Upload
tuong-huyen-tram
View
221
Download
0
Embed Size (px)
Citation preview
7/28/2019 Switch Asia _ Access 2 finance
1/391
Engging with inncing institutins
r grEEning sMEs
H ngg H Fnnng
nun g nd lnlnd Fm H H- Pgmm
H-sia network Faciity
is e by the ropea uio.
H-sia network Faciity is ipeete by the oaborati etre
o staiabe osptio a Proctio a pperta stitte
or iate, viroet a ery.
7/28/2019 Switch Asia _ Access 2 finance
2/392
rEvitins
cP apacity bii prorae
cDM ea deveopet mechais
cEr ertife eissios rectios
EE ery efciecy
E&rE ery a resorce efciet
EuM-EnP u-maaysia Bioass trepreers nrtri Prorae
Eu-Pic u Project cbatio etre
Esc ery service copaies
i Fiacia istittios
ghg greehose as
iEM stria eqipet aactrer
ic teratioa Fiace ooperatioMEEt-is maistreai ery fciecy hroh Bsiess ovatio pport Vieta
(m-B Vieta)
PDD Project esi ocet
r&D esearch a deveopet
scP staiabe cosptio a proctio
sME a a ei-size eterprises
sscM staiabe sppy chai aaeet
SWITCH-Asia | ENGAGING WITH fINANCING INSTITuTINS f GEENING SmES
PuishEr
H-sia network Faciity
oaborati etre o staiabe
osptio a Proctio (P)
Haeaer trae 30
42107 pperta | geray
Phoe | +49.202.45 95 8.10
Fax | +49.202.45 95 8.31
www.switch-asia.e
aito:[email protected]
cPyright
he H-sia network Faciity
uthrs
sae mer a Brc er
with contribtions ro Jio res oso grizaes,
ybe grovestis a eco va tappershoe
suPErvisin nD guiDncEFras Verspeek (Tea Leader, the Network facility)
DEsign
ar aer
This pblication has been prodced or the SWITCH-Asia Prograe and the Eropean union. The contents o this pblication are the soleresponsibility o the Collaborating Centre on Sstainable Consption and Prodction (CSCP) and can in no way be taken to reect the viewso the Eropean union.
http://www.elmarsander.de/http://www.elmarsander.de/http://www.elmarsander.de/7/28/2019 Switch Asia _ Access 2 finance
3/393
Table o Contents 3
Foreword 5
Summary o main fndings 6
1. Introduction 9
1.1 Accesstonanceadriverforeconomicdevelopment 10
1.2FinancingneedsofSMEs 11 1.3Financingsolutions 11
1.4Thenancinggap 14
2. Which strategies and tools do SWITCH-Asia projects implement
to close the fnance gap? 17
2.1Strategy1:AddressingtheEnablingEnvironmentforAccesstoFinance 18
2.2Strategy2:PromotingFinancialServices 20
2.3Strategy3:IncreasingCapacityofSMEstoAccessFinance 24
2.3.1 Raisingawarenessonnancialliteracy 25
2.4Strategy4:AddressingBanksfromAwarenesstoTechnicalAssistance 26
2.4.1Buildingrelationswiththenancialsector 26
2.4.2RaisingawarenessonSCP 27
2.4.3ExplainingtheBusinessCaseofEnergyEfciency/
ResourceEfciency(EE/RE) 28
2.4.4Showcasinginvestmentopportunities 30
2.5Strategy5:EnablingInvestmentLinkages 31
2.5.1 Creatingdialoguebetweendemandandsupply 31
2.5.2CreatingjointplatformsviaStudyTours 31
2.5.3BusinessMatchmaking 32
2.5.4Forminginstitutionalpartnershipswithnancialinstitutions,
banksandinvestors 33
3. What lessons have been learned by SWITCH-Asia projects? 35
3.1Opportunities 36
Reerences 39
TA
F CTTS
SWITCH-Asia | ENGAGING WITH fINANCING INSTITuTIoNS for GrEENING SmES
7/28/2019 Switch Asia _ Access 2 finance
4/394
hia motor
haee
co-riey
Baboo
Bioass-P
-PK
gree Phiippies
sas
m eb
tootive
m
m-B
ectric motor ystes ery-avi haee
provi the perati fciecy o hiese ectric
motor ystes
staiabe reviva o iveihoos i post-isaster icha:
haci eco-riey pro-poor baboo proctio sppy
chais to spport the recostrctio eort
staiabe Proctio o the Bioass stries i
maaysia: ptiisi cooic Potetia a moviowars Hiher Vae hai
staiabe a eaer Proctio i the maactri
stries o Pakista
reati gree Phiippies sas o staiabiity
m Bu: ms or viroeta ccotabiity,
esposibiity a rasparecy
greei ppy hais i the hai to a tootive
Parts stries
maistreai ery fciecy hroh Bsiess
ovatio pport Vieta
Pojee loao
hia
hia
maaysia
Pakista
Phiippies
Phiippies
haia
Vieta
switch-si PrEcts DDrEssing ccEss t inncE
r grEEning sMEs
bbeao Poje le
SWITCH-Asia | ENGAGING WITH fINANCING INSTITuTINS f GEENING SmES
7/28/2019 Switch Asia _ Access 2 finance
5/395
key chaee or ay eveopet
prorae is to scae-p sccess ap-
proaches a ethoooies to spee
p the path to sstaiabe eveopet. the
ast ecae, a vast array o oo practices o ss-
taiabe proctio a cosptio have bee
eveope a eostrate.
he H-sia prorae ais to take
this oe step rther. he projects e er
the prorae sho epoy scai p ech-aiss to tipy, eare a sprea existi
oo practices. H-sia projects iht
scae-p horizotay a/or verticay. Hori-
zota scai-p (aso reerre as scai-ot)
reers to the raa ro-ot o activities withi
a sector or to a wier eoraphic area. Vertica
scai-p ocses ore o oraisatios a
raeworks at oca, reioa a/or atioa
eves, ivovi both the irect sppy chai ac-
tors as we as eabers sch as overet a
facia istittes.
Projects appy their ow approach to sca-
i-p, brii asti ipact to a wier eo-
raphic area tha oriiay aresse, to a criti-
ca portio o a sector, a to a are ber o
coser rops.
2010, the network Faciity ache a proc-
ess o aaysis, which ocse o how these
scai-p echaiss cotribte to the eec-
tive aistreai o sstaiabe cosptio
a proctio (P) i society. Five ajor areaseere:
ai with service proviers
Bii parterships with sppy chai
actors
liki with poicy-akers
ai with cosers towars ethica
prchase a se
abi access to face
his report ocses o access to face (2F) or
scai-p P. ms a over the wor beeft
whe they ipeet P strateies. may tar-
ete by the H-sia prorae ocs o
iprovi eery a resorce efciecy, a
the switch to ore efciet techooy which
eas kowee, eaership a, ost
o a, ivestet. may sia ms are cha-
ee by the iits o their iqiity to eet
short- a ie-ter coitets a i-
vestet pas. sch cases access to face
is crcia or aki ree rowth a reaity, sca-
i-p the aactri o a prooti theea, or ree procts.
o be abe to preset the strateies H-
sia projects are si to access face, this
report presets isihts base o project e-
orts towars eabi access to (ree) face
schees or ms. By ate 2012 oy a sa
ber o H-sia projects ha recoise
the iportace o provii access to face
a were si it to everae a shit i proc-
tio practices. most projects ocs o raisi
the capacity or ceaer proctio bt whe it
coes to ipeetatio, access to face has
bee o to be key. oe projects, thereore,
rear face as a spporti istret. his
report asses that eve spporti activities
ca eabe eari i how to pa, proote a
process access to face. he essos eare
ca provie crret a tre project a pro-
rae eveopers with erichi ioratio
a tips o how to iprove their ipact by e-
haci activities i the eveopet a ex-ectio o projects with ore eective 2F.
his report is the frst part i the aaysis o
P scai-p echaiss a ietifes iter-
esti areas that ca ake a ierece. Frther
research reports o scai-p echaiss are
proce by the H-sia network Faciity
a are avaiabe er www.switch-asia.e/
switch-ino/pblications.htl.
his sty wi be cotie as the projects a-
vace a as ew oes coe o-strea.
rEwrD
SWITCH-Asia | ENGAGING WITH fINANCING INSTITuTINS f GEENING SmES
http://www.switch-asia.eu/switch-info/publications.htmlhttp://www.switch-asia.eu/switch-info/publications.htmlhttp://www.switch-asia.eu/switch-info/publications.htmlhttp://www.switch-asia.eu/switch-info/publications.htmlhttp://www.switch-asia.eu/switch-info/publications.html7/28/2019 Switch Asia _ Access 2 finance
6/396
suMMry
Min inDings
iacia resorces iht be essetia or
their aoptio o eviroetay riey
practices a techooies by sia sa
a ei size eterprises (ms). o, i the
H-sia Prorae, ree face is a very
everae poit or the pscai o sstaiabe
proctio practices.
ms have a wie rae o faci ees
as they set to ree their bsiess. the short-
ter, ms reqire worki capita, or exapeto prchase eviroetay riey raw ate-
rias. the ei-ter, ms ee access to
aeqate faci or ivesti i eco-efciet
eqipet a cea techooies. the o-
ter ree faci wo be eee or
scai-p the ree bsiess oe to other
reios a sectors.
respose to these ees, ms ca f a
spectr o faci sotios i the arket.
hese co be rope i six cateories: ebt
faci (e.. coercia oas); eqity fac-
i (e.. vetre capita); istittioa i
(e.. pbic rats); easi a actori; tai-
ore facia istrets (e.. carbo face),
a spporti o-facia services (e..
capacity-bii o facia services). xperi-
ece ro H-sia has cofre that i
sia both creit a eqity faci sotios
are avaiabe, at varios staes o atrity o
ms. he it coes to ree s, these areaiy avaiabe as bak oas or cea eery
or eery efciecy sotios. Vetre capita
a start-p s are aso eteri the arket
a awaiti etrepreers, who ike to ake
a ipact throh faci resorce efciet
procts a services.
despite the easiy ietifabe faci
ees a a wie rae o faci sotios
i the arket, there is sti a isatch betwee
the ea a sppy sies. evera barriers
co be ietife o both sies ici:
lack o facia iteracy;
lack o facia trasparecy;
ervices o faci istittios perceive
too costy;
Poor arketi a coicatio
by facia istittios;
ms ack coatera;
Baks reqire ms trasparecy;
lack o eective chaes a oaities or
coicatio with creit proviers ori prposes;
Baks o ot cosier m ei as
proftabe bsiess.
ee, the roe o the H-sia Prorae
is to aress the barriers o both sies with
specifc strateies. hese ice: aressi
the eabi eviroet or ccess to Fiace;
prooti facia sotios; icreasi capac-
ity o ms to access face; aressi baks
ro awareess to techica assistace, a
eabi ivestet ikaes.
SWITCH-Asia | ENGAGING WITH fINANCING INSTITuTINS f GEENING SmES
7/28/2019 Switch Asia _ Access 2 finance
7/397
strtEgy 1:
DDrEssing thE Ening EnvirnMEnt
r ccEss t inncE
he reatory raework pays a critica roe i
iprovi the faci ascape or ms.
oo ea raework a facia irastrc-
tre ca set the ecessary pre-coitios oreabi ms to access face. Few H-
sia projects sch as SCI-Pak ocs o ietiy-
i potetia opportities to iprove existi
poicies a aki recoeatios or ew
poicy istrets or eabi facia access
towars sstaiabe proctio. other ap-
proach observe was to ocs o avocati a
particar poicy istret. For exape, base
o ipts ro ti-stakehoers, the Bioass-
SP project evisios eveopi poicy reco-
eatios or a Bioass ctio Pa. co-crete easre co ice reevat ecooic
istrets to proote the coerciaizatio
o bioass.
strtEgy 2:
PrMting innci sutins
most H-sia projects that are crrety
aressi the topic access to face are i-
ci the topic i raisi awareess activities.
depei o the project, teas icorporate
ioratio o facia optios i roa shows,
awareess ors or workshops. For exape,
Bioass-SP project presets avaiabe faci
assistace or existi aactri bioass
copaies, especiay throh the aciity o
sot oas, or creit aratee ri the oa
hows. workshops a project exhibitios,
the mEET-BIS project ivites a represetative o
a oa aratee , a speaker ro itera-
tioa faci istittio a a represetative
o a m bak to exchae o facia serv-ices to ehace m access to eery efciet
techooy.
strtEgy 3:
incrEsing cPcity sMEs t ccEss
inncE
o sccee i etti facia resorces, m s
ee to coicate the bsiess case or P
to facia istittios a ivestors by show-
i the the copetitive avataes o ipe-
eti P strateies i their operatios. lack
o bsiess kowee a aaeet abiity
ca icrease facia barriers or ms. low ev-
es o facia iteracy ca prevet ms ro
aeqatey assessi a erstai i-
eret faci optios. t the sae tie, the
act that ms accoti recors a facia
stateets are ote either cear or eviet.
For exape, SmAT Ceb project appies i-ivia coachi to ms or attei their
facia ees.
strtEgy 4:
DDrEssing nks rM wrEnEss
t tEchnic ssistncE
vestors a faci istittios base their
faci ecisio o the expectatio that the
ivestet wi bri abot rear icoes.
heir evaatio o ms perorace is oe
prey o the basis o ecooic risk. te theyhave very iite kowee o erstai
eviroeta risk a ack the iaostic toos
to evaate ms oa reqests or resorce
efciecy a ceaer aactri projects.
Fiaci istittios have reat potetia to
iprove their risk aaeet systes a
processes with rears to m s eviroeta
projects. most ote observe approach ao
the H-sia projects has bee the expaa-
tio o the bsiess case o resorce a eery
efciecy to baks.
strtEgy 5:
Ening invEstMEnt inkgEs
o proote ivestets ivestors reqire ore
ioratio abot taret ms. H-sia
projects take varios steps to eabe co-
icatio betwee ms a faciers. ty
tors or ivestors a atchaki evets
were ietife as the ost coo activities.
SWITCH-Asia | ENGAGING WITH fINANCING INSTITuTINS f GEENING SmES
7/28/2019 Switch Asia _ Access 2 finance
8/398
he chaee o etti access to face or
reei ms operatios iht be e to both
ea- a sppy-sie actors. H-siaprojects reviewe or the sty have showe
that ay o the ca be aresse as part o
the o-oi H-sia Prorae. How-
ever, there are sti tappe opportities
reaii:
sale-p ee ed le ad ba loa
reit faci sotios with a cosieratio
o eviroeta, socia a overace criteria
ao traitioa facia etrics are sti sa
i size. ve deveopet Fiaci stittios
(dFs) that have a aate to provie face
to the private sector or ivestets that pro-
ote eveopet have ot yet strateicay
aistreae sstaiabiity isses ito their
operatios. here is sti a ot o potetia or
iterati sstaiabiity isses ito the bak-
i operatios ro procreet to creit risk
assesset.
mpa e o lreit faci sotios are ti ow the ost
reqety observe cateory o sotios cov-
ere by the H-sia projects. Bt what
abot other faci istrets that co
be reevat or reei o ms? ther cateo-
ries especiay ipact ivestet piar eserve
attetio as it oers exceet opportities or
scai-p sstaiabe cosptio a pro-
ctio. pact ivesti sotios cocetrate
o copaies, whose priary oa is eiveri
socia a eviroeta oo, whist aso e-
iveri copetitive arket retrs.
impoe dead ad fomao
proveet o ms erstai behi
resorce efciecy opportities a their
reach-ot to ioratio o avaiabe s sti
reais to be both a bi chaee a a reat
opportity. itia avice o reci iora-
tio efcits abot resorce savi optios a
etaie costi o resorce savi eas-
res a ivestet optios are essetia. hese
services ca be ice as techica assistace
or via costi copoets i specia m
s.
sppo mao odo eeded
t the icro eve, worki o the opportities
behi sppy a ea sie o faci is
essetia bt it is ot sfciet. utiizatio or
creatio o spporti acro eve coitios is
aso eee. Havi spporti poicy oas aeviroet proraes i pace iisptaby
cotribtes to eective se o ree s or
ms. For exape, dFs ici eveopet
baks a oca eveopet aecies ee
to eveop iovative faci sotios i
respose to the eveopet oas set at the
atioa a reioa eve. atioa eve-
opet pas o ake reerece to oas or
faci o cea techooies a/or eabi
ree m faci, the eveopet baks
wo esi a ipeet reevat faci
procts to serve these oas.
SWITCH-Asia | ENGAGING WITH fINANCING INSTITuTINS f GEENING SmES
7/28/2019 Switch Asia _ Access 2 finance
9/399
intrDuctin
sms pay a ajor part i ree ecooic
eveopet, above a i eeri ar-
kets. Fiacia resorces iht be key
or their aoptio o eviroetay riey
practices a techooies. hereore, access to
face (2F) has becoe a iportat topic
o the iteratioa eveopet aea. 2F
or sa a ei-size eterprises (ms)
say ecopasses the avaiabiity, accessi-biity, aorabiity a eective istribtio o
facia services.
he H-sia prorae recoises that
eabi 2F ca catayse the ptake o P
practices i reater bers across sia. Havi
face avaiabe ca aow a aster a wier
repicatio o resorce-efciet sotios that
have a positive cost beeft ratio.
his sty coects essos eare ro the
H-sia projects operati ri 2012
that ha activities ike to 2F. he H-
sia network Faciity cocte extesive esk
research a iterviews with the projects, be-
efciaries, facia istittios, a poicy-ak-
ers i orer to raw ot the essos. his ior-
atio wi provie crret a tre project
eveopers with erichi ioratio a tips
o how to iprove the ipact o projects by
icorporati ore eective 2F which, i tr,
ehaces project activities.
he specifc objectives o this theatic sty are:
o ather a overview o faci ees oms especiay those tarete by the
H-sia prorae;
o provie a overview o facia sotios
or ms;
o aayse the ap betwee facia ees
a facia sotios; a
o coect a copie iitia essos eare
a sotios to facia chaees as
ipeete by H-sia projects.
he sty is ivie ito fve chapters. he frst
chapter hihihts the reevace o ree f-
ace or sstaiabe eveopet. he seco
chapter ooks at 2F ro the perspectives o
ms o oe ha, a ro baks o the other
ha. t expais the areas where m access to
ree face bris abot positive ecooic,
eviroeta a socia ipact a why it is
iportat to joi has i orer to eabe it.
his chapter aso provies a overview rear-
i the facia ees o ms a the fa-cia sotios avaiabe to the. Base o the
overview, the chapter characterises a isatch
betwee ea a sppy. he thir chapter
o the sty eas with the strateies that the
H-sia projects are epoyi to aress
2F. t hits at approaches a ethos se
by seecte projects to eae with facia
istittios a poicy-akers ro the fa-
cia sector. the fa chapter, iitia essos
are presete a opportities ietife or
the H-sia prorae i the area o ea-
bi 2F.
1
SWITCH-Asia | ENGAGING WITH fINANCING INSTITuTINS f GEENING SmES
7/28/2019 Switch Asia _ Access 2 finance
10/3910
Access to finAnce
A driver for economic
development
SMEs play a major role in the economic andsocial development of emerging markets. In
society, they are an important source of employ-
ment and income generation for low-income
groups. The economic relevance of SMEs is even
greater when informal businesses are taken into
account.
Studies indicate that the role of SMEs in an
economy appears to increase with a countrys
average income level. This might indicate that
SMEs are themselves a driver of economic
growth1. In Asia, many SMEs are part of localand global supply chains. Improving their per-
formance, as well as that of local entrepreneurs,
can help increase business, and employment. As
such, SMEs access to nancial services is a cru-
cial factor for economic development. Adopting,
and investing in, up-to-date and resource-ef-
cient technologies requires nancial resources
but nancing SMEs is risky for banks and other
nancial institutions.
Especially in emerging markets, access to nan-
cial services for SMEs frequently remains a chal-
lenge. According to the World Bank Enterprise
Survey, SMEs in developing countries are more
likely to report constraints in accessing nance
than SMEs in developed countries2 (see Figure 1).
From the bankers perspective, SMEs remain vul-nerable, with evident weaknesses. Their size can
limit their market approach. A small number of
staff might mean limited management capac-
ity. With limited resources, SMEs lack the ability
to expand their capacity. They face tough com-
petition especially from larger enterprises that
might be able to offer better deals due to their
lower production costs. Financial institutions
and investors who offer debt nancing, equity
nancing, leasing and factoring instruments are
mainly interested in doing business with SMEsthat can deliver transparent accounts and show
operational and market consistency to lower
the risk of defaulting of loans.
