9
© 2012 P&RO Solutions Targeted Boiler Management T argeted Boiler Management (TBM) Indian Power Station Conference 2012 Date: 13 February, 2012 By: Patrick D. Abbott

Targeted Boiler Management (TBM) - IPS 2018indianpowerstations.org/Presentations Made at IPS-2012/Day-1 at...Targeted Boiler Management (TBM) Indian Power Station Conference 2012

Embed Size (px)

Citation preview

Page 1: Targeted Boiler Management (TBM) - IPS 2018indianpowerstations.org/Presentations Made at IPS-2012/Day-1 at...Targeted Boiler Management (TBM) Indian Power Station Conference 2012

© 2012 P&RO Solutions Targeted Boiler Management

Targeted

Boiler

Management

(TBM)

Indian Power Station Conference 2012

Date: 13 February, 2012 By: Patrick D. Abbott

Page 2: Targeted Boiler Management (TBM) - IPS 2018indianpowerstations.org/Presentations Made at IPS-2012/Day-1 at...Targeted Boiler Management (TBM) Indian Power Station Conference 2012

© 2010 P&RO Solutions Targeted Boiler Management

What is and Why TBM®?

What is TBM? TBM predictive and proactively manages all damage mechanisms that cause Boiler Tube Failure’s Why TBM? Boiler Tube Failures Remain the Most Significant EFOR & Cost Challenge - Difficult to Manage without a Dedicated System & Method

Page 3: Targeted Boiler Management (TBM) - IPS 2018indianpowerstations.org/Presentations Made at IPS-2012/Day-1 at...Targeted Boiler Management (TBM) Indian Power Station Conference 2012

© 2010 P&RO Solutions Targeted Boiler Management

TBM versus Common Practice

Existing Programs

• Reactive

o Corrective

o Preventive (Go/No Go)

• Technical Focus

• Broad-Based

• Root Cause Analysis

• Planned Outage Inspections

• Root Cause-driven repairs

• Fragmented

o Difficult to Sustain

• Lagging

Attributes

Value

O&M Impact

Key Technologies

Failure Reduction

Knowledge Capture

Metrics

TBM

• Failure Prevention

o Predictive (Trending)

o Proactive

• Efficient (MTTI, MTTR)

• “Targeted “Management

• Technical & Process Focused

• Comprehensively Engineered

• Opportunistic Risk Inspection

• On Line Process Sensitivities

• Active Damage Mechanisms

• Incipient Damage Mechanisms

• Incidental Damage Mechanisms

• System Ownership

o Sustainable

• Strong use of Metrics

o Leading

o Lagging

Page 4: Targeted Boiler Management (TBM) - IPS 2018indianpowerstations.org/Presentations Made at IPS-2012/Day-1 at...Targeted Boiler Management (TBM) Indian Power Station Conference 2012

© 2010 P&RO Solutions Targeted Boiler Management

How does TBM do it?

Strategy

Test & Inspection

Plan

Tactics

Effective; Increase Damage Mechanism Data

& Visibility

Goals

Increase MTBF

Efficient; Targeted Damage

Mechanism Management

Decrease MTTI

Page 5: Targeted Boiler Management (TBM) - IPS 2018indianpowerstations.org/Presentations Made at IPS-2012/Day-1 at...Targeted Boiler Management (TBM) Indian Power Station Conference 2012

© 2010 P&RO Solutions Targeted Boiler Management

A Closer Look…..

Test & Inspection Plan

TBM PM’s

Targeted TBM

Inspections

Targeted On-line

Monitoring

Reliability Basis

Da

ma

ge

M

ech

an

ism

s

FMEA

Data Management

and Usage Optimization

Component Analytic

Methodology

MTTI Minimization

Effort

Manage Damage

Mechanisms

TBM Process Optimization

Detailed WO/WPkg.

Planning

Boiler EIN’s and Assembly

Hierarchies

TBM Templates

Target Vulnerabilities

On

-Lo

ad

P

lan

Operations Mgmt.

Off

-Lo

ad

Pla

n

Protective Operating

Actions

Plant History and Circumstance

Analysis

Page 6: Targeted Boiler Management (TBM) - IPS 2018indianpowerstations.org/Presentations Made at IPS-2012/Day-1 at...Targeted Boiler Management (TBM) Indian Power Station Conference 2012

© 2010 P&RO Solutions Targeted Boiler Management

TBM’s Financial Impact

Page 7: Targeted Boiler Management (TBM) - IPS 2018indianpowerstations.org/Presentations Made at IPS-2012/Day-1 at...Targeted Boiler Management (TBM) Indian Power Station Conference 2012

© 2010 P&RO Solutions Targeted Boiler Management

TBM Project Design

Eng. Review

T&IP On-Line

/ Off-Line

Implement

On-Line / Off-Line

Third Unit

Extract Value

Extract Value

Engineering Review

Test & Inspection Plan

On-Line / Off-Line

Implementation

On-Line / Off-Line

First Unit

Approximately 4 months

Implement

On-Line / Off-Line

Engineering Review

Test & Inspection

Plan On-Line /

Off-Line

Second Unit

Approximately 3 months

Approximately 2 months

Page 8: Targeted Boiler Management (TBM) - IPS 2018indianpowerstations.org/Presentations Made at IPS-2012/Day-1 at...Targeted Boiler Management (TBM) Indian Power Station Conference 2012

© 2010 P&RO Solutions Targeted Boiler Management

TBM® Defends Material against 30+ Damage Mechanisms for High Reliability at Nominal Cost……………

The Result:

Page 9: Targeted Boiler Management (TBM) - IPS 2018indianpowerstations.org/Presentations Made at IPS-2012/Day-1 at...Targeted Boiler Management (TBM) Indian Power Station Conference 2012

© 2012 P&RO Solutions Targeted Boiler Management

…….through Proactive Operations , Predictive Engineering and Effective, Efficient Condition Management

The Result: