Sydney Metro Northwest project4 double shield TBMs excavate 15 km of twin tunnels
Thomas CamusFabrice ThervilleHector Sanchez
NFM Technologies, France
2
Rapid transit train project 8 new stations 30 km of tunnels in urban
context 4 km elevated lineFully automated train systemTo be opened end 2019 with
trains every 4 minutes
Sydney Metro Northwest project
Project Overview
3
Sydney Metro Northwest project
15 km of Twin Tunnels Contract awarded to
Thiess - John Holland - Dragados 725 M€ contract Bored tunnels + mined tunnels 6.7 m diameter Overburden 30 to 60 m 4 TBMs 3 TBM sites & launching shafts Cross-passages every 240 m Crossover at Castle Hill
4
Sydney Metro Northwest projectLaunching TBMs 1 & 2Bella Vista
5
Sydney Metro Northwest project
The TBMs – Double ShieldsCharacteristic Unit ValueExcavation diameter [m] 6.985Shield length [m] 12.4Total length [m] 115Disc cutters diameter [mm] 19"Disc cutters (single discs) [nr.] 40Disc cutters (twin discs) [nr.] 5Drive unit torque continuous [kN.m] 2.890Drive unit torque unlocking [kN.m] 6.500Total thrust [kN] 36.000
6
Sydney Metro Northwest project
Geological context
40%60%
40250 38000 35800 33650 31200 25250
TBMs 1 & 2
TBMs 3 & 4
Fault zone
2 main rock masses • Hawkesbury
Sandstone• Ashfield Shaleseparated by thin transitional unit (siltstone):• Mittagong formation
Low permeability
7
Sydney Metro Northwest project
Rock characteristics – rock strength
0
10
20
30
40
50
60
70
Tensile strength -Brazilian test
Point load - axial Point load -diametral
UCS
MPa
Min Max Mean
Ashfield Shale
0
10
20
30
40
50
60
70
Tensile strength -Brazilian test
Point load - axial Point load -diametral
UCS
MPa
Min Max Mean
Hawkesbury Sandstone
8
Sydney Metro Northwest project
Rock abrasivity
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
< 0.05Low abrasiveness
0.05 to 0.1Abrasive
0.1 to 0.5Highly abrasive
> 0.5Extremely abrasive
Perc
enta
ge o
f sam
ples
F-Schimazek Abrasivity
Ashfield Shale
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
0.3 to 0.5 not very abrasive
0.5 to 1 slightly
abrasive
1 to 2 medium
abrasiveness
2 to 4 very abrasive
4 to 6 extremely abrasive
6 to 7 quartzitic
Perc
enta
ge o
f sam
ples
CERCHAR Abrasivity
Hawkesbury Sandstone
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
< 0.05Low abrasiveness
0.05 to 0.1Abrasive
0.1 to 0.5Highly abrasive
> 0.5Extremely abrasive
Perc
enta
ge o
f sam
ples
F-Schimazek Abrasivity
Hawkesbury Sandstone
9
Sydney Metro Northwest project
0
1000
2000
3000
4000
5000
6000
01/09/2014 31/10/2014 30/12/2014 28/02/2015 29/04/2015 28/06/2015 27/08/2015 26/10/2015
Exca
vate
d di
stan
ce (
m)
Cumulated TBM1 Cumulated TBM2 Cumulated TBM3 Cumulated TBM4
Excavation performance
HolBTCB
BTCB
CB
BTCBTR
BTCBTR
CB
BT TR
10
Sydney Metro Northwest project
Excavation performanceObserved average daily advance Unit TBM 1 TBM 2 TBM 3 TBM 4
Overall [m] 16.2 17.0 16.1 14.2Excluding days off [m] 32.2 32.8 32.3 29.2
Average since beginning of project
Parameter Unit Shift 1 Shift 2 Shift 3 TotalAverage
Rings 18 17 19 54Advance [m] 30.6 28.9 32.3 91.8Excavation time [hh:mm] 5:22 5:44 5:47 16:53Thrust [ton] 876 857 859 864Torque [kN.m] 1971 1862 1859 1897Penetration [mm/rev] 18.6 17.6 17.7 18.0Advance rate [mm/min] 95 84 93 91
Record day 5 Aug. 2015TBM1Rock: Sandstone
11
Standard type 19” diameter. 1” tip
Sydney Metro Northwest project
Disc cutter wear
19” diameter with carbide inserts
Chipping Flat
Tear of inserts Tear and Wear
12
Sydney Metro Northwest project
Rock type Changes TBM3
m3/disc TBM3
Changes TBM4
m3/disc TBM4
Total changes
m3/disc Total
Shale 2 NS 3 NS 5 NSSiltstone 27 1130 35 780 62 931Sandstone 199 380 146 290 345 344Total 228 643 184 613 412 629
Cherrybrook to EppingDisc cutter wear
Predictions for complete drive:• 640 m3/disc • 560 m3/disc
13
Sydney Metro Northwest project
Influence of geology on TBM performance
0
100
200
300
400
500
600
700
800
900
TBM1 TBM2 TBM3 TBM4
Thru
st (t
ons)
Shale Sandstone
Thrust
0
500
1000
1500
2000
2500
TBM1 TBM2 TBM3 TBM4
Torq
ue (k
N.m
)
Shale Sandstone
Torque
14
Sydney Metro Northwest project
Influence of geology on TBM performance
0
2
4
6
8
10
12
14
16
18
20
TBM3 TBM4
Pene
trat
ion
(mm
/rev
)
Shale Sandstone
Penetration
0
10
20
30
40
50
60
70
80
90
TBM3 TBM4
Adva
nce
rate
(mm
/min
)
Shale Sandstone
Advance rate
15
Sydney Metro Northwest project
TBM production data
TBM4Sandstone section
16
Sydney Metro Northwest is indeed a challenging tunnel project
Double shield TBMs achieve very high performance when properly managed and maintained
Adapted disc cutters allows to maintain performance almost unchanged from shale to harder and more abrasive sandstone
Project ahead of schedule
Sydney Metro Northwest project
Conclusions
17