15
Job Number: Bridge Scoping Statewide Scoping Package Master Checklist BRIDGE CSM/CPM (Refer to Chapter 7 of the Scoping Manual for Details) II. Project Scoping Document Package Bridge Scoping Report & Details Worksheet MPINS Project Concept Statement Trns*port (Itemized Estimate Report & Project Concept Estimate Report) Constructability Checklist I. Job and Scoping Package Information (Major Only - see page 2 for additional information) Engineer's Estimate R&R T&S CPM Hand Calculations & Assumptions Other By Template, if checkbox appears, item is required (unless otherwise noted). General Items & Information Proposed Pavement Recommendations (if applicable) Included in Package? Soils Information and Recommendations (If applicable, From Region Soils Engineer) NA TSC QC By: Date: Region QA By: Date: Scoped By: Date: Proposed Fix: Location: Culvert Scope Inspection Form (for applicable templates) Construction Cost: Construction Engineering (CE) Cost: Preliminary Engineering (PE) Cost: Right-of-Way Cost: Current Year RSL: Construction Year RSL: Year Value Prop Fix Life: Yrs Yes Yes Yes Yes NA Yes Sufficiency Rating: Page 1 of 2 Details / Checklist Statewide Scoping Package Master Checklist - Bridge Yes Program Revision Request (Form 2604) Traffic Preliminary MOT Concept Mobility Analysis Traffic Analysis & Safety Review Geometric Summary Review (reviewed and/or addressed per the 3R/4R Guidelines) As-Builts/Old Plans Current Sufficiency Report Condition Reports for Existing Sewers (if applicable) NBI Rating: Bridge CSM Bridge Rplc Bridge Rehab Bridge CPM % Total Project Cost: Control Section: Route: Job Number: Template: CS EMP: CS BMP: Length: PR EMP: PR BMP: Length: PR Number: Structure ID: Featured Intersection: Route Over: Michigan Department of Transportation 0594 (10/15) Highway Safety Manual Analysis (Not Mandatory)

Statewide Scoping Package Master Checklist BRIDGE … Job Number: Bridge Scoping Statewide Scoping Package Master Checklist BRIDGE CSM/CPM (Refer to Chapter 7 of the Scoping Manual

  • Upload
    hathu

  • View
    240

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Statewide Scoping Package Master Checklist BRIDGE … Job Number: Bridge Scoping Statewide Scoping Package Master Checklist BRIDGE CSM/CPM (Refer to Chapter 7 of the Scoping Manual

Job Num

ber: B

ridge ScopingStatewide Scoping Package Master Checklist

BRIDGE CSM/CPM (Refer to Chapter 7 of the Scoping Manual for Details)

II. Project Scoping Document Package

Bridge Scoping Report & Details Worksheet MPINS Project Concept Statement

Trns*port (Itemized Estimate Report & Project Concept Estimate Report)

Constructability Checklist

I. Job and Scoping Package Information (Major Only - see page 2 for additional information)

Engineer's Estimate R&

RT&

SC

PM

Hand Calculations & Assumptions

Oth

erBy Template, if checkbox appears, item is required (unless otherwise noted).

General Items & Information

Proposed Pavement Recommendations (if applicable)

Included in Package?

Soils Information and Recommendations (If applicable, From Region Soils Engineer)

NA

TSC QC By: Date: Region QA By: Date:

Scoped By: Date:

Proposed Fix:Location:

Culvert Scope Inspection Form (for applicable templates)

Construction Cost:Construction Engineering (CE) Cost:

Preliminary Engineering (PE) Cost:Right-of-Way Cost:

Current Year RSL: Construction Year RSL:YearValue Prop Fix Life: Yrs

YesYesYesYes NAYes

Sufficiency Rating:

Page 1 of 2

Details / Checklist

Statewide Scoping Package Master Checklist - Bridge Yes

Program Revision Request (Form 2604)

Traffic

Preliminary MOT ConceptMobility AnalysisTraffic Analysis & Safety Review

Geometric Summary Review (reviewed and/or addressed per the 3R/4R Guidelines)

As-Builts/Old PlansCurrent Sufficiency Report Condition Reports for Existing Sewers (if applicable)

NBI Rating:

Brid

ge C

SM

Brid

ge R

plc

Brid

ge R

ehab

Brid

ge C

PM

%

Total Project Cost:

Control Section:Route:

Job Number:

Template:CS EMP:CS BMP:

Length:PR EMP:PR BMP:

Length:

PR Number:

Structure ID:

Featured Intersection: Route Over:

Michigan Department of Transportation

0594 (10/15)

Highway Safety Manual Analysis (Not Mandatory)

Page 2: Statewide Scoping Package Master Checklist BRIDGE … Job Number: Bridge Scoping Statewide Scoping Package Master Checklist BRIDGE CSM/CPM (Refer to Chapter 7 of the Scoping Manual

MDOT 0594 (10/15)Job N

umber:

Bridge Scoping

Project Van Tour Notes or Other Project Constraints

Existing Utility Information Field Review Notes

Previous Call For Projects Information

ROW Sheets with Impacts Highlighted http://mdotwas1.mdot.state.mi.us/public/ROWFiles/index.cfm

CP

M

R&

RT&

S

Oth

erN

A

Supporting Photos (Road Approach)

Statewide Scoping Master Package Checklist

Additional CS, PR, Direction and Etc Information (other than the major listed on page 1)

Page 2 of 2

III. General Items and Background Information

Is the project to be packaged with other projects?

List potential package job numbers & templates

Yes No

Correspondence

Pavement Historical Database (PHD) Data (if applicable)Maintenance Log Sheets

Additional Information Resulting from the Worksheet

Has the project been added to ProjectWise?

Bridge Scoping Report Executive SummaryField Site ReviewRehabilitation OptionsSummary of Repair RecommendationMaintaining Traffic/Mobility SummaryAppendix:

PhotosBridge Rehabilitation Scoping Checklist (Form 1891)Estimate Sheets for Each OptionField Notes & SketchesExisting Plan Sheets (General Plan of Site & General Plan of Structure)Current Bridge Inspection Reports:

Bridge Safety Inspection Form (Form 2502)Bridge Analysis Report (Form 231)

Bridge Underclearance Measurements (Form 1190)Detail Beam Survey Report (Form 267) (If available/applicable)

Diver Inspection Report (If available/applicable)

Yes

Brid

ge R

ehab

Brid

ge C

SM

Brid

ge R

plc

Brid

ge C

PM

Condition Reports for Existing Culverts (if applicable)

Page 3: Statewide Scoping Package Master Checklist BRIDGE … Job Number: Bridge Scoping Statewide Scoping Package Master Checklist BRIDGE CSM/CPM (Refer to Chapter 7 of the Scoping Manual

MDOT 0594 (10/15)Job N

umber:

Bridge Scoping

BRIDGE CSM/CPM SCOPING REPORT & DETAILS WORKSHEET (Refer to Chapter 7 of the Scoping Manual for Details)

III. Typical Cross SectionsExisting Typical: (Bridge/Road Approach)

Proposed Typical: (Bridge/Road Approach)

II. Executive Summary

I. Job and Scoping Package Information (Major Only)Job Number: Control Section:

Route:

Template:CS EMP:CS BMP:

Length:PR EMP:PR BMP:

Length:

PR Number:

Structure ID:

TSC QC By: Date: Region QA By: Date:

Scoped By: Date:

Proposed Fix:Location:

Page 1 of 13

Featured Intersection: Route Over:

Page 4: Statewide Scoping Package Master Checklist BRIDGE … Job Number: Bridge Scoping Statewide Scoping Package Master Checklist BRIDGE CSM/CPM (Refer to Chapter 7 of the Scoping Manual

MDOT 0594 (10/15)Job N

umber:

Bridge Scoping

IV. Existing Conditions (Typical)

B. Existing Approach - Mainline:Type: HMA Concrete Composite

Mainline Pavement Depths: Agg Base: Subbase:in in inApproach Pavement: Agg Base: Subbase:in in in

CompositeHMA Design Speed: mph

BRIDGE CSM/CPM SCOPING REPORT & DETAILS WORKSHEET

Structure Type:

NBI Rating:

Structure Length: Reference A Width: Deck Area:ftft sft

Condition Ratings

#58 Deck:#59 Superstructure: #60 Substructure:

#58A Deck Surface:

Is the structure scour critical?Is the structure fracture critical?

