    n any given project, you may have hundreds of tasks and dozens of dependencies. It can feel almost impossible to identify the most important tasks; the ones

    hat, if missed, will impact your whole project. In other words, the ones you really need to worry about to make sure you meet your deadlines.

    The critical path method, a project management technique created in the 1950s, allows you to identify these important tasks and stay on track throughout your

    roject. Starting as hand-drawn diagrams and evolving into automated software, the critical path method has become an essential part of planning a project.

    Share

    (http://www.facebook.com/sharer.php?u=https%3A%2F%2Fwww.smartsheet.com%2Fcritical-path-method) (http://twitter.com/share?

    rl=https%3A%2F%2Fwww.smartsheet.com%2Fcritical-path-method&text=&hashtags=smartsheet) (https://plus.google.com/share?

    rl=https%3A%2F%2Fwww.smartsheet.com%2Fcritical-path-method) (http://www.linkedin.com/shareArticle?

    mini=true&url=https%3A%2F%2Fwww.smartsheet.com%2Fcritical-path-method) (mailto:?

    Subject=The%20Ultimate%20Guide%20to%20the%20Critical%20Path%20Method%20&Body=https%3A%2F%2Fwww.smartsheet.com%2Fcritical-path-method)

    What Is the Critical Path Method (CPM)?

    The Project Management Body of Knowledge (PMBOK), an internationally recognized collection of processes and knowledge areas accepted as best practice for

    he project management profession, defines the critical path as the sequence of scheduled activities that determines the duration of the project. It is the longest

    equence of tasks in a project plan that must be completed on time in order for the project to meet its deadline. If there is a delay in any task on the critical path,

    hen your whole project will be delayed. Although many projects have only one critical path, some projects may have multiple critical paths.

    The critical path method is a step-by-step project management technique to identify activities on the critical path. It is an approach to project scheduling that

    reaks the project into several work tasks, displays them in a flow chart, and then calculates the project duration based on estimated durations for each task. It

    dentifies tasks that are critical, time-wise, in completing the project.

    m nu

    https://www.smartsheet.com/https://www.smartsheet.com/mailto:?Subject=The%20Ultimate%20Guide%20to%20the%20Critical%20Path%20Method%20&Body=https%3A%2F%2Fwww.smartsheet.com%2Fcritical-path-methodhttp://www.linkedin.com/shareArticle?mini=true&url=https%3A%2F%2Fwww.smartsheet.com%2Fcritical-path-methodhttps://plus.google.com/share?url=https%3A%2F%2Fwww.smartsheet.com%2Fcritical-path-methodhttp://twitter.com/share?url=https%3A%2F%2Fwww.smartsheet.com%2Fcritical-path-method&text=&hashtags=smartsheethttp://www.facebook.com/sharer.php?u=https%3A%2F%2Fwww.smartsheet.com%2Fcritical-path-methodhttps://www.smartsheet.com/try-it?lpv=stkcta&trp=8514
  • 7/25/2019 The Ultimate Guide to the Critical Path Method (CPM)

    2/17

    Dr. Larry Bennett (https://www.linkedin.com/pub/f-lawrence-bennett/5b/521/b99), a civil engineer, project manager, and author of four books, including a guide on

    ritical path written in 1978 and titled, Critical Path Precedence Networks (http://www.amazon.com/Critical-Precedence-Networks-Lawrence-

    Bennett/dp/0442121903/ref=la_B001HMQP5Y_1_3?s=books&ie=UTF8&qid=1434480925&sr=1-3), explains that the critical path method helps manage projects in

    wo different ways: It produces a planned schedule to guide the project team, and it forms the basis for tracking project schedule performance by comparing

    ctual with planned task progress.

    The Critical Path Method According to Two Experts

    We asked two critical path users for the best way to explain it. Here's what they had to say:

    The critical path is just a fancy way of saying 'How long does each task take before you can finish the project? Use this information to figure out the project's end

    ate.' If a task takes longer than anticipated, the end date is pushed back. There are some tasks that don't immediately impact the project's end date that can be

    ushed back for some time. There are a whole bunch of calculations that go into figuring out what-ifs, forecasting, and scheduling, but that's where project

    management software comes in and makes everyone's lives easier. "

    Rachel Burger (https://www.linkedin.com/in/rachelmwburger), Capterra Construction

    Twitter: @CapterraBuilder (https://twitter.com/CapterraBuilder)

    Some of the activities must happen in parallel. For example, if you tried to make a fried breakfast by doing one task at a time, and one after the other, things would

    o wrong. The plates need to be warming while other activities are going on. The toast needs to be toasting while the sausages are frying, and at the same time

    he bacon and sausages are under the grill. The eggs need to be fried last. A critical path analysis is a diagrammatical representation of what needs to be done

    nd when. Timescales and costs can be applied to each activity and resource."

