    PROCEDURE FOR

    RECEIVING BULK

    DELIVERY BY TANK

    TRUCK KinglongCooperative

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    2/35

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    3/35

    Request invoice from driver and verify al ldetails oninvoice and ensure that the following itemsare in order:

    1.1

    1.2

    1.

    31.4

    1.

    1.!

    "#$%niform ofdriver

    Consignee

    Customer &o.

    '(tensions$)ooti

    ngs *roduct +,uantity -eing

    delivered

    mount to -e

    paid

    TANK TRUCK RECEIVING

    STEP 1

    3

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    4/35

    "ndicate time of arrival on the invoice andaccomplish customerreceiving chec/list.

    )or C0# deliveries e(cept for industrial customerson account prepare the corresponding chec/ andshow correct payment to driver.

    TANK TRUCK RECEIVING

    STEP 1

    4

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    5/35

    • easure receiving tan/ ullage.

    TANK TRUCK RECEIVING

    STEP 2

    5

    • Record the easurement inthe log-oo/

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    6/35

    Chec/ for water using water5 nding paste.

    TANK TRUCK RECEIVING

    STEP 2

    Kolor /ut 6 for#0$"#0

    7asoila 6 for '18gasoline

    6

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    7/35

    "nstruct driver to par/ trailer$tan/ truc/ onlevel ground.

    TANK TRUCK RECEIVING

    STEP 3

    7

    &o 9mo/ing w$in 8 ft FLAMMABLE

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    8/35

    erify from driver compartments to -e discharged.;ave driver open emergency valve levers of thecompartment from which product wi ll -edischarged.

    TANK TRUCK RECEIVING

    STEP 3

    8

    alve

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    9/35

    "nspect seals of valve -o( and gauge hatches ofcompartments to-e discharged.

    Customers must ma/e sure that valve -o( andgauge hatch covers cannot -e opened without-rea/ing seals and that seals are in order and notremoved.

    Chec/ for any signs of

    tampering. 'nsure that

    seal num-ers aresequential and match the

    num-ers re=ected in the

    TANK TRUCK RECEIVING

    STEP 4

    10

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    10/35

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    11/35

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    12/35

    Receiver should personally -rea/ the seals ofhatch covers and valve -o(.

    "n a rare instance of multiple delivery points thedischargevalves are also sealed.

    >efore -rea/ing the seals chec/ forany signs of tampering.Refer to ppendi( for *etron

    seal inspection guidelines.

    TANK TRUCK RECEIVING

    STEP 4

    12

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    13/35

    TANK TRUCK RECEIVING

    STEP 5

    0pen hatch cover of the compartment to -eunloaded and do the following:

    1. Chec/ that the #09?$"?#" seal on gauge mar/eris intact.

    2. erify that gauge mar/er is weldedto rod and the -rac/ets.9hould there -e any dou-tsas to the accuracy of the

    gaugemar/ers require driver toproduce an updated#09?$"?#"

    or *etron ?$? Cali-ration +"nspection Certi5cate

    and ta/e measurements 13

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    14/35

    TANK TRUCK RECEIVING

    STEP 5

    14

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    15/35

    TANK TRUCK RECEIVING

    STEP 5

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    16/35

    *lease turn to page 2 for sample of cali-rationcerti5cate. )or instructions in ta/ing gaugemar/er measurements refer to ppendices @>A

    and @CA. ?he measurements ta/en should -e thesame as that indicated in the Cali-rationCerti5cate.

    .3.

    "nspect product level and ma/e sure thatproduct level

    reaches the -ottom side of gauge mar/er. " f

    product levelis -elow the gauge ar/er refer to ppendi( @#A.

    TANK TRUCK RECEIVING

    STEP 5

    16

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    17/35

     ?o chec/ the quality of the products delivereduse test /it and

    perform the following Refer to ppendi( @'A:

    !.1 "f product is gasolinepremium and regularcon5rm a-sence of

    contamination with/erosene or diesel -yusing ar/er ?est Kit.

    TANK TRUCK RECEIVING

    STEP 6

    17

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    18/35

    ;ave driver position trailer$tan/ truc/ on place ofdischarge ensure that hand -ra/es are securelyengaged and wheel cho/ed in place.Require driver to place his 5re e(tinguisher on the=oor near

    discharge point appro(imately 1 ft. away.

    TANK TRUCK RECEIVING

    STEP 7

    20

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    19/35

    )ire e(tinguisher must -e left in place unt il completionof discharge. s an added precaution the customermay also provide a 5re e(tinguisher.'nsure that there is no source of ignition or open = amewithin the 8 ft.

    radius of the discharging point.

