17
sustineo SUSTAINABILITY | SIMPLIFIED PREPARED FOR LOCATION DATE CORPORATE RESUME + PROJECTS sustineo CORPORATE RESUME + PROJECTS

sustineo€¦ · sustineo SUSTAINABILIT SIMPLIFIED 2007 - 2020 PROJECT HIGHLIGHTS TIMELINE Bakersfield So Cal GasBakersfield, CA 468 kW 2019 FMG Toyota National City, CA 412 kW 2019

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: sustineo€¦ · sustineo SUSTAINABILIT SIMPLIFIED 2007 - 2020 PROJECT HIGHLIGHTS TIMELINE Bakersfield So Cal GasBakersfield, CA 468 kW 2019 FMG Toyota National City, CA 412 kW 2019

s u s t i n e o S U S T A I N A B I L I T Y | S I M P L I F I E D

P R E PA R E D F O R LO C AT I O N DAT E

C O R P O R AT E R E S U M E + P RO J E C T S

sustineoSimplifiedSustainability

CORPORATE RESUME + PROJECTS

Page 2: sustineo€¦ · sustineo SUSTAINABILIT SIMPLIFIED 2007 - 2020 PROJECT HIGHLIGHTS TIMELINE Bakersfield So Cal GasBakersfield, CA 468 kW 2019 FMG Toyota National City, CA 412 kW 2019

s u s t i n e o S U S T A I N A B I L I T Y | S I M P L I F I E D

We focus on being agile, responsive, and reliable with attention to detail while collaborating with our customers.

COMPANY PROFILE

Target Customers

Business Sectors

Type of Business Organization

Incorporation

Registered Small Business

Ownership Status

Subsidiary

Bonding Capability

Dun & Bradstreet #

Licenses

Certifications

Number of Employees

NABCEP Installers

Loss Time Incidents

Financial Status

Arbitration/Litigation

Equipment Owned

Engineering Design, Construction, O&M, Asset Management, & Consulting

Agricultural, Utility, Military, Commercial, & School Districts

Renewable Energy, Solar PV, Energy Efficiency, & Green Building

2008, State of California; Founded 2007

Yes, State of California #1011839

Privately Held Corporation

Sustineo Construction Corporation

Yes

00-529-3889

C-46, C-10; Electrical Engineering; Civil Engineering

Multi-State/North America; Electrical, Civil, Mechanical, Structural Engineers; CertifiedEnergy Managers; Certified Plans Examiners; OSHA-30

25, Exclusive to Solar PV Business

Yes, On Staff

None Over Past 5 Years

No bankruptcies or credit issues over company history

None in company history

All necessary equipment to self-perform feasibility & solar shading studies, AutoCAD,electrical & structural engineering plotting, mechanical & electrical installation, systemcommissioning, IV curve tracing, & troubleshooting of electrical systems; O&M test equip.

SUSTINEO is a Design + Build + Operate engineering, procurement, and construction firm specializing in sustainability and renewable energy power projects. Based in San Diego, California, we provide feasibility studies, engineering design, procurement, construction, commissioning, and maintenance services to clients throughout the U.S. market. Our core expertise is solar PV projects for commercial, government, military, and utility scale clients. Our strengths are providing flexible and comprehensive approaches to system designs, with unparalleled speed and accuracy.

2 0 0 7 - 2 0 2 0

CORPORATE RESUME

CORPORATE RESUME

Page 3: sustineo€¦ · sustineo SUSTAINABILIT SIMPLIFIED 2007 - 2020 PROJECT HIGHLIGHTS TIMELINE Bakersfield So Cal GasBakersfield, CA 468 kW 2019 FMG Toyota National City, CA 412 kW 2019

