19
Status of 1.5.3 Detector Characterization a.k.a. Calibration & Monitoring Project Year 2 objectives (→ Mar ‘04) 1. Calibration plan (first draft in March ‘03 – still circulating…) 2. Define contents of calibration DB 3. Define algorithms 4. Monitoring interface for TestDAQ 5. Monitoring plan (new L4 for monitoring: Rodin Porrata) Manpower 1 FTE (UCB) + 0.5 FTE (UW) + 0.2 FTE (UD) + δ Kurt Woschnagg, UC Berkeley

Status of 1.5.3 Detector Characterization a.k.a. Calibration & Monitoring

  • Upload
    annot

  • View
    46

  • Download
    0

Embed Size (px)

DESCRIPTION

Status of 1.5.3 Detector Characterization a.k.a. Calibration & Monitoring. Project Year 2 objectives ( → Mar ‘04) 1. Calibration plan (first draft in March ‘03 – still circulating…) 2. Define contents of calibration DB 3. Define algorithms 4. Monitoring interface for TestDAQ - PowerPoint PPT Presentation

Citation preview

Page 1: Status of 1.5.3 Detector Characterization a.k.a. Calibration & Monitoring

Status of

1.5.3 Detector Characterization

a.k.a. Calibration & Monitoring

• Project Year 2 objectives (→ Mar ‘04)1. Calibration plan (first draft in March ‘03 – still circulating…)2. Define contents of calibration DB3. Define algorithms4. Monitoring interface for TestDAQ5. Monitoring plan (new L4 for monitoring: Rodin Porrata)

• Manpower1 FTE (UCB) + 0.5 FTE (UW) + 0.2 FTE (UD) + δ

Kurt Woschnagg, UC Berkeley

Page 2: Status of 1.5.3 Detector Characterization a.k.a. Calibration & Monitoring

Calibration Tasks

Low-level calibrations:• Timing 7 ns• Geometry 1 m• Charge, OM gain (lab, ice)• Angular OM acceptance (lab)• Optical ice properties

High-level calibrations:• Energy (cascades)• Vertex resolution• Pointing accuracy and angular resolution

DOM lab calibrations not included here

Page 3: Status of 1.5.3 Detector Characterization a.k.a. Calibration & Monitoring

Timing calibrationAutomatic, part of normal DAQ ops

1. Every waveform time-stamped (coarse, fine) locally in DOM

2. Clock calibration (RAPcal) to relate local times to global (master) time

3. PMT transit time measurement (in lab, in-situ with onboard LED)

Testing (post-deployment):- with flasher data- with muons (req. reconstruction)

Development and testing underway @LBL

Page 4: Status of 1.5.3 Detector Characterization a.k.a. Calibration & Monitoring

Calibration devices

• Standard candles (lasers) vertex, energy• Flasher boards geometry, timing, vertex,

energy, ice• Dust loggers ice properties• On-board LEDs charge, timing (transit time)

• Pressure sensors geometry, deployment

• Payout, drill, GPS geometry• Acoustic televiewer drilling

So far: physics requirements, cable issues

Page 5: Status of 1.5.3 Detector Characterization a.k.a. Calibration & Monitoring

Geometry calibration in 3 stages

►Stage 1 (~days)Combine deployment data: surface survey, drill log, pressure data, payout etc. One shot!

►Stage 2 (~weeks→days?)Interstring calibration with flasher dataRequires: timing calib.

►Stage 3 (~months→weeks→days?)Muon surveyRequires: timing calib., reconstruction

Page 6: Status of 1.5.3 Detector Characterization a.k.a. Calibration & Monitoring

Geometry calibration – Stage 1

Initial geometry from deployment data:

• GPS survey of surface locations

• Pressure sensors• Drill log• Well depth• Cable payout

+ Hole diameter from acoustic televiewer

→ Absolute OM positions within ~1 m

Time scale: days → day?

Page 7: Status of 1.5.3 Detector Characterization a.k.a. Calibration & Monitoring

Geometry calibration – Stage 2

→ Relative string positions within ~0.5 m Time scale: weeks → days?

