilitiesforthe21stcentury.TheproposedassessmentwillprovideSLCLwithaframeworktoenhancechildrensspacesandearlylearning,teen,adultandseniorprograms. Itwillprovideopportunitiesforgrowthbydeliveringdirectinvestmentstoeachcommunity.
From1973to1982,theLibraryBuildingFund(.05/$100assessment)supportedtheconstructionoflibrariesinSt.LouisCounty. Thevalueofhousingincreasedandjobgrowthfollowed.Overthelastthreeyears(2008to2011),theoverallassessmentofhousing,commercialandretail,hasdecreasedby11%. Atthesametimetheeconomyhasslowed,St.LouisCountyLibrarys circulationof librarymaterialshas increasedby34%andprogrammingattendancehas
doubled.
Thelibrarysmasterfacilityplanoffersaboldvisionforthefuture. AaronCohenAssociates(ACA)isgratefultotheStaffPlanningCommitteeandthemanypeoplewhoprovidedinputincraftingthisdocument. Theplanlaysoutrecommendationsforeachfacilityforthenexttenyears.
From December 2011 to February 2012, ACA analyzed all of the libraries in the St. LouisCountyLibrarysystem. Ourteamdevelopedpreliminarycostestimatesfortheconstructionofnewbuildings$76.9M,renovations$12.70Mandadditionsandupgrades$9M.Amorede
tailedanalysis
is
included
in
the
study.
We foundSLCLbuildings ingeneralneedof significant retrofittingand renovationand inmanycases,newbuildings.The levelofmaintenance isgood;but,theoverallimpression isof aging buildings.Other libraries in the region have invested significantlymore in theirbuildings.Historically,SLCLhasbeenfiscallyconservative,butthetimehasnowcomewhenmajorfacilitiesupgradesarenecessary.
Thisupdateofthe2008FacilitiesMasterPlanfocusesonsupportforfamilies,childrenandteens.
7/31/2019 St. Louis County Library Facilities Master Plan 2012
5/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 5 02/08/2012
OVERVIEW
BasedonACAsthreedecadesoflibrarybuildingresearchandobservations,thisdocumentwas
developedtoinstigatethemodernizationoftheSt.LouisCountyLibraryDistrict. Itstartsbyde
finingthe
space
options
for
the
Headquarters
Branch
and
continues
with
aframework
for
the
librarysystemasawhole,whichincludesprioritizingimprovementsandidentifyingchallenges.
St.LouisCountyLibrarycanimproveitsinfrastructurewithasystematicinvestmentplanforthe
next10years. Inthisdocument,wewillillustratethesignificanceoftheHeadquartersBranch
asaculturalhubandtheneedforOperationstobeplacedinafunctionalandmodernbuilding.
InAppendixA,weprovideamodelbuildingprogram fortheLewisandClarkBranch;options
thatmovebeyondthetraditionalmatrixoflibraryservicesprogrammingthatmaximizeboth
educationalandculturalopportunities.
This
study
represents
a
compelling
case
for
a
new
and
dynamic
Headquarters
with
a
childrens
libraryanddynamicmeetingandcollaborationspace. Italsoincludesinvestmentsrequiredto
updateSLCLbranchesandimprovelibraryoperations.TheSt.LouisCountyLibraryplaysavital
rolesupportingpositiveactivitieswithinthecommunity. Thisdocumentpresentsanopportu
nitytostrengthenchildrenservicesandprogrammingbyenhancingthelibraryfacilities.
UpdatingtheFacilitiesMasterPlan
St.LouisCountyLibrarysFacilitiesMasterPlanisambitiousinscopeandscale. Itrespondsto
majorforcesaffectingthelibrary;anacceleratedpaceofchange,dispersedinformationecology
(ereaders,iPads,booksandDVDs),andagreaterneedtosupportfamilies,childrenandteens.
According
to
the
2008
Facilities
Master
Plan,
developed
by
Robert
H.
Rohlf
Associates,
a
major
goalistoprovideLibraryusersofallageswithfriendly,inviting,safefacilitieswhichareacces
siblephysicallyandvirtually.
For thepast twentyyears, library serviceshavebeenevolving to includemoreelectronic re
sources and new technologies. Moving forward, library patrons will increasingly use virtual
meanstoaccessinformation.However,thelibrarybuildingsandtheservicestheyprovidestill
haveagreat impacton the communities they serve. The librarybuildingsareplaceswhere
children learn to readandadults learncomputer skills. Theyareplaces teensgo touse the
computerforhomework. Theyareplacesforpeoplewithlimitedmeanstocrossthedigitaldi
vide,engageinsocialnetworking,preparetaxes,filloutjobformsandsendresumes.
Webelievethereisanopportunitytodynamicallysupporttheregionbycreatingopportunities
togatherandcollaborateatthepubliclibrary. Asweembraceanincreasinglydigitalworld,the
librarybuildingsneedtobedesignedtoengagethechildrenofSt.LouisCountyinnewanddif
ferentways.
7/31/2019 St. Louis County Library Facilities Master Plan 2012
6/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 6 02/13/2012
TheMasterPlan focuseson the importanceof the libraryasacommunitygatheringplaceas
wellasspacesforchildrenandfamiliestolearn,discoverandexplore.
HeadquartersLibraryBuilding
Patrons
of
the
St.
Louis
County
Library
view
the
library
as
a
good
value
for
the
money
and
as
a
wellrespectedorganization.Aconservativeoutlookhasguideddecisionsinmostareasinclud
ingthebudgetandplanning.Suchconservatismhasresultedindecadesofstability,evenwhen
otherlibrariesofsimilarsizewereclosingbranches,limitinghoursandfreezingcollectionbudg
etsandsalaries.However,thecurrentHeadquartersbuildingconfiguration,whichincludesop
erations,processing,ashopandagarage,creates long termchallenges thatcannotbeover
looked. The1960sbuildingcontainsaselfsupportingstacksystemthatwas installedtopro
videefficientbookstorage.TheselfsupportingstacksarenolongerusefultoSLCL,becauseof
innovationsinthedistributionandthedeliveryofmaterialstolibrarybranches.
Headquarters isonan inadequatesite for thenumberof functionsandactivities it supports.
Parkingspace
is
shared
between
the
library
and
operations
center.
Library
patrons
are
often
unabletofindaparkingspace. Duetothegrowthofoperationsoverthelastthirtyyears,these
servicescannotefficientlyfunctiononthesamesiteasalibrary.
The Headquarters Branch should focus on public service and collaborative/program spaces.
Theoperationscentercanbemovedoffsitetoaleasedlocation,enablingstafftofocusoncir
culationgrowthandmodernizingcustomerservicemodels.
Branches
Duringthis
project,
the
consultants
visited
SLCL
branches
and
found
that
the
service
paradigm
canbeenrichedwithaseriesofnewbuildings,additionsandrenovationprojects. Theaverage
ageofSLCLbuildingsis30yearsoldandmanyhadnotseenarenovationinoverthreedecades.
The2008FacilitiesMasterplan states thatManyof thebranchesare inneedof repairand
renovation,anddevelopingaFacilitiesMasterPlanisimperative.Todosowithoutanticipating
improvements to the servicemodel isunwise.Rather, it isprudent tocoordinate theservice
paradigmwith the facilitiesparameters in lightofnew technologyand the communitysex
pandingalternativesforentertainmentandrecreation. Belowisagraphillustratingtheageof
thelibrarybuildings.
7/31/2019 St. Louis County Library Facilities Master Plan 2012
7/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 7 02/13/2012
Overall,thelevelofmaintenancethatSLCLemployedisgood. However,manyofthefacilities
areatleastthirtyyearsold.St.LouisCountyLibraryisstrivingtointroducenewchildrensser
vices,teen
spaces,
computer
training
and
new
technologies
for
patron
use.
The
existing
build
ingdesignsandlackofphysicalspacemakesitdifficulttooperatewithoutmajorinvestmentsin
theinfrastructure.
Sincethe2008FacilitiesMasterPlanwas introduced,SLCLhascontinuedto improve itsfacili
ties. Recently, the librarymovedtoanew location inEureka,greatlyexpanding its footprint
and opening a new childrens zone. There is enthusiasm for the additional space and local
communitymembersarewillingtovolunteerandinvesttheirfundstoimproveEurekasBranch
library.
St.Louis
County
Library
has
managed
their
existing
budget
to
improve
all
of
the
branches
in
someway. MostbrancheshaveupdatedHVAC(heating,ventilation,andairconditioning)sys
temsand lighting;othershavemade improvements inroofsandparking lots. The libraryhas
applieditsbestresourcestomakethephysicalspacesmoreinvitingandoriginal. However,it
wouldbeprudenttolookatthesefixesasstopgapmeasuresandnotlongtermsolutions.
7/31/2019 St. Louis County Library Facilities Master Plan 2012
8/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 8 02/13/2012
Recommendations
Theprimaryrecommendationsresultingfromthisstudyaretwofold.
1. ItisrecommendedthattheSLCLmakessystemwideimprovementstofamily,childrensand
teen
spaces.
All
of
the
branches
should
receive
abudget
to
improve
library
services.
2. Itisrecommendedthatthelibrarybeginatenyearconstructionprogram. Toimprovethephysicalspaceofeachlibrarybranch,eachfacilityshouldreceiveabudgetinpriority
order.
The libraryneedstobeavibranthubandcrossroadsforearly learning inthecommunity. St.
LouisCountyLibrarysphysicalspaceswillprovideattractiveanddynamicenvironmentscondu
civetoearlylearning,familyactivities,collaborationandchildrensprogramming.
St.LouisCountyLibrarysphysicalpresenceshouldprovideanopportunityforchildrenand
families
to
learn
in
an
inviting
and
safe
environment.