s u s t i n e o S U S T A I N A B I L I T Y | S I M P L I F I E D

2 0 0 7 - 2 0 2 0

PROJECT HIGHLIGHTS TIMELINE

Bakersfield So Cal Gas Bakersfield, CA 468 kW 2019

FMG Toyota National City, CA 412 kW 2019

FMG Subaru National City, CA 307 kW 2019

FMG Used cars National City, CA 86 kW 2019

FMG Hyundai National City, CA 178 kW 2019

Westfield Valley Fair Santa Clara, CA 1,450 kW 2019

Westfield UTC San Diego, CA 1,018 kW 2019

Westfield Garden State Paramus, NJ 1,322 kW 2019

HP (SPWR) Palo Alto, CA 1,445 kW 2019

WF Coddingtown (SPWR Sub) Santa Rosa, CA 315 kW 2019

Whole Foods Santa Clara, CA 141 kW 2018/2019

Whole Foods Santa Rosa, CA 315 kW 2018/2019

Whole Foods Reno, NV 341 kW 2018/2019

Hoover HS (SPWR Sub) Glendale, CA 644 kW 2018

Glendale HS (SPWR Sub) Glendale, CA 487 kW 2018

Whole Foods San Jose, CA 348 kW 2018

Whole Foods Roseville, CA 455 kW 2018

Target Distribution Center Woodland, CA 2,511 kW 2018

Macy's Concord, CA 725 kW 2018

Macy's San Jose, CA 107 kW 2018

Westfield Valley Fair San Jose, CA 1,162 kW 2017

Whole Foods Cupertino, CA 497 kW 2017

Whole Foods Freemont, CA 232 kW 2017

Whole Foods Los Altos, CA 282 kW 2017

Macy’s Walnut Creek, CA 671 kW 2016

Bing Concert Hall | Stanford University Stanford, CA 157 kW 2016

Bonair | Stanford University Stanford, CA 169 kW 2016

Target Distribution Center Shafter, CA 2,072 kW 2016

Macy’s Mission Viejo, CA 628 kW 2016

Macy's National City, CA 659 kW 2016

Macy's Chula Vista, CA 636 kW 2016

Southern California Gas Company Palm Desert, CA 59 kW 2015

P RO J E C T N A M E LO C AT I O N S I Z E C O M P L E T E D

PROJECT HIGHLIGHTS

Page 4: sustineo€¦ · sustineo SUSTAINABILIT SIMPLIFIED 2007 - 2020 PROJECT HIGHLIGHTS TIMELINE Bakersfield So Cal GasBakersfield, CA 468 kW 2019 FMG Toyota National City, CA 412 kW 2019

s u s t i n e o S U S T A I N A B I L I T Y | S I M P L I F I E D

2 0 0 7 - 2 0 2 0

PROJECT HIGHLIGHTS TIMELINE

We commit to creating customers for life through innovative sustainability, excellence in workmanship, and impeccable service.

P RO J E C T N A M E LO C AT I O N S I Z E C O M P L E T E D

DiMare Company Indio, CA 331 kW 2014

New Jersey PPA Portfolio Various Locations in NJ 8,000 kW 2014

University of California Riverside Riverside, CA 500 kW 2014

Southern California Gas Company Redlands, CA 303 kW 2013

Sol Orchard - Imperial I El Centro, CA 25,000 kW 2013

Mc Bride RV Chino, CA 1.5 kW 2012

Blue Beetle Solar Farm Barceloneta, Puerto Rio 28 kW 2012

Bee Safe Storage Unit Temecula, CA 1.2 kW 2012

San Vincente Habitat 4 Humanity South Gate, CA 120 kW 2012

City of Murrieta Police Station Murrieta, CA 302 kW 2011

Kingman Solar Farm Kingman, AZ 360 kW 2011

Excelsior Solar Farm Five Points, CA 14,000 kW 2011

Adera Solar Farm Chowchilla, CA 20,000 kW 2011

Ravenswood Winery Sonoma, CA 580 kW 2010

Temecula Valley RV Temecula, CA 1.5 kW 2010

Estancia Winery Soledad, CA 1.1 kW 2010

Clos Du Bios Winery Geyserville, CA 1.1 kW 2010

Los Angeles Valley Performing Arts (LEED) Palm Desert, CA 150 kW 2010

China Lake Hangar Building Ridgecrest, CA 450 kW 2010

Ventura Naval Base Ventura, CA 500 kW 2010

El Centro Naval Air Station El Centro, CA 210 kW 2010

Post Graduate Naval Academy Monterey, CA 250 kW 2009

San Diego Naval Base San Diego, CA 215 kW 2009

Carmel Valley Community Center (LEED) San Diego, CA 30 kW 2009

China Lake Michelson Labs Ridgecrest, CA 200 kW 2008

Big Park School Discrict (LEED) Sedona, AZ 150 kW 2008

China Lake Barracks Ridgecrest, CA 121 kW 2007

PROJECT HIGHLIGHTS

Page 5: sustineo€¦ · sustineo SUSTAINABILIT SIMPLIFIED 2007 - 2020 PROJECT HIGHLIGHTS TIMELINE Bakersfield So Cal GasBakersfield, CA 468 kW 2019 FMG Toyota National City, CA 412 kW 2019

s u s t i n e o S U S T A I N A B I L I T Y | S I M P L I F I E D

Sustineo Construction acted as GC and EPC for (4)

Car Dealerships in National City, CA. The Largest

system, at 468 kWp was a combination of ballasted roof

mount dual tilt modules and Carport Canopy Shade

cover mounted solar. Scope of Work included Design

and permitting with the city, construction, test and

commissioning, and includes a Lobby Display of real

time PV Production.

