13
RPC Trigger ESR Warsaw 08 July 2003 F. Loddo I.N.F.N. Bari Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB RPC electronics status RPC electronics status Flavio Loddo I.N.F.N. Bari

Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB

  • Upload
    hedwig

  • View
    91

  • Download
    1

Embed Size (px)

DESCRIPTION

RPC electronics status. Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB. Flavio Loddo I.N.F.N. Bari. Barrel FEB Production status. All the Barrel FEBs produced and tested (5500) - PowerPoint PPT Presentation

Citation preview

Page 1: Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB

RPC Trigger ESR Warsaw 08 July 2003 F. Loddo I.N.F.N. Bari

• Status report on RPC FEB production• Status report on RPC Distribution Board• Interfaces RPC-LB

RPC electronics statusRPC electronics status

Flavio Loddo

I.N.F.N. Bari

Page 2: Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB

RPC Trigger ESR Warsaw 08 July 2003 F. Loddo I.N.F.N. Bari

Barrel FEB Production Barrel FEB Production statusstatus

• All the Barrel FEBs produced and tested (5500)

• The Boards classified according to the delay time in steps of 250 ps --> Time code produced

• Boards with the same time code are mounted on the 6-FEB rows

• Test & classification results logged into Barrel RPC production Database (www.ba.infn.it/rpc)

Page 3: Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB

RPC Trigger ESR Warsaw 08 July 2003 F. Loddo I.N.F.N. Bari

Barrel FEB Production Barrel FEB Production statusstatus

16 inputs from strips

Page 4: Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB

RPC Trigger ESR Warsaw 08 July 2003 F. Loddo I.N.F.N. Bari

Barrel FEB DatabaseBarrel FEB Database

Page 5: Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB

RPC Trigger ESR Warsaw 08 July 2003 F. Loddo I.N.F.N. Bari

EndcapEndcap FEB Production status FEB Production status (PK (PK responsability)responsability)

• 50 Endcap FEBs produced and used during 2002 Test Beams• Mechanical problems (poor locking) on the input connector

other connectors under evaluation

32 inputs from strips

Page 6: Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB

MLink Board

SLink Board

DistributionBoard

Backup I2C busfrom DT (for 2 RPC’s)

FEB

FEB

RPC

LV1

LV2

LV3

MUX

(I2C from LB)

(Backup I2C)

I2C (LVDS)

LV input cable

Signals + test pattern cable

I2C connector

LV input

FieldbusOPTO

BarrelBarrel Distribution Board Distribution BoardFull production: done (450 boards)

Page 7: Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB

RPC Trigger ESR Warsaw 08 July 2003 F. Loddo I.N.F.N. Bari

BarrelBarrel Distribution Board Distribution Board

Power Connector

I2C Conn.

(Sec. 1-2,DT)

I2C Conn.

(Sec. 3)To FEB row # 3

To FEB row # 1

To FEB row # 2

Dim: 13 x 21 cm2

(including connectors)

Page 8: Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB

RPC Trigger ESR Warsaw 08 July 2003 F. Loddo I.N.F.N. Bari

EndcapEndcap Distribution Board Distribution Board (PK (PK responsability)responsability)

Power ConnectorI2C Conn.

To FEB row # 1

To FEB row # 2(to be used only in RE2/1)

Dim: 7.8 x 5.9 cm2

Power: ~ 100 mW

Page 9: Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB

RPC Trigger ESR Warsaw 08 July 2003 F. Loddo I.N.F.N. Bari

Interfaces RPC-LBInterfaces RPC-LBRPC-LB interfaces

FEB-LB

1. FEB -> LB:

16 LVDS output signals

2. LB -> FEB:

4 LVDS Test Input

(1 per 4 channels)

All available on the same 40-pin Scotchflex connector

Distr.Board – Control Board

(Slow Control)

Page 10: Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB

RPC Trigger ESR Warsaw 08 July 2003 F. Loddo I.N.F.N. Bari

RPC Distr. Board-LB Control RPC Distr. Board-LB Control BoardBoard

• The Control Board sends remote control to RPC via I2C bus

• One I2C line can control up to 8 Barrel FEB or 4 Endcap FEB

Barrel: 12 (18) FEBs/Chamb.

We need:

• 15 lines in sectors 4,10

• 12 lines in sectors 9,11

• 13 in the other barrel sectors

Endcap: 8 FEBs/RE2/1

3-4 FEBs elsewhere

We need:

• 1 line for each chamber, including RE2/1 where we use I2C Mux to address 2 rows

Page 11: Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB

RPC Trigger ESR Warsaw 08 July 2003 F. Loddo I.N.F.N. Bari

RPC Distr. Board-LB Control RPC Distr. Board-LB Control BoardBoard

• The I2C bus is a local bus running at 100 kbit/s in standard mode

• It consists of 2 serial lines: SCL (uni-directional) and SDA(bi-directional)

•It cannot drive long lines (few meters max) because it suffers of high capacitive loads

• To overcome this limitation, on the Control Board the SDA line is split into 2 uni-directional lines using the Philips component (P82B96) and SCL, SDA_IN, SDA_OUT are sent to RPC in LVDS on twisted-pair cable

•On the RPC Distr. Board they are reconverted into standard I2C and sent to FEBs

• This link (25 meter cable) was tested successfully during last test beam (I don’t expect problems with longer cables, due the very low transmission rate)

Page 12: Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB

RPC Trigger ESR Warsaw 08 July 2003 F. Loddo I.N.F.N. Bari

RPC Distr. Board-LB Control RPC Distr. Board-LB Control BoardBoard

• The I2C bus is used to set and read-back the Vthresholds and the Pulse widths on the FEBs

• Typical I2C operations are:

1. Write 1, 2 or 3 bytes

2. Read 1 or 2 bytes

• It could not be tested during 2003 test beam due to limitations in the CCU

Page 13: Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB

RPC Trigger ESR Warsaw 08 July 2003 F. Loddo I.N.F.N. Bari

ConclusionsConclusions

• The Barrel electronics was fully produced and is under installation in the detectors

• The Endcap electronics was designed and is ready for production

• During the 2003 Test Beam (25ns beam) were tested successfully:

1. the RPC-LB connection (RPC signals and Test pattern signals)

2. the Control Board-Distr. Board only under the electrical point of view

• More investigations are needed for I2C routines implemented in the Control Board