5
RESUME Sunil Kumar k v Email:[email protected] B.E in Mechanical Mobile No.: +91 9886501874 S/0 Vasanth Kumar, No 15, 2 nd Floor, MadhuNivas, Narayana Reddy Layout, Electronic City, Bangalore OBJECTIVES Seeking to take up challenging position where I can utilize and grow my technical and Managerial skill and effectively contribute in Mechanical engineering, in the role I can take up. Profile Qualified B.E., (Mechanical Engineering) from PES College of EngineeringVisvesaraya Technological University. Accented with the latest trends and techniques of the Project Management field, having an inborn quantitative aptitude & determined to carve a successful and satisfying career in the HVAC industry Fast and Self Directed Learner and ability to adjust to the situation Self confident, Capable Of Decision Making & Executing Honesty, Time Conscious, Sense of Responsibility, hard worker and a good listener Ability to deal with People Management And Work Output Enthusiastic for Team Work and open to New and Creative Ideas Capable to foster a Stimulating Working Environment and provide the Work With Commitment Adroit in using 3D software (CATIA-V5, SOLID EDGE), Proficient in reading AUTOCAD Drawings. Experience Summary 4 YEAR & 6 Months WORK EXPERIEANCE IN HVAC PROJECT MANAGEMENT Zamil Air Conditioners 2015 to Present Designation: Sr Project Engineer - Turnkey Projects & Products ABS Aircon Engineers Pvt ltd 2014 to 2015 Designation: Project Engineer – HVAC Project Engineer LUWA India Pvt Ltd., Bangalore 2011 to 2013 1

Sunil Kumar K V- Mechanical Resume

Embed Size (px)

Citation preview

Page 1: Sunil Kumar K V- Mechanical Resume

RESUMESunil Kumar k v Email:[email protected] in Mechanical Mobile No.: +91 9886501874S/0 Vasanth Kumar, No 15, 2nd Floor, MadhuNivas, Narayana Reddy Layout, Electronic City, Bangalore

OBJECTIVES

Seeking to take up challenging position where I can utilize and grow my technical and Managerial skill and effectively contribute in Mechanical engineering, in the role I can take up.

Profile

Qualified B.E., (Mechanical Engineering) from PES College of EngineeringVisvesaraya Technological University. Accented with the latest trends and techniques of the Project Management field, having an inborn quantitative aptitude & determined to carve a successful and satisfying career in the HVAC industry

Fast and Self Directed Learner and ability to adjust to the situation Self confident, Capable Of Decision Making & Executing Honesty, Time Conscious, Sense of Responsibility, hard worker and a good listener Ability to deal with People Management And Work Output Enthusiastic for Team Work and open to New and Creative Ideas Capable to foster a Stimulating Working Environment and provide the Work With

Commitment Adroit in using 3D software (CATIA-V5, SOLID EDGE), Proficient in reading AUTOCAD Drawings.

Experience Summary4 YEAR & 6 Months WORK EXPERIEANCE IN HVAC PROJECT MANAGEMENT

Zamil Air Conditioners 2015 to PresentDesignation: Sr Project Engineer - Turnkey Projects & Products

ABS Aircon Engineers Pvt ltd 2014 to 2015Designation: Project Engineer – HVAC Project Engineer

LUWA India Pvt Ltd., Bangalore 2011 to 2013Designation: Project Engineer – Project Management

Areas of ExpertiseAdminProject Management – Preparation of Work Schedules, Technical Submittal, attending meeting With Consultants, Undertaking and Executing till final Hand over to Client’s.Material Management - Documentary of Materials Used, to be Used and Shortage.Client Interaction – Project Discussion, Execution and Completing, Problem Solving Vendor & Contractor Management.

TechnicalSupply & Exhaust Air Volume CalculationsAuto control type Humidification Plant through DIGI-5 & VFD. Chillers, Dampers, Rotary Air Filters, Air Washers, Fan housing, Compactors, Rotary pre filters, Radial & Axial fans, AHU’s, Plug type fans, Cassette units, VAV, VRF, PAC,FCU, VFD.