FRANK MOTORS GROUP | TOYOTA

Sustineo Construction successfully bid on a

competitive RFP for a 468 kWp Rooftop solar system

for a new construction series of buildings for So Cal

Gas Bakersfield Base compound in Kern County,

CA. Scope of Work included Design and permitting

with the county, procurement, construction, test and

commissioning, and includes O&M and monitoring of

production for the utility.

SOUTHERN CALIFORNIA GAS COMPANY

Sustineo Construction completed a 1,018 kWp

solar project atop a parking garage at the Westfield

University Town Center mall in La Jolla CA. This was 1

of 3 1,000 kWp + size carpark projects we completed

in 2019 for Westfield. Scope of Work included Design

and permitting with the city, procurement, construction,

test and commissioning, and includes O&M and

monitoring of production for the customer.

UNIBAIL RODAMCO WESTFIELD

RECENT PROJECTS

PROJECT PORTFOLIO

Page 6: sustineo€¦ · sustineo SUSTAINABILIT SIMPLIFIED 2007 - 2020 PROJECT HIGHLIGHTS TIMELINE Bakersfield So Cal GasBakersfield, CA 468 kW 2019 FMG Toyota National City, CA 412 kW 2019

s u s t i n e o S U S T A I N A B I L I T Y | S I M P L I F I E D

PROJECTS

PROJECT DETAILS

WESTFIELD | VALLEY FAIR2 0 1 7 | S A N TA C L A R A , C A

Westfield – Valley Fair Mall is a 1.89MWdc/1.44MWac Solar

PV project comprised of 2 carports over parking stalls at the

Westfield Mall – Valley Fair in Santa Clara, CA . The Northwest

Parking Structure’s system is 968kWdc/750kWac and

interconnects with the utility PG&E. The Northeast Parking

Structure’s system is 918.5kWdc/690kWac and interconnects

with Silicon Valley Power. In December, 2016 Sustineo executed

an EPC agreement with Westfield Eco, Inc. for delivery of the

system in 2017.

The project has modules attached with a fixed tilt on

T-cantilevered steel structures fastened to the top level of the

parking decks. The DC side of the system comprise of 275W

monocrystalline modules operating at 1000V leading into 30kW

string inverters. This project is unique because there are 2

points of interconnection with 2 different utilities from the same

property.

SUSTINEO provided full-scope turnkey engineering,

procurement, and construction of the 2 systems. This project falls

inside Sustineo’s geographic territory where it will self-perform

the mechanical and electrical scopes of the project. Construction

began in March of 2017 with final completion and hand-off to the

owner, September, 2017.

PROJECT FEATURES

PROJECT VALUE

• Steel carports cantilevered over parking stalls.

• 2 Systems and 2 interconnections with 2 different utilities

• Fixed tilt mono-crystalline modules

• 1000Vdc design

• 48 string inverters at 30kWdc each

• Annual Production – 3,100kWh/year

• 5.9 M

PROJECT PORTFOLIO

Page 7: sustineo€¦ · sustineo SUSTAINABILIT SIMPLIFIED 2007 - 2020 PROJECT HIGHLIGHTS TIMELINE Bakersfield So Cal GasBakersfield, CA 468 kW 2019 FMG Toyota National City, CA 412 kW 2019

s u s t i n e o S U S T A I N A B I L I T Y | S I M P L I F I E D

PROJECTS

PROJECT DETAILS

WESTFIELD | GARDEN STATE2 0 1 7 | PA R A M U S , N J

Westfield - Garden State Mall a 2.86MWdc/2.34MWac Solar

PV project of 2 parking canopies atop existing, multi-level

parking structures at the Westfield Mall – Garden State Plaza

in Paramus, NJ. The Northwest Parking Structure’s system is

939kWdc/780kWac and the Southwest Parking Structure’s

system is 1,917kWdc/1,560kWac. The systems will interconnect

with the utility PSE&G. In November, 2016 Sustineo submitted

a proposal to Westfield and has received feedback that Sustineo

will likely be awarded the EPC contract with an expected

execution date in January, 2017.