If yes, # 113 scour rating?

A. Existing Structure Features and Ratings

Reference B Width: ftSkew Angle: degrees

Sufficiency Rating:#58B Deck Bottom Surface:

Bridge Rail Condition:Bridge Rail Type:

Are any of the bridge elements considered historic? Yes No

Is the structure considered structurally deficient?Is the structure considered functionally obsolete?

Page 2 of 13

Is there existing pedestrian fencing?Is there an existing HMA overlay?

Yes NoYes No If yes, HMA thickness?

#59A Paint

inExisting beam type?

Section Loss Joint Condition

Are there any temporary supports?

If yes, what elements?

How many temporary supports are in place?What is the condition of the existing temporary supports?

Right Shoulder Left ShoulderPaved Width: Paved Width:

Total Width: Total Width :

HMA Concrete CompositeType:Widths:

ftft

ftft

Aggregate (Only)

Shoulder Pavement Depths: Agg Base: Subbase:in in inShoulder Pavement: Agg Base: Subbase:in in in

Are there existing sleeper slabs?Is there a wide-flanged beam terminal joint?

Yes No UnknownYes No Unknown

C. Existing Approach - Shoulder:

Yes NoYes NoYes NoYes NoYes No

If yes, which one?

Measure:

Is there evidence of scour? Yes No If yes, what elements?

No. of Spans:

Not Applicable?

Not Applicable?

Number of Lanes: Lane Widths: Posted Speed: ft mph

Page 5: Statewide Scoping Package Master Checklist BRIDGE … Job Number: Bridge Scoping Statewide Scoping Package Master Checklist BRIDGE CSM/CPM (Refer to Chapter 7 of the Scoping Manual

MDOT 0594 (10/15)Job N

umber:

Bridge Scoping

Existing Bridge Cross Slope?

Superelevations meet Standard?

Horizontal Curve(s) meet Standard?Vertical Curve(s) meet Standard?

Lanes Shoulders

Is the structure superelevated?

% %

Is the structure curved?

Other notes on geometrics and/or existing super rates:

Yes NoYes NoYes NoYes NoYes No

Parabolic Cross Slope? NoYes NA

E. Existing Photos: (If applicable per proposed Scope)

F. Existing Geometrics:

BRIDGE CSM/CPM SCOPING REPORT & DETAILS WORKSHEET

Page 3 of 13

Other notes on existing ramps:

Full Accel/Decel Lanes Present on the Structure? Length: ft

Lane Tapers Present on the Structure?Yes NoYes No

D. Existing Ramps on the structure:

Elevation views (both sides of bridge)Deck surface, joints and railingApproaches

Underside of DeckSuperstructure Elements (beams, bearings, pin & hanger and etc)Substructure Abutments (including slope protection) and piersWaterways/Railroad tracksMajor deterioration areasSigns (vertical clearance signs, load posting signs or etc)UtilitiesQuadrant photos

Included NA

Included NA

Included NAIncluded NA

Included NAIncluded NAIncluded NAIncluded NAIncluded NAIncluded NA

Included NA

Not Applicable?

Not Applicable?

Building Location Relative to Structure Included NA

Page 6: Statewide Scoping Package Master Checklist BRIDGE … Job Number: Bridge Scoping Statewide Scoping Package Master Checklist BRIDGE CSM/CPM (Refer to Chapter 7 of the Scoping Manual

MDOT 0594 (10/15)Job N

umber:

Bridge Scoping

G. Existing Guardrail or Median Barrier: (attached to bridge rail)Existing Guardrail?

Existing Median Barrier?Existing Glare Screen?Existing Attenuators?

Yes No

Yes NoYes NoYes No

Existing Guardrail Retrofit?Existing Guardrail Anchorage?

