4
Mass Grid Fill Explode Network RE -ASSEMBLED// Located on the Island of St. Criox, Virgin Islands, the site provides an ecosystem that is quite delecate in which any type of contruction would bring harm to the habitat. Several issues that exist in the site is forest fragmentation. What this problem causes is the dispersement of forest in this case more specifically the mangrooves which are native to the site, which slowly destroys the ecosystem as it no longers works as a whole but as a frag- mented system which can no longer bare the natural conditions and gradually disappears. Therefore because the site is located specifically in the ecological preserve in which the mangrooves are bieing preserved, it is absolutley crucial that only the minimal amount of construction should be assigned to the site. The project RE -ASSEMBLED// is a sustainable laboratory aimed at providing a means of sustainable building by RE using shipping containers and their frames through a system of pre-ASSEMBLED// modules. This system of pre assembly allows for the contruction on site to be reduced in a major way, without impacting the site in a harmful way as a system of networks connected to several columns raised above the ground. The columns location is predetermined as it is driven by the site and are placed in a position in which least harm would be done to the site which is where there is the least amount of trees. The advantage of this system of column placement, and pre-ASSEMBLED modules allows for a system in which in the future can grow depending on the type of programatic demands the building needs. This allows for an always expanding building that grows in a sustainable manner as it not only takes the site into consideration but allows the site to RE - generate.

Steel Competition Virgin Islands

Embed Size (px)

Citation preview

  • Mass Grid Fill Explode Network

    RE-ASSEMBLED//Located on the Island of St. Criox, Virgin Islands, the site provides an ecosystem that is quite delecate in which any type of contruction would bring harm to the habitat. Several issues that exist in the site is forest fragmentation. What this problem causes is the dispersement of forest in this case more specically the mangrooves which are native to the site, which slowly destroys the ecosystem as it no longers works as a whole but as a frag-mented system which can no longer bare the natural conditions and gradually disappears.

    Therefore because the site is located specically in the ecological preserve in which the mangrooves are bieing preserved, it is absolutley crucial that only the minimal amount of construction should be assigned to the site. The project RE-ASSEMBLED// is a sustainable laboratory aimed at providing a means of sustainable building by RE using shipping containers and their frames through a system of pre-ASSEMBLED// modules. This system of pre assembly allows for the contruction on site to be reduced in a major way, without impacting the site in a harmful way as a system of networks connected to several columns raised above the ground. The columns location is predetermined as it is driven by the site and are placed in a position in which least harm would be done to the site which is where there is the least amount of trees.

    The advantage of this system of column placement, and pre-ASSEMBLED modules allows for a system in which in the future can grow depending on the type of programatic demands the building needs. This allows for an always expanding building that grows in a sustainable manner as it not only takes the site into consideration but allows the site to RE- generate.

  • Exterior Render- Green Roof

    N

    PM

    AM

    Summer

    Winnter

    Administration

    Community Outreach

    Lecture/ Teaching

    Collections

    Laboratories

    Maintenence

    Boat Dock

    Living/ Housing

    PHASE 1 PHASE 2

    Site Conditions

    Wind Diagram

    Theater Section

    Roof System

  • Detail Connection

    Water Collection through Steel Truss

    PHASE 3

    Horizontal Circulation

    Vertical Circulation

    Roof Axon

    Module Connections

  • PRO

    DU

    CED

    BY

    AN

    AU

    TOD

    ESK

    ED

    UC

    ATI

    ON

    AL

    PRO

    DU

    CT

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

    PRO

    DU

    CED

    BY A

    N A

    UTO

    DESK

    EDU

    CA

    TION

    AL PR

    OD

    UC

    T

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

    PRO

    DU

    CED

    BY

    AN

    AU

    TOD

    ESK

    ED

    UC

    ATI

    ON

    AL

    PRO

    DU

    CT

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

    PRO

    DU

    CED

    BY A

    N A

    UTO

    DESK

    EDU

    CA

    TION

    AL PR

    OD

    UC

    T

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

    PHASE 4

    3rd Floor Plan

    1st Floor Plan

    Laboratory Axon

    Sta Resident Axon

    Student Resident Axon

    Theater Module Axon

    Open Module Axon