19
09/11/2011 1 TBM Tunneling in Mixed Grounds Laboratoire de Mécanique des Roches LMR Tunneling Technology Prof. Jian Zhao Ecole Polytechnique Fédérale de Lausanne (EPFL) Laboratoire des Mécanique des Roches (LMR) Why in mixed ground? Tunnel diameters are increasing Tunnel drives are getting longer The better places are taken Deep metro tunnels in rock or firm soil Laboratoire de Mécanique des Roches LMR Tunneling Technology Shallow utility tunnels – in soft soil New tunnels can be built between them Not ideal environment Interface of different material Sensitive surruonding structures 2 Contents Definition of mixed ground Mixed ground classifications Problems in different mixed ground compositions Laboratoire de Mécanique des Roches LMR Tunneling Technology Solutions and Recent developments Case study 3 Documents pédagogiques internes au Mastère TOS

TBM Tunneling in Mixed Grounds - aftes.asso.fr 2011...−Problems with face stability: −EPB/Slurry mode needed, reducing performance and increasing cost −Difficult to get the right

  • Upload
    others

  • View
    15

  • Download
    2

Embed Size (px)

Citation preview

Page 1: TBM Tunneling in Mixed Grounds - aftes.asso.fr 2011...−Problems with face stability: −EPB/Slurry mode needed, reducing performance and increasing cost −Difficult to get the right

09/11/2011

1

TBM Tunneling in Mixed Grounds

Laboratoire de Mécanique des Roches − LMR Tunneling Technology

Prof. Jian ZhaoEcole Polytechnique Fédérale de Lausanne (EPFL) Laboratoire des Mécanique des Roches (LMR)

Why in mixed ground?

− Tunnel diameters are increasing

− Tunnel drives are getting longer

− The better places are taken− Deep metro tunnels ‐ in rock or firm soil

Laboratoire de Mécanique des Roches − LMR Tunneling Technology

p− Shallow utility tunnels – in soft soil

− New tunnels can be built between them− Not ideal environment

− Interface of different material

− Sensitive surruonding structures

2

Contents

− Definition of mixed ground

− Mixed ground classifications

− Problems in different mixed ground compositions

Laboratoire de Mécanique des Roches − LMR Tunneling Technology

− Solutions and Recent developments

− Case study

3

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

Page 2: TBM Tunneling in Mixed Grounds - aftes.asso.fr 2011...−Problems with face stability: −EPB/Slurry mode needed, reducing performance and increasing cost −Difficult to get the right

09/11/2011

2

Definition of mixed ground

− What do we call mixed ground?“From a geological viewpoint, the mixed face ground can be defined as simultaneous occurrence of two or more geological formations, or the same geological formation with conspicuously different weathering

Laboratoire de Mécanique des Roches − LMR Tunneling Technology

formation with conspicuously different weathering grades.” … “On the other hand, from TBM tunneling viewpoint, the mixed face ground defined on the 

geological basis may not influence the TBM operation and performance parameters.” (Zhao, 

2009)

4

Definition of mixed ground

− What do we call mixed ground?− Two ore more material present in THE SAME cross section with SIGNIFICANT differences in mechanical properties

Uniaxial Compressive Strength

Laboratoire de Mécanique des Roches − LMR Tunneling Technology

− Uniaxial Compressive Strength

− Elasticity

− Permeability

− Stability

5

Definition of mixed ground

− The ‘Hard’ material− Usually hard rock

− High UCS

− High Elasticity

Laboratoire de Mécanique des Roches − LMR Tunneling Technology

− STABLE face− Low permeability

6

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

Page 3: TBM Tunneling in Mixed Grounds - aftes.asso.fr 2011...−Problems with face stability: −EPB/Slurry mode needed, reducing performance and increasing cost −Difficult to get the right

09/11/2011

3

Definition of mixed ground

− The ‘Hard’ material− In rock tunneling face is stable, no ‐or limited‐need of shielded machine

− No need of segmental liningk l h h l

Laboratoire de Mécanique des Roches − LMR Tunneling Technology

− In rock tunneling high UCS means low penetration rate, high thrust forces and torque are needed

− Disk cutters are used to excavate material− Depending on abrasivity, cutter wear might be an issue