The project will have modules attached with a fixed tilt on

steel canopy structures fastened to the top level of the parking

decks. The DC side of the system will be comprised of 280W

monocrystalline modules operating at 1000V leading into 30kW

string inverters. This project has 2 points of interconnection with

PSE&G, one for each parking structure.

SUSTINEO provided full-scope turnkey engineering,

procurement, and construction of the 2 systems. Construction

management was provided by Sustineo while mechanical and

electrical work was performed by subcontractors as this project

is outside the company’s self-performance territory. Construction

began in March of 2017 with final completion and hand-off to the

owner by October, 2017.

PROJECT FEATURES

PROJECT VALUE

• Steel canopies atop parking structures.

• 2 Systems and 2 interconnections

• Fixed tilt mono-crystalline modules

• 1000Vdc design

• 78 string inverters at 30kWdc each

• Annual Production – 3,599kWh/year

• 10.5 M

PROJECT PORTFOLIO

Page 8: sustineo€¦ · sustineo SUSTAINABILIT SIMPLIFIED 2007 - 2020 PROJECT HIGHLIGHTS TIMELINE Bakersfield So Cal GasBakersfield, CA 468 kW 2019 FMG Toyota National City, CA 412 kW 2019

s u s t i n e o S U S T A I N A B I L I T Y | S I M P L I F I E D

PROJECTS

PROJECT DETAILS

FOX STUDIOS2 0 1 5 | L . A . , C A ( L A D W P S E R V I C E T E R R I TO R Y )

Fox Studios – Carports is a 1.2MWdc/1MWac designed on top

of 2 parking structure garages and 1 roof top. The project is

interconnected with the Fox Studios medium voltage distribution

system. LADWP is the governing utility. The project provides

enough power for 375 homes.

SUSTINEO provided engineering design services, product

procurement, equipment staging plan, crane lift logistics,

safety, lift plan, skilled labor, electrical interconnection designs,

permitting, QA/QC on the carport layouts and connection to

the structures. Sustineo is acting as the engineer of record for

electrical single-lines, as well as coordinated with the Authority

Having Jurisdiction on permitting review and approval. Site walks

were conducted regularly with a multi-disciplinary engineering

team advising on structural, electrical, and environmental issues.

Sustineo will also manage all aspects of the construction to ensure

project goals are met.

PROJECT FEATURES

PROJECT VALUE

• Carport & Roof Top (1,200kWp)

• 480V Interconnection Voltage

• 3 Interconnection Points

• 16-acres

• Fixed Tilt mc-Si Modules

• 1000Vdc Design

• 28 String Inverters

• Annual Production: 1,800-MWh

• 4.2 M

PROJECT PORTFOLIO

Page 9: sustineo€¦ · sustineo SUSTAINABILIT SIMPLIFIED 2007 - 2020 PROJECT HIGHLIGHTS TIMELINE Bakersfield So Cal GasBakersfield, CA 468 kW 2019 FMG Toyota National City, CA 412 kW 2019

s u s t i n e o S U S T A I N A B I L I T Y | S I M P L I F I E D

PROJECTS

PROJECT DETAILS

SOL ORCHARD2 0 1 3 | E L C E N T RO, C A ( I I D S E R V I C E T E R R I TO R Y )

Sol Orchard, Imperial I is a 25MWdc/20MWac Solar PV power

facility commissioned and built in Q3-2013 in El Centro, CA. The

project was interconnected with the IID’s transmission system at

92-kV. The project will provide enough power for 7,500 homes.

SUSTINEO provided engineering design services for civil,

electrical, and structural engineering. Sustineo acted as

the engineer of record for electrical single-lines, as well as

coordinated with the Authority Having Jurisdiction on permitting

review and approval. Site walks were conducted regularly with

a multi-disciplinary engineering team advising on geotechnical,

structural, electrical, and environmental issues.