Yes NoYes NoYes No

Type: Condition:Length:

Condition:Length:Condition:Length:

Type:

Number:

ft

ftft

Type: Length: ftType: (choose or enter text)

H. Existing Utilities: (on the structure)Existing Private Utilities?Existing Public Utilities?

List Utility Type & Info

Existing Water Mains? Condition:

Existing Asbestos?

Yes NoYes NoYes No

Yes No

USGS Stream Gauging Station? Yes No

I. Existing Signals: (on the structure)Existing Signals?

Existing Ped Signals?Number of Intersections:

Existing Ped Push Buttons?

Existing Traffic Loops?Existing Flashers?

Yes NoYes NoYes NoYes No

Yes No Unknown

Page 4 of 13

BRIDGE CSM/CPM SCOPING REPORT & DETAILS WORKSHEET

Existing sidewalk? Barrier separated?:Width: ftYes NoSidewalk location

Yes No

Existing non-motorized?

Are ramps ADA compliant?

Number of ramps:Existing sidewalk ramps? Condition:Number of non-compliant ramps:

Width: ft Barrier separated?: Yes NoYes NoYes NoYes No

J. Existing Sidewalk or Non-Motorized Facility: (on the structure)

Not Applicable?

Not Applicable?

Not Applicable?

Not Applicable?

Page 7: Statewide Scoping Package Master Checklist BRIDGE … Job Number: Bridge Scoping Statewide Scoping Package Master Checklist BRIDGE CSM/CPM (Refer to Chapter 7 of the Scoping Manual

MDOT 0594 (10/15)Job N

umber:

Bridge Scoping

K. Existing General Conditions: (some items below will require photos - see manual)

Existing railroad crossings?

Is there an Access Management Plan for the project area?Is there an EA or EIS Study for the project area?

Existing freeway lighting attached?Existing ITS facilities attached?

Is this a Corridor of Significance?

L. Other General Notes on Existing Conditions:

Existing truss or cantilever signs attached? Number:

Existing slope stability issues?Existing erosion issues?

Existing maintenance issues/concerns?

Existing raised pavement markers?

Type:

Existing settlement areas?

Type:

Existing airport in the vicinity?

Page 5 of 13

Are the sign mounts welded to the structure?Are the sign mounts bolted to the structure?

Yes NoYes No

Yes NoYes No

Yes NoYes No

Yes NoYes No

Yes NoYes NoYes NoYes No

Yes NoYes NoYes No

BRIDGE CSM/CPM SCOPING REPORT & DETAILS WORKSHEET

Existing trees or brush within Clear Zone? Yes NoExisting encroachments within Clear Zone? Yes No Type:

Is this on a National Truck Network? Yes No

Is there evidence of pedestrian activity leading up to the structure?

Yes No

Does the community or communities have a Complete Streets Policy? NoYes

Page 8: Statewide Scoping Package Master Checklist BRIDGE … Job Number: Bridge Scoping Statewide Scoping Package Master Checklist BRIDGE CSM/CPM (Refer to Chapter 7 of the Scoping Manual

MDOT 0594 (10/15)Job N

umber:

Bridge Scoping

Epoxy overlay?

Patch isolated spalls?

Replace joints? Type:

Bridge railing work? Length: ft

HMA overlay with waterproofing membrane?

Concrete deck patching?

Other fix or notes on superstructure and/or deck rehabilitation:

Beam end repairs? Material:

Reinforcing plates and/or angles?

Pin & hanger replacement? Number: eaAll?If selected number list quantity and location:

Structure painting?

Bearing replacement?

Location:Type:

Number: eaRocker re-alignment? Number: ea

Yes No

HMA overlay without waterproofing membrane?

Deck Drain Extensions?

Structural steel repairs?

Yes NoYes NoYes NoYes NoYes NoYes NoYes NoYes NoYes NoYes NoYes No

Yes NoYes NoYes NoYes No Number: ea

V. Proposed Structure WorkA. Proposed Superstructure and/or Deck Rehabilitation

Type:

Page 6 of 13

BRIDGE CSM/CPM SCOPING REPORT & DETAILS WORKSHEET

B. Proposed Substructure RehabilitationConcrete spall patching? Abutment area: sft Pier area: sft

Other fix or notes on substructure rehabilitation:

Yes NoTemporary supports? Yes No

Not Applicable?