Global interstring fit to flasher timing data

Does it work in IceCube?

Page 8: Status of 1.5.3 Detector Characterization a.k.a. Calibration & Monitoring

Measuring ice flow with cosmic-ray muons

Rigid down to 2000 m

Stuck atbedrock

Lagging

1. Reconstruct downgoing muon tracks2. Find location for each OM that minimizes

its contribution to the reconstruction likelihood

Page 9: Status of 1.5.3 Detector Characterization a.k.a. Calibration & Monitoring

Geometry calibration – Stage 3

Survey with downgoing muons

→ OM positions within ~0.3 m

Time scale: month(s) → weeks → days?

Test: finds artificial shifts

Development and testing on AMANDAdata underway @ UCB (Jeff Allen, Dima)

Page 10: Status of 1.5.3 Detector Characterization a.k.a. Calibration & Monitoring

Optical properties of ice

So what is left to do…

From in-situ light sources in AMANDA we get (after some analysis):

Page 11: Status of 1.5.3 Detector Characterization a.k.a. Calibration & Monitoring

Optical properties in IceCube

1. Are the dust bands horizontal over km-scale?

2. What happens below 2100 m?

3. Can we measure hole ice prop.?

Page 12: Status of 1.5.3 Detector Characterization a.k.a. Calibration & Monitoring

Calibration hardware

Flasher boards• Requirements document (ERD) finalized

• Each board has 12 LEDs (405 nm)6 horizontal for geometry6 at ~45° for cascade simulationAll 12 can be fired independentlyAdjustable light output

• Cascade energies up to 10 TeV (at least)

Page 13: Status of 1.5.3 Detector Characterization a.k.a. Calibration & Monitoring

Calibration hardware

Dust loggers

Conceptual design stage,but:• Experience at UCB• Proven method

Optimal placement: in IceCube corners andat AMANDA center

Deploy first season?

Page 14: Status of 1.5.3 Detector Characterization a.k.a. Calibration & Monitoring

Record of Northern climate variations at GISP2(Greenland Ice Sheet Project, 3054 meters)

Dust in ice core

Temperature record from ice core

Dust logger data

A dust logger in actionRyan Bay,

UCB

Page 15: Status of 1.5.3 Detector Characterization a.k.a. Calibration & Monitoring

DOM gain (charge) calibrationRelate measured charge to number of photoelectrons

• In lab (pre-deployment): measured for all DOMs → database- SPE peak- linearity- dynamic range- saturation- dependence on HV, temperature

• In situ (post-deployment): on-board LED, min-bias muon data- SPE peak- linearity? saturation?

Page 16: Status of 1.5.3 Detector Characterization a.k.a. Calibration & Monitoring

Calibration hardware

On-board LEDsHardware:

Separate UV LED on DOM main board

Purpose:Charge calibration: SPE peakTiming calibration: PMT transit time

Work in progress (@LBL):Light outputPulse widthOptical couplingPlacement

Page 17: Status of 1.5.3 Detector Characterization a.k.a. Calibration & Monitoring

Cascade energy calibration

~105 photons/GeV

In-situ light sources:

1. Flashers; up to 10 TeV2. Lasers; 1 TeV and up

Standard candles: absolute calibration in labRealistic cascade simulation (light distribution, timing)

• Overlay events to reach higher energies- saturation (database with lab measurements)- software

Page 18: Status of 1.5.3 Detector Characterization a.k.a. Calibration & Monitoring

Getting ready for the first strings

The first IceCube string is deployed in Dec ’04…then what?

Mainly calibrations in ’05

• Timing calibration• Reconstruction• Deployment daqAMANDA/IceCube cross calibrations:

- Common reconstruction- Coordinate system

Page 19: Status of 1.5.3 Detector Characterization a.k.a. Calibration & Monitoring

Dependencies by WBS element

• Reconstruction• Deployment• DAQ• AMANDA-IceCube integration• Software• Simulation• In-ice devices (in-situ light sources)

• Monitoring, database, …