    TECHNOLOGY GOING DEEP.

    HERRENKNECHT VERTICAL.

    GERMAN TECHNOLOGY FOR THE TURKISH MARKET

  • Jrgen Binder

    General Manager

    AGENDA

    Company

    Herrenknecht in Turkey

    Technology going deep

    Geothermal Projects in Germany

    Track Records

    Summary

  • Jrgen Binder

    General Manager

    Herrenknecht Group- More than 3000 employes- Almost one billion turnover- Over 30 years of engineering

    and know how- Market leader in

    tunnel boring business

    100% subsidiaryHerrenknecht Vertical GmbH

    COMPANY

  • Jrgen Binder

    General Manager COMPANY EMPLOYEES AND OPERATING PERFORMANCE

    1518 16651849

    2915

    2345

    0

    500

    1000

    1500

    2000

    2500

    3000

    3500

    2004 2005 2006 2007 2008

    Employeesaverage peryear

    459

    594680

    874

    1013

    0

    200

    400

    600

    800

    1000

    1200

    2004 2005 2006 2007 2008

    Total operatingperformance inMio. EUR

  • Jrgen Binder

    General Manager

    USA

    VENEZUELA

    SPAINFRANCE

    NETHERLANDSUK UKRAINE

    RUSSIA

    ITALY

    THAILAND

    CHINA

    AUSTRALIA

    MALAYSIASINGAPORE

    SUBSIDIARIES

    REPRESENTATIVES

    INDIA

    IRAN

    DUBAI

    GERMANYSWITZERLAND

    CANADA

    MEXICO

    BRAZIL

    SAUDI ARABIA

    HERRENKNECHT GLOBAL

  • Jrgen Binder

    General Manager HERRENKNECHT IN TURKEY PROJECTS SINCE 1997

    2009 S- 506/505 Kadikoy Kartal Metro Project 6.540 m

    2007 S-391 Melen 7 Istanbul 6.110 m beneath the

    Bosporus

    2007 S-369 Bogazkoy Atiksu Tunelleri

    2007 S-363/360 Istanbul Metro 6.540 m

    2006 S-330 Uluabat 4.990 m

    2005 S-325 Istanbul Metro Otogar 6.490 m

    2005 S-324 Ankara Metro 5.890 m

    2000 S-166 Tarabya Waste Water Tunnel 2.870 m

    1997 S-114 Light Rail Transit System Izmir 6.520m

  • Jrgen Binder

    General Manager METRO ISTANBUL.

  • Jrgen Binder

    General Manager

    S-325 | Metro Otogar | Istanbul | Turkey

    EPB ShieldDiameter: 6.490 mmCutterhead power: 630 kWTunnel length: 2x 3.000 mGeology: silty clay, silty sandContractor: Glermak Dogus; Adi Ortakligi

    HERRENKNECHT IN TURKEY

  • Jrgen Binder

    General Manager

    S-360 and S-363 | Istanbul Metro Kadiky Lo1 | Turkey

    2 x EPB ShieldDiameter: 6,540mmTunnel length: 2x 8,662m

    Customer: Dogus Insaat A.S.; BelenInsaat Ltd. Sti; Yuksel Insaat A.S.; Yapi Merkezi A.S.; Yenigun InsaatA.S.

    HERRENKNECHT IN TURKEY

  • Jrgen Binder

    General Manager

    8.8km of new metro tunnelby October 2009

    HERRENKNECHT IN TURKEY A GERMAN TURKISH SUCCESS STORY

  • Jrgen Binder

    General Manager

    S-391 Melen 7 | Istanbul

    EPB Shield

    Diameter 6,110mm

    Water tunnel

    Breakthrough April 13, 2009

    The first connection of twocontinents driven by machine

    HERRENKNECHT IN TURKEY 135 METERS BENEATH THE BOSPORUS.

  • Jrgen Binder

    General Manager

    Istanbul | Turkey

    TBM2500XH

    Geologiy: Rock

    Diameter: 3.065 mm

    Length: 4.241 m

    Customer: Depar Insaat Ltd. Sti.

    HERRENKNECHT IN TURKEY WATER LINE TO THE GOLDEN HORN

  • Jrgen Binder

    General Manager

    COMPANY

    Herrenknecht Headquarter in Schwanau, Germany.