Figure 1: Percentage of firms viewing access to finance as a major obstacle by firm size and country income group
(Source: World Bank Enterprise Surveys 2006-2009)
Note: The Enterprise Surveys defne small frms as having ewer than 20 employees and medium-sized frms as having
between 20 and 100 employees. Data are or the most recent year available or each country, ranging rom 2003 to
2009. Statistics by country income group are simple averages o the countries in each group.
45
40
35
30
2520
15
10
5
0
Percent(%
)
Low Income Middle Income High Income
Small (
7/28/2019 Switch Asia _ Access 2 finance
11/3911
inncing nEEDs sMEs
e o the streths o ms ies i their abiity
to respo qicky to opportities a to o-
er ew oos a services as arkets chae.
Bt to prae their processes, to expa a
iovate, they ee access to facia serv-ices (creit, israce, payet aciities), a to
have a heathy cash ow (access to bak creit,
aratees, vetre capita, easi, trae creit,
etc.).
i e o-em, sME eqe o apal
to cover the aiy proctio a aiistra-
tio costs associate with ri the bsiess,
or exape payro, ret, a copeetary
services or proctio processes sch as water
a eery. ree approach or eabi ac-
cess to the ecessary face co be i theprovisio o face or eviroetay riey
raw aterias, or i capacity bii or sta i
ceaer proctio practices.
i e medm-em, sME eed ae o ade-
qae a fo eqpme ad mae
inncing sutins
or its prchase, aiteace a repair.
looki at eviroeta perorace, access
to ree face co ea to ivestet i ef-
ciet eqipet a services as we as i cea
techooies so the ms ca stay copetitive
i the ei ter.
Fiay, lo-em a pmal efeo mae expao. For istace, a eterprise
iht wat to expa its aciities to icrease its
proctio voe, or to ope ew sbsiiaries
i other reios becase o the attractiveess
o ew arket opportities. hs, facia
resorces are eee to efciety prae ex-
isti aciities. ypicay, the aite o sch
ivestets is hih a the retrs, i ost
cases, o-ter. Fro a sstaiabe proctio
perspective, o-ter ree faci iht
ea scai-p the ree bsiess oe it-se to other reios or sectors.
ith this pictre o tepora facia ees
i i, it is se to exaie what sitabe
facia istrets (procts a services)
iht be avaiabe i sia arkets.
1.2
1.3
SWITCH-Asia | ENGAGING WITH fINANCING INSTITuTINS f GEENING SmES
Fiaci istrets ca be ivie ito six
broa cateories accori to the short-, ie-
a o-ter facia ees o ms (ee
Fire 2):
debt faci: coercia oas,
cocessioa oas, icrocreit;
qity faci: private eqity, vetre
capita, ezzaie face;
stittioa i: pbic rats, tax
icetives, oa aratees; ther facia istrets: easi,
actori;
aiore facia istrets or eery
a resorce efciecy: arraeets with
the eery a service copaies (s)
(ro s itera s or by the cstoer,
or by a thir party i), carbo face
sch as throh the ea deveopet
mechais (dm), a
pporti o-facia services
(e.. capacity-bii o facia services).
Bak faci eeray reais the ost i-
portat sorce o extera face to ms. debt
faci coprises ei activities to ms,
where the m sis a cotract with a bak to
receive a certai aot o oey with the
coproise o payi the borrowe aot
back to the bak with aitioa arket iterest
rates or the tie spa o the cotract. he ie
spa ca be short-, ie-, or o-ter. debt
faci ices a variety o types o oas.
oercia oas say ea coatera,
sch as a specifc property to be pee as a
secrity or the repayet o the oa. oces-sioa oas are sbsiise by pbic creit ies
kow as pbic or sot oas or rats, which
rece the cost o iterest. micro-creits are
sa-scae oas or icro-eterprises. ms
iht avor icro-oas sice icro-eers
o ot ecessariy reqire physica coatera.
the case o eqity faci, private eqity
is capita provie by private a/or istittioa
ivestors who asse a owership stake i a
rowi m or a iite perio o tie (co-
oy 5 to 10 years). qity faci ices
private eqity ivestets, vetre capita a
7/28/2019 Switch Asia _ Access 2 finance
12/3912SWITCH-Asia | ENGAGING WITH fINANCING INSTITuTINS f GEENING SmES
Figure 2:
The spectrum
of financing
solutions for
SMEs
Financing
Solutions
Debt
financing
Spporting non-
nancial services
Eqity
financing
Tailored nancial
instrents
Instittional
fnding
Leasing,
factoring
for exaple: eceivables anageent
to iprove short-tercash ows o SmEs
Contracts between twoparties where the lessonprovides an asset orsage to another party
or a period o tie, inretrn or specied
payents
for exaple: Pblic grants Tax incentives Loan garantees
for exaple: Coercial loans Consessional loans micro-credits
for exaple: Private eqity Ventre capital mezzanine capital
for exaple: Capacity bilding oninancial literacy
for exaple: Arrangeent withEnergy and ServiceCopanies (ESCs)(ro its internal ndsor by the coster, or bya third party nding
Carbon finance (CDm)
ezzaie capita. Vetre capita is a o-ter
faci istret everae by aaeet
a bsiess eveopet spport (icba-
tio) to iste, iovative, a potetiay
hih rowth eterprises i a eary eveopet
stae. vestets are characterise by a hih
risk o aire bt, i tr, eqay hih rates o
retr. mezzaie capita cobies characteris-
tics o ebt a eqity faci. he ierece
is that ivestors are ot rate owership i
the m. mezzaie oas are say o shorter
ratio a are ore expesive or ms.
stittioa i ices pbic rats,
tax icetives, a oa aratees. grats are
facia cotribtios provie by overets,eveopet facia istittios, iteratioa
eveopet oraisatios a oatios.
grats ca be provie or ay prpose that the
rator a the ratee aree o. ax icetives
ici tax ectio a tax rectios seek
to ive specia coitios to ms or specifc
prposes, or exape, to proote P practices.
oa aratee is a facia proct avaiabe
to ms or a chare as a partia sbstitte or
coatera a track recors. he arator wi,
y or party, asse the ebtors oa obia-
tio i the case o eat a this provies se-
crity to the bak. ther facia istrets
ice actori a easi. Factori is a or
o receivabes face whereby a bsiess ses,
or assis its accot receivabes (i.e. ivoices)
to a face copay (cae a actor) at a is-
cot, i exchae or ieiate oey with
which to face cotie bsiess. Factori
iers ro a oa i three ai ways. Firsty, the
ephasis is o the qaity o the receivabes a
ot oy o the ms creit worthiess. eco-
y, actori is ot a oa it is a avace o a
ms otstai ivoices. hiry, a bak oa
ivoves two parties whereas actori ivoves
three (borrower byer- actor).
likewise, easi appears as a iportatcopeetary sorce o ivestet face,
especiay i cotries where the coatera re-
ie a the ioratio irastrctre are
weak. leasi is broay efe as a cotract be-
twee two parties where oe party (the essor)
provies a asset (achiery, eqipet, vehi-
ces, a/or property) or sae to aother party
(the essee) or a specife perio o tie, i re-
tr or specife payets. leasi is base o
the propositio that profts are eare throh
the se o assets, rather tha ro their ower-
ship. t ocses o the essees abiity to eerate
7/28/2019 Switch Asia _ Access 2 finance
13/3913
Figure 3: Figure 3: Availabilit of green financing solutions along different maturit stages of a SME
Sorce: http://ec.eropa.e/enterprise/policies/nance/nancing-environent/index_en.ht
Risk Capital Loan Finance+
+SmE developent stage
SmErevenue
Pre-seed phase Seed phase Start-up phase Emerging Growth Development
faily & friendsBsiness Angels
Seed & Early StageVentre Capital fnds
Bank Loans & Garantees
foral Ventre Capital fnds
Pblic Stock markets
Most availabilit
of green SME financing
SWITCH-Asia | ENGAGING WITH fINANCING INSTITuTINS f GEENING SmES
cash ow ro bsiess operatios to service
the ease payet, rather tha o the baace
sheet or past creit history.
s oer taiore facia services. hese
are private copaies with techica expertise
which assess, esi, a ipeet eery ef-
ciet sotios or pbic a private ciets. de-pei o the s bsiess oe, they ay
face (share savis) or assist i arrai
faci (aratee savis) or the iprove
operatio o a ciets eery syste. ost
cases, the reeratio o the epes o
the aot o savis that their iproveets
are abe to eerate or the cstoer. he ik-
ae o perorace a payet is cooy
efe as perorace cotracti.
aiore facia services aso ice car-
bo face. arbo face provies a iopportity that heps to rece potio a
reehose as (gHg) eissios by ivesti i
reewabe eery or eery efciecy iprove-
ets. arbo projects have becoe icreas-
iy iportat sice the ipeetatio o the
ea deveopet mechais (dm) er the
Kyoto Protoco. he dm ecoraes eery co-
servatio a the aoptio o reewabe eery
by issi certifcates or verife a recore
eissios rectios (certife eissios rec-
tios) that ca be so to overets, are-
scae copaies a carbo s to eet project
ivestet costs or to ehace project revees.
pporti o-facia services ca be
essetia or iprovi access to face. net-
works, or exape, hep to f a ersta
sotios by eai ieret ebers iiscssios a ecorai the exchae o
experieces, both sccess a sccess.
ooperatio betwee etwork ebers is es-
setia or sstaiabe eari. his ices
techooy iovatio, which is ostere by the
coi toether o experts a ieret stake-
hoers ro isie a otsie the etwork.
xperiece ro H-sia, a other,
projects has cofre that i sia both creit
a eqity faci sotios are avaiabe, at
varios staes o atrity o ms, a i re-spose to their particar faci ees (see
Fire 3). he it coes to ree s, these
are aiy avaiabe as bak oas or cea eer-
y or eery efciecy sotios. Vetre capita
a start-p s are aso eteri the arket
a awaiti etrepreers, who ike to ake
a ipact throh faci resorce efciet
procts a services. he fre shows that,
especiay i the eary staes o bsiess eve-
opet, access to face reais a chaee.
7/28/2019 Switch Asia _ Access 2 finance
14/3914
thE inncing gP
here is sti a isatch betwee the ea
a the sppy or face, especiay ree
face; a severa actors are at pay i eve-
opi cotries, which ake it ifct or ms
to access it. s ca be see i Fire 4, these ac-tors ca be cassife ito two ai cateories:
sppy-sie a ea-sie. aki a aciitat-
i roe, H-sia projects try to aress oe
or ore o these isses.
thE DEMnD siDE wht rriErs
cE sMEs?
a of aal lea
ms with iite aiistrative capacity ote
o ot keep facia recors a ay have o
so accoti syste. hey ack capacity or
pai a beti their operatios. his is
very coo i ms tarete by the H-
sia prorae. ve the H-sia projects
that are ot irecty aressi the isse o
access to face report sch shortcois.