Thebranchlibrariesshouldtransformtheirphysical layoutstoensurehighqualityprogrammingspace;spaceforstorytime,craftsandtutoringactivities.
An updated plan should include flexible seating arrangements, new technologies andequipment, early learning themes and multipurpose space, essential to improve chil
drensservicesateachbranch.
TenyearSystemwideConstructionProgram
Thisdocumentoutlinesapriority listofconstructionprojectstobecompleted inthenextten
years. Therecommendedprojectsareoutlinedonthenextpage. TheStaffPlanningCommit
teeandLibraryAdministrationwillreviewtherecommendationsandimplementtheseprojects
baseduponcommunityneedsandavailablefunds.
Theprojectswillinclude:
Constructionofnewfacilities. Expansionofexistingfacilitiesbybuildingnewadditions. Replacementofexistingfacilitieswithnewones. Renovationsofexistingfacilities. Implementationofnewtechnologies.
Serviceimprovements:
ChildrensServices. TeenService. Literacyspaces. Userseating.
o Quietspace(includingindividualandsmallgroupstudyrooms)
7/31/2019 St. Louis County Library Facilities Master Plan 2012
9/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 9 02/13/2012
o Increasednumberofseatsatmostlocations Reference:
o Eresources.o Seatingforcomputeruse(laptops,ipads,Kindle,Nooks).o Accesstonewtechnologies
Flexiblemeetingspacesforcommunityprograms. Trainingintheuseofnewtechnologies. Operations:
o Materialshandlingsystem:tomakematerialsavailabletousersmorequicklyandincreasestaffefficiency.
o Reorganizationofoperationsandimprovementofstaffworkflow.o Improveenvironmentcomfortlevels:lighting,heating,cooling,ventilating,etc.o Provideenvironmentsforstaffcollaboration:meetingspacesandtrainingareas
topromotesystemwideefficiency.
Renovationissues:
Improveaestheticswithnewfurnishingsandinteriorfinishes. Improvetheflowinandoutofthebrancheswithexpressselfcheckequipment. ReplacementofoutdatedandinefficientHVACsystems. SustainabledesignandGreenTechnologies. ImplementAmericanswithDisabilitiestransitionplans,accessibilityandphysicalsafety. Enhancesecuritysystemsforbothpersonalandbuildingprotection.
7/31/2019 St. Louis County Library Facilities Master Plan 2012
10/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 10 02/08/2012
TenyearSystemwideImprovementPrioritiesList
HighLevel
HeadquartersBranchNewBuildingConstruction TessonFerryBranchNewBuildingConstruction LewisandClarkBranchNewBuildingConstruction MeramecValleyBranchNewBuildingConstruction DanielBooneBranchExistingBuilding/Renovation/NewAdditionConstruction GrandGlaizeBranchExistingBuilding/Renovation/NewAdditionConstruction
IntermediateLevel
MidCountyBranch NewBuildingConstruction ThornhillBranch NewBuildingConstruction RockRoadBranchExistingBuilding/Renovation/NewAdditionConstruction FlorissantValleyBranchExistingBuilding/Renovation/NewAdditionConstruction
Upgrades
SamuelSachsBranchUpgradeofExistingFacility IndianTrailBranchUpgradeofExistingFacility NaturalBridgeBranchUpgradeofExistingFacility CliffCaveBranchUpgradeofExistingFacility JamestownBluffsBranchUpgradeofExistingFacility OakBendBranchUpgradeofExistingFacility BridgetonTrailsBranchUpgradeofExistingFacility PrairieCommonsBranchUpgradeofExistingFacility WeberRoadBranchUpgradeofExistingFacility
Theproposedprojectswillincludenewbuildingconstruction,additionandrenovation.Project
implementationwillbebaseduponthebestuseoflibraryresourcesandavailablefunding.
7/31/2019 St. Louis County Library Facilities Master Plan 2012
11/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 11 2/06/2012
ST.LOUISCOUNTYLIBRARYSYSTEMPLANNING
With theexceptionofHeadquarters and the rental locations atEureka andMeramecValley, the
branchlibrariesinSt.LouisCountyhavebeendevelopedinafairlyuniformway. Libraryserviceswere
extendedto
the
north,
south
and
west
as
populations
moved
in
aring
around
the
City
of
St.
Louis.
Mostbrancheswerebuiltbetween1973and1982;basedupontheneedofthecommunity.
St.LouisCountyLibraryDistrictneedsamethodicalprocesstoreimagineitsfacilitiesaswasdonein1973.
Thelibraryneedsafacilityplanthatwillenableittoimproveservicesoverthenexttenyears.MeetingtheNeedsoftheCommunity:
Overtheyears,AaronCohenAssociates,LTDhascompletedanumberofmasterfacilityplans. Inthe
1990s,ACAdevelopedaregionalplanforBuffaloandErieCounty.In2005,aregionalplanfortheLas
VegasClarkCountyLibraryDistrictandin2007FortCollinsLibraryDistrict.Themasterplansfocusedonhowtomeetpopulationgrowthwithappropriatechildrenandteenspaces,adultprogrammingand
meetingfacilities. Overtheyears,thisresponsetocommunityneedshasenabledlibraryservicestobe
extendedtourban,suburbanandruralcommunitiesinamethodicalmanner. Ithasprovedtobea
solidapproachtoextendservicesinalogicalandeffectivemanner.
Belowisagraphthatillustratestheinteriorsquarefootageofeachbranchcomparedtothepopulation
served.
7/31/2019 St. Louis County Library Facilities Master Plan 2012
12/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 12 02/13/2012
ST.LOUISCOUNTYLIBRARYSYSTEMTENYEARPLANNINGCOSTESTIMATE
ConstructionofNewBuildings PreliminaryCostEstimate$76.9million
Headquarters 60,000sq.ft. $19.5million Operations# 40,000sq.ft. $10.0million TessonFerry* 40,000sq.ft. $20.0million CenterforFamilyHistory 40,000sq.ft. (privatefunding) LewisandClark 20,000sq.ft. $ 6.5million Thornhill 20,000sq.ft. $ 6.5million MeramecValley* 15,000sq.ft. $ 7.9million MidCounty+ 20,000sq.ft. $ 6.5million
Subtotal $ 76.9million
#Leased.
*LandCosts
included
in
budget.
+Excludeslandcost.
RenovationsandAdditions PreliminaryCostEstimate$12.70million
FlorissantValley(newentrance) $ 3.0million DanielBoone (addition) 20,000sq.ft. $ 6.5million GrandGlaize (addition) 5,000sq.ft. $ 1.6million RockRoad (addition) 5,000sq.ft. $ 1.6million
Subtotal $ 12.70million
Upgrades PreliminaryCostEstimate$9.0million
BridgetonTrails $ 1.0million CliffCave $ 1.0million IndianTrails $ 1.0million JamestownBluffs $ 1.0million NaturalBridge $ 1.0million OakBend $ 1.0million PrairieCommons $ 1.0million SamuelC.Sachs $ 1.0million WeberRoad $ 1.0million
Subtotal $ 9.0million
Total $ 98.60million
10%Contingency $ 9.86million
GRANDTOTAL $108.46million
7/31/2019 St. Louis County Library Facilities Master Plan 2012
13/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 13 02/13/2012
TOTALEXPENDITURE10YEARPLAN
Theoverallbudget isestimatedusing2012costmodels. Thepreliminarycostestimateforall
theprojectslistedincludesnewconstructions,improvementsandoptiontwofortheheadquar
terslibrarybuildingthetotalcostfortheentiremasterplan,includingcontingency,is108.46
milliondollars.
Thefollowingbestpracticescanbeusedtosupportthemasterfacilitiesplan:
Approach
A. DevelopaBuildingProgramfornewfacilities.B. DevelopaBuildingProgramforrenovation,reorganizationandadditions.C. Selectionofarchitect(s).D. Schedule.
Newconstruction3.5to4years. Renovationandaddition1to1.5years. Reorganization6monthsto1year.
A. DevelopaBuildingProgramforeachnewfacility: ACAhascreatedaprototypebuildingprogramfora20,000grosssquarefootli
brary.
Thelibraryadministrationcangivetheprototypetotheprojectarchitect. Thelibrarystaffwillreviewandreviseprogramrequirements. The library staffwilldevelop librarybuildingprograms for15,000 GSF,40,000
GSFand60,000GSFlibrarybuilding.
Thelibrarystaffwilldevelopthebuildingprogramforthe40,000GSFOperationsCenter.
Thebuildingprogramandfunctionelementswillbetestedforprojectfitduringtheschematicdesignphase.
B. DevelopBuildingProgramforeachoftheupgradeprojects;tobeusedforrenovation,reorganizationandlibrarybuildingadditions.
Thelibrarystaffwilldevelopbuildingprogramsforeachproject. ThelibrarywillprovidetheBuildingProgramstotheprojectarchitect. TheBuildingProgramsfunctionalelementswillbetestedforprojectfitinthe
schematicdesignphase.
7/31/2019 St. Louis County Library Facilities Master Plan 2012
14/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 14 02/13/2012
HIGHLEVEL
HeadquartersLibrary/Operations
TheHeadquartersBranchisafullservice
facility. Therearethreecomponentsto
thelibrary:
RegionalLibrary MeetingRoomSpace OperationsCenter
TheheadquarterslibrarybuildingiscentrallylocatedintheCounty. Itisinagoodlocationfor
communityservicesandoperations including:outreachservices,bookmobileandcountywide
deliveryof librarymaterials.Theheadquarters librarybuilding isona7.76acresitewith395
parkingspaces.
Thebuilding
was
originally
built
in
1960
and
expanded
on
several
sides
in
1989.