  • Jrgen Binder

    General Manager

    COMPANY

    Supplier of safe and modern deepdrilling rigs with drilling depth up to 6000m

    Founded: March 2005

    Employees: 125

    (Status January 2010)

    Herrenknecht Vertical:

  • Jrgen Binder

    General Manager

    TECHNOLOGY GOIND DEEP

    Hook Load: 350 mtDrilling Depth up to: 6000mTripping speed: 500 m/hHoist power: 1600 kWHoist stroke: 22mSubstructure: Box-on-BoxPipehandling: Semi-automated

    Range doubles

    TERRA INVADER 350T

  • Jrgen Binder

    General Manager

    TECHNOLOGY GOING DEEP

    Less transport units less transport costs

    Less space requirement less space costs

    Less human-resource allocation less personnel costs

    Minimize risk while drilling less drilling costs

    High human safety factor less personnel costs

    Main Advantges:

  • Jrgen Binder

    General Manager

    TECHNOLOGY GOING DEEP

    Drill Site:

  • Jrgen Binder

    General Manager

    TECHNOLOGY GOING DEEP

    1

    2

    3 4

    Easy Rig-up without heavy crane:

  • Jrgen Binder

    General Manager

    TI 350 Slingshot Substructure,

    Mast and Substructure erected:

    TECHNOLOGY GOING DEEP RIGS EASY TO MOBILIZE

  • Jrgen Binder

    General Manager TECHNOLOGY GOING DEEP DESIGNED FOR REMOTE AREAS

    TI 350 Slingshot Substructure.

    Mast extended to drillingposition.

  • Jrgen Binder

    General Manager

    TECHNOLOGY GOING DEEP

    Pipe Handling System:

  • Jrgen Binder

    General Manager

    TECHNOLOGY GOING DEEP.

    Casing in detail

  • Jrgen Binder

    General Manager

    TECHNOLOGY GOING DEEP

    Horizontal Pipe Rack

    Almost unlimited set back area

    Fits for different tubular sizes

    Horizontal make up / break out unit saves importantoperations time.

    Low noise level because of elimination of monkeyboard

    No need for dangerous work of Derrickmen

    Characteristics of Pipehandling:

  • Jrgen Binder

    General Manager

    TECHNOLOGY GOING DEEP

    Semi automated pipehandlerIron roughneckHydraulic powerslipsSemi automated catwalkSafe and comfortable drillers cabin

  • Jrgen Binder

    General Manager

    GEOTHERMAL PROJECTS

    Rig: TI-350 (B-002, InnovaRig)Two wells: GT1 4393m MD

    GT2 4530m MDCustomer: SGGOperator: Angers und Shne

    DRRNHAAR, GERMANY

  • Jrgen Binder

    General Manager

    GEOTHERMAL PROJECTS IN GERMANY.

    approx. 2000m

  • Jrgen Binder

    General Manager

    GEOTHERMAL PROJECTS IN GERMANY

    MD Borehole Casing

    0m - 45m: Conductor pipe 26"45m 953m: 23" Casing 18 5/8"953m 2180m: 16" Casing 13 3/8"2180m 3726m: 12 1/4" Liner 9 5/8"3726m 4393m: 8 1/2" Liner 7"

    45m

    953m

    2180m

    3726m

    4393m

  • Jrgen Binder

    General Manager

    GEOTHERMAL PROJECTS IN GERMANY

    140C hot steam from more than 4000 m below the surface is being produced.

  • Jrgen Binder

    General Manager

    GEOTHERMAL PROJECTS IN GERMANY

    B-002: GENESYS, HANOVER1 well, 3901mGeothermal heat.Noise protection very important due to drilling to urban area, close to BGR.

    Project Genesys:

  • Jrgen Binder

    General Manager

  • Jrgen Binder

    General Manager

    GEOTHERMAL PROJECTS IN GERMANY

    Kirchstockach (B-004) GT1:0

    500

    1000

    1500

    2000

    2500

    3000

    3500

    4000

    4500

    5000

    0 30 60 90 120

    days

    mea

    sure

    d de

    pth

    [m]

    23" Drilling

    Casing 18 5/8"

    16" Drilling

    Casing 13 3/8"

    12 1/4" Drilling

    Casing 9 5/8"

    Kirchstockach Well 1 (planned)

    Kirchstockach Well 1 (101 days)

    Kirchstockach Well 2 (81 days)

  • Jrgen Binder

    General Manager SUMMARY WHAT DISTINGUISHES HERRENKNECHT

    More than 30 years of engineering know-how

    New Generation Technology

    Focus on Safety and Automation

    Rigs are easy to mobilize

    Less Personell needed

    Experience in working in Turkey

    Track record in Geothermal Projects

  • Jrgen Binder

    General Manager