43
The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER Improving Safety and Sustainability Craig Dubler Construction Management Senior Thesis Presentation Craig Dubler Steven F. Udvar-Hazy Center Construction Management Chantilly, Virginia

The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

  • Upload
    india

  • View
    53

  • Download
    0

Embed Size (px)

DESCRIPTION

Craig DublerSteven F. Udvar-Hazy Center Construction ManagementChantilly, Virginia. The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER. Improving Safety and Sustainability Craig Dubler Construction Management Senior Thesis Presentation. - PowerPoint PPT Presentation

Citation preview

Page 1: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

The National Air and Space Museum

STEVEN F. UDVAR-HAZY CENTER

Improving Safety and SustainabilityCraig Dubler

Construction ManagementSenior Thesis Presentation

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Page 2: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Presentation Outline

• Project Overview• Analysis I: Steel Sequencing• Analysis II: Simulated Safety Plan• Analysis III: Sustainable Redesign• Conclusions

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Page 3: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Presentation Outline

• Project Overview• Analysis I: Steel Sequencing• Analysis II: Simulated Safety Plan• Analysis III: Sustainable Redesign• Conclusions

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Page 4: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Project Overview

• Function: Display and preservation of Smithsonian’s collection of

historic aviation and space artifacts

• Size: 470,000 S.F. • Cost: $125,000,000• Delivery Method: Design-Bid-Build• Duration: 30 months

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Page 5: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Project Overview

Architectural features:

• Main Exhibition Hangar• Public Amenities• Observation Tower• Space Hangar

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Main Exhibition Hangar

Space Hangar

Public Amenities IMAXObservation Tower

Page 6: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Project Overview

• Main Exhibition Hangar– Arched tri-truss design– Hanging mezzanine

walkways– Counter-weighted exhibit

doors– Rubber membrane roof

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Page 7: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Project Overview

• Public Amenities including IMAX Theater– Consists of class rooms,

restaurants and retail shop

– Exterior:• Curved glazing• Metal panels• Metallic ceramic tiles

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Page 8: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Structural System• Main Hangar

– Arched tri-truss steel system that ties into cast-in-place thrust blocks

– Drilled caisson foundation

• Public Amenities & IMAX Theater– Steel skeleton with slab on metal

deck– Spread footing foundation

• Observation Tower– Steel system encased in concrete– Mat footing foundation

Project Overview

Page 9: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Facts• 6500 tons of steel • 40,000 cubic yards of concrete • 30,000 cubic yards of excavation • 800,000 sq. feet of roofing • 64,000 linear feet (12 miles) of Walker

duct

Project Overview

Page 10: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Presentation Outline

• Project Overview• Analysis I: Steel Sequencing• Analysis II: Simulated Safety Plan• Analysis III: Sustainable Redesign• Conclusions

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Page 11: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Steel Sequencing

• Main Hangar Steel– 15 percent of total construction cost– Erection process complex and unsafe– Steel fabricated in

Montreal, Quebec– Total erection time

around six months

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Extra planning required!

Page 12: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Steel Sequencing

Proposed solution:

• 4D Model of Steel Sequencing– Show steel erection including cranes

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Page 13: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Steel Sequencing

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Page 14: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Existing Plan: 2D Proposed Plan: 4D

Steel Sequencing

Page 15: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Steel Sequencing

Advantages of 4D Steel Sequencing

• Allows Smithsonian to easily understand erection process

• Subcontractors aware of where and when steel erection takes place

• Steel erectors develop milestones• Ask question about erection feasibility

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Page 16: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Presentation Outline

• Project Overview• Analysis I: Steel Sequencing• Analysis II: Simulated Safety

Plan• Analysis III: Sustainable Redesign• Conclusions

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Page 17: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Simulated Safety Plan

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Jobsite safety extremely important

• Complex size and shape of building• Dangerous activities (e.g. Steel erection)• Contractor Controlled Insurance Plan

(CCIP)• Half of workforce is Hispanic, and

understands little English

Page 18: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Simulated Safety Plan

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

• Hispanic Workforce– Creates a communication barrier

• Increases site safety hazards• Lowers productivity• Creates conflicts between managers and

workers

– Workers killed has more than doubled in last five years

Page 19: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Simulated Safety Plan

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

4-D Safety Plan• Safety Plan Model

– Shows where and when activities take place

• Safety Plan Legend– Shows hazards associated with each activity

• Worker and Bystanders

• Specific Job Hazard Analysis– Describes hazards in more detail

Page 20: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Simulated Safety Plan

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Steel Erection

Roofing

Fire ProtectionMechanical

Glazing

Painting

Electrical

Metal Studs

Concrete

Page 21: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Simulated Safety Plan

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Sample Hazard Analysis(Northwest side of Hangar)

04-08-2002

Fire Protection Contractor•Falling•Welding•Cutting Metal•Heavy lifting•Struck by objectsAlso…•Roofing (struck by objects)•Steel (welding, struck by objects)•Mechanical (cutting metal)

Mechanical

Fire ProtectionRoofing

Steel Erection

Page 22: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Simulated Safety Plan

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Feasibility of 4-D Safety Plan• Preconstruction Meetings• Jobsite Orientation• Weekly Safety Meetings (Toolbox

Talks)

Page 23: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Simulated Safety Plan

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Key factors for Implementation• Develop in early stage of project

• Be sure model is understood by all workers– Model is useless if workers are not trained

to notice hazards

Page 24: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Presentation Outline