PROJECT FEATURES

PROJECT VALUE

• Utility Scale PV Plant ~ 25MWdc

• 92k Interconnection Voltage

• Onsite Substation

• 220 Acres

• Single Axis Tracking mc-Si Modules

• 1000Vdc Design

• 15 Powerstations/Inverter Skids

• Annual Production ~ 54,000-MWh

• 70 M

PROJECT PORTFOLIO

Page 10: sustineo€¦ · sustineo SUSTAINABILIT SIMPLIFIED 2007 - 2020 PROJECT HIGHLIGHTS TIMELINE Bakersfield So Cal GasBakersfield, CA 468 kW 2019 FMG Toyota National City, CA 412 kW 2019

s u s t i n e o S U S T A I N A B I L I T Y | S I M P L I F I E D

PROJECTS

PROJECT DETAILS

DIMARE COMPANYI N D I O, C A ( I I D S E R V I C E T E R R I TO R Y )

DiMare Company is a 330kWdc/260kWac Solar PV power facility

that was commissioned in Q4-2014 in Indio CA. The project is

interconnected with the DiMare distribution system at 480V with

a line side tap. The project is under the Imperial Irrigation District

(IID) Performance Based Incentive program for the next 5-years.

SUSTINEO provided feasibility planning, shading studies with a

Solmetric SunEye, solar resource assessment, financial analysis,

offsets, structural studies, preliminary engineering designs for

layout, electrical single-lines, as well as coordinated with the local

AHJ on permitting questions prior to design submission. Sustineo

provided all installation services for the carport and rooftop areas.

Sustineo will also act as the long term provider of Operations and

Maintenance. Our team provides monthly asset management on

system performance and handles warranty repairs.

PROJECT FEATURES

PROJECT VALUE

• Carport & Rooftop Project ~ 330kWdc

• 480V Interconnection Voltage

• 10 acres

• Fixed Tilt mc-Si Modules

• 600Vdc Design

• 1 Central Inverter (260kW)

• Annual Production ~ 562-MWh

• 1.4 M

PROJECT PORTFOLIO

Page 11: sustineo€¦ · sustineo SUSTAINABILIT SIMPLIFIED 2007 - 2020 PROJECT HIGHLIGHTS TIMELINE Bakersfield So Cal GasBakersfield, CA 468 kW 2019 FMG Toyota National City, CA 412 kW 2019

s u s t i n e o S U S T A I N A B I L I T Y | S I M P L I F I E D

PROJECTS

PROJECT DETAILS

CLOS DU BOIS2 0 1 2 | G E Y S E R V I L L E , C A ( P G & E T E R R I TO R Y )

Complete engineering design and permitting package provided to

Constellation Wines for a 975-kW roof mount system and a 150-

kW carport system. Expedited permitting required design and

engineering to take place over a 3 week period.

SUSTINEO provided Project Development & Hourly Generation

Profile Creation; Incentive and Interconnection Administration/

Support; Product Selection, Due Diligence, and Procurement

Support; Engineering Design & Permitting Package; Permitting

& Plan Check Support; Commissioning Reporting & Operation/

Maintenance Manual; Customer Coordination, Handoff Support,

Engineering Management, As-Built Drawings.

PROJECT FEATURES

PROJECT VALUE

• Carport & Rooftop Project ~ 1.125MWdc

• 480V Interconnection Voltage

• 5 acres

• Fixed Tilt mc-Si Modules

• 600Vdc Design

• 6 Central Inverter (260kW)

• Annual Production ~ 1100 MWh

• 4 M

PROJECT PORTFOLIO

Page 12: sustineo€¦ · sustineo SUSTAINABILIT SIMPLIFIED 2007 - 2020 PROJECT HIGHLIGHTS TIMELINE Bakersfield So Cal GasBakersfield, CA 468 kW 2019 FMG Toyota National City, CA 412 kW 2019

s u s t i n e o S U S T A I N A B I L I T Y | S I M P L I F I E D

PROJECTS

PROJECT DETAILS

ADERA SOLAR FARM2 0 1 1 | C H O W C H I L L A , C A ( P G & E T E R R I TO R Y )

The 190 acre PV plant will utilize multi-crystalline PV modules

with a fixed tilt racking system. The DC side of the system

will operate at 1000V before entering the inverters. The 20

powerstations skids at 1MW each, will feed power with a

13.8kV distribution system to the 20MVA onsite substation. The

substation will step-up the voltage to 115kV where a 0.4 mile

transmission line will be constructed to interconnect the project

with the CA utility grid.