The
building
is
approximately 121,000 gross square feet. The library site includes 395 parking spaces. The
parkinglotlimitsthefutureexpansionoflibraryservicesandoperations.
ConditionAssessment
Therearethreemajorspacecomponentswhichmakeuptheheadquartersbuilding,eachoccu
piesapproximatelyonethirdofthespace.
PublicLibrarySpace 42,660
Selfsupportbookstack 40,740Operations 37,600
121,000
Theselfsupportingbookstacksconsistoffive(5)tiersmeasuringapproximately40,740sq.ft.
Constructed/Remodeled 1960 1989
Carpet 2004 2008
HVAC 1989
ParkingLot 2006
Roof 2008
7/31/2019 St. Louis County Library Facilities Master Plan 2012
15/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 15 02/13/2012
Theselfsupportbookstacktiersshouldberemoved. Thedisconnectionsandoddfloorlevels
create significant security issues. The operations functions that are located in the self
supporting stack areaaredysfunctional and create an inefficientworkingenvironment. The
structurecannotbemodifiedtosupportoperations.
Publiclibrary
functions
occupy
37,067
sq.ft.
on
the
first
floor
and
consist
of:
ChildrensServices Reference,Computers Periodicals BookShelving ReaderSeating CirculationDesk YoungAdultServices MeetingSpaces
SpecialCollections
is
located
on
5th
tier
of
self
supporting
stacks
and
occupies
5,533
sq.ft.
OperationsCenteroccupies37,600squarefeet
TheOperationsCenterincludes:
Administration TechnicalServicesandProcessing YouthServicesSupport OutreachServicesandBookmobiles DeliveryServices InformationTechnology Communications FacilityMaintenanceandRepair Garage
SeatingandServiceAssessment
Thelibraryhasatotalreaderseatingcapacityof239seats. Therearenoindividualorgroupstudyrooms. Therearefourpublicservicedesks.Threedesksarelocatedonthemainfloorandone
on
Tier
5.
TheHeadquarterscollectionconsistsof369,000items Headquarterscirculatesover800,000itemsayear Thegate count is inexcessof500,000visitors,without includingpatronswhoattend
meetingsortrainingsessionsinthemeetingrooms.
7/31/2019 St. Louis County Library Facilities Master Plan 2012
16/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 16 02/13/2012
History
The51yearoldlibraryfacilitywasexpandedonallsidesin1989. Overtheyears,ithasbecome
increasingly inadequateand inefficient.Thebuilding isnotonlyundersizedforpresentneeds,
butisextremelyinefficientandawkwardtooperate.
ThepublicareasneedtoberearrangedandexpandedtosupportnewYouth,YoungAdultand
Adultservicesgroup study, tutoring,collaboration,quietand individual research. Thenew
Headquartersbuildingshouldbebuilttosupportstateoftheartlibraryservices.
StaffandOperations
Thestaffandworkareasareextremely inefficient. Theworkflow,securityandaccess in the
buildingaredysfunctional. Thebuildingspaceslimitoperationalefficiency.
TheexistingHVACsystemdoesnotprovideproperheating,coolingandventilationinthebuild
ing.In
particular,
the
work
areas
for
Outreach,
Communications,
IT,
Processing,
Cataloging,
Ac
quisitionsandFacilitiesaffectemployeescomfortandproductivity.HVACandlightingsystems
needtobeimprovedusingsustainabledesignandgreentechnologies.Stafffunctionslocatedin
the1987expandedareasaroundtheoriginalbuildingarepoorlyarrangedandcongested.The
staffofficeareasaredisconnectedandarelocatedonseveralsplitfloorlevels,whereverspace
couldbefound.
Theneedforparkingofservicevehiclesisasfollows:
8 maintenancevans.
2 vansthatgotoretirementhomes.
1bookmobile
that
goes
to
retirement
centers.
2 vehiclesforITSDepartment.
3 vehiclesforstaffuse.
3 bookmobilesthatgotoschools.
4 deliveryvansthatgotothebranches.
1 vanforspecialdeliveries.
Conclusion
TheConsultantsproposedthreeoptionstobeevaluatedfortheHeadquartersBranchandOp
erationCenter.
7/31/2019 St. Louis County Library Facilities Master Plan 2012
17/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 17 2/06/2012
FacilityPlanningOptionsforHeadquartersPublicServiceandOperationsCenter
OptionOne32.5million
Demolishthepresentbuilding in itsentiretyandconstructanew60,000sq.ft. librarybuilding
and
a
40,000
sq.ft.
Operations
Center
on
the
same
site.
Building
on
the
present
site
would
not
increase the site coverage,butwould require getting local community approval.This option
wouldprovide:
LibraryBuilding:
PublicServices 40,000sq.ft.
YouthServices&Programs 20,000sq.ft.
OperationsCenter: 40,000sq.ft.
Thisoptionwouldnotrequireacquiringtemporaryspaceforoperationsanddeliveryofmateri
als,becausetheexistingspacewillbeinoperationduringconstruction.
OptionOneAdvantages:
PotentialtoachieveLEEDGoldStatus. Newpublicspacewillincreasefrom42,660to60,000 NewOperationsbuildingwillincreaseto40,000sq.ft. Operationsbuildinglocationisgoodformeetingswithlibraryadministration.
OptionOneDisadvantages:
Theexistingsiteistoosmallforoperationsandapubliclibrarytocoexist. Optiononerequireshalfoftheexistingparkingspacesforstaffandoperationalvehicles.
Thisoptionwillprovidelessparkingforthepublic;alreadyamajorconcern.
Thisoption limits theoverall site layout, reducingopportunities to improve the landscapearoundthefacility.
Thesizeofthesiteinthisoptionlimitstheflexibilityofanewbuildingdesign. Thisisthemostexpensiveoption.
7/31/2019 St. Louis County Library Facilities Master Plan 2012
18/83
7/31/2019 St. Louis County Library Facilities Master Plan 2012
19/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 19 02/13/2012
OptionTwoLibrary19.5million/Operations 10million
Demolishthepresentbuilding in itsentiretyandconstructanew60,000sq.ft. librarybuilding
onsite
and
lease
an
Operations
Center
off
site.
LibraryBuilding:
PublicServices 40,000sq.ft.
YouthServices&Programs 20,000sq.ft.
OperationsCenter:
OperationsCenter(offsitelease): 40,000sq.ft.
OptionTwoAdvantages:
PotentialtoachieveLEEDGoldStatus. Newpublicspacewillincreasefrom42,660to60,000. Excellentlongtermsolutionforefficientoperations. Betterutilizationofexistingsite:itcanprovideparkingforapproximately150morecars. Thisoptionallowsforabetterlibrarysitedesignsolution. Developmentofanewchildrenslibraryandlargestateoftheartprogrammingspace. Thisistheleastexpensiveoption.
OptionTwo
Disadvantages:
Operations Center offsite may reduce collaboration between Public and Operationsservices.
Itispossiblethattravelexpensescouldincreaseforthedeliveryofservices.
7/31/2019 St. Louis County Library Facilities Master Plan 2012
20/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 20 02/13/2012
7/31/2019 St. Louis County Library Facilities Master Plan 2012
21/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 21 02/13/2012
OptionThree31.0million
InOptionThree, theexistingHeadquartersbuildingwillbe renovated. The five (5) tier self
supportingbook stackswillbecompletely removed. Thiswillallowconstructionof twonew
floors.The
total
renovation
will
be
60,000
sq.ft.
ThepresentOperationsCenterwillbedemolishedandanewbuildingof40,000sq.ft.wouldbe
builtattherearofthepresentsite.
Buildingonthepresentsitewoulddecreasetheamountofparkingandgreenspaceonsite.The
amountofspacewouldbethesameasOptionOne:
LibraryBuilding: 60,000sq.ft.
OperationsCenter: 40,000sq.ft.
OptionThreeAdvantages:
Newpublicspacewillincreasefrom42,660to60,000. Newoperationsbuildingwillbelocatedonsite.
OptionThreeDisadvantages:
Theexistingsiteistoosmallforoperationsandapubliclibrarytocoexist. CannotachieveLEEDGoldStatuswithexistingbuilding. Optionthreetakesuphalfoftheexistingparkingspacesforstaffandoperationalvehi
cles.This
option
will
provide
less
parking
for
the
public;
already
amajor
concern.
Thisoption limits theoverall site layout, reducingopportunities to improve the landscapearoundthefacility.
Thesizeofthesiteinthisoptionlimitstheflexibilityofthenewoperationsbuilding. Thisoptionhasthehighestriskforbudgetoverruns.
7/31/2019 St. Louis County Library Facilities Master Plan 2012
22/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 22 02/13/2012
7/31/2019 St. Louis County Library Facilities Master Plan 2012
23/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 23 02/13/2012
Recommendations
ComparativeCost
OptionOne
$32.5
million
OptionTwo $29.5million
OptionThree $31.0million
WerecommendOptionTwoasthebestlongtermsolutionforHeadquarters.
Relocationof theOperationsCenteroffsitetoa leased facility isanefficient longtermsolu
tion.
7/31/2019 St. Louis County Library Facilities Master Plan 2012
24/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 24 2/06/2012
TessonFerryBranch9920LinFerryDr.St.Louis,Mo63123
The Tesson Ferry Branch, built in 1958, is a
27,775sq.ft. Thebuildingstructureisdeterio
rating, mechanical systems are failing and the
property features multiple sink holes. The de
sign of the parking lot is inefficient and the
numberofspacesisinadequate.
Recentupdatestothefacilityinclude:
ExpressCheck FurnitureUpdates LightingInterior ReferenceDesk SignageInterior SignageExterior TeenArea
Recommendation
ThepresentfiftyyearoldTessonFerryBranchbuildingshouldbereplacedwithanewbuilding
of40,000sq. ft.onanewsite.Anew lotaminimumof200,000sq. ft.and/or5acres is re
quired.