Not Applicable?

Page 9: Statewide Scoping Package Master Checklist BRIDGE … Job Number: Bridge Scoping Statewide Scoping Package Master Checklist BRIDGE CSM/CPM (Refer to Chapter 7 of the Scoping Manual

MDOT 0594 (10/15)Job N

umber:

Bridge Scoping

Replace bridge railing? Length: ftBlock out existing railing with thrie beam?Upgrade approach guardrail?Concrete filler wall between pier columns?Guardrail for pier protection?

Other fix or notes on safety upgrading:

Length: ftLength: ftLength: ftLength: ft

Pedestrian fence? Length: ft

Yes NoYes NoYes NoYes NoYes NoYes No

C. Proposed Miscellaneous RehabilitationScour analysis required?Scour Erosion/erosion repairs (add notes below)?

Replace approach pavement?Repair slope protection?Park or business concerns?

Other fix or notes on miscellaneous rehabilitation:

Scour countermeasures?

Yes NoYes NoYes NoYes NoYes NoYes No

Length:

D. Proposed Safety Upgrading

Page 7 of 13

BRIDGE CSM/CPM SCOPING REPORT & DETAILS WORKSHEET

E. Proposed Approach - Mainline:

Number of Lanes: Lane Widths: Pavement Thickness: Agg Base: Subbase:

Design Speed: ftType: HMA Concrete Composite

in in in

Do the proposed widths result in any widening?

List all work type(s) and related fix life(s):

Yes NoProposed sleeper slabs? Yes No Unknown

Approach Length: ft

Not Applicable?

Not Applicable?

Not Applicable?

Page 10: Statewide Scoping Package Master Checklist BRIDGE … Job Number: Bridge Scoping Statewide Scoping Package Master Checklist BRIDGE CSM/CPM (Refer to Chapter 7 of the Scoping Manual

MDOT 0594 (10/15)Job N

umber:

Bridge Scoping

F. Proposed Approach - Shoulder:

Page 8 of 13

BRIDGE CSM/CPM SCOPING REPORT & DETAILS WORKSHEET

G. Proposed Geometric Corrections:

Type:Right Shoulder Left Shoulder

Paved Width: Paved Width: Total Width: Total Width :

HMA Concrete Composite

Widths:

Pavement Thickness: Agg Base: Subbase:

ftft

ftft

in in in

Do the proposed widths result in any widening?

Aggregate (Only)

Yes NoWill the existing shoulders be left in place in the proposed project (if yes, continue)?

Will the existing shoulder be used for Maintaining Traffic (if yes, continue)?

Yes No Unknown

Yes No Unknown

Are shoulder cores for the existing shoulders needed?Are existing shoulder cores available?

Is the existing shoulder density 92% or greater?Is the existing shoulder density 90% or greater?

Yes No UnknownYes No UnknownYes No UnknownYes No Unknown

YesYes

Proposed Normal Section Cross Slope: Lanes:

Superelevation Modification(s)?

Other notes on geometrics and/or existing super rates:

%Cross Slope Modification(s)? Yes No

Yes NoHMA Wedging? No

NoHMA Wedging?

Proposed Guardrail? Type: Length:

Proposed Median Barrier? Length:

Proposed Glare Screen? Length:

Proposed Attenuators?

Type:

Type: Number:

ft

ftft

Yes No

Yes NoYes NoYes No

Proposed Guardrail Retrofit?Proposed Guardrail Anchorage?

Type: Length: ftYes NoYes No

Type: (choose or enter text)

Proposed Signals?Proposed Flashers?Proposed Ped Signals?

Number of Intersections:

Proposed Ped Push Buttons?

Proposed Traffic Loops:Yes NoYes NoYes NoYes No

Yes No

Proposed non-motorized?Proposed sidewalk? Barrier separated?Width:

Number of ramps:Proposed ADA ramps?

ftWidth: ft Barrier separated?

