SunGard Docklands Workplace Datasheet

Embed Size (px)

Citation preview

  • 8/6/2019 SunGard Docklands Workplace Datasheet

    1/2

    AVAILABILITY SERVICESWORKPLACE RECOVERY CAMPUS

    Physical Features

    RecoveryArea135,885 sq ft

    CER/WorkplaceRatingsProtected

    CER/FlexArea28,768 sq ft

    MaxPositions2,255

    PositionsShared982

    PositionsDedicated1,273

    SharedDealing186

    SharedSuites16 ConferenceRooms2

    MeetingRooms5

    CrisisManagementSuite1

    PostRooms1

    ShowerRooms8

    UPSYes

    GeneratorYes

    RestArea/TeaPoints8

    StorageNA

    Parking51.

    SunGards Flexible Workplace Recovery estate provides you

    with the largest network of secure recovery locations that areconvenient and seamlessly connected to ensure your recoveryis easier, faster and sustainable.

    UK Wide WorkplaceRecovery Specifcation

    BS25999Part2certied Resilient

    business operations across every Workplace

    Recovery centre.

    SingleResilientNationalSecuritySystem

    Ideal for nationwide recovery needs, onesystem for easy, rapid admin:

    Governmentagencyintelligencefeeds

    Every location aware of latest national and

    local threats

    Mannedsecurity Counter surveillance,

    rst aid and conict management

    trained staff

    SmartautomatedCCTV Perimeter

    and internal: automated detection and

    alerts with keyboard and monitor zoom.

    Compliant with Home Ofce and policeevidentiary recording standard

    PhysicalaccesscontrolsPreventing

    opportunistic intrusion

    Centralisedcontrolandadministration

    Rapid and easy customer conguration

    and tailoring.

    Standardised,premier,enterpriselevel

    recoveryinfrastructure Rapid, reliable,

    easier recovery and rollback:

    PCbuild Reduces recovery complexity.

    Telephony Inbound and outbound calls,

    RTO from 10 mins:

    Centralisedswitch Recovery from

    any location

    Localswitch Permits greater control

    and tailoring of service

    LocalswitchcontrolEnables greater

    security and tailoring for customers

    TDMandIPTtelephonysystems

    Recover both types for your

    usual functionality

    Freeseating/AutomatedCall

    DistributionSit anywhere, securecall distribution even for multiple

    shift workers.

    Docklands

  • 8/6/2019 SunGard Docklands Workplace Datasheet

    2/2

    Dundee

    Coventry

    Milton Keynes

    Bristol

    Poole

    Elland

    Livingston

    Warrington

    Stockport

    Leicester

    DOCKLANDSWORKPLACE RECOVERYCAMPUS

    United Kingdom & European Head Office, 12-13 Bracknell Beeches, Old Bracknell Lane West,

    Bracknell, Berkshire RG12 7BW 0800 143 413 [email protected] www.sungard.co.uk

    2010SunGardAvailabilityServices(UK)LimitedSunGardandtheSunGardlogoaretrademarksorregisteredtrademarksofSunGardDataSystemsInc.oritssubsidiariesinthe

    USandothercountries.Allothertradenamesaretrademarksorregisteredtrademarksoftheirrespectiveholders.

    LONDON

    Theale

    Borehamwood

    LTC

    CityRecoveryCampus

    Leatherhead

    Crawley

    South BankRecoveryCampus

    DocklandsRecoveryCampus

    Recovery Connectivity

    SunGardNationalNetworkDedicated

    recovery network linking all sites and

    data centres:

    DualDiverse1GbMPLSnetwork

    Greater resilience, two separate links,

    ducts, switches and providers

    StandardisedLAN10/100Mbtothe

    desk Standard offering suitable for mostofce environments

    OptionalLANEnhancement1Gbto

    thedesk Enhanced performance for

    bandwidth hungry applications

    Rollback Mitigates wide area events

    recover to the next available centre.

    V1:07/10