Constructed /
Remodeled
1958,1975,1991
Carpet 2005
ParkingLot 1991
Roof 2005
MainFloorPlan
7/31/2019 St. Louis County Library Facilities Master Plan 2012
25/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 25 02/13/2012
LewisandClarkBranch9909LewisClarkBlvd.St.Louis,MO,63136
TheLewisandClarkBranch,builtin1963,isa
16,000sq.
ft.
building.
Recentupdates
to
the
facility
include:
Recommendation
Thepresent49yearoldLewis&ClarkBranchbuildingshouldbereplacedwithnewbuildingof
20,000sq.ft.onthepresentsite.Thenortheastsideofthe lothasthepotentialtodevelopa
newbuilding.Thecurrentlibrarywouldbeabletofunctionduringtheconstruction.
Constructed/
Remodeled
1963 2000
Carpet 2000
HVAC 2007
ParkingLot 2000
Roof 2004
ExpressCheck Furnitureupdates ReferenceArea SignageInterior SignageExterior
7/31/2019 St. Louis County Library Facilities Master Plan 2012
26/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 26 02/13/2012
MeramecValleyBranch625NewSmizerMillRd.Fenton,MO,63026
Openedin2000,MeramecValleyBranch
isarental
facility
of
2,690
sq.
ft.
The libraryscirculationwas241,601 last
year. The present site is inadequate for
thepopulationthatitservesandthevol
umeofbusinessitprovides.
Recommendation
Therentalfacilityshouldbereplacedwithanew15,000squarefeetLibrarybuilding. Thebuild
ingshouldbeconstructedinanewlocation;aminimumof140,000sq.ft.or3.5acres.
FloorPlan
7/31/2019 St. Louis County Library Facilities Master Plan 2012
27/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 27 02/13/2012
DanielBooneBranch300ClarksonRd.Ellisville,MO,63011
TheDanielBooneBranch,builtin1966,isa
33,960sq.ftbuilding.
The present site is inadequate for the
populationthatitservesandthevolumeof
businessit
provides.
The
library
is
split
into
twofloors. Thebottomfloor isameeting
space with opportunities for interior ex
pansionandutilizationofspace.
Thetwosideentriestothelibrary,theflow
around the siteand the treesconceal the
libraryfromtheroad.
ThestrategicimportanceoftheAsian
Center
and
the
space
aligned
to
support
fu
tureneedsshouldbeevaluated. Childrens
andTeenareasareinadequateforde
mand.
Recommendation
Thepresentfacilityshouldbereorganizedand20,000squarefeetadditionshouldbebuilt:
Themainentranceareashouldbereorganized. Newadditionshouldbebuilttoexpandbuildingontheeastside.
Constructed /
Remodeled
1966 1996
Carpet
2008
HVAC 2011
ParkingLot 2009
Roof 2008
ExpressCheck Furnitureupdates LightingInterior TeenArea SignageInterior SignageExterior StaffWorkArea AutomatedMaterialsHan
dling
Recentupdatestothefacilityinclude:
7/31/2019 St. Louis County Library Facilities Master Plan 2012
28/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 28 02/13/2012
GrandGlaizeBranch1010MeramecStationRd.Manchester,MO,63021
TheGrandGlazeBranch,builtin1987,isa
20,185sq.ft.building.
Recentupdatestothefacilityinclude:
Recommendations
Anadditionofapproximately5,000sq.ft.andarenovationoftheexisting20,185sq.ftbuilding
isrequiredtoimproveservicesandefficiencies.
Constructed
/
Remodeled 1978
Carpet 1998
HVAC 2008
ParkingLot 2002
Roof 2011
ExpressCheck Furnitureupdates ReferenceArea TeenArea SignageInterior SignageExterior
FloorPlan
7/31/2019 St. Louis County Library Facilities Master Plan 2012
29/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 29 2/06/2012
INTERMEDIATELEVEL
MidCountyBranch7821MarylandAve.StLouis,MO,63105
The MidCounty Branch, built in 1977, is a
16,099 sq. ft. Theparkingon the site isnot
adequateor
convenient.
The
meeting
facility
islimitedbyparkingrestrictions. Itisdifficult
torestrictparkingtolibrarycustomersonly.
Recentupdatestothefacilityinclude:
Recommendation
Thepresent35yearoldMidCountyBranchLibrary16,099squarefeetshouldbereplacedwith
newsinglefloor20,000sq.ft.buildingonanewsite.
Constructed/
Remodeled
1977
Carpet 2002
HVAC 2005
ParkingLot 1977
Roof 2007
ExpressCheck Furnitureupdates InteriorLighting ReferenceArea SignageInterior SignageExterior
7/31/2019 St. Louis County Library Facilities Master Plan 2012
30/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 30 02/13/2012
ThornhillBranch12863WillowyckDr.St.Louis,MO,63146
The Thornhill Branch, built in 1976, is a
19,500sq.ft.building. Thelibraryisdiffi
cult to see from the road. The facility is
unableto
meet
current
and
future
needs
oflibraryusers. Thearrangementofstaff
work areas can be improved to increase
efficiencies.
Recentupdatestothefacilityinclude:
Recommendation
The existing building should be replaced; a new 20,000 square feet building should be con
structedontheexistingsite.
Constructed/
Remodeled
1976
Carpet 1999
HVAC 2007
ParkingLot 2008
Roof 1995
ExpressCheck Furnitureupdates LightingInterior ReferenceDesk SignageInterior SignageExterior StaffArea
7/31/2019 St. Louis County Library Facilities Master Plan 2012
31/83
7/31/2019 St. Louis County Library Facilities Master Plan 2012
32/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 32 02/13/2012
SLCLshoulddevelopaconnectionbetweenchildrensspaceandthecurrentmeetingroom(as
shown),improvingtheflexibilityofthechildrensarea.
Recommendation
Anadditionofapproximately5,000sq.ft.andarenovationoftheexisting15,500sq.ft.building
arerequiredtoimproveservicesandefficiencies.
FloorPlan
7/31/2019 St. Louis County Library Facilities Master Plan 2012
33/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 33 02/13/2012
FlorissantValleyBranch195NewFlorissantRd.,S.Florissant,MO,63031
TheFlorissantValleyBranch,builtin1964,is
a38,168sq.ft.building.Thebranchwasre
cently updated with a new design for the
service
desk,
selfcheck
and
self
service
holds.
Recent updates to the facility include:
Recommendations
Thefrontentrancecanberelocatedtoimproveaccessibilityandsecurity. Arenovationandre
organizationofthe38,168sq.ft.buildingisrequired.
Constructed/
Remodeled
1965 1996
Carpet 2008
HVAC 2006
ParkingLot 1996
Roof 2007
ServiceDesks ComputerCables ExpressCheck Furnitureupdates LightingInterior TeenArea SignageInterior SignageExterior StaffWorkArea
FloorPlan
7/31/2019 St. Louis County Library Facilities Master Plan 2012
34/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 34 02/13/2012
UPGRADES
BridgetonTrailsBranch3455McKelveyRd.,Bridgeton,MO,63044
TheBridgetonTrailsBranch,builtin1978,isa
17,500sq.ft.building.
Recentupdatestothefacilityinclude:
Recommendations
Upgrades should include enhancements to Childrens, Teen and Adult spaces. Building im
provementsshould includeadditionalseating,collaborativespacesandupgrades to furniture
andfinishes.
Constructed/
Remodeled
1978
Carpet 1998
HVAC 2008
ParkingLot 1978
Roof 2007
ExpressCheck Furnitureupdates SignageInterior SignageExterior TeenArea
FloorPlan
7/31/2019 St. Louis County Library Facilities Master Plan 2012
35/83
7/31/2019 St. Louis County Library Facilities Master Plan 2012
36/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 36 02/13/2012
IndianTrailsBranch8400DelportDr.,St.Louis,MO,63114
TheIndianTrailsBranch,builtin1987,isa
15,500sq.ft.building.
Recentupdates to the facility in
clude:
Recommendations
UpgradesshouldincludeenhancementstoChildrens,TeenandAdultspaces.Buildingim
provementsshouldincludeadditionalseating,collaborativespacesandupgradestofurniture
andfinishes.
Constructed/
Remodeled
1987
Carpet
2005
HVAC 2009
ParkingLot 2009
Roof 1987
ExpressCheck Furnitureupdates ReferenceArea SignageInterior SignageExterior StaffWorkArea TeenArea
FloorPlan
7/31/2019 St. Louis County Library Facilities Master Plan 2012
37/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 37 02/13/2012
JamestownBluffsBranch4153N.Highway67,Florissant,MO,63034
The Jamestown Bluffs Branch, built in
1998isa16,500sq.ftbuilding.
Recentupdatestothefacilityinclude:
Recommendations
Upgrades should include enhancements to Childrens, Teen and Adult spaces. Building im
provementsshould includeadditionalseating,collaborativespacesandupgrades to furniture
andfinishes.
Constructed/
Remodeled
1998
Carpet 1998
HVAC 1998
ParkingLot 1998
Roof 2001
ExpressCheck Furnitureupdates ReferenceDesk SignageInterior SignageExterior
FloorPlan
7/31/2019 St. Louis County Library Facilities Master Plan 2012
38/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 38 02/13/2012
NaturalBridgeBranch7606NaturalBridgeRd.,StLouis,MO,63121
TheNaturalBridgeBranch,built in1993,
isa15,900sq.ftbuilding.
Recentupdatestothefacilityinclude: FloorPlan
Recommendations
Upgrades should include enhancements to Childrens, Teen and Adult spaces. Building im
provementsshould includeadditionalseating,collaborativespacesandupgrades to furniture
andfinishes.
