Page 1: TBA (Team #5) Launch Readiness Review

Quinn Kostelecky, Vincent Staverosky, Gloria Chen, Roshan Misra, Jacqueline Godina, Raymond Auyeung

TBA (Team #5)Launch Readiness Review

Fall 2011 Rev A11-01-11

Page 2: TBA (Team #5) Launch Readiness Review

•Measure the Earth’s magnetic field intensity•Measure the voltage produced •Determine the orientation of pictures

Mission Overview

Page 3: TBA (Team #5) Launch Readiness Review

Purpose of Mission: • Prove or disprove Tesla’s Free Energy

Theory• Discover intensity of Earth’s magnetic field• Test the viability of a magnetometer as an

attitude determination system

Mission Overview

Page 4: TBA (Team #5) Launch Readiness Review

•Low Current Sensor and Magnetometer•Arduino UNO and MicroSD Shield•Camera, Hobo, Heater, Batteries

Design Overview

Page 5: TBA (Team #5) Launch Readiness Review

Experiment Testing-Current/Solenoid System

Current Sensor Calibration

Solenoid/Current Sensor Test Readings

MilliAmpsAverage Sensor

Readings0 476.18710 589.29120 690.31830 772.33340 880.00049 980.150

100.792=10 milliAmps

Current Sensor Calibration

Control Readings

Avg. Readings w/weak magnet Difference

milliAmps Produced

497.269 525.355 28.086 2.786

477.375 19.894 1.974

Page 6: TBA (Team #5) Launch Readiness Review

Experiment Testing-MagnetometerR H446.

4 225491.

1 189535 188536.

7 188536.

8 188537.

2 188537.

8 188537.

9 188538.

2 187538.

2 187538.

6 188705.

8 200712.

8 205732.

9 194733.

8 198775.

4 196782.

6 193

Page 7: TBA (Team #5) Launch Readiness Review

• Sync Magnetometer readings with camera pictures

• First picture taken on the eighth reading• Picture taken every two readings after

eighth

Experiment Testing-Camera/Magnetometer

Page 8: TBA (Team #5) Launch Readiness Review

Structure Testing

Whip Test

Drop Test Staircase Test

After Drop and Staircase Test

Page 9: TBA (Team #5) Launch Readiness Review

• Heater malfunctioned during cooler test• Need to turn on heater in advance of

cooler test to maintain temperature• Another cooler test to be run today

Cooler Testing

Page 10: TBA (Team #5) Launch Readiness Review

HOBO Testing

Internal Temperature Relative Humidity

HOBO taken out of freezer

HOBO placed in freezer

HOBO

HOBO placed outside spout of hot kettle

Page 11: TBA (Team #5) Launch Readiness Review

• Low current generated by solenoid during flight• Magnetic field intensity decreases as altitude

increases• Accurately predict orientation of satellite

Expected Results

Page 12: TBA (Team #5) Launch Readiness Review

• Keeping satellite at proper operating temperatures

• Arduino doesn’t run for flight duration

Biggest Worries

Page 13: TBA (Team #5) Launch Readiness Review

Level 0 Requirements# Requirement Origin

0.0Test energy generation capabilities of Earth's magnetic field

Mission Statement

0.1Measure magnetic field as function of altitudeMission Statement

0.2Reach an altitude of 30kmMission Statement

0.3Keep internal temperature above -10°C RFP

0.4Keep total weight and money spent under 850g and $250 respectively RFP

0.5Take inflight pictures,correlate pictures to heading, and measure temperature (internal and external) RFP

0.6Safety & Reliability RFP

0.7BalloonSat must be able to fly again RFP

Page 14: TBA (Team #5) Launch Readiness Review

Questions?