Yes NoYes NoYes No

Yes NoYes No

H. Proposed Guardrail or Median Barrier: (attached to bridge rail)

I. Proposed Signals: (on the structure)

J. Proposed Sidewalk or Non-Motorized Facility: (on the structure)

Not Applicable?

Not Applicable?

Not Applicable?

Not Applicable?

Not Applicable?

Page 11: Statewide Scoping Package Master Checklist BRIDGE … Job Number: Bridge Scoping Statewide Scoping Package Master Checklist BRIDGE CSM/CPM (Refer to Chapter 7 of the Scoping Manual

MDOT 0594 (10/15)Job N

umber:

Bridge Scoping

Page 9 of 13

BRIDGE CSM/CPM SCOPING REPORT & DETAILS WORKSHEET

K. Proposed General Conditions:

Proposed freeway lighting attached?

Proposed truss or cantilever signs?

Proposed ITS facilities attached?

Number:

Proposed railroad impacts?

Proposed slope stabilization work?

Proposed ROW fence replacement?

Will a Phase I Site Assessment be needed?

Proposed erosion control items?

Is the proposed work consistent with an EA or EIS Study for the proposed project?

Any features from an existing Access Management Plan being incorporated into the proposed project?

Yes NoYes NoYes NoYes NoYes NoYes NoYes NoYes NoYes No

Yes No

L. Other General Notes on Proposed Improvements:

VI. Bridge Underclearances (see Design Manual for Details)Corridor Underclearance Requirements (14' 6” or 16'):

Structures underclearance requirements:Grade separated facilities:

Grade separated railroad meet underclearance requirements (23'): Yes No NARR Horizontal Clearance: lt rt

Page 12: Statewide Scoping Package Master Checklist BRIDGE … Job Number: Bridge Scoping Statewide Scoping Package Master Checklist BRIDGE CSM/CPM (Refer to Chapter 7 of the Scoping Manual

MDOT 0594 (10/15)Job N

umber:

Bridge Scoping

Lane WidthDesign Speed

Shoulder WidthBridge WidthStructural Capacity Cross Slope

GradeVertical (SSD)Vertical AlignmentVertical Clearance

Horizontal Clearance SuperelevationHorizontal Alignment Accel & Decel LengthsHorizontal (sightline offset)

VII. Anticipated Design Exception(s) (check all that apply)

IX. Environmental Information

Statutory Participation (Act 51)

Drainage AgreementCorp of EngineersCounty Drain (for review, not permitting)

DEQParking AgreementsUtility Relocation AgreementsNon-motorized Maint. Agreements

Participation (other)Variance (noise, other...) Maintenance AgreementsFAA (obstruction evaluation)

VIII. Permits & Agreements Required (check all that apply)

Page 10 of 13

BRIDGE CSM/CPM SCOPING REPORT & DETAILS WORKSHEET

X. Stakeholder InformationProposed Activity Level of Stakeholder Engagement

Level ILevel IILevel IIILevel IVLevel V

Yes NoYes NoYes NoYes NoYes No

XI. Supplemental InformationIs this project in an Metropolitan Planning Organization (MPO)?

Is there pavement coring information available?Is there survey information available?

Will there be FHWA Oversight on this project?

Will there be Multi-Modal or Modal Connectivity opportunities?Have different alternatives been analyzed?

Will a Value Engineering (VE) be required (cost > $25 Million)?Yes No UnknownYes No UnknownYes No UnknownYes No UnknownYes No UnknownYes No UnknownYes No Unknown

Not Applicable?Wetland impacts?Floodplain impacts?Known contamination sites (LUST, etc...)?Known threatened or endangered species?

Approx Acreage:100 Yr Flood Elev:

Yes No UnknownYes No UnknownYes No UnknownYes No Unknown

Known archaeology? Yes No UnknownTribal coordination required? Yes No Unknown

Not Applicable?

Not Applicable?

Known historic bridges or other structures?

Tree removals and/or replacements?River or stream impacts?