Constructed/
Remodeled
1993
Carpet
2001
HVAC 2010
ParkingLot 1993
Roof 1993
ChildrenArea ExpressCheck Furnitureupdates ReferenceDesk TechnologyCenter LightingInterior SignageInterior SignageExterior TeenArea
7/31/2019 St. Louis County Library Facilities Master Plan 2012
39/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 39 02/13/2012
OakBendBranch842S.HolmesAve,St.Louis,MO,63122
TheOakBendBranch,built in1986, is
16,668sq.ft. Ithasbeen25yearssince
amajorrenovation.
Recentupdatestothefacilityinclude:
Recommendations
Upgrades should include enhancements to Childrens, Teen and Adult spaces. Building im
provementsshould includeadditionalseating,collaborativespacesandupgrades to furniture
andfinishes.
Constructed/
Remodeled
1986
Carpet
2007
HVAC 2008
ParkingLot 2008
Roof 2007
ExpressCheck Furnitureupdates ReferenceDesk SignageInterior SignageExterior
FloorPlan
7/31/2019 St. Louis County Library Facilities Master Plan 2012
40/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 40 02/13/2012
PrairieCommonsBranch915UtzLn.,Hazelwood,MO,63042
The Prairie Commons Branch, built in
1986,isa16,995sq.ft.building.
Recentupdatestothefacilityinclude:
Recommendations
Upgrades should include enhancements to Childrens, Teen and Adult spaces. Building im
provementsshould includeadditionalseating,collaborativespacesandupgrades to furniture
andfinishes.
Constructed/
Remodeled
1986
Carpet
2007
HVAC 2006
ParkingLot 2003
Roof 2005
ExpressCheck Furnitureupdates ReferenceDesk SignageInterior SignageExterior
FloorPlan
7/31/2019 St. Louis County Library Facilities Master Plan 2012
41/83
7/31/2019 St. Louis County Library Facilities Master Plan 2012
42/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 42 02/13/2012
WeberRoadBranch4444WeberRd.,St.Louis,MO,63123
TheWeberRoadBranch,builtin1972isa
19,500sq.ft.building.
Recent Updates to the Facility Include:
Recommendations
Upgrades should include enhancements to Childrens, Teen and Adult spaces. Building im
provementsshould includeadditionalseating,collaborativespacesandupgrades to furniture
andfinishes.
Constructed/
Remodeled
1971
1993
Carpet
2005
HVAC 2009
ParkingLot 2008
Roof 2007
ExpressCheck. Furnitureupdates. ServiceDesks. ReferenceDesk. SignageInterior. SignageExterior. StaffArea.
FloorPlan
7/31/2019 St. Louis County Library Facilities Master Plan 2012
43/83
FACILITIESMASTERPLANST.LOUISCOUNTYLIBRARYDISTRICT
AaronCohenAssociatesLTD. 43 02/13/2012
APPENDIXA
Buildingprogram
7/31/2019 St. Louis County Library Facilities Master Plan 2012
44/83
7/31/2019 St. Louis County Library Facilities Master Plan 2012
45/83
ST. LOUIS COUNTY LIBRARY
SAMPLE BRANCH BUILDING PROGRAM
Department Name: Lobby
Space Name: Building's Lobby/Vestibule
Room or Area No: 101
Ref
#Description of Furniture and Equipment Unit NASF
Amount of
units
Extended
NASF
1 Set of exterior automated sliding doors N/A 1 N/A
2 Electrically operated overhead gates leading to the Library proper N/A to be
determined
N/A
3 Set of interior doors with electric opening capability (for thedisabled), to the Community Rooms Complex.
N/A 1 N/A
4 Security gate system including in-turnstile(s) w/electronic counter 50 1 50
5 Alarm and security cameras for the doors N/A 1 N/A
6 Pedimat (carpet) with chains and drains to collect and drain rain --
just inside the exterior doors.
50 2 100
7 Graphic map of Library, directional signs N/A 1 N/A
8 Built-in Display cases 50 2 100
9 Electronic Kiosk 4-sided (library information) 40 1 40
10 Set of restrooms (outside security gate) N/A 1 N/A
11 Water fountain (outside security gate) 10 1 10
12 Pay telephone (outside security gate) 10 2 20
290
# Power/Communication/Network Requirements1 Electric receptacles
2 High speed multimedia network connections3 Electric receptacles for printer
4 High speed multimedia network connections for printer5 Telephone outlets
OCCUPANCY: Staff and patrons passing through.
DESCRIPTION OF USE: The public entry point into the building.
SPECIAL REQUIREMENTS: Security cameras and door alarms. Lockable doors. Security gate system just
inside Library proper. Consider electronic keycard for all interior doors.
ENVIRONMENTAL CONDITIONS (HVAC): +/- 60 degrees; +/- 30-50% RH.
ACCESS FOR THE DISABLED: Accessible
ACOUSTICS: N/a
ILLUMINATION: 300 lux
SPATIAL RELATIONSHIPS: Close to Circulation desk.
FLEXIBILITY AND EXPANDABILITY: None
FENESTRATION: Not required
1 for printer1
Subtotal
Amount and Description2 for workstation
1 for workstation
1 for printer
Aaron Cohen Associates, LTD Appendix A - Page 2 4/13/2012
7/31/2019 St. Louis County Library Facilities Master Plan 2012
46/83
ST. LOUIS COUNTY LIBRARY
SAMPLE BRANCH BUILDING PROGRAM
Department Name: Circulation
Space Name: Circulation Desk
Room or Area No: 201
Ref
#Description of Furniture and Equipment Unit NASF
Amount of
units
Extended
NASF
1 Check-out counter section workstation (39"-40"h) w/knee hole,
shelves and drawers underneath
80 1 80
3 Counter section workstation (30"-32"h) for handicapped w/knee
hole
80 1 80
4 Shelving 6 shelves h x 12"d for reserves and book sorting 0.5 126 63
5 High stool, swivel, posture with casters N/A 1 N/A
6 Chairs, swivel, posture with casters N/A 1 N/A
7 Book trucks 5 4 20
9 Multifunctional computers, networked with bar code reader N/A 2 N/A10 Printer, networked N/A 1 N/A
11 Telephone N/A 2 N/A12 Fire alarm control box N/A 1 N/A
243
# Power/Communication/Network Requirements
1 Electric receptacles
2 High speed multimedia network connections
3 Electric receptacles for printer4 High speed multimedia network connections for printer5 Telephone outlets
SPECIAL REQUIREMENTS: Cushioned carpeting behind Desk
ILLUMINATION: 500 lux at Desk countertop; 300 lux at shelving. Task lights as required.
OCCUPANCY: Staff - 2
ACCESS FOR THE DISABLED: 1 counter with w/ free knee space outside and 30-32" high.
ACOUSTICS: Noise criteria NC-30.
ENVIRONMENTAL CONDITIONS (HVAC): +/- 70 degrees; +/- 30-50% RH.
FLEXIBILITY AND EXPANDABILITY: Modular for flexibility
FENESTRATION: Not required
DESCRIPTION OF USE: A major service point. Staff at the Desk maintains surveillance over the entry/exit, and
performs the following: check-out and check-in library materials, and registration. Shelving is primarily used for
sorting, reserves.
SPATIAL RELATIONSHIPS: In sight of and with good control of entry/exit, security gates
Subtotal
Amount and Description
2 for workstation
1 for workstation
1 for printer1 for printer
2
Aaron Cohen Associates, LTD Appendix A - Page 3 4/13/2012
7/31/2019 St. Louis County Library Facilities Master Plan 2012
47/83
ST. LOUIS COUNTY LIBRARY
SAMPLE BRANCH BUILDING PROGRAM
Department Name: Circulation
Space Name: Self Check Stations
Room or Area No: 202
Ref
#Description of Furniture and Equipment Unit NASF
Amount of
units
Extended
NASF
1 Self check-out stations 50 4 200
2 Self check-out computers, networked N/A 4 N/A
200
# Power/Communication/Network Requirements
1 Electric receptacles
2 High speed multimedia network connections
FLEXIBILITY AND EXPANDABILITY: Flexible space.
Subtotal
SPECIAL REQUIREMENTS: Floor outlets for flexibility
ILLUMINATION: 300 lux, indirect lighting.SECURITY REQUIREMENTS: None.
ACCESS FOR THE DISABLED: Accessible
FENESTRATION: Not required.
SPACE FINISHES: Floor: carpeting; walls: painted; ceiling: acoustical tile.
ACOUSTICS: Noise criteria NC-30
ENVIRONMENTAL CONDITIONS (HVAC): +/- 70 degrees; +/- 30-50% RH.
Amount and Description
OCCUPANCY: N/a
DESCRIPTION OF USE: Patrons check-in/check-out library materials by themselves.
1 for station1 for station
SPATIAL RELATIONSHIPS: In close proximity to the entrance and Reference Service desk
Aaron Cohen Associates, LTD Appendix A - Page 4 4/13/2012
7/31/2019 St. Louis County Library Facilities Master Plan 2012
48/83
ST. LOUIS COUNTY LIBRARY
SAMPLE BRANCH BUILDING PROGRAM
Department Name: Circulation
Space Name: Circulation Office
Room or Area No: 203
Ref
#Description of Furniture and Equipment Unit NASF
Amount of
units
Extended
NASF
1 Professional furniture workstation containing: 80 1 80
swivel task chair - 1
mobile drawer pedestal w/ box, pencil and file drawers - 2
multifunctional microcomputer networked -1telephone-1
printer networked-1
2 Support staff workstation containing: 60 2 120
file/drawer mobile pedestal -2
adjustable height task chair -1
shelving bins above - 2
book truck -2
multifunctional microcomputer, networked -1
telephone - 1
3 Shelving 7 shelves h x 12"d for sorting 0.5 189 95
5 Book 5 6 30
324.50
# Power/Communication/Network Requirements1 Electric receptacles
2 High speed multimedia network connections3 Telephone outlets
Subtotal
DESCRIPTION OF USE: The office where circulation staff perform their work.