For exape, the project Jte: An Eco-friendly
Alternative or a Sstainable ftre in Bangla-
desh, reporte that ost ms tarete by the
project say they ack access to face. Bt whe
aaysi their sitatio, the project o that
ms ack kowee o costi a prici.
he project saw a ee to frst strethe fa-
cia iteracy a bsiess pai. ith sch
capacity, it the becoes easibe or ms to
access bak oas. other project, Encoraging
and Ipleenting Sstainable Prodction and
Consption o Eco-friendly Batik in Indonesia
and malaysia, aso cosiers that capacity o
1.4
The demand side
What are the barriers aced
by SmEs?
The suppl side
What are the barriers aced
by nancing instittions?
Lack o nancial literacy
Lack o nancial transparency
Services o nancing instittions
perceived too costly
Poor arketing and
conication by nancial
instittions
SmEs lack collateral
Banks reqire SmEs transparency
Lack o eective channels and
odalities or conication
with credit providers or nding
prposes
Banks do not consider SmE
lending as protable bsinessSWITCH-Asias role
Addressing the legal raework
or A2f
Prooting nancial soltions
Increasing capacity o SmEs to
access nance
Addressing banks ro awareness
to technical assistance
Enabling investent linkages
Figure 4: The role of the SWITCH-Asia Programme in addressing demand and suppl side barriers
SWITCH-Asia | ENGAGING WITH fINANCING INSTITuTINS f GEENING SmES
7/28/2019 Switch Asia _ Access 2 finance
15/3915
costi a prici is essetia or a ms pro-
itabe operatio. he project oers sch sessios
or tarete ms i its arketi copoet.
maaysia, the Sstainable Prodction o the
Bioass Indstries in malaysia: ptiising Eco-
noic Potential and moving Towards Higher Val-
e Chain (Bioass-SP) project fs that ost otheir tarete ms o ot keep proper recors
a ack a so aaeet syste.
a of aal apae
sia, a proprietor, or her or his aiy, say
operates oe icro-eterprise. he SmAT Ceb
project o that ote a etrepreer o a
tarete m tee to ake itte istictio
betwee the faces reate to their bsi-
ess activities a those o their ow persoa
hoseho trasactios. oe ms operate othe basis o two books, so that profts are re-
cacate owwars to evae taxes. However,
whe these ms appy or a oa o the basis o
their acta bsiess (i.e. profts) their oa ap-
picatio oes ot atch their facia recors.
ch aaeet a o-trasparet
practices have e to ms bei see as risky
borrowers a aki the ess appeai to
eers.
see of a o ae peeed
a oo ol
te facia istittios oer oas oy at
hih ees or iterest rates. ms are ote ot
abe or wii to pay sch hih ees. For ms
i Vieta, or exape, the iterest rates or
a bak oa reach 15%. ter iterest rates, the
ms ee to cover the costs or easibiity st-
ies a trasactio costs chare by the baks.
utiatey, facia services o at the bak
are perceive to be too cbersoe a tootie-cosi by ms.
Poo mae ad ommao b a-
al o
Poor arketi a ieective coicatio
betwee baks a etrepreers are ajor ob-
staces or ms seeki bak face. his is the
case i Pakista where the H-sia project,
Sstainable and Cleaner Prodction in the man-
actring Indstries o Pakistan (SCI-PAK), o
that ms ack ioratio o the beefts a
coitios o a baks facia sotios.
thE suPPy siDE wht rriErs
cE inncing institutins?
sME la ollaeal
he baks rat oas or creit, their eci-
sios are osty base o the avaiabiity o
fxe assets as coatera. may ms caot
provie coatera as they caot ispose oeqipet, achiery, or a. Freqety,
baks o ot accept a persoa arator ike
ay icro-faci istittios o. ms i
the H-sia project SmEs or Environental
Accontability, esponsibility and Transparency
(SmAT Ceb) ote ser ro bak eas
or coatera. hey iht ask or hih aots
o coatera, 150% or ore o the oa vae.
he SmAT Ceb etrepreers cosier sch
eas too striet. hereore, these baks
with sch physica coatera reqireets wiot accept the ms as ciets, a the ms
caot access face ro the baks.
a eqe sME apae
most facia istittios a baks ack i-
oratio o ms a their ikey cash ows
or creit histories. he baks the obt the
ms capacity to repay a oa. hey aso reqire
facia stateets a recors bt sch oc-
etatio is aso reqety acki. he a-
jority o sa a icro-eterprises tarete
by H-sia projects, a reviewe i this
report, ack corporate overace, a this is a
ajor hre or the baks.
a of effee ael ad modale fo
ommao ed pode fo
fd ppoe
ms are ote ot aware o facia sotios
provie by the baks, especiay i the area o
ree face, or o the proceres to oowto ai access to face. his co be the case
o a o-trasparet baki syste as the
H-sia project mainstreaing Energy E-
ciency throgh Bsiness Innovation Spport
Vietna (mEET-BIS) reports. he H-sia
project Sstainable and Cleaner Prodction in
the manactring Indstries o Pakistan (SCI-
PAK) o that baks o ot have the capacity
to eae a ior ms o accessibe fa-
cia sotios, or o they have the kowee
or assessi ceaer proctio ivestets.
SWITCH-Asia | ENGAGING WITH fINANCING INSTITuTINS f GEENING SmES
7/28/2019 Switch Asia _ Access 2 finance
16/3916
a do o ode sME led a poable
be
de to their size ms are ote oy ooki or
a sa ivestet bt baks o ot f sch
sa trasactios proftabe. Hih operati
costs or m ei a cotract eorce-
et reai a obstace eve at ow eatrates. he mEET-BIS project i Vieta o
that baks are ote ot itereste i servi
m ciets eei sa oas to boost P or
eery efciecy. aer copaies i Vieta
that wat to ivest i eery efciecy p-
raes, sch as a u$ 15,000 soar water heater
syste, have ore ifcties fi a bak
that faces sch ivestet. By tareti
the facia ees o arer eterprises, baks
te to o better bsiess tha by aressi
ms. may facia istittios across sia oot ake eoh proft with ms as their soe,
or ajor, ebt cietee, espite chari a pre-
i o the iterest becase o the hih risk
a trasactio cost.
med ompeo fo aloed ee
ae sME
s arer copaies a their ees or i-
vestet oer better bsiess, ost facia
istittios o ot oer taior-ae services
or ms. de to the ow eree o copetitio
ao baks or m ciets, there is a shortae
o iovative facia procts aressi the
ees o ms.
a ode sME led
loas respoi to facia reqests ro
ms are ote cosiere hih risk by the baks.
he weak capacity iheret i ms or raw-
i p bsiess pas a eveopi bsiess
projectios ea that baks f it ifct to
assess proftabiity a, at the sae tie, coace a icrease facia risk as a eer i
case o eat. he SmAT Ceb project beieves
that baks o ot y ersta the eviro-
et srroi m ei. hey aso o ot
appear to have appropriate toos to hep the
assess the risk o ei to ms or particar
ivestets, sch as ceaer proctio eas-
res. he H-sia Bioass-SPproject sees a
probe with the capacity o baks. maaysia
a Vieta, the project o that the baks
ack reevat skis to evaate ew, ree bsi-ess ieas especiay i the coerciaisatio
o bioass. Bakers are ot aiiar with the
ree techooy arket copare with a-
tre arket procts sch as ortae oas.
here creit evaators o ot ersta the
bioass bsiess, they are ikey to cosier
ei as hih risk.
Fiaci probes ace by ms are e to
both ea a sppy actors. hese ac-
tors ca be aresse by the H-sia
prorae as istrate by the oowi case
sties.
SWITCH-Asia | ENGAGING WITH fINANCING INSTITuTINS f GEENING SmES
7/28/2019 Switch Asia _ Access 2 finance
17/3917
the m face ap is the otcoe o a
isparity betwee the ees o the ms
a the sppy o facia stittios.
rrety, a ber o H-sia projects are
worki towars cosi the ap. heir activities
ca be cateorize i the oowi strateies:
strtEgy 1: ressi the abiviroet or ccess to Fiace
strtEgy 2: Prooti Fiacia otios
strtEgy 3: creasi apacity o ms
to ccess Fiace
strtEgy 4: ressi Baks ro
wareess to echica ssistace
strtEgy 5: abi vestet likaes
which strtEgiEs nD ts D
switch-si PrEcts iMPEMEnt
t csE thE inncE gP?2Table 2: SWITCH-Asia projects activities aiming at enabling access to finance for sustainable production in SMEs
Strateg
Project
SMART Cebu
Biomass-SP
Eco-friendl
Bamboo
SCI-PAK
MEET-BIS
Green Philippines
Islands
China MotorChallenge
SWITCH-Asia | ENGAGING WITH fINANCING INSTITuTINS f GEENING SmES
3 4 521Addressing the
Legal Framework
for Access to Finance
Policy recoendationsor a Bioass ActionPlan incldingeconoic instrents
Policy recoendationsor enabling SmEsaccess to nance;mlti-stakeholderdialoges
Increasing Capacit of
SMEs to Access Finance
Providing nancialliteracy to the eberso the Bms and indi-
vidal coaching
Individal coaching orCDm project develop-ent; EntreprenersNrtring Prograe(EumBENP)
Assisting to prepareInvestent Plans
Awareness Session withBms
Cooperation withESCs
Addressing Banks
from Awareness to
Technical Assistance
SCP Awareness orbanks (advocacy, stdytors, workshops)
Awareness on resorceand energy eciency
Bilding relationshipwith banks, edcingtransactions cost orbanks
Inclsion o bank intotraining prograe
Enabling Investment
Linkages
match-making byjoint ora
match-making onlineand oine plators
match-making:Investors Stdy Tor,Bsiness Directories
ond Table
Instittionalpartnership witha SmE bank
Promoting
Financial Services
Awareness raisingaong SmEs on nan-cial options available
Prootion o Greenfnds, Prootion oCDm
Prootion o CDm
market-scan o nancialinstittions/soltionsand integration o theino and nancial insti-ttion representativesto the trainings, exhibi-tions; feasibility Stdy
or ESC developent
Envisioned trainingpackage on nancialsoltions
Cooperation withESCs
7/28/2019 Switch Asia _ Access 2 finance
18/3918
strtEgy 1
DDrEssing thE Ening
EnvirnMEnt r ccEss
t inncE
he reatory raework pays a critica roe
i iprovi the face ascape or ms.
oo ea raework a facia irastrc-
tre ca set the ecessary pre-coitios or
eabi ms to access face.