1

Page 2: Sunil Kumar K V- Mechanical Resume

AchievementPlanning, Installation& Commissioning and Made Working of HUMUDIFICATION PLANT –H-PLANT Control through DIGI-5 having capacity of 600000CMH for Samrudha International ltd, Maharashtra– This is done in Switzerland by our company, in India I had Applied in this Project Successfully.Roles Planning, Execution, commissioning & Maintaining of Air Handling Units (AHU’s) or

Humidification plant Read the built Drawings & instructions, coordinating & discussing with Client Engineers &

designers. Preparation work schedules, technical submittals, attending meeting with consultants to acquire

approval. Study of Drawings &final understanding of the general analysis and all submittal drawings Coordinating with clients & contractors Material & Man power coordinating Preparing of work schedule as per project requirement Daily work progress reporting & Planning for every activity according site progress Manage installation of ducts for ventilation purposes. Chillers installations with necessary pump and pipe fittings. Sub-contractors finalization. To ensure minimum wastage of man, material time at site. Preparation of Variation Statement and NT Items as per site execution.

Projects Handled in Textile Industries Sitaram spinning ltd, Hyderabad, Andhra Pradesh NandanAxims Industries, Ahmadabad, Gujarat. Samrudha international ltd, Dhulia, Maharashtra Etco denim Pvt ltd, Bijapur, Karnataka FabtechPvt ltd, Sangola, Maharashtra Jaijyothi Pvt ltd, Rajapalayam, Tamilnadu Kallam Brothers Pvt ltd, Guntur, Andhra Pradesh Keihin fie Pvt ltd, Doddaballapur, Bangalore Mico Bosch, Bidadi, Bangalore Signature Club, Brigade, Bangalore Grand Mercure Brigade, MysoreSoftware Used Solid Works & AutoCAD MS Office for DocumentaryQUALIFICATION

QUALIFICATION INSTITUTION YEAR OF PASSING %B.E in ME PESCE-VTU 2011 71.562nd P.U.C S.V.C-PU Board 2007 72.5

10th J.S.S-KSEEB 2005 85.76

PROJECTS

TECHNICAL SEMINAR ON: “Run flat tyres Technology and Air inflation Technology”

PROJECT SEMINAR ON: “Fabrication and testing of Polymeric composites with Natural fiber Reinforcement with different Heating periods

2

Page 3: Sunil Kumar K V- Mechanical Resume

Job Responsibilities

1. Inspection/Documentation/Planning of work for the Materials received at the site.2. Preparation of work schedules as per projects, preparation of reports and schedules.3. Follow up with Design, Works and others departments for daily activities.4. Follow-up with Vendor Development & Purchase department for material status.5. Installation of HVAC Humidification Products & Commissioning of that Product.6. Modification Of Materials, Design according to Site Situation7. Planning and executing the project according to the site situation8. Monitoring & reporting on automated test runs.9. Project inspection involves civil works, Air duct installations, Piping installations &

Electrical Cabling for panel &Motors.10. Site clearances checking where there is safety to work.11. Supervising planning and scheduling, progress Monitoring, QC, Monitoring activities of

Contractors & Sub Contractors.12. Preparation of BOQ, Variation Statement and Tracking of Bill of Material from isometric

drawings.13. Preparation of Check list For installation, testing, Commissioning.14. The Equipment Erection& Assembly involves – Installing Chillers, radial blowers, axial

fans, Diff types of fans, Spray bank, structural work of AHU, piping, welding, PAC, Air washer, Cassette Units, Duct able Ac, Diff types of Dampers, CU Piping, Insulation Work, Hi wall units, including electrical and instrumentation job such as cabling and instrumentation.

Hobbies

Playing cricket, badminton, carom & chess Listening to film songs.

PERSONAL PROFILE

Name : Sunil Kumar K VFather’s Name : Vasanth KumarDate of birth : 01-11-1989Gender : MaleMarital Status : SingleNationality : IndianLanguages Known : English (Read, Write & Speak) Kannada (Read, Write & Speak) Hindi (Read, Write & Speak) Telugu, Tamil (Learning)Permanent Address : No #414b C Block, Manandavadi Road, Mahadevapura, Mysore Mysore-570008, Karnataka

DECLARATION

I hereby declare that the above information furnished is true to the best of my knowledge and belief.Place : BangaloreDate :

(Sunil Kumar K V)

3