ILLUMINATION: 500 lux at desk and table top.
SPECIAL REQUIREMENTS: None
Amount and Description
SPATIAL RELATIONSHIPS: Behind the Circulation Desk
FLEXIBILITY AND EXPANDABILITY: None
FENESTRATION: Desirable
ACCESS FOR THE DISABLED: Accessible
ENVIRONMENTAL CONDITIONS (HVAC): +/- 70 degrees; +/- 30-50% RH.
OCCUPANCY: Staff - 3
2 for workstation
1 for workstation1 for workstation
ACOUSTICS: Noise criteria NC-30
Aaron Cohen Associates, LTD Appendix A - Page 5 4/13/2012
7/31/2019 St. Louis County Library Facilities Master Plan 2012
49/83
7/31/2019 St. Louis County Library Facilities Master Plan 2012
50/83
ST. LOUIS COUNTY LIBRARY
SAMPLE BRANCH BUILDING PROGRAM
Department Name: Adult Services
Space Name: Adult Services Desk
Room or Area No: 301
Ref
#Description of Furniture and Equipment Unit NASF
Amount of
units
Extended
NASF
1 Counter section workstation (30"h) w/knee hole, shelves and
drawers underneath
80 2 160
2 Shelving, ready reference 1 72 72
3 Chair, swivel castered, posture N/A 4 N/A4 Multifunctional microcomputers N/A 4 N/A
5 Networked printer N/A 1 N/A
6 Telephone N/A 4 N/A
232
# Power/Communication/Network Requirements
1 Electric receptacles
2 High speed multimedia network connections3 Electric receptacles for printer
4 High speed multimedia network connections for printer5 Telephone outlets
ACCESS FOR THE DISABLED:
ACOUSTICS: Noise criteria NC-30.
ENVIRONMENTAL CONDITIONS (HVAC): +/- 70 degrees; +/- 30-50% RH.
ILLUMINATION: 500 lux at Desk countertop
Subtotal
Amount and Description
2 for workstation
1 for workstation
1 for printer
1 for printer2
SPECIAL REQUIREMENTS: Floor outlets for flexibility
OCCUPANCY: Staff - 2
DESCRIPTION OF USE: Staff provides consultation and assistance in research and use of the Library and itsmaterials.
SPATIAL RELATIONSHIPS: Centrally located within Adult Services
FLEXIBILITY AND EXPANDABILITY: Modular for flexibility
FENESTRATION: Not required
Aaron Cohen Associates, LTD Appendix A - Page 7 4/13/2012
7/31/2019 St. Louis County Library Facilities Master Plan 2012
51/83
ST. LOUIS COUNTY LIBRARY
SAMPLE BRANCH BUILDING PROGRAM
Department Name: Adult Services
Space Name: Popular Library Collection
Room or Area No: 302
Ref
#Description of Furniture and Equipment Unit NASF
Amount of
units
Extended
NASF
1 Shelving, 5-shelf display type for New Books, Book Express, and
Book Club
1 600 600
2 Shelving, 5-shelf display type for Paperbacks 0.7 120 84
684
# Power/Communication/Network Requirements
1 Electric receptacles
2 High speed multimedia network connections
ACCESS FOR THE DISABLED: Accessible
ACOUSTICS: Noise criteria NC-30.
ENVIRONMENTAL CONDITIONS (HVAC): +/- 70 degrees; +/- 30-50% RH.
ILLUMINATION: 300 lux at shelving.
SPECIAL REQUIREMENTS: None
FENESTRATION: Not required
as requiredwireless
OCCUPANCY: None
DESCRIPTION OF USE: Popular Library shelving
SPATIAL RELATIONSHIPS: In sight of and with good control from Circulation desk
FLEXIBILITY AND EXPANDABILITY: Open, flexible area
Amount and Description
Subtotal
Aaron Cohen Associates, LTD Appendix A - Page 8 4/13/2012
7/31/2019 St. Louis County Library Facilities Master Plan 2012
52/83
ST. LOUIS COUNTY LIBRARY
SAMPLE BRANCH BUILDING PROGRAM
Department Name: Adult Services
Space Name: Periodicals Collection & SeatingRoom or Area No: 303
Ref
#Description of Furniture and Equipment Unit NASF
Amount of
units
Extended
NASF
1 Lounge seats 24 14 336
2 Occasional table 12 2 24
3 Shelving 5 shelves h x 12"d for periodicals (l.f.) 1 300 300
660# Power/Communication/Network Requirements
1 Electric receptacles
2 High speed multimedia network connections
several floor outlets
Subtotal
wireless
OCCUPANCY: Patrons - 14
FLEXIBILITY AND EXPANDABILITY: Open, flexible area
DESCRIPTION OF USE: Loungeseating, gathering and reading periodicals. Patrons can use their laptops in
this area.
SPATIAL RELATIONSHIPS: Within easy access of the entry.
Amount and Description
FENESTRATION: Desirable
ACOUSTICS: Noise criteria NC-30
ENVIRONMENTAL CONDITIONS (HVAC): +/- 70 degrees; +/- 30-50% RH.
ILLUMINATION: 300 luxSPECIAL REQUIREMENTS: None
Aaron Cohen Associates, LTD Appendix A - Page 9 4/13/2012
7/31/2019 St. Louis County Library Facilities Master Plan 2012
53/83
ST. LOUIS COUNTY LIBRARY
SAMPLE BRANCH BUILDING PROGRAM
Department Name: Adult Services
Space Name: Information Commons
Room or Area No: 304
Ref
#Description of Furniture and Equipment Unit NASF
Amount of
units
Extended
NASF
1 Equipment dedicated stations (individual tables that can be ganged
together)
40 14 560
2 Counter high workstation (39"-40"h) equipment dedicated station
for OPAC, stand-up
20 4 80
3 Chair, swivel castered N/A 14 N/A
4 Multifunctional microcomputer N/A 18 N/A
640
# Power/Communication/Network Requirements
1 Electric receptacles
2 High speed multimedia network connections
SPATIAL RELATIONSHIPS: In close proximity to the entrance and Adult Service desk
FLEXIBILITY AND EXPANDABILITY: Flexible space.
ACOUSTICS: Noise criteria NC-30
ENVIRONMENTAL CONDITIONS (HVAC): +/- 70 degrees; +/- 30-50% RH.
ILLUMINATION: 300 lux, indirect lighting.
SECURITY REQUIREMENTS: None.
SPECIAL REQUIREMENTS: Floor outlets for flexibility
DESCRIPTION OF USE: Online access, access to the catalog and other databases.
ACCESS FOR THE DISABLED: Accessible
FENESTRATION: Not required.
1 for workstation
OCCUPANCY: Patrons 18
2 for workstation
Subtotal
Amount and Description
Aaron Cohen Associates, LTD Appendix A - Page 10 4/13/2012
7/31/2019 St. Louis County Library Facilities Master Plan 2012
54/83
ST. LOUIS COUNTY LIBRARY
SAMPLE BRANCH BUILDING PROGRAM
Department Name: Adult Services
Space Name: Copier Alcove
Room or Area No: 305
Ref
#Description of Furniture and Equipment Unit NASF
Amount of
units
Extended
NASF
1 Photocopier / Printer / Scanner, coin or card operated 50 1 50
2 Change machine, wall mounted N/A 1 N/A
3 Counter height table for sorting 10 1 10
60
# Power/Communication/Network Requirements
1 Electric receptacles
2 High speed multimedia network connections
SPECIAL REQUIREMENTS: None
OCCUPANCY: NoneDESCRIPTION OF USE: The copier is used by patrons and staff to copy library materials. The copier is
connected to the network and can be used as high speed printer/scanner.
SPATIAL RELATIONSHIPS: Close to the Adult Services desk.
ILLUMINATION: 300 lux
ACCESS FOR THE DISABLED: Accessible
ACOUSTICS: Noise criteria NC-30.
ENVIRONMENTAL CONDITIONS (HVAC): +/- 70 degrees; +/- 30-50% RH.
FLEXIBILITY AND EXPANDABILITY: None
FENESTRATION: Not required
1 for photocopier / printer
Amount and Description
1 for photocopier / printer
Subtotal
Aaron Cohen Associates, LTD Appendix A - Page 11 4/13/2012
7/31/2019 St. Louis County Library Facilities Master Plan 2012
55/83
ST. LOUIS COUNTY LIBRARY
SAMPLE BRANCH BUILDING PROGRAM
Department Name: Adult Services
Space Name: Reference Collection
Room or Area No: 306
Ref
#Description of Furniture and Equipment Unit NASF
Amount of
units
Extended
NASF
1 Reference shelving 3 shelves h 1 180 180
2 Atlas case 10 1 10
3 Dictionary stand 10 1 10
4 Map case 24 1 24224
# Power/Communication/Network Requirements
1 Electric receptacles
2 High speed multimedia network connections
Subtotal
Amount and Description
SPATIAL RELATIONSHIPS: Close to the Adult Services Desk
ACCESS FOR THE DISABLED: Accessible
ENVIRONMENTAL CONDITIONS (HVAC): +/- 70 degrees; +/- 30-50% RH.ILLUMINATION: 300 lux
SPECIAL REQUIREMENTS: None
FENESTRATION: Not required
ACOUSTICS: Noise criteria NC-30.
FLEXIBILITY AND EXPANDABILITY: Open, flexible area
not requirednot required
OCCUPANCY: None
DESCRIPTION OF USE: Reference Collection shelving and stands.