Clearing required?Yes No UnknownYes No UnknownYes No UnknownYes No Unknown

Impacts to local park facilities (4F, 6F)? Yes No UnknownImpacts to US National Forest land? Yes No Unknown

Page 13: Statewide Scoping Package Master Checklist BRIDGE … Job Number: Bridge Scoping Statewide Scoping Package Master Checklist BRIDGE CSM/CPM (Refer to Chapter 7 of the Scoping Manual

MDOT 0594 (10/15)Job N

umber:

Bridge Scoping

XII. Site Visit Notes

Page 11 of 13

BRIDGE CSM/CPM SCOPING REPORT & DETAILS WORKSHEET

Page 14: Statewide Scoping Package Master Checklist BRIDGE … Job Number: Bridge Scoping Statewide Scoping Package Master Checklist BRIDGE CSM/CPM (Refer to Chapter 7 of the Scoping Manual

MDOT 0594 (10/15)Job N

umber:

Bridge Scoping

Please list any known traffic restrictions (including detour route)

XIII. Traffic and MobilityA. Maintenance of Traffic (MOT) Scheme:

Please give a brief description of MOT plan (including detour route)

Full Closure:

Full Detour Route:

Combination:Closure Type:Traffic Routing:

Will detour route utilize local roadways?If yes, will local approval of the detour route be attainable?Will detour route require improvements?

On existing Route:

Will project require pedestrian detours?

B. Safety Items:

C. Mobility (see Mobility Manual):Existing Capacity Analysis (includes V/C calc, travel time, LOS, etc) Proposed Capacity Analysis (includes V/C calc, Delay Worksheet, LOS, etc)Preliminary Transportation Management Plan (TMP) (if applicable)

Traffic Restrictions?

Other Delay Mitigation Notes:

Delay Mitigation Measures:

Brid

geC

PM

R&

RT&

S

Oth

er

Page 12 of 13

Yes No UnknownYes NoYes NoYes No Unknown

BRIDGE CSM/CPM SCOPING REPORT & DETAILS WORKSHEET

Yes No

Temporary CrossoversTemporary Widening

Incentive/ Disincentive

Night or Weekend WorkMobile ClosureFlag ControlTemporary Signal

Lane Rental

Dynamic Lane Merge System

A + B

Moveable Temp Barrier

Part width Construction:Directional Detour Route:

Signed Alternate Route:

Has this project been identified on the FHWA Transparency Report? http://safety.fhwa.dot.gov/hsip/fivepercent/

Safety Review/Crash Analysis

TOR Package a. TOR Calculation Spreadsheet b. UD-10s; Only for miss codings or additional crashes

Geometric Sketch

Has this proposed project been identified on the High Crash List? YearYes NoYes No

Highway Safety Manual Analysis (Not Mandatory)

Year

Crash History (Information from One Line Listing)

NA

Page 15: Statewide Scoping Package Master Checklist BRIDGE … Job Number: Bridge Scoping Statewide Scoping Package Master Checklist BRIDGE CSM/CPM (Refer to Chapter 7 of the Scoping Manual

MDOT 0594 (10/15)Job N

umber:

Bridge Scoping

Transportation Alternatives Program

Tree Removals

XIV. Concept Statement Info (check all that apply)

Adjacent JobsBridge PaintingContaminated Site in AreaCrosses FarmlandCrosses Streams/Lakes/DrainsDetour or Road/Ramp Closure

Heritage RouteHigh Tourist RouteNatural/Federal Landmarks

Over 5 Acres Earth DisturbanceReduced Traffic FlowROW/Grading Permit on Recreational PropertyROW/Grading Permit on Farmland

Work Outside of Existing Shldr/Curbs Work Outside Toe of Slope

Over 1 Acre Earth Disturbance

Change in Bus Access/ParkingControversialCrosses FloodplainsCrosses WetlandsDisplacements of Residences/Businesses

Hazardous MaterialsHigh Impact ProjectHistoric Bridge

Public ControversyRip Rap RequiredROW/Grading Permit NeededTraffic GeneratorsWidening of Road or Bridge

Engineering Survey RequiredEnvironmental Issues

Other Environmental IssuesOther

Agency Permit Required

Page 13 of 13

BRIDGE CSM/CPM SCOPING REPORT & DETAILS WORKSHEET

Community or Communities have Complete Streets Policy