Eablme of aal meam
ed fo sME
he H-sia project Sstainable and Clean-
er Prodction in the manactring Indstries o
Pakistan (SCI-Pak) sets a ocs o the eabipoicy eviroet or prooti sstaiabe
Proctio i the textie a taery sector
i Pakista. he SCI-Pak project cocte a
assesset sty to ietiy potetia oppor-
tities to iprove existi poicies er the
raework o P. he sty presete the ex-
isti eisatio a ietife opportity ar-
eas that co beeft ost ro iproveets
o the oa o icreasi sstaiabe proctio
with a ocs o resorce efciecy i ms.
Fro their aaysis the SCI-Pak project coc-
e there are a reat ber o opportities i
the poicy area icreasi access to face that
wo beeft ms to iprove their proctio
towars sstaiabe proctio. new facia
echaiss or m ipeetatio o ef-
ciecy easres sho be estabishe. ptios
ice vetre capita i or start-ps,
trasparet a copetitive &d rats shobe provie a ivoice base faci, where
borrowers provie accepte ivoices (or receiva-
bes) as coatera to the coercia bak, that
co be proote by the tate Bak as a a-
terative to coatera base ei (natioa
stria Poicy, 2010).
the sty, it was seste that ew f-
acia echaiss or ms ertaki the
efciecy easres sho be estabishe. c-
cori to the project parters, perorace
cotracti is aother aterative to prooteeery a resorce efciecy i Pakista. his
wo eabe risk shari betwee the cotrac-
tor, the bak, a ms ipeeti iova-
tive sstaiabiity vetres. aitio, m
faci sho be icorporate ito the -
a reit Pa o the tate Bak o Pakista.
Proraes or creit aratee a creit i-
srace aecies co provie the icetives as
we as risk coverae or baks sho be estab-
ishe. Fiacia istittios sho be spport-
e i esii a achi istry base
prora-ei schees (m Poicy, 2007).
2.1
SWITCH-Asia | ENGAGING WITH fINANCING INSTITuTINS f GEENING SmES
7/28/2019 Switch Asia _ Access 2 finance
19/3919
other cocsio was that
a wae sbsiy prorae
sho be estabishe to sp-
port o the oor traii o
workers. Firs sho pay, or
istace, sevety percet o
the ii wae to theworker with the reaii
thirty per cet bei pai by a
overet cotribtio pay-
abe throh a traii orai-
satio irecty to the worker.
itioay, eai frs
sho sposor a traii it
withi a pbic sector istitte, where traiees
ca be traie specifcay o their achies
a accori to their reqireets a sta-
ars (natioa stria Poicy, 2010).he assesset sty was se as back-
ro or a orietatio sessio or poicy
akers o the Poicy Fraework or staiabe
Proctio (P) i Pakista. ith the orietatio
sessio, the project soht to eveop a ae-
a or the scceei poicy iaoe ao
ieret stakehoers ro overet, ms,
Bsiess ssociatios, Fiacia stittios a
qipet maactrers. miistry o natioa
disaster maaeet aree to host a to
ea the sbseqet activities i poicy area.
Pol ieeo a Eoom ime
he project Sstainable Prodction (SP) o the
Bioass Indstries in malaysia: ptiising Eco-
noic Potential and moving Towards Higher
Vale Chain (Bioass-SP) ais to eveop the
bioass istry base o the pricipe o
sstaiabe cosptio & proctio (P).
maaysia has a abace o bioass avai-
abe a its potetia or coerciaisatio
reais tappe. he project itervees withreater arket access a ree sppy chai
opportities ro the u. he project stratey
ices the eveopet a appicatio o
eective ecooic istrets that ehace
P.
Base o ipts ro ti-stakehoers, the
Bioass-SP project evisios eveopi poicy
recoeatios or a Bioass ctio Pa.
cocrete easre co ice reevat eco-
oic istrets to proote the coercia-
isatio o bioass. ch istrets wi hep
poicy akers to iprove crret raete
overet eorts i spporti the eveop-
et o aactri o eco-riey procts,
bioass techooies a resorce efciecy
i maaysia. o eveop sch istrets the
project evisios cocti workshops which
iscss the se o ecooic istrets i -
rope aressi bioass is-
ses. Participats wi aayse
case sties o the sccessse o ecooic istrets
aressi bioass a ie-
tiy proisi se o ecooic
istrets i maaysia. hese
activities were sti at the pa-
i stae whe this sty
was writte so esso eare
wi be obtaie i 2013.
SWITCH-Asia | ENGAGING WITH fINANCING INSTITuTINS f GEENING SmES
7/28/2019 Switch Asia _ Access 2 finance
20/3920
strtEgy 2
PrMting innci
sErvicEs
Baks ee to provie ioratio o the ters
a coitios o their facia services toms. he avaiabiity a accessibiity o sch
ioratio provies the basis or iteractio
betwee baks a ms. o icrease avaiabi-
ity a accessibiity o ioratio o facia
procts ost H-sia projects that are
crrety aressi the topic access to face
are ici the topic i raisi awareess ac-
tivities. depei o the project, teas icor-
porate ioratio o facia optios i roa
shows, awareess ors or workshops.
rD shws crEtE wrEnEss
in Mysi
t the heart o the Bioass-SPproject is a co-
pietary traii to strethe ms fa-
cia, techica a eviroeta copiace
capacities to icrease export copetitiveess
o bioass procts, services a techooies.
its frst year, the project cocts a series o
roa shows to raise awareess o the potetia
o coerciaisatio o bioass ao h-
res o ms. Fiacia sotios or icreas-
i bioass bsiess were aways part o the
aea o the roa shows as accori to the
projects aaysis access to face is a crcia
botteeck or the ms.dri the oa hows the project presets
the avaiabe i echais. Fiacia i-
stittios preset their avaiabe faci as-
sistace or existi aactri bioass
copaies, especiay throh the aciity o sot
oas, or creit aratee. he project hihiht-
e that bio-base copaies are aso expose
to icetives oere as we as vetre capita
opportities.
he Bioass-SP project aso provies ms
with a overview o i opportities o-ere by the maaysia goveret ecies.
he project aso provies ioratio o the
varios i optios a rat schees by
iistries er ieret aecies, a aso
ethoooy to tap these opportities i ie
with the 10th maaysia Pa. he project seeks to
ivite miistry o ciece, echooy & ova-
tio (m) / miistry o rictres (mo),
2.2
Figure 5: Biomass-SP project interventions aiming to enable access to finance for SMEs
Assumptions
Strateg 1: aise awareness
o bioass SmEs
Strateg 2: Link SmEs wit &D
Strateg 3:Address banks and
nancial instittions
Strateg 4: Enable access to
nance by coaching SmEs
Strateg 5: Linking SmEs to
Eu Spply Chains
Inoration on pricing
and arket is accessible
and available
SmEs are aware and
know how to apply or
access to nance
Access to nance or
bioass ventres isaccessible and available
SmEs access private
nds
Local bioass &D
is coercialised
SmEs access
Governent nds
and grants
SmEs innovate with
local esearch and
Developent knowledge
Bsiness odels or bioass
ventres are developed
Pblicity on deo projects inedia and internet
SWITCH-Asia | ENGAGING WITH fINANCING INSTITuTINS f GEENING SmES
7/28/2019 Switch Asia _ Access 2 finance
21/3921
deveopet orporatio (md)s coer-
ciaisatio o & d s, rae F 500, ma-
aysia lie ciece F (V F), maaysia debtVetres Bh (ebt faci base o project
a o-coatera approach), gree echooy
Fiaci chee (sot oa or ree techo-
oy projects), m Baks (sot oa or ms e-
veopet), rats oere by Biotechorp or
biotech projects stats to preset their facia
sotios.
ith the seve wareess oa how ei-
ar, the project aae to reach ot to ore
tha 800 stakehoers ivove i the bioass
sppy chai. Besies isseiati project i-
oratio, the prpose o this otreach exercise
is to proote their traii prorae ao
bioass ms. he Bioass-SP project seects
a coaches 50 ms to iprove the bsiess
a eviroeta perorace with varios
capacity bii proraes a avisory
avice. o the coachi services oere
are: access to overet rats, sot oas, i-
vestet icetives, vetre capita, a other
project faci echaiss (or ore ior-atio see tratey 3).
in-sEssins n thE cEn DEvEPMEnt
MEchnisM in Pkistn
so the H-sia project Sstainable and
Cleaner Prodction in the anactring inds-
tries o Pakistan (SCI-Pak) prootes facia
sotios. he SCI-Pak project oraize three
workshops to itroce bsiess a istria
represetatives to the opportities o opt-
i or ea deveopet mechais (dm).
he dm is a arraeet er the Kyoto
Protoco which aows istriaize cotries
with a reehose as rectio coitet
to ivest i iitiatives that esse eissios i
eveopi cotries as a aterative to ore
costy eissio rectio easre. Pakista is
ai behi the eveopi wor to captre
the carbo arket. Pakista has oy 9 projectsthat have bee reistere by the dm exective
boar whie this ber or hia a ia is
969 a 534 respectivey. Pakista has oy 26
projects i pipeie or dm whie the sae
ber or hia a ia is 2,536 a 1,825
respectivey. hereore, there is a ee to catch
p with the wor. his sceario reects the ack
o awareess abot dm a scarcity o fa-
cia icetives. eak istittioa capacity a
a o project cyce are the reasos that have
hiere the dm peetratio i oca istry.o ior ms ike to the project abot dm,
the SCI-Pak project presete case sties o i-
eret dm projects i extie a aery sec-
tors i ia. he workshops itroce techi-
ca presetatio o writi the Project desi
docet (Pdd), which is the ost iportat
part o the dm process. t was hihihte that
Project desi docet serves as the basis
or the dm project evaatio by the dm ex-
ective boar. qaity Pdd wi esre sooth
vaiatio, positive vaiatio report, qick reis-
tratio o the project with dm exective boar
a o tie copetio o verifcatio a iss-
ace o s by the dm exective boar.