• Project Overview• Analysis I: Steel Sequencing• Analysis II: Simulated Safety Plan• Analysis III: Sustainable

Redesign• Conclusions

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Page 25: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Sustainable Redesign

Mechanical System Redesign • Lower energy cost in Public Amenities

area

Site Redesign• Improved water retention system

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Page 26: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Mechanical System Redesign

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

FiltersReturn Air

OutdoorAir

ReheatCoil Cooling

Coil

Supply Fan

SecondReheat Coil

SupplyAir

Mixed Air

Exhaust

Existing AHU A-07

Page 27: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Mechanical System Redesign

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

FiltersReturn Air

OutdoorAir

ReheatCoil Cooling

Coil

Supply Fan

SecondReheat Coil

SupplyAir

Mixed Air

Exhaust

Proposed AHU A-07

Enthalpy Wheel

Page 28: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Mechanical System Redesign

Advantages of Enthalpy Wheel• Lower energy costs

– Save around $8,000 per year– Increased indoor air quality (IAQ)

• Low maintenance• Long life expectancy

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Page 29: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Site Redesign

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Main Hangar

Public Amenities

Bituminous Pavement Bituminous Pavement

Water RetentionPond

Water RetentionPonds

Existing Site Water Retention System

Page 30: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Site Redesign

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Main Hangar

Public Amenities

Overflow (.5%)

Porous Pavement Porous Pavement

Water RetentionPonds

Proposed Site Water Retention System

Page 31: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Site Redesign

Advantages of Porous Pavement• Elimination of large water retention

pond– Save approximately $130,000 – Space available for future expansion

• Natural rain-water filtration (pollutant removal)

• Increased skid resistance

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Page 32: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Sustainable Redesign

Summary

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Sustainable Item

Initial Savings After 10 Years

Enthalpy Wheel -$30,000 $50,000*

Porous Pavement $130,000 $100,000**

Total Saved $100,000 $150,000* Including energy saving of $8,000 per year** Including maintenance cost of $3,000 per year

Page 33: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Presentation Outline

• Project Overview• Analysis I: Steel Sequencing• Analysis II: Simulated Safety Plan• Analysis III: Sustainable Redesign• Conclusions

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Page 34: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Conclusions

• 4D Steel Sequencing– Simplifies erection process

• Simulated Safety Plan– Elimination of careless accidents only

if understood by every worker onsite• Sustainable Redesign

– Lower energy costs and increased IAQ– Natural rain-water runoff

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Page 35: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Thanks To….

• Hensel Phelps Construction Company– Mike Mattivi, Chad Mease, John Louge, and Dave Webb

• Smithsonian Institution – Lin Ezel

• Penn State AE Faculty– Dr. Messner, Dr. Horman, Dr. Riley, and Dr. Ling

• Family and Friends– Mom, Dad, Kelly, Amy, Jessica, and Gram….

You are truly my inspiration to succeed.

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Page 36: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Questions?

Page 37: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER
Page 38: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Enthalpy Wheel

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

How it works• Transfers heat and humidity between

the exhaust and supply air • Brings the supply (incoming) air closer

in temperature and humidity to the exhaust air

• Reduces the load on the heating and cooling systems

Page 39: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Sizing Enthalpy Wheel

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Taken from Appendix E

Return air flow = 7314 cfm Vmin/Vmax = 0.80Supply air flow = 9200 cfm

Unit effectiveness = 0.825

Using a TE 3-9, the face velocity is 760 FPM, the pressure loss is 0.76 in. wg.

Page 40: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Enthalpy Wheel - Energy Savings

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

$/kWh

$/therm

Annual Cost savingsCooling costs = $0.1/cfmHeating costs = $1.0/cfm

Total saved = $1.1/cfm of outdoor air

Total OA = 7314 cfm

Total Annual Savings = 7314 cfm * $1.1/cfm

= $8,045 per year

Rate of return = $33,000 / $8,045 = 4.1 Years

Washington D.C

Enthalpy Hrs. Cooling = 9,000Enthalpy Hrs. Heating= 41,000

Heating and Cooling cost*

Cooling = $0.055/kWhHeating = $0.55/therm*gathered from MSN living index

Page 41: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Porous Pavement

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Four Layers:•Wearing layer - asphalt with

greater than normal percentage of voids•Transition layer - layer between top wearing layer and the stone reservoir •Stone reservoir - thick layer of aggregate (5ft)•Geotextile – keeps soil out of

stone reservoir

Page 42: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Porous Pavement - Construction

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia

Subsurface excavated without heavy equipment compacting the bed bottom. Fine grading is done by hand Geotextile is laid. Then clean/washed uniformly graded aggregate is place in the bed as the storage media.

Porous pavement asphalt layer is then placed, the same way as regular, on top of the stone reservoir

Page 43: The National Air and Space Museum STEVEN F. UDVAR-HAZY CENTER

Porous Pavement - Concerns

• Heavy equipment not allowed on porous soil– No staging in future porous pavement areas– Compacts soil and greatly lessens permeability

• Facilities maintained on a regular basis– Leaf Removal– Vacuum Sweeping

• Restricted Snow Removal– Plastic plow blades – does not damage surface– No sand or anti-skid – clogs pores

• Vehicle Restrictions– Passenger Cars and Trucks Only – Rutting may occur

Craig Dubler Steven F. Udvar-Hazy CenterConstruction Management Chantilly, Virginia