SUSTINEO provided feasibility planning, shading study analysis,

solar resource assessment, weather station installation support,

interconnection design support and planning with CAISO’s

interconnection review team. Our team also assembled

preliminary engineering designs for layout concepts, electrical

single-lines, and coordinated with the local AHJ on permitting

questions prior to design submission. Site walks were conducted

regularly with a multi-disciplinary engineering team advising on

geotechnical, structural, electrical, and environmental issues.

PROJECT FEATURES

• System Size: 26MWdc / 20MWac

• Module Type: 300W Poly-crystalline

• Racking System: Fixed Tilt

• DC Voltage: 1000V

• Cabling System: Wiring Harness & Direct Burial

• Powerstations: Advanced Energy 1-MWac skids

• AC Distribution: 13.8kV

• Interconnection: PG&E System @ 115-kV

• Annual Production: 42,000-kWh or 1553-kWh/kWp

PROJECT PORTFOLIO

Page 13: sustineo€¦ · sustineo SUSTAINABILIT SIMPLIFIED 2007 - 2020 PROJECT HIGHLIGHTS TIMELINE Bakersfield So Cal GasBakersfield, CA 468 kW 2019 FMG Toyota National City, CA 412 kW 2019

s u s t i n e o S U S T A I N A B I L I T Y | S I M P L I F I E D

SummaryMr. Handman has thirteen years of experience in the electrical trades. He has been the superintendent and electrical project manager in the construction of over 200 photovoltaic systems, for government, commercial, military, and utility scale projects.

Electrical Systems Installation Experience Extensive installation experience with multiple renewable energy power systems including photovoltaic, concentrating PV, solar thermal, combined heat and power, and municipal solid waste to energy.

Northern & Southern NJ Electrical Install & Testing Principal Electrician and testing lead for over 20MW of PV systems in New Jersey. Responsible for fixing 12 systems that were offline and not working properly. Tested all DC and AC systems to determine why each system wasn’t working. Installed new combiner boxes, tested inverters, and recommissioned each system.

China Lake Naval Weapons Air Station, Weapons Test Hanger520-kW Rooftop PV Supervisor of Electrical Work. Worked with base engineers, prime contractor, and naval project Sustainability | Simplified™managers to provide turn-key electrical and structural installation for multiple buildings and carport projects. PV projects were located within the sphere of influence of the airfield authority.

Expert Witness for 1MW Rooftop Analysis Analyzed, re-wired and tested inverter performance output and stringing configuration for a 1MW rooftop project that had performance issues. Reviewed existing construction, performed IV curve tracing on strings, and provided technical presentations on system performance and construction deficiencies during client mediations and legal testimony.

DiMare Company, Agricultural Packing FacilityElectrical Superintendent for a 330-kW rooftop and carport mounted PV project. Managed the construction team from electrical DC to AC installation. San Pasqual Band of Mission Indians, Valley View Casino & Hotel – 1-MW Solar Farm, Electrician for a 1-MW single axis tracker system on tribal land adjacent to the Harrah’s Casino in Valley Center California. Interconnection lead electrician.

Areas of Expertise

• Project Management

• Project Development and Feasibility

• Revenue Modeling for PV Projects

• Performance Modeling of Photovoltaic Projects

• Photovoltaic System Design

• Photovoltaic System Installation & Inspection

• PV System Commissioning

[email protected]

Office: 858.270.9333, x301Direct: 619.415.4203

www.sustineoplanet.com

P R I N C I PA L E N G I N E E R

DAVID HANDMAN

EMPLOYEE RESUME

Page 14: sustineo€¦ · sustineo SUSTAINABILIT SIMPLIFIED 2007 - 2020 PROJECT HIGHLIGHTS TIMELINE Bakersfield So Cal GasBakersfield, CA 468 kW 2019 FMG Toyota National City, CA 412 kW 2019

s u s t i n e o S U S T A I N A B I L I T Y | S I M P L I F I E D

P R I N C I PA L E N G I N E E R

DAVID HANDMAN

Electrical Systems Installation Experience (cont.)

Fort Mojave Indian Reservation | Utility Scale Solar Thermal Facility Planning1000-MW, worked with tribal council and the Bureau of Indian Affairs to study the applicability and feasibility of locating a large solar thermal facility on fallow farm land that is no longer producing alfalfa.

Sol Orchard – Imperial I, Isolux CorsanElectrical installation team for a 25-MW single axis tracker utility scale system in the California Imperial Valley. Responsible for turn-key engineering design. Company acted as Engineer of Record and provided full electrical, civil and structural permitting. Coordinated plan package assembly for multi-discipline engineering team. Provided support during construction for engineering questions.