7

Definition of mixed ground

− Schematics of a gripper TBM

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 8

Definition of mixed ground

− Typical hard rock cutter head

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 9

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

Page 4: TBM Tunneling in Mixed Grounds - aftes.asso.fr 2011...−Problems with face stability: −EPB/Slurry mode needed, reducing performance and increasing cost −Difficult to get the right

09/11/2011

4

Definition of mixed ground

− The ‘Soft’ material− Material might wary from soft rock – stiff clay ‐ soil

− LOW UCSl

Laboratoire de Mécanique des Roches − LMR Tunneling Technology

− Low Elasticity

− Possible UNSTABLE face

− Might be problem with groundwater

10

Definition of mixed ground

− The ‘Soft’ material− In rock tunneling face might not be stable, shielded machine is needed to excavate the tunnelNeed of using segmental lining

Laboratoire de Mécanique des Roches − LMR Tunneling Technology

− Need of using segmental lining

− Low UCS result high advance rates, lower thrust force and torque

− Scrapers, teeth and buckets are used to excavate

− Keeping face stable and avoid surface movements is the biggest issue

11

Definition of mixed ground

− Schematics of a soft rock TBM

EPB TBM

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 12

Slurry TBM

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

Page 5: TBM Tunneling in Mixed Grounds - aftes.asso.fr 2011...−Problems with face stability: −EPB/Slurry mode needed, reducing performance and increasing cost −Difficult to get the right

09/11/2011

5

Definition of mixed ground

− Typical soft rock cutter head

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 13

Definition of mixed ground

− Mixed ground− Two or more material present on face

No clear definition yet!!!− Literature uses UCS as differentiate the different

Laboratoire de Mécanique des Roches − LMR Tunneling Technology

Literature uses UCS as differentiate the different materials

UCSHARD : UCSSOFT >= 10 : 1  Mixed ground

−Others say  8 : 1 (6 : 1) already should be considered as mixed ground

14

Definition of mixed ground

− Mixed ground Condition or changing ground condition?− Mixed ground : two significantly different material present in the same cross section

Ch i G d i l h l h i

Laboratoire de Mécanique des Roches − LMR Tunneling Technology

− Changing Ground : material change along the axis of tunnel, but sections can be determined, where there is only one material present on the tunnel face  

15

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

Page 6: TBM Tunneling in Mixed Grounds - aftes.asso.fr 2011...−Problems with face stability: −EPB/Slurry mode needed, reducing performance and increasing cost −Difficult to get the right

09/11/2011

6

Definition of mixed ground

− Issues with mixed ground− Sum of  negative properties of the different materials:

Hard part: high UCS  low penetration, high thrust force

disc cutters needed

Laboratoire de Mécanique des Roches − LMR Tunneling Technology

Soft part: stability issues  face stabilization is needed

groundwater problems

segmental lining is necessary

16

Mixed ground classifications

− Three different categories− Class 1: Layered, Banked, Interfaced Mixed Ground

− Class2: Two or Three portion Mixed Ground l l k d d

Laboratoire de Mécanique des Roches − LMR Tunneling Technology

− Class 3: Blocky Mixed ground

17

Mixed ground classifications

− Class 1: Layered, banked Mixed GroundFace is composed of stable materialsIntrusion can be harder or softer than surrounding materialDifference in permeability can

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 18

Around shear zones, dykes, discontinuities, volcanic areas

Difference in  permeability can cause groundwater issuesEven relative small amount of harder material can slow down excavationDirection of the interface (angle, dipping) can influence performance

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

Page 7: TBM Tunneling in Mixed Grounds - aftes.asso.fr 2011...−Problems with face stability: −EPB/Slurry mode needed, reducing performance and increasing cost −Difficult to get the right

09/11/2011

7

Mixed ground classifications

− Class 2: Two/Three Portion Mixed Ground

Usually face is composed of hard material covered with softer ground

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 19

Tropical weathering cause such face compositions

Bedrock covered with weathered rock, soil or artificial fills

Mixed ground classifications

− Class 3: Blocky Mixed ground

Cobbles, boulders embed in soft, clayey or sandy material

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 20

River or Glacier deposits, landfills, landslides

Problems

− Overview of different issues:

− Excavation

Laboratoire de Mécanique des Roches − LMR Tunneling Technology

− Face stability

− Material transport

− Groundwater problems

21

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

Page 8: TBM Tunneling in Mixed Grounds - aftes.asso.fr 2011...−Problems with face stability: −EPB/Slurry mode needed, reducing performance and increasing cost −Difficult to get the right

09/11/2011

8

Problems

− Problems with excavation:− When cutters moving from a soft material, there is an impact load on cutter

− This is causing vibration in cutter headh f l d b d h f

Laboratoire de Mécanique des Roches − LMR Tunneling Technology

− Thrust force is not evenly distributed on the face

− Driving TBM is more difficult

− Extensive wear of cutters due to broken bearing, stuck cutters, break/chipping of cutting ring, not enough resistance in soft material

22

Problems

− Problems with excavation:− Reduced penetration, as thrust force and rotation speed has to be reduced

− Mere frequent working chamber interventions needed reducing advance speed further

Laboratoire de Mécanique des Roches − LMR Tunneling Technology

needed reducing advance speed further

− Specially in blocky mixed ground freely moving boulders rotating with cutterhead cause extensive wear on tools

23

Problems

− Problems with face stability:− EPB/Slurry mode needed, reducing performance and increasing cost

− Difficult to get the right consistency of soil mixture in working chamber

Laboratoire de Mécanique des Roches − LMR Tunneling Technology

in working chamber

− Face support pressure is not evenly distributed

− High risk of overcutting, face collapse, development of sinkholes

− Risk of large surface movements

− Hard to break boulders embed in weak ground24

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

Page 9: TBM Tunneling in Mixed Grounds - aftes.asso.fr 2011...−Problems with face stability: −EPB/Slurry mode needed, reducing performance and increasing cost −Difficult to get the right

09/11/2011

9

Problems

− Problems with material transport:− Difficult to transport blocky/bouldery material with screw conveyor/conveyor belts

− Difficult to keep the pressure in the screw conveyor blow out

Laboratoire de Mécanique des Roches − LMR Tunneling Technology

conveyor  blow out− Blocky ground can plug/damage slurry lines, specially in curves

25

Problems

− Problems with groundwater:− There is high risk of groundwater flowing in at rock/soil interface

− Flowing water in tunnel face increase the probability of face collapse

Laboratoire de Mécanique des Roches − LMR Tunneling Technology

probability of face collapse

26

Problems

− Particular problems in Class 1 Mixed Ground:− Vibration caused by cutters moving from one material to other

− Extensive wear on moving parts in cutterhead working chamber

Laboratoire de Mécanique des Roches − LMR Tunneling Technology

working chamber

− High cutter consumption due to dynamical loading− Damage of cutter bearing

− Breaking, Chipping of cutting ring

27

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

Page 10: TBM Tunneling in Mixed Grounds - aftes.asso.fr 2011...−Problems with face stability: −EPB/Slurry mode needed, reducing performance and increasing cost −Difficult to get the right

09/11/2011

10

Problems

− Particular problems in Class 1 Mixed Ground:

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 28

Problems

− Particular problems in Class 1 Mixed Ground:

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 29

Problems

− Particular problems in Class 2 Mixed Ground:− Same problems as in Class 1 Mixed Ground

− Pre‐stressed disk cutters do not rotate in soft material 

ll l l b fl

Laboratoire de Mécanique des Roches − LMR Tunneling Technology

− Small particles can clog cutter bearing causing flat, multi‐flat wear on disk cutters

− Increased face pressure leads to increased abrasion and temperature

30

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

Page 11: TBM Tunneling in Mixed Grounds - aftes.asso.fr 2011...−Problems with face stability: −EPB/Slurry mode needed, reducing performance and increasing cost −Difficult to get the right

09/11/2011

11

Problems

− Particular problems in Class 3 Mixed Ground:− Same problems as in Class 1 and Class 2 Mixed Ground

− In low strength soil matrix cobbles/boulders dislocate

Laboratoire de Mécanique des Roches − LMR Tunneling Technology

dislocate

− Dramatically decreased advance rate

− High risk of over‐excavation− Moving blocks damage tools and cutter head

− Working chamber interventions to clear face from moving blocks of rock 

31

Solutions and Recent developments

− In not real mixed ground case− Slurry machines can be capable of excavate material, should be equipped with stone crusher for boulders entering the working chamber