Aaron Cohen Associates, LTD Appendix A - Page 12 4/13/2012
7/31/2019 St. Louis County Library Facilities Master Plan 2012
56/83
ST. LOUIS COUNTY LIBRARY
SAMPLE BRANCH BUILDING PROGRAM
Department Name: Adult Services
Space Name: Reference Seating
Room or Area No: 307
Ref
#Description of Furniture and Equipment Unit NASF
Amount of
units
Extended
NASF
1 Individual study table ( tables that can be ganged together) 30 8 240
2 Reading chairs N/A 8 N/A
240
# Power/Communication/Network Requirements
1 Electric receptacles
2 High speed multimedia network connections
1 for table
FENESTRATION: Desirable
DESCRIPTION OF USE: Reference patron seating
SPATIAL RELATIONSHIPS: Close to the Reference Collection
ACCESS FOR THE DISABLED: Accessible
ILLUMINATION: 500 lux , inderect
ACOUSTICS: Noise criteria NC-30.
Subtotal
Amount and Description
SPECIAL REQUIREMENTS: None
1 for table
OCCUPANCY: Patrons - 8
ENVIRONMENTAL CONDITIONS (HVAC): +/- 60 degrees; +/- 30-50% RH.
FLEXIBILITY AND EXPANDABILITY: Open area
Aaron Cohen Associates, LTD Appendix A - Page 13 4/13/2012
7/31/2019 St. Louis County Library Facilities Master Plan 2012
57/83
ST. LOUIS COUNTY LIBRARY
SAMPLE BRANCH BUILDING PROGRAM
Department Name: Adult Services
Space Name: General Collection
Room or Area No: 308
Ref
#Description of Furniture and Equipment Unit NASF
Amount of
units
Extended
NASF
1 Shelving 7shelves h and various depth for:
Fiction - 10"d 0.6 1,680 1,008
Non-Fiction - 10"d 0.6 1,470 882
1,890# Power/Communication/Network Requirements
1 Electric receptacles
2 High speed multimedia network connections
Amount and Description
as required
FENESTRATION: Not Required
wireless
FLEXIBILITY AND EXPANDABILITY: Open space
ENVIRONMENTAL CONDITIONS (HVAC): +/- 70 degrees; +/- 30-50% RH.
ACCESS FOR THE DISABLED: Accessible
ACOUSTICS: No special requirements
DESCRIPTION OF USE: General Collection shelving
SPATIAL RELATIONSHIPS: Within Adult services.
SPECIAL REQUIREMENTS: None
Subtotal
ILLUMINATION: 300 lux at bottom shelf.
OCCUPANCY: None
Aaron Cohen Associates, LTD Appendix A - Page 14 4/13/2012
7/31/2019 St. Louis County Library Facilities Master Plan 2012
58/83
ST. LOUIS COUNTY LIBRARY
SAMPLE BRANCH BUILDING PROGRAM
Department Name: Adult Services
Space Name: General Seating
Room or Area No: 309
Ref
#Description of Furniture and Equipment Unit NASF
Amount of
units
Extended
NASF
1 Individual study table ( tables that can be ganged together) 30 14 420
2 Reading chairs N/A 14 N/A
420
# Power/Communication/Network Requirements
1 Electric receptacles
2 High speed multimedia network connections
ACOUSTICS: Noise criteria NC-30
ENVIRONMENTAL CONDITIONS (HVAC): +/- 70 degrees; +/- 30-50% RH.
SPECIAL REQUIREMENTS: None
OCCUPANCY: Patrons - 14
DESCRIPTION OF USE: Seating for study and redaing
SPATIAL RELATIONSHIPS: Near the windows and close to General Collection
2 for each table
Subtotal
ILLUMINATION: 500 lux at table top
wireless
FLEXIBILITY AND EXPANDABILITY: Flexible space.
FENESTRATION: Required
ACCESS FOR THE DISABLED: Accessible
Amount and Description
Aaron Cohen Associates, LTD Appendix A - Page 15 4/13/2012
7/31/2019 St. Louis County Library Facilities Master Plan 2012
59/83
ST. LOUIS COUNTY LIBRARY
SAMPLE BRANCH BUILDING PROGRAM
Department Name: Adult Services
Space Name: 2 Group Study RoomsRoom or Area No: 310
Ref
#Description of Furniture and Equipment Unit NASF
Amount of
units
Extended
NASF
1 6 seat reading table w/ power/data/telephone outlets 150 1 150
2 Reading chairs N/A 6 N/A
150
300
# Power/Communication/Network Requirements
1 Electric receptacles
2 High speed multimedia network connections
ACCESS FOR THE DISABLED: Accessible
ENVIRONMENTAL CONDITIONS (HVAC): +/- 70 degrees; +/- 30-50% RH.
ACOUSTICS: No special requirements
4 for table
ILLUMINATION: 500 lux at table top
Subtotal for one room
SPECIAL REQUIREMENTS: Provide glass door and window with blinds to the interior.
OCCUPANCY: Patrons - 6 for each room
DESCRIPTION OF USE: Group study, conference
SPATIAL RELATIONSHIPS: Within Adult services
FLEXIBILITY AND EXPANDABILITY: None
FENESTRATION: Not required
Amount and Description
2 for table
Subtotal for two rooms
Aaron Cohen Associates, LTD Appendix A - Page 16 4/13/2012
7/31/2019 St. Louis County Library Facilities Master Plan 2012
60/83
ST. LOUIS COUNTY LIBRARY
SAMPLE BRANCH BUILDING PROGRAM
Department Name: Adult Services
Space Name: Adult Services Office
Room or Area No: 416
Ref
#Description of Furniture and Equipment Unit NASF
Amount of
units
Extended
NASF
1 Professional furniture workstation containing: 80 3 240
swivel task chair - 1
mobile drawer pedestal w/ box, pencil and file drawers - 2
multifunctional microcomputer networked -1telephone-1
printer networked-1
2 Shared workstation 48 1 48
file/drawer mobile pedestal -1
adjustable height task chair -1
multifunctional microcomputer, networked -1
3 Lateral file 10 4 40
328
# Power/Communication/Network Requirements
1 Electric receptacles
2 High speed multimedia network connections
3 Telephone outlets
2 for workstation
SPECIAL REQUIREMENTS: None
ACCESS FOR THE DISABLED:
ACOUSTICS: Noise criteria NC-30.
ENVIRONMENTAL CONDITIONS (HVAC): +/- 70 degrees; +/- 30-50% RH.
ILLUMINATION: 500 lux at desk and task lights.
1 for workstation
OCCUPANCY: Staff - 4
FENESTRATION: Desirable
DESCRIPTION OF USE: Adult services workroom
SPATIAL RELATIONSHIPS: Within Adult services
FLEXIBILITY AND EXPANDABILITY: None
1 for workstation
Subtotal
Amount and Description
Aaron Cohen Associates, LTD Appendix A - Page 17 4/13/2012
7/31/2019 St. Louis County Library Facilities Master Plan 2012
61/83
ST. LOUIS COUNTY LIBRARY
SAMPLE BRANCH BUILDING PROGRAM
Department Name: Young Adult Services
Space Name: Young Adult Collection
Room or Area No: 401
Ref
#Description of Furniture and Equipment Unit NASF
Amount of
units
Extended
NASF
1 Shelving, 5 shelves h, 12"d display type with storage/flat shelves
underneath for Current Periodicals
1 15 15
2 Shelving, 5 shelves h, 10"d 0.7 255 179
194
# Power/Communication/Network Requirements
1 Electric receptacles
2 High speed multimedia network connections
ENVIRONMENTAL CONDITIONS (HVAC): +/- 70 degrees; +/- 30-50% RH.
ILLUMINATION: 300 lux at shelving.SPECIAL REQUIREMENTS: None
Subtotal
OCCUPANCY: None
wireless
FENESTRATION: Not required
SPATIAL RELATIONSHIPS: In sight of and with good control from Sevice desk
FLEXIBILITY AND EXPANDABILITY: Open, flexible area
Amount and Description
as required
ACCESS FOR THE DISABLED: Accessible
DESCRIPTION OF USE: Young Adult collection shelving
ACOUSTICS: Noise criteria NC-30.
Aaron Cohen Associates, LTD Appendix A - Page 18 4/13/2012
7/31/2019 St. Louis County Library Facilities Master Plan 2012
62/83
ST. LOUIS COUNTY LIBRARY
SAMPLE BRANCH BUILDING PROGRAM
Department Name: Young Adult Services
Space Name: Young Adult Seating
Room or Area No: 402
Ref
#Description of Furniture and Equipment Unit NASF
Amount of
units
Extended
NASF
1 Lounge seats 24 8 192
2 Occasional table 12 2 24
3 4-seater Table 4'x 6' with electrical and data connections 100 2 200
4 Reading chairs N/A 8 N/A416
# Power/Communication/Network Requirements
1 Electric receptacles
2 High speed multimedia network connections
SPECIAL REQUIREMENTS: None
SPATIAL RELATIONSHIPS: Within the Young Adult collection
FENESTRATION: Required
ACOUSTICS: Noise criteria NC-30
ENVIRONMENTAL CONDITIONS (HVAC): +/- 70 degrees; +/- 30-50% RH.
FLEXIBILITY AND EXPANDABILITY: Open, flexible area
Subtotal
ILLUMINATION: 500 lux
DESCRIPTION OF USE: Loungeseating, gathering and study. Patrons can use their laptops in this area.
Amount and Description
OCCUPANCY: Patrons - 16
floor outlets for tableswireless
Aaron Cohen Associates, LTD Appendix A - Page 19 4/13/2012
7/31/2019 St. Louis County Library Facilities Master Plan 2012
63/83
ST. LOUIS COUNTY LIBRARY
SAMPLE BRANCH BUILDING PROGRAM
Department Name: Children's Services
Space Name: Children's Services Desk
Room or Area No: 501
Ref
#Description of Furniture and Equipment Unit NASF
Amount of
units
Extended
NASF
1 Counter section workstation (30"h) w/knee hole, shelves and
drawers underneath
80 2 160
2 Shelving, ready reference 1 72 72
3 Chair, swivel castered, posture N/A 4 N/A4 Multifunctional microcomputers N/A 4 N/A
5 Networked printer N/A 1 N/A
6 Telephone N/A 2 N/A
232
# Power/Communication/Network Requirements
1 Electric receptacles
2 High speed multimedia network connections3 Electric receptacles for printer
4 High speed multimedia network connections for printer5 Telephone outlets
ENVIRONMENTAL CONDITIONS (HVAC): +/- 70 degrees; +/- 30-50% RH.
ILLUMINATION: 500 lux at Desk countertop
SPECIAL REQUIREMENTS: Floor outlets for flexibility
Subtotal
Amount and Description
2 for workstation
1 for workstation
1 for printer
1 for printer
ACCESS FOR THE DISABLED: Accessible
ACOUSTICS: Noise criteria NC-30.
2
OCCUPANCY: Staff - 2
DESCRIPTION OF USE: Staff provides consultation and assistance in research and use of the Children'sLibrary and its materials.
SPATIAL RELATIONSHIPS: In front of Children's Services
FLEXIBILITY AND EXPANDABILITY: Modular for flexibility
FENESTRATION: Not required
Aaron Cohen Associates, LTD Appendix A - Page 20 4/13/2012
7/31/2019 St. Louis County Library Facilities Master Plan 2012
64/83
ST. LOUIS COUNTY LIBRARY
SAMPLE BRANCH BUILDING PROGRAM
Department Name: Children's Services
Space Name: Children's Computer Area
Room or Area No: 502
Ref
#Description of Furniture and Equipment Unit NASF
Amount of
units
Extended
NASF
1 Equipment dedicated stations (individual tables that can be ganged
together) intermediate height
30 8 240
3 Chair, swivel castered, intermediate height N/A 8 N/A
4 Multifunctional microcomputer N/A 8 N/A240
# Power/Communication/Network Requirements
1 Electric receptacles
2 High speed multimedia network connections
SPECIAL REQUIREMENTS: Floor outlets for flexibility
Subtotal
Amount and Description
FENESTRATION: Not required.
ENVIRONMENTAL CONDITIONS (HVAC): +/- 70 degrees; +/- 30-50% RH.ILLUMINATION: 300 lux, indirect lighting.
SECURITY REQUIREMENTS: None.
1 for workstation
ACCESS FOR THE DISABLED: Accessible
ACOUSTICS: Noise criteria NC-30
2 for workstation
OCCUPANCY: Patrons 8
DESCRIPTION OF USE: Online access, access to the catalog and other databases.
SPATIAL RELATIONSHIPS: In close proximity to the entrance and Children's Service desk
FLEXIBILITY AND EXPANDABILITY: Flexible space.
Aaron Cohen Associates, LTD Appendix A - Page 21 4/13/2012
7/31/2019 St. Louis County Library Facilities Master Plan 2012
65/83
ST. LOUIS COUNTY LIBRARY
SAMPLE BRANCH BUILDING PROGRAM
Department Name: Children's Services
Space Name: Preschool Reading & Play Area
Room or Area No: 503
Ref
#Description of Furniture and Equipment Unit NASF
Amount of
units
Extended
NASF
1 Shelving, 3 shelves h, 15"d for Picture Books. 1 324 324
2 Shelving, 3 shelves h, 10"d for Easy Readers, Board Books 1 72 72
3 Play area 1 160 160
4 Toy chest 1 20 205 Tackable wall space to display children's art N/A 1 N/A
6 Table, round, 4-seater, juvenile height 100 3 300
7 Reading chairs, juvenile height N/A 12 N/A8 Lounge chair, adult height 24 2 48
924
# Power/Communication/Network Requirements
1 Electric receptacles
2 High speed multimedia network connections
Subtotal
not required
Amount and Description
not required
ACCESS FOR THE DISABLED: Accessible
SPECIAL REQUIREMENTS: None
DESCRIPTION OF USE: For children to look/read board books, picture books, easy readers, and other simple
to read materials, and to play with toys.
SPATIAL RELATIONSHIPS: Close to the Children's Services DeskFLEXIBILITY AND EXPANDABILITY: Open, flexible area
FENESTRATION: Required
ENVIRONMENTAL CONDITIONS (HVAC): +/- 70 degrees; +/- 30-50% RH.
ILLUMINATION: 300 lux
ACOUSTICS: Noise criteria NC-30.
OCCUPANCY: Patrons - 14
Aaron Cohen Associates, LTD Appendix A - Page 22 4/13/2012
7/31/2019 St. Louis County Library Facilities Master Plan 2012
66/83
ST. LOUIS COUNTY LIBRARY
SAMPLE BRANCH BUILDING PROGRAM
Department Name: Children's Services
Space Name: Story Hour and Craft Room
Room or Area No: 504
Ref
#Description of Furniture and Equipment Unit NASF
Amount of
units
Extended
NASF
1 Counter with sink and cabinets above and below 50 1 50
2 Electrically operated beaded screen, flush mounted in ceiling N/A 1 N/A
3 Puppet Theater Stage, portable 20 1 20
5 Table 3'x 6' (intermediate height), folding 100 2 2006 Chair (intermediate height), stacking N/A 16 N/A
7 Area to sit on the floor up to 30 children 100 1 100
8 Storage cabinets, built-in with shelves along one wall 25 1 25
9 Tackable wall surfaces to display children's art N/A 8 N/A
10 Telephone N/A 1 N/A
395
# Power/Communication/Network Requirements
1 Electric receptacles
2 High speed multimedia network connections3 Telephone outlets 1
OCCUPANCY: Patrons - 16
DESCRIPTION OF USE: Children listen to stories; see puppet shows; work on crafts.
as required for equipment
Subtotal
Amount and Description
as required for equipment
ILLUMINATION: 300 lux , indirect
SPECIAL REQUIREMENTS: Sliding doors with viewing panel; wide opening to enable room expansion when
needed.
ACOUSTICS: Noise criteria NC-30.
ENVIRONMENTAL CONDITIONS (HVAC): +/- 60 degrees; +/- 30-50% RH.
SPATIAL RELATIONSHIPS: Close to the Preeschool Area
FLEXIBILITY AND EXPANDABILITY: Enclosed room
FENESTRATION: Desirable
ACCESS FOR THE DISABLED: Accessible
Aaron Cohen Associates, LTD Appendix A - Page 23 4/13/2012
7/31/2019 St. Louis County Library Facilities Master Plan 2012
67/83
ST. LOUIS COUNTY LIBRARY
SAMPLE BRANCH BUILDING PROGRAM
Department Name: Children's Services
Space Name: Parenting Area
Room or Area No: 505
Ref
#Description of Furniture and Equipment Unit NASF
Amount of
units
Extended
NASF
1 Shelving, 5 shelves h, 10"d (Parenting Collection) display type,
includes brochures, videos, etc.
0.7 15 11
2 Lounge chair 24 4 96
3 Occasional table 12 1 12108
# Power/Communication/Network Requirements
1 Electric receptacles
2 High speed multimedia network connections
SPECIAL REQUIREMENTS: Children's restrooms should be in close proximity with baby changing stations.
FLEXIBILITY AND EXPANDABILITY: Open space
FENESTRATION: Not Required
ENVIRONMENTAL CONDITIONS (HVAC): +/- 70 degrees; +/- 30-50% RH.ILLUMINATION: 300 lux
Subtotal
Amount and Description
as requiredwireless
ACCESS FOR THE DISABLED: Accessible
ACOUSTICS: Noise criteria NC-30.
DESCRIPTION OF USE: Parents can read and wait for their children while they are in program.
SPATIAL RELATIONSHIPS: Within the Children's services.
OCCUPANCY: Patrons - 4
Aaron Cohen Associates, LTD Appendix A - Page 24 4/13/2012
7/31/2019 St. Louis County Library Facilities Master Plan 2012
68/83
ST. LOUIS COUNTY LIBRARY
SAMPLE BRANCH BUILDING PROGRAM
Department Name: Children's Services
Space Name: Children's Collection
Room or Area No: 506
Ref
#Description of Furniture and Equipment Unit NASF
Amount of
units
Extended
NASF
1 Shelving, 5 shelves h, 12"d display type with storage/flat shelves
underneath for Current Periodicals
0.7 6 4
2 Shelving, 5 shelves h, 10"d 0.7 840 588
3 Dictionary Stand, child height, with rolling shelves 10 1 104 Atlas Stand, child height, with rolling shelves 10 1 10
612
# Power/Communication/Network Requirements
1 Electric receptacles
2 High speed multimedia network connections
Subtotal
Amount and Description
as required
OCCUPANCY: None
FLEXIBILITY AND EXPANDABILITY: Open, flexible area
DESCRIPTION OF USE: School Children's collection shelving.
SPATIAL RELATIONSHIPS: In sight of and with good control from Sevice desk
ACCESS FOR THE DISABLED: Accessible
ACOUSTICS: Noise criteria NC-30.ENVIRONMENTAL CONDITIONS (HVAC): +/- 70 degrees; +/- 30-50% RH.
ILLUMINATION: 300 lux at shelving.
SPECIAL REQUIREMENTS: None
FENESTRATION: Not required
wireless
Aaron Cohen Associates, LTD Appendix A - Page 25 4/13/2012