nEtwrk t incrEsE ccEss t
inrMtin n innci sutins
o proote facia sotios, the SCI-Pak
project evisios estabishi a ery a
esorce fciet (&) network to aress
the facia ees o a a mei ter-prises. he ecisio to eveop sch a etwork
was take toether with the tate Bak o Paki-
sta (BP) a coercia baks at a ro ta-
be. he ro tabe coce that the probe
o access to face i Pakista was ot the ack
o facia resorces bt the ack o iteractio
toos a echaiss to cose the sppy a
ea o facia resorces. For that reaso,
the participats wecoe the appropriate o-
et o the ach o the & network.
he parties evisio that & etwork is
base o a web pator that provies ior-
SWITCH-Asia | ENGAGING WITH fINANCING INSTITuTINS f GEENING SmES
7/28/2019 Switch Asia _ Access 2 finance
22/3922
atio o reevat & poicy itervetio
a aitioa faci opportities irecty
taiore to ms wii to icrease their eery
a resorce efciecy sho aso be a oa o
the etwork. Fiay, the etwork sho acii-
tate the traser a eveopet o techoo-
ies, which are rety eee to icrease e-
ery a resorce efciecy o ms.
innci sutins s Prt trinings,
wrEnEss PrgrMMEs nD Ehiitins
Vieta, the H-sia project main-
streaing Energy Eciency throgh Bsiness
Innovation Spport (mEET-BIS) prootes e-
ery a water efciecy or ms by biithe arketi a saes capacity o techica
proct sppiers. he project has bit capacity
with the techooy sppiers to serve the m
eery a water efciecy arket throh
arket research, seiars, (booths o) exhibi-
tios, saes traii sessios, workshops a
bsiess cb eetis, attracti ore tha
700 participats so ar. Besies bii capa-
city i the proct sppy chai, mEET-BIS ais
to ehace m access to face or ivest-
et i eery efciecy by worki with oca
facia istittios. hereas the ocs o the
awareess prorae ies o eery efciet
sotios, facia sotios have aso bee
part o the aea. workshops a project
exhibitios the project ivite a represetative
o a oa aratee , a speaker o F a a
represetative o a bak to exchae o fa-
cia services to ehace m access to eery
efciet techooy.
he H-sia project Green Philippines Is-
lands o Sstainability (GPIoS) ais to iiise
the eviroeta ipact o ms i metro ma-
ia a the lBZn reio. he project
cetres o workshops i ceaer proctio a
iivia costi by experiece cost-
ats. he project ais to traser kow-howthroh traii workshops a coachi, co-
bie with a syste o qaity assrace a
oitori. he coercia m bak Paters-
bak is a project parter a a project beef-
ciary at the sae tie. s project beefciary
Patersbak is taki part o the traii a is
eroi ceaer proctio aits toether
with ay other ms ro iverse sectors. s
project parter Patersbak has the vee r-
i the GPIoS traii prorae to proote
their faci prorae to the participati
copaies.
Figure 6: SCI-Pak project strateg on how to create a network to increase access to information on financial solutions
Educational and financial institutes,
government organisations
Consumers / RetailersIEMS(Indstrialeqipent
anactrer)
SMEs
Provide inoration
and knowledge
IEms provide technical
soltions or SmEs
er their prodcts
Increased Energ and Resource Efficienc
SWITCH-Asia | ENGAGING WITH fINANCING INSTITuTINS f GEENING SmES
7/28/2019 Switch Asia _ Access 2 finance
23/3923
PrMtin unDs vi EnErgy sErvicE
cMPniEs
For the ree ivestet arket to peror
better, aecies or istittio that have kow-
ee a techica capacity o the techooy
a cost-savi potetia ee to hep ietiy
opportities, cocts cost beeft aaysis oroo easibiity sties. ery service copa-
ies (s) are private copaies with techi-
ca expertise, which assess, esi a ipe-
et eery efciecy iproveets or pbic
a private ciets. heir ai is to iprove the
eery efciecy sotios. next to eveop a
esi eery efciet, s aciitate fac-
i o eery efciecy project.
hia, the H-sia project China mo-
tor Challenge aciitates iproveet o the
operati efciecy o eectric otors i coop-eratio with s. ver 400 ajor istria
sers o eectric otor systes have prae
otors their systes. o ecorae otor ser
to prae to ore efciet otors, the project
iks otor syste sers with s, who ca
sppy kow-how, eqipet a faci to
reaize the prae. ery ervice opaies
(s) are a reativey ew type o ervice o-
pay i hia. rrety severa hre s
are operati cotry-wie, avisi copaies
how to iprove their eery efciecy. he typi-
ca arraeet i hia is that the takes
o a p-rot costs o the eery ait a
eqipet prchase, a is pai a proportio
o the eery savis achieve. his cotract-
i etho is kow as ery Perorace
otracti a eectivey reces the risk or
the cstoer. thoh this provies a cove-
iet echais or otor sers to save eery
a cost, the cocept o services is ew so
that i ay sectors they have yet to ai trst.
By traii a bii capacity o s, the
project China motor Challenge project cotrib-
tes to rther eectricity savis o istria
otor syste sers beyo the irect project
ipacts. Vieta, eery service strctres are sti
eveopi. he law o ery fciecy a
oservatio cae ito eect oy o Jaary
1, 2011. he aw ecoraes the eveopet o
eery coservatio techooy a the pro-
ctio o eery efciet procts, a itro-
ces obiatory abei staars or eery
cosptio o procts he law has aso e-
coraes the eveopet o eery service
copaies (s).
he mEET-BIS project i Vieta tarets tech-ooy sppiers. ber o these techooy
sppiers are itereste i tri ito ery
ervice opaies to provie service so-
tios to ei a are size copaies.
However, ti a stro eery service strc-
tre is eveope, barriers a chaees ee
to overcoe as techooy sppier iht -
erestiate the ctio o a especiay
whe it coes to faci a the facia
risk. For eery service proviers to operate
sccessy i the arket aio skis are
reqire ici: bsiess eveopet a
arketi, eieeri, eery-savis a
process optiizatio techooies, project a
cotract aaeet, facia a accot-
i, as we as oitori a vaiatio. mEET-
BIS is crrety assisti oe o her parter co-
paies with a pre-easibiity sty or a .
SWITCH-Asia | ENGAGING WITH fINANCING INSTITuTINS f GEENING SmES
Upgrading of
such electric
Motors is
financed b
ESCO.
7/28/2019 Switch Asia _ Access 2 finance
24/3924
strAtegy 3
increAsing cApAcity of
smes to Access finAnce
To succeed in getting nancial resources, SMEs
need to communicate the business case for SCPto nancial institutions and investors by show-
ing them the competitive advantages of imple-
menting SCP strategies in their operations. Lack
of business knowledge and management ability
can increase nancial barriers for SMEs. Low lev-
els of nancial literacy can prevent SMEs from
adequately assessing and understanding dif-
ferent nancing options. At the same time, the
fact that SMEs accounting records and nancial
statements are often neither clear nor evident.
rAising AwAreness on finAnciAl literAcy
The inadequate level of nancial literacy con-
stitutes a major constraint to the economic
growth of SMEs in developing countries. In this
study nancial literacy generally refers to the
ability to understand nance. This understand-
ing initially includes knowledge to take personal
decision on nance and extends to questions of
corporate governance. Lack of such nancial lit-
eracy often results in poor planning, underesti-
mating market volatility, and/or inadequate ac-
counting, which can lead to nancial losses for
many SMEs. Especially among small and emerg-
ing businesses the deciency of the nancial
literacy is a challenge, while medium and large
enterprises are less likely to struggle with it.
SWITCH-Asia projects can help SMEs over-
come this burden by providing support and/
or capacity building. The capacity building of
SMEs can include providing technical and busi-
ness support services such as training, businessdevelopment services, assistance in formalis-
ing nancial statements, and loan application
preparation. Such services could be potentially
provided by appropriate associations such as
SME development agencies, SME associations,
or chambers of commerce.
In Pakistan, SMEs constitute 90 per cent of
businesses, playing a critical role in the manu-
facturing sector by providing 80 per cent of in-
dustrial employment, constituting about 30% of
GDP, and generating one-fourth of the sectors
export earnings3. Pakistani SMEs lack of access
to nancial resources to support the implemen-
tation of E&RE-oriented strategies and achieve
the appropriate upgrade of environmental-
sound technologies. In order to address SME the
SCI-Pak project developed and disseminated in
July 2011 two workshops on A2F in Karachi and
Feisalabad with Business Member Organisa-tions. Recognizing the fact that Pakistani SMEs
lack capacities for the reliable proper delivery of
information to banks, the project focused the
workshops on to answer the following ques-
tions: How can BMOs support SMEs to deliver
quality and relievable information for nancial
institutions? What are the capacities and tech-
nologies needed to ensure the collection and
preparation of reliable data? The project devel-
oped guiding materials to show business mem-
bership organisation and SMEs how to identifythe best nancial instruments in order to reduce
administrative costs related to the production
process and to develop an effective and quality
nancial reporting through the elaboration of
sustainable-oriented business plans.