Adera Solar Farm, Commercial Solar PowerElectrical Systems Manager for a 26-MW singlProject management experience includes projects with Department of Defense, Division of State Architect (DSA), CalTrans, SCE, PG&E, SDG&E, and California municipalities.

1.124-MW PV System, Clos Du Bois WineryElectrician for multi-type PV system including roof mount, ground mount, and carport. Design included electrical, structural, and mechanical. Full interconnection and commissioning validation was conducted to ensure proper system performance.

50-kW Roof Mount PV SystemProject Manager for LEED-Gold Performing Arts Center. Provided full engineering design and permitting package to DSA.

580-kW PV System, Ravenswood WineryProject Manager for multi-type PV system including roof mount and ground mount systems. Design included electrical, structural, and mechanical. Also, full interconnection and commissioning validation was conducted to ensure proper system performance.

Registrations & CertificationsFacilitates project management of multi-disciplinary team of biologists, land planners, engineers, and architects to determine the feasibility and level of effort needed to meet all LEED-EB prerequisites and points toward certification.

Publications & Professional SocietiesFacilitates project management of multi-disciplinary team of biologists, land planners, engineers, and architects to determine the feasibility and level of effort needed to meet all LEED-EB prerequisites and points toward certification.

Past PositionsFacilitates project management of multi-disciplinary team of biologists, land planners, engineers, and architects to determine the feasibility and level of effort needed to meet all LEED-EB prerequisites and points toward certification.

EMPLOYEE RESUME

Page 15: sustineo€¦ · sustineo SUSTAINABILIT SIMPLIFIED 2007 - 2020 PROJECT HIGHLIGHTS TIMELINE Bakersfield So Cal GasBakersfield, CA 468 kW 2019 FMG Toyota National City, CA 412 kW 2019

s u s t i n e o S U S T A I N A B I L I T Y | S I M P L I F I E D

P R I N C I PA L E N G I N E E R

DAVID HANDMAN

Electrical Systems Installation Experience (cont.)

1-MW PV System, GM Distribution CenterDesign Engineer. Included system sizing, current facility power usage analysis, data acquisition system design, and annual PV system performance modeling. Conducted extensive systemacceptance test that measured actual system output versus expected output.

750-kW PV System, Convention CenterDesign Engineer. Included panel layout, system sizing, current facility power usage analysis, BOS design, data acquisition system design, and system modeling. Handled procurement of laminates, inverters, and data acquisition system components.

Permitting Study for Solar Thermal Power Plant, Mojave Desert Conducted preliminary permitting study for development of 1000-MW solar thermal power plant. Site Sustainability | Simplified™ assessment of primary power block and all associated linears, including 15 mile transmission corridor, water supply pumps, and natural gas distribution system.

DOE, Zero-EnergyProject Engineer for design and development of PV powered Zero-Energy Home. Managed team of multi-disciplinary engineers and architects. Also modeled the thermal envelope, electrical loads, and hot water needs to quantify monthly and yearly energy use. Responsible for project budget and timeline for design and procurement of 4.9-kW photovoltaic system.

Food Manufacturer, Production FacilityConducted electrical installation of solar thermal oil-heating loop to augment facility’s natural gas usage.

Project Specific ExperienceConversion Technology & Feasibility Evaluation

City of Los Angeles MSW Conversion Technology StudyAssisted in technology evaluation of MSW conversion technologies, including gasification, pyrolysis, and anaerobic digestion systems. Analyzed results of life cycle analysis to compare various systems’ power consumption and emission levels.

County of Los Angeles Conversion Technology EvaluationAided in feasibility study of combining Materials Recovery Facility [MRF] Transfer Station with conversion technology facility to increase diversion rate of MRF residue being transferred to a landfill.