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 32

Solutions and Recent developments

− In not real mixed ground case− Ground improvement can be applied to make the face more uniform

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 33

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

Page 12: TBM Tunneling in Mixed Grounds - aftes.asso.fr 2011...−Problems with face stability: −EPB/Slurry mode needed, reducing performance and increasing cost −Difficult to get the right

09/11/2011

12

Solutions and Recent developments

− In not real mixed ground case− Ground improvement can be applied to make the face more uniform

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 34

Solutions and Recent developments

− Convertible TBM

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 35

Open mode

Solutions and Recent developments

− Convertible TBM

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 36

Slurry mode

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

Page 13: TBM Tunneling in Mixed Grounds - aftes.asso.fr 2011...−Problems with face stability: −EPB/Slurry mode needed, reducing performance and increasing cost −Difficult to get the right

09/11/2011

13

Solutions and Recent developments

− Convertible TBM

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 37

Slurry mode EPB mode

Solutions and Recent developments

− Radars mounted on cutterhead to detect boulders and cavities

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 38

Solutions and Recent developments

− Radars mounted on cutterhead to detect boulders and cavities

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 39

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

Page 14: TBM Tunneling in Mixed Grounds - aftes.asso.fr 2011...−Problems with face stability: −EPB/Slurry mode needed, reducing performance and increasing cost −Difficult to get the right

09/11/2011

14

Solutions and Recent developments

− Sensors installed with cutting tools to detect extensive wear and blocked disks

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 40

Solutions and Recent developments

− Extensive muck and pressure control to reduce settlements and over‐excavation

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 41

Laser sensor mounted over conveyor belt

Solutions and Recent developments

− Extensive muck and pressure control to reduce settlements and over‐excavation

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 42

Flow sensor on slurry lines

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

Page 15: TBM Tunneling in Mixed Grounds - aftes.asso.fr 2011...−Problems with face stability: −EPB/Slurry mode needed, reducing performance and increasing cost −Difficult to get the right

09/11/2011

15

Case study

− SOCATOP project, Paris

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 43

Case study

− SOCATOP project, Paris

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 44

OpenMode EPB Slurry EPB

Geology

Case study

− SOCATOP project, Paris

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 45

Slurry mode EPB mode

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

Page 16: TBM Tunneling in Mixed Grounds - aftes.asso.fr 2011...−Problems with face stability: −EPB/Slurry mode needed, reducing performance and increasing cost −Difficult to get the right

09/11/2011

16

Case study

− Singapore DTSS

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 46

Case study

− Singapore DTSS

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 47

T‐05 TBM T‐06 TBM

Case study

− Singapore DTSS

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 48

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

Page 17: TBM Tunneling in Mixed Grounds - aftes.asso.fr 2011...−Problems with face stability: −EPB/Slurry mode needed, reducing performance and increasing cost −Difficult to get the right

09/11/2011

17

Case study

− Singapore DTSS

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 49

Old cutterhead Modified cutterhead

Case study

− Singapore DTSS

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 50

Case study

− Singapore Circle Line, C855 project

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 51

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

Page 18: TBM Tunneling in Mixed Grounds - aftes.asso.fr 2011...−Problems with face stability: −EPB/Slurry mode needed, reducing performance and increasing cost −Difficult to get the right

09/11/2011

18

Case study

− Singapore Circle Line, C855 project

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 52

Case study

− Metro Line 9, Barcelona

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 53

Case study

− Metro Line 9, Barcelona

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 54

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

Page 19: TBM Tunneling in Mixed Grounds - aftes.asso.fr 2011...−Problems with face stability: −EPB/Slurry mode needed, reducing performance and increasing cost −Difficult to get the right

09/11/2011

19

Case study

− Metro Line 9, Barcelona

Laboratoire de Mécanique des Roches − LMR Tunneling Technology 55

Discussion

− Challenges for TBMs in Mixed Grounds− Characterization of mixed ground

− Effective exploration methods

− Solving face stability problems

Laboratoire de Mécanique des Roches − LMR Tunneling Technology

− Mechanical problems involving groundwater− Cutter‐ground interaction

− Ground treatment 

56

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S