The SWITCH-Asia SMART Cebu project aims to
increase the competitiveness and sustainabil-
ity of SMEs in three exporting sectors in Cebu
in Southern, Philippines. In order to increase -
nancial literacy, the project has taken to two tier
strategy. In the rst stage, the project provided
an overview on nancial literacy topic including
corporate governance and operational manage-
ment to the members of the BMOs. In a second
step, the project aims to attend to the actual
nancial needs of the SMEs, which were iden-
tied in the cleaner production audits by the
project. With individual coaching, the project
aims to support companies with their business
plans, their business projection and application
to the banks. The project decided that providingdetailed nancial literacy input at the beginning
of the project would be too abstract and only
confuse the SME partners.
the entrepreneurs nurturing
progrAmme coAching by biomAss-sp
Also the Biomass-SPoffers support to SMEs in
its agship initiatives the Entrepreneurs Nur-
turing Programme (EUMBENP). The project se-
lected 50 small and medium enterprises (SMEs)
to receive complimentary environmental and
business coaching facilities related to biomass
2.3
3 SCI-Pak: Business Industrial Associations fostering the Access to Finances for Energy and Resource EfciencyConceptual Material, accessed under www.sci-pak.org/LinkClick.aspx?fleticket=FOIowy5R2M4%3d&tabid=76
7/28/2019 Switch Asia _ Access 2 finance
25/3925
sppy a tiisatio activities. he nrtri
Prorae is oe o the core eeets o the
project. he prorae cosists o a series o
ie apacity Bii Proraes (BPs) o
sbjects reevat to bioass coerciaisatio
e.. rat appicatio opportities, ea de-
veopet mechais (dm), carbo ootprit
a sstaiabe cosptio a proctio
(P), ecooic becharki o bioass a
bioass procts, u ree arket access op-
portities a peeti/briqetti techoo-
ies a arket opportities. he BPs have
bee ri parae with um-BnPs coach-
i activities. he project has bee seecti
the ms i a etaie process. next to writte
appicatios the ms ha to ero iterview
processes. he project was abe to ietiy the
type o bioass tiisatio taki pace, the
ms capacity, ocatio a eestock avaiabi-ity, as we as to ietiy the type o assistace
reqire ro Bioass-SP. he project kew
ro the start how the ms aie to eveop
a what ki o facia ivestet were e-
visio. this way, the ms co atte the
eee awareess proraes or coachi o
facia echaiss. s part o the nrtri
Prorae, the Bioass-SP project cocts a
capacity bii prorae or ms to ex-
pose the to faci avees avaiabe or
bioass coerciaisatio. Fro the eort o
costat otreach exercise a awareess o
project brai, Bioass-SP has captre the
attetio o dm ivestors. he project Bioass-
SPoers irect coachi to projects that seek to
tap the ea deveopet mechais (dm).
orer to be eiibe or certifcatio, eissios
rectio projects have to be reistere i a-
vace i the dm desiate natioa thor-
ity. e iportat actor i reaizi carbo
vae is the reqireet o aitioay, which
ipies that the project st eostrate that
it is aitioa to arket activity that wo
have occrre ayway. For bsiesses a ms,
dm oers a aterative eas o revee or
ree projects that ices bioass tiisatio
o reewabe power eeratio, bioas, e-
switchi projects, pa oi i eet (Pm)
ethae captri, as we as bio-coposti
projects. he Bioass-SP project oers a coach-
i prorae or ms who have bsiessieas to expoit the oca bioass resorces. he
coachi is provie at zero cost with expert
costacy services or the eveopet o
dm projects ro Project ea note (Pn) stae
p to Project desi docet (Pdd) stae. he
Bioass-SP project ca aciitate dm project
owers by atchi the with the avaiabe
dm project ivestors, costats a techo-
oy proviers ivovi i co-faci or eqity
participatio o gree Projects. his capacity
bii prorae is ri parae with
um-BnPs coachi activities.
Obstacles identified SMART Cebu actions
SmEs are intiidated by banks.
SmEs lack knowledge o nancial soltions.
SmEs do not know what technical pgrades
are necessary and nder- or overestiate
investents.
SmEs are consed with the dierent nancial
options on oer. Entrepreners tend to opt
or zero interest soltion oered by the local
governent even thogh these options nds
eqipent not reqired.
SmAT Ceb partner ADfIAP condcts eeting and
workshop to prepare dialoge sessions with banks.
SmAT Ceb partner ADfIAP condcted overview o
nancial literacy to the ebers o targeted bsinessebership organisation that are part o the projects.
SmAT Ceb condcts CP adits and provides recoen-
dation to increase environental perorance inclding
the speci-cation o necessary investents.
Based on the technical recoendation ater the CP
adits SmAT Ceb partner ADfIAP provide coaching or
each individal SmEs how to prepare a bsiness plan,
and a application to get a loan or the reqired technical
pgrade.
Table 3:
The actions
identified b
the SWITCH-
Asia project
SMART Cebu
to address the
challenges
that SMEs
have for
access to
finance
SWITCH-Asia | ENGAGING WITH fINANCING INSTITuTINS f GEENING SmES
7/28/2019 Switch Asia _ Access 2 finance
26/3926
strtEgy 4
DDrEssing nks
rM wrEnEss t
tEchnic ssistncE
vestors a faci istittios base their
faci ecisio o the expectatio that the
ivestet wi bri abot rear icoes.
heir evaatio o ms perorace is oe
prey o the basis o ecooic risk. te they
have very iite kowee o erstai
eviroeta risk a ack the iaostic toos
to evaate ms oa reqests or resorce e-
fciecy a ceaer aactri projects.
Fiaci istittios have reat potetia to
iprove their risk aaeet systes aprocesses with rears to ms eviroeta
projects.
uiDing rEtins with thE innci
sEctr
he Vietaese facia sector cosists o
abot a hre baks either state-owe,
private or orei bak braches. he sector is
sti ereveope i ters o its service oer-
i to the popatio o Vieta, as we as iters o efciecy a aaeet practices.
he probe that ms i Vieta have i ac-
cessi faci or eery efciecy ivest-
ets see to be siiar to ms i ay other
cotries. difcties ice ack o coatera
a iaeqate facia recors. m face is
ote reerre to as the issi ie i the
facia services arkets i eeri ecoo-
ies.
here are severa eery efciecy creit ies
operatioa i Vieta. Vietaese facia i-stittios sch as echoBak, VietBak a
others have receive capacity bii spport
o eery efciecy face a operate iter-
atioa eery efciecy creit ies extee
by teratioa Fiace ooperatio (F), the
wiss deveopet ooperatio () a
2.4
Obstacles identified MEET-BIS actions
MEEt-is ao
Energy Eciency is beyond their noral bsiness. I the
bsiness as sal scenario oers prots and growth,
there is little incentive or a bank to invest in soething
new. The arket or nancing EE projects perceived as
sall, it is not worthwhile or banks to develop a par-
ticlar nancial prodct. market developent reqires
an p-ront investent, which the coercial banks
were not willing to ake.
Banks preer to lend to state-owned /large enterprises,
SmE lending is not protable becase o high transac-
tion costs
Banks expressed their concern with the qality o
energy ecient installations; how can the bank and the
client be sre that the identied savings are realised?
market research to bild / explain the bsiness case
to the Bank.
Explore possibilities o redcing transaction costs with
a credit scoring tool, or by groping transactions
Spport developent o the Bankss network o energy
adit copanies who can provide a second opinion
Training bank sta on energy eciency eqipent
and related qality standards
Explore possibility o Energy Service Copanies
(ESCs) targeting the SmE segent
Table 4: SWITCH-Asia project MEET-BIS' actionsaiming at enabling access to finance for sustainable production in SMEs
SWITCH-Asia | ENGAGING WITH fINANCING INSTITuTINS f GEENING SmES
7/28/2019 Switch Asia _ Access 2 finance
27/3927
others. he mEET-BIS kicke o, eery ef-
ciecy creit ies i Vieta were hihy -
ertiise. the oe ha, reasos or er
perorace ice cear a/or very ex-
tesive appicatio proceres, o perorace
icetive or the Vietaese baks, a iite
capacity i the private sector to eiver tr-keysotios. the other ha, baks abiity to
aeqatey ersta a appraise eery e-
fciecy projects were very iite. Frtherore,
baks preer arer projects tha the saer e-
ery efciecy projects (eery efciecy pro-
ct face) that ms wo ee.
he mEET-BIS project works towars bi-
i reatios a potetiay parterships with
these facia istittios a the oca pri-
vate sector sppy eery efciecy eqipet.
he mEET-BIS experts cotacte baks a ex-chae with the to expore how the project
co cotribte to bii a pipeie o pote-
tia eery efciecy ivestet projects or the
baks. s a seco step, the project cocte
a hih eve workshop i partership with F,
where techooy sppiers ha the chace to
eet with key parter facia istittios.
dri the workshop, Vietaese techooy
sppiers a bak aaeet iscsse the
barriers or ms to access face a toether
ooke or sotios to overcoe the barriers (see
abe 4).
rising wrEnEss n scP
s sias rowi ecooies are ptti pres-sre o atra resorces, baks a other f-
acia istittios sho take the eviro-
eta perorace o ms ito accot whe
they take ivestet ecisios. o icrease the
erstai o facia istittio o P,
severa H-sia projects coct activities
to icrease awareess o baks.
he SmAT Ceb project cosorti ices
the ssociatio o deveopet Fiaci -
stittios i sia a the Pacifc (dFP).
the SmAT Ceb project, dFP is oeri ex-pertise o sstaiabe faci echaiss.
dFP provies spport to ms a avocate
with baks to ree their facia services a
aapt the to the ees o ms. he la-
bak o the Phiippies a the deveopet
Bak o the Phiippies are ebers o dFP:
hroh their ebership i the associatio,
the SmAT Ceb project has areay estabishe
Figure 7: The structure of the SWITCH-Asia SCI-Pak project training targeting financing institutions
gs innci institutins
Adding vale to their shareholders and increasing prots
ne alternative:
Integral Systes or Environental manageent
The bsiness case or E&E
Access to nance (A2f) strategies and instrents
ecognition osstainable-
oriented SmEs as
a bsiness driver
Increase ointernal resorce
and energy
eciency
Integration oenvironental
risks anageent
instrents
SWITCH-Asia | ENGAGING WITH fINANCING INSTITuTINS f GEENING SmES
7/28/2019 Switch Asia _ Access 2 finance
28/3928
cotacts a reatioship with the two baks.
he project ietifes these two baks as the e-
try poit ito the arket o facia istittio
i the Phiippies. ccori to the project bothbaks as eveopet baks have a eai roe
i the arket o facia istittio i the Phi-
ippies. he assptio is oce the eveop-
et baks have aapte their services to ree
ms other baks wi oow.
he project bit p cose reatioship with
the two baks. t takes a twoo avocacy stra-
tey: the oe ha, it prootes ersta-
i o the baks o the isse o ms ei.
SmAT Ceb creates awareess with the baks
o ms ifcties rai ro facia
stateet to provii coatera. the other
ha, the otost oa o this avocacy is to
eveop facia toos that are aapte to the
ees o ms.
EPining thE usinEss csE EnErgy
EiciEncy/rEsurcE EiciEncy (EE/rE)
Baks are se to eai with risks as a bak
ei ecisios are say expose to soe
eree o risk. Baks ace the chaee to priceoas accoriy. s i every bsiess, facia
istittios aso epe o the qaity o the f-
acia perorace o their parters to achieve
their oas. hs expaii the bsiess case
P is a iportat etry poit to iterest baks
i faci ree ivestets o ms. he SCI-
Pak project i Pakista eveops traii ate-
rias or baks to icrease baks erstai
o the beefts o /. he traiis packae
seeks to preset the ew bsiess atosphere
or facia istittios a to itroce te-
ra yste or viroeta maaeet as
a stratey to rethik bsiess oe i facia
istittios. next to the proper treatet a
se o atra resorces i the ms the trai-
i poits to baks to irect facia ais i-ci cost savis, cost-cosciosess ao
epoyees, ower tre copiace costs a
better bsiess opportities with sstaiabi-
ity-oriete ciets. ith the traii aterias
SCI-Pak aso hihihts the reptatioa/iae
beefts o /. /e attracts a retais cs-
toers a parters a attracts a retais
oo epoyees. Proraes prooti /
oer better recoitio i society a pbic i
eera.
ea fom ee sd o o scP
SmAT Ceb prootes the beefts o sstai-
abe proctio practices ao ms to baks.
he two baks tarete by the project joit a
sty tor to rope i orer to ersta how
eviroeta perorace iproveets ca
be qatife ito ecooic savis. eior rep-
resetatives o the project parters toether
with seecte poicy-akers a represetatives
o baks visite the netheras a gerayto aiiarise theseves with how P is i-
peete i rope. he costatio r-
i the tor ocse particary o staars,
ree proct esi a iovatios, atest
eveopets i the area o ceaer proctio,
a trae show tres. o reach ot to ai-
tioa facia istittios, the SmAT Ceb i-
vite 28 participats ro faci istittios
ici pbic a coercia baks a the
oaitio o ociay esposibe ms i sia
(m) attee a exective brief o
sstaiabe cosptio a proctio (P).
SWITCH-Asia | ENGAGING WITH fINANCING INSTITuTINS f GEENING SmES
7/28/2019 Switch Asia _ Access 2 finance
29/3929
Baks i the Phiippies reqire their borrowers
to sbit a eviroeta copiace certif-
cate to show that they copy with the crret
ea raework. Fiacia stittios are e-
viroeta coscios. However, accori to
the project they ack erstai o how to
eectivey iterate sstaiabe cosptioa proctio (P) thiki ito their aiy
processes. he project evisios that i sstai-
abiity thiki is iterate ito both ms
a baks operatios, ecooic rowth wo
i itse becoe ore sstaiabe. dri the
SmAT Ceb sessio, the bakers showe kee
iterest i P a potetia bsiess oppor-
tities. Participats aso sai that sstaiabe
eveopet isses ike P, which baaces
ecooic, socia a eviroeta iesios
provies baks a facia istittios theeverae to proote ree pricipes a prac-
tices to existi a potetia m ciets.
udead ee eolo
he H-sia project Bioass SPcocte
a brief sessio or facia istittios (Fs)
a eveopet facia istittios (dFs)
o ree techooy. he project aie to show
that ree techooy ay very we be the ew
river or tre ecooic rowth. t the evet,
the project icrease awareess o facia isti-
ttios a eveopet facia istittios
o the rowi bioass istry i maaysia
a the icreasi ea i the oba arket
or bioass-base procts. ccori to the
project, the sessio was a steppi stoe a
a oo way to isseiate facia ees o
m a ms potetia rowth. t serve as a
pator or bsiess opportities to be ae,
kowee a ioratio bei share, a
etworks as we as rieships bei ore.
Fro the brief sessio, the project coce
that it is iportat to ecate ot oy the Fs
a dFs o what they ca o to hep the ree
bsiesses to row, bt aso aress the ms.ms ee to kow the risks ivove whe they
vetre ito the bioass istry. he project
reaize that there sho aso be a two-way
coicatio betwee the ms a the f-
aciers so that both wi have a ta er-
stai o the isses a risks ivove, which
is ater hope to ea to a wi-wi areeet:
itioay, the project reporte that ore
capacity bii proraes ee to be co-
cte or Fs a dFs to iprove their techi-
ca kowee or i easibe ree tech-ooy projects.
red aao o
he probe that ms i Vieta have i ac-
cessi faci or eery efciecy ivest-
ets see to be siiar to ms i ay other
cotries. difcties ike ack o coatera or i-
aeqate facia recors, the mEET-BIS project
caot tacke i the crret project set-p i a
coprehesive aer. o sti spport iivi-
a ms the project is crrety expori the
optio whether saes aets o techooy sp-
piers ca provie aitioa spport to ms.
aes aets ea with m o rear basis,
a co i pricipe 1) provie ioratio
o existi m eery efciecy creit ies;
2) peror a frst assesset o the creitwor-
thiess o the fr, a the proftabiity o the
eery efciecy ivestet;
a 3) assist eiibe ms
copeti the oa appica-tio. ptiay, the echica
ppier sbits batches o
e.. 10 copete oa appica-
tios o ms, a therewith
ake m face ch
ore attractive to the bak.
he project crrety bis
o parterships betwee the
techica sppiers a the
baks, a arraes or saes
aets to be traie i the
creit appicatio procere
SWITCH-Asia | ENGAGING WITH fINANCING INSTITuTINS f GEENING SmES
MEET-Bisenvisions
sales agents
to disseminate
information
on financial
options
7/28/2019 Switch Asia _ Access 2 finance
30/3930
by the oca bak. However, saes sta is osty
techica experts with o backro i bsi-
ess face. hereore, mEET-BIS is aso eve-
opi a set o toos that hep the saes aet as-
sess the costs a beefts o staarise meery efciecy procts. his too wi aow
techica saes sta to assess the creitworthi-
ess o the fr, bt aso o the ivestet ow
whether a bak oa or eery efciecy wi
otweih the creit costs (15% iterest rate).
shw csing invEstMEnt PPrtunitiEs
lack o ivestet ote a ajor actor respo-
sibe or ms sow rowth. his is aso tre
or the baboo sector i icha, hia. t
preset, oy 10% o Baboo ms i icha
receive ay or o ivestet, with ivest-
et i sei-processi ms o-existet.
o ior ivestors a baks abot the sector
the H-sia project Sstainable revival o
livelihoods in post-disaster Sichan: Enhancing
eco-riendly pro-poor baboo prodction spply
chains to spport the reconstrction eorteve-
ope a ivestet pa or the icha m
baboo sector. ith the ivestet pa the
project strives to provie ior-atio to potetia ivestors
abot the opportities a
risks o baboo ivestets
i icha. he ivestet
overview athere basic ior-
atio abot the possibiities
o baboo ici existi
baboo proct specifca-
tios. moreover, the pa as-
sesses the crret oestic
ivestet ciate or the
sector a ietifes streths,
weakesses, opportities a threats. he pa
was eveope po costatio with oca
baks that hepe to ietiy faci echa-
iss, which ca be accesse by baboo tar-
et ms. meetis were aso he with repre-
setatives ro the costrctio a ritre
sectors ro withi a withot the provicei orer to assess potetia sector-rive i-
vestet. he vestet pa hihihts the
actors that ake icha a the baboo i-
stry attractive or ivestets sch as poicy
spport (ici tax ectios a exep-
tios, ea restrictio o tiber avori ba-
boo a avaiabe techica spport. he vest-
et Pa was wiey isseiate to reevat
poicy-akers, etrepreers o baboo eter-
prises a ivestors, which provie a pictre o
crret sitatio o icha baboo istrya provie se ioratio to ivestors or
taki ivestet ecisio.
Dele o ae o l e be
ae of scP o ba
he project Green Philippines Island o Sstain-
ability (GPIoS) takes reat care to ocet the
sccess o the projects itervetio with co-
pay reports. he hih-eari easres oc-
ete i their eviroeta reports serve as
showcases or the beefts o ceaer proctio
as we as to expai to baks a ivestors the
potetia o efciecy possibe by ipeeti
sstaiabe proctio practises.
he show case series ocets how copa-
ies participati i the -H traii
have iprove their eviroeta peror-
ace. itioay, the actsheets which cotai
the acta qatife eviroeta a eco-
oic savis are share to the bak as shii
showcases o the participati copaies. hisserves as a bsiess case or recoeatios
provie by the project, with qatife rests
ici the etr o vestet. rrety,
the GPIoS project ais to bi a series shi-
i showcases o the participati copaies
withi the etwork o the Paters Bak o o
the baks attache to the project with a eo-
ra o erstai. s the bak is aso
oe o the beefciaries o the projects ceaer
proctio prorae, bak aaers wi et
a i-epth erstai o what the -
H approach is abot.
SWITCH-Asia | ENGAGING WITH fINANCING INSTITuTINS f GEENING SmES
7/28/2019 Switch Asia _ Access 2 finance
31/3931
strtEgy 5
Ening invEstMEnt
inkgEs
o proote ivestets ivestors reqire ore
ioratio abot taret ms. H-siaprojects take varios steps to eabe coi-
catio betwee ms a faciers.
crEting DiguE EtwEEn DEMnD
nD suPPy
e stratey to rece the isatch betwee
sppy a ea is to create stroer rea-
tioships betwee facia istittios a
ms is to eabe iaoe. Varios projects
have take easres to bri the toether.
he H-sia project Sstainable revivalo livelihoods in post-disaster Sichan: Enhanc-
ing eco-riendly pro-poor baboo prodction
spply chains to spport the
reconstrction eort proce
a bsiess irectory. he i-
rectory ais at icreasi
cotact betwee taret ms
a potetia ivestors ro
istry, facia istittios
a goveret. he irec-
tory is ivie ito sectios o
ieret baboo istries,
with a ocs o the ai i-
stries taret by the actio
(boar, oori, ritre, a
costrctio), as we as arer
sei-processi ms. he biia irectory, i
hiese a ish, coecte ioratio o
cotact etais or ms ao with their pro-
ct rae.
he H-sia project Sstainable andCleaner Prodction in the anactring inds-
tries o Pakistan (SCI-Pak) broht baks a
ms toether to ietiy strateies to oster the
coicatio a iteractio betwee fa-
cia istittios a ms. SCI-Pak starte their
rotabe by hihihti the bsiess be-
efts o eery a resorce efciecy or ms
a facia istittios as they are easres
to rece the cosptio o eery a re-
sorces a iiize waste a greehose
gas eissios. fciecy easres at the sae
tie strethe the ecooic perorace a
copetitiveess o ms throh cost rec-
tios. he participats ecie that awareess
capais or ms sho be ache at the
rass root eve to ecate the asses reari
ieret facia istrets eveope by tate
Bak o Pakista or the oerisatio o ms.
he SCI-Pak project cooperate with the tateBak o Pakista (BP) to ietiy strateies to
oster the coicatio a iteractio be-
twee BP, facia istittios a a &
mei terprises (ms) i aciitati ms
access to face (2F) to ertake eery a
resorce efciet (&) proctio.
he cooperatio was trace i a work-
shop, which ivite hih-eve represetatives
o aro 12 oca baks, a 4 irectors o bsi-
ess eber oraisatios a the repre