Project Specific ExperienceSystem Modeling and Analysis

Designed computer program to estimate utility blended rate and variable avoided cost associated with installation of PV systems. Also developed proprietary program capable of quantifying a facility’s demand reduction due to PVsystem’s input. [2006]

Developed database for comparative analysis of multiple MSW conversion technologies, including gasification, pyrolysis, waste to energy, anaerobic and aerobic digestion facilities. [2005]

Analyzed thermal and biological conversion technologies feedstock throughput versus conversion unit power output for City of Los Angeles; determined various theoretical system efficiencies. [2004-2005]

EMPLOYEE RESUME

Page 16: sustineo€¦ · sustineo SUSTAINABILIT SIMPLIFIED 2007 - 2020 PROJECT HIGHLIGHTS TIMELINE Bakersfield So Cal GasBakersfield, CA 468 kW 2019 FMG Toyota National City, CA 412 kW 2019

s u s t i n e o S U S T A I N A B I L I T Y | S I M P L I F I E D

P R I N C I PA L E N G I N E E R

DAVID HANDMAN

Project Specific ExperienceSystem Modeling and Analysis

Modeled thermal envelope of a Zero-Energy Home for Department of Energy to quantify effects of various building materials on conductive and convection heat transfer characteristics. [2004]

Modeled theoretical performance of various PV systems at locations throughout North America to estimate power output, degradation of system performance due to temperature, and useful daylight hours on monthly and yearly bases. [2004]

Project Specific ExperienceHVAC System Design

Extensive simulation and design experience for maximizing energy efficiency in commercial and residential buildings. Simulation software includes Energy-10, HAP, and EES.

Computer simulations for maximizing energy savings in multiple building designs, including water andconcrete Trombe walls, window orientation and shading, and parametric studies of various insulationmaterials and wall characteristics.

Project management for design and development of HVAC system for Zero- Energy Home.Building load calculations, thermal envelope characteristic analysis, system sizing, and duct layout for Zero-Energy Home.

LEED Projects

Engineer in charge for preparation of proposals to existing and new clients seeking LEED-EB certification.

Facilitates project management of multi-disciplinary team of biologists, land planners, engineers, andarchitects to determine the feasibility and level of effort needed to meet all LEED-EB prerequisites andpoints toward certification.

Specific responsibilities for LEED-EB documentation sections include Energy & Atmosphere and IndoorEnvironmental Quality

EMPLOYEE RESUME

Page 17: sustineo€¦ · sustineo SUSTAINABILIT SIMPLIFIED 2007 - 2020 PROJECT HIGHLIGHTS TIMELINE Bakersfield So Cal GasBakersfield, CA 468 kW 2019 FMG Toyota National City, CA 412 kW 2019

s u s t i n e o S U S T A I N A B I L I T Y | S I M P L I F I E D

DAV E H A N D M A N

EMPLOYEE DATASHEET

S U M M A R Y

Dave’s PI Pattern is extremely wide, which means that his behaviors are very strongly expressed and his needs are very strongly felt.

Dave is an engaging, stimulating communicator, poised and capable of projecting enthusiasm and warmth, and of motivating other people. He has a strong sense of urgency, initiative and competitive drive to get things done, with emphasis on working with and through people in the process. He understands people well and uses that understanding effectively in influencing and persuading others to act.

In general terms, Dave is an ambitious and driving person who is motivated by opportunity for advancement to levels of responsibility where he can use his skills as team builder, motivator and mover.

LET ME COLLABORATE

LET ME TALK IT OUT

P R E D I C T I V E I N D E X

FORMALITY

PATIENCE

LET ME DRIVE

GIVE ME STABILITY

GIVE ME STRUCTURE

DOMINANCE

EXTRAVERSIONLET ME THINK IT THROUGH

GIVE ME VARIETY

GIVE ME FLEXIBILITY

A

B

C

D3 2 1 -+ 1 2 3

3 2 1 -+ 1 2 3

3 2 1 -+ 1 2 3

3 2 1 -+ 1 2 3

FAC TO R S

DOMINANCE

EXTRAVERSION

PATIENCE

FORMALITY

B

A

C

D

I N T ROV E R S I O N S E N S I N G T H I N K I N G P E RC E I V I N G

Logical. Quietly analytical. Practical. Adaptable. Curious. Cool. Observer. Problem-solver. Exact. Realistic. Troubleshooter. Hands-on. Variety. Adventurous. Independent.

Tolerant and flexible, quiet observers until a problem appears, then act quickly to find workable solutions. Analyze what makes things work and readily get through large amounts of data to isolate the core of practical problems. Interested in cause and effect, organize facts using logical principles, value efficiency.

iINFLUENCE

SSTEADINESS

CCONSCIENTIOUSNESS

CH

AL

LE

NG

E

RESU

LTS ACTION ENTHUSIASM

C

OLLA

BO

RA

TIO

N

SU

PPORT STABILITY ACCURAC

Y

DDOMINANCE

EMPLOYEE DATASHEET