    TANK TRUCK RECEIVING

    STEP 7

    21

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    20/35

    Chec/ presence of water in tan/ truc/ productcompartments Refer toppendi( @)A.

    TANK TRUCK RECEIVING

    STEP 8

    22

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    21/35

    "nstruct driver where to discharge each product -eingdeliveredconnect discharge hose and open discharge valve.

    #ou-le chec/ that not only the correct product is to -eunloaded -utalso the quantity can -e accommodated to the storagetan/.

    TANK TRUCK RECEIVING

    STEP 9

    23

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    22/35

    0pen emergency alve for productdischarge

    TANK TRUCK RECEIVING

    STEP 9

    24

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    23/35

    TANK TRUCK RECEIVING

    STEP 9

    Customer should o-serve if there are lea/s at thedischarge valve connection and from the dischargehose. Rechec/ and ensure that the emergency valvelevers are left open.

    #river and customer shouldalways -e at the dischargepoint throughout the period ofdischarge. 9hould there -eproduct lea/s anywhere from

    the tan/ truc/ to the 5 ll ingpipe unloading operationsmust immediately -e stopped.Resume unloading whenlea/s has

    -een 5(ed. 25

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    24/35

    fter discharging has -een completed instruct the driverto disconnect the discharge hose with emergencyvalve and discharge valve lever open.

    TANK TRUCK RECEIVING

    STEP 10

    26

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    25/35

    0pen the hatch cover again and visually chec/ that thecompartment iscompletely empty.

    "f visual inspection shows that product is sti ll present inthe compartment -ut product is not =owing out refer toppendi( @7A for instructions on what to do.

    0therwise the delivery isconsidered completed.

    TANK TRUCK RECEIVING

    STEP 11

    27

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    26/35

     ?he customers ac/nowledge receipt of delivery -yprinting their name and aB (ing their signature onthe space provided for on the invoice and issues thecorresponding payment as required.

    TANK TRUCK RECEIVING

    STEP 12

    28

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    27/35

     ?he tan/ truc/ may now -e released. "f the customer hasany complaintssuggestions or comments refer to ppendi( @;A forprocedure to follow.

    TANK TRUCK RECEIVING

    STEP 12

    29

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    28/35

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    29/35

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    30/35

    13

    inches

     ?"<

    PROPER SEAL INSPECTION

    34

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    31/35

    SEAL

    NUMBER

    LOGO

    PROPER SEAL INSPECTION

    35

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    32/35

    36

    1. &ote for any signs of tampering such as cuts-ro/en viewwindow etc. on the seal

    2. 'nsure that the tail of the seal fully e(tends-eyond the view window.

    3. )rom the view window inspect the condition ofthe seals for any cuts and connections.

    4. 'nsure that the seal num-er matches with the

    seal num-erindicated in the invoice.

    PROPER SEAL INSPECTION

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    33/35

    *ull the tail of the seal to chec/ if the seal is intact.

    lways inspect from the view window for any

    signs of tampering such as cuts.

    PROPER SEAL INSPECTION

    37

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    34/35

    Republic of the Philippines

    Departm ent of Science and Technology

    INDUSTRIA L TECH NO LO G Y DEVELO PM ENT INSTITUTE

    (Form erly National Institute of Science and Technology)

    Bicutan Taguig !etro !anila

    Tel N!" 8220961 #! 67

    L!$%l 291& 230

    PO '!( N! 774& M%)*l%

    :

    :

    C%+le, NISTECH

    Tele(, ITT 40404 '!( 0050

    -%( N! .632/ 592275

    Date

    Request Reference

    No. Sample of (a)

    (b)

    (c)

    (d)

    (e)

    (f)

    Capacity

    Make

    Motor No.

    Casis No.

    !late No.

    Compartments

    :

    :

    :

    :

    :

    :Submitted by :

     "ddre ss:

    REPORT:

    #is certifies tat te abo$e $eicle tank as been calibrated by te

    %olume Measurement &ni t of tis 'ffice usin te standard $olumetric metod

    it te folloin results* referred to a temperature of +, -C:

    Compartment Capacity, Liters

    (including lines)

    Distance from top rim of

    dome to product level, mm

    (without cover)

    #otal

     "ccura cy of c alib rat ion . .

    itin /,.01 #est liqu id

    ater 

    R E M A R K S:

    #e abo$e $alues are tose obtained at te time of test and refer only to

    te particular tank submitted.

    Recommended date of ne2t calibration :

    DOST-ITDI CALIBRATION CERTIFICATE

    51

  • 8/15/2019 Tank Truck Receiving_ kinglong Cooperative

    35/35

    52