    Terence Jackson (https://www.linkedin.com/pub/terence-jackson-ph-d/10/184/576), Ph.D and CEO/Managing Partner at WEpiphany LLC

    Background & History of Critical Path

    Using the Critical Path Method for Project Management

    Dr. Bennett is no stranger to critical path. He has applied critical path scheduling to a wide variety of projects since 1965. He has also spent 29 years on the

    ngineering faculty at the University of Alaska Fairbanks, teaching undergraduate and graduate courses in technical management, including project management

    nd scheduling.

    n addition to his books (http://www.amazon.com/F.-Lawrence-Bennett/e/B001HMQP5Y), he has written more than 50 professional papers and articles on topics

    anging from construction management to network techniques for project scheduling.

    Dr. Bennett points out that critical path has come a long way. In fact, the original critical path method was done by hand. As Dr. Bennett describes it:

    http://www.amazon.com/F.-Lawrence-Bennett/e/B001HMQP5Yhttps://www.youtube.com/watch?v=u1VK4zKVN7Uhttps://www.linkedin.com/pub/terence-jackson-ph-d/10/184/576https://twitter.com/CapterraBuilderhttps://www.linkedin.com/in/rachelmwburgerhttp://www.amazon.com/Critical-Precedence-Networks-Lawrence-Bennett/dp/0442121903/ref=la_B001HMQP5Y_1_3?s=books&ie=UTF8&qid=1434480925&sr=1-3https://www.linkedin.com/pub/f-lawrence-bennett/5b/521/b99
  • 7/25/2019 The Ultimate Guide to the Critical Path Method (CPM)

    3/17

    The original critical path method used arrows to represent tasks and tied them together by connecting their beginning and end at nodes, so that proper

    equencing was developed. This approach persisted for a decade, when a different method, with the same results, became popular. Professor John W. Fondahl, a

    rofessor of construction management at Stanford University, proposed in a 1961 paper that each task be represented by a node square, circle, or oval and the

    odes be tied together with lines or arrows representing the sequence between tasks. This approach, referred to as the activity-on-node (AON) or precedence

    method, caught on rapidly and has supplanted the earlier activity-on-arrow (AOA) method in nearly all uses.

    How the Critical Path Method Was Created

    Using the critical path method to schedule projects began in the late 1950s, with two simultaneous, unrelated projects. The US Navys Fleet Ballistic Missile

    Polaris) Program was behind schedule and needed help resolving the problem. The suggested solution was to divide the project into several thousand tasks,

    epresent each task by an arrow, connect the arrows in proper sequence, estimate the duration of each task, and calculate the project duration and the degree of

    chedule criticality of each task.

    At about the same time, the EI DuPont de Nemours Company, an American chemical company, was experiencing delays in its plant turnarounds, a project to

    earrange production facilities for different products. They, too, needed help and the proposed answer was similar to that of the Polaris Program.The developers of the Polaris Programs approach called their solution the Project Evaluation and Review Technique (PERT), while the DuPont method was called

    Critical Path Method (CPM). Although these methods are similar, they used different techniques for estimating task duration.

    The PERT method used three different time estimations for each task duration and calculated the probability of project completion by any given time. The DuPont

    pproach used one time duration for each task; it was concerned not only with project completion time, but also with analyzing the extra costs that would accrue if

    he project duration were decreased.

    Dr. Bennett says that today, the terms PERT and CPM are used interchangeably, both meaning any network scheduling method and PERT having lost its inclusion

    f three time estimates and probabilities.

    The Everyday Advantages of Critical Path

    Although it originated in the late 1950s, critical path is still incredibly important to project managers today. It provides a visual representation of project activities,

    learly presents the time required to complete tasks, and tracks activities so you dont fall behind. The critical path method also reduces uncertainty because you

    must calculate the shortest and longest time of completion of each activity. This forces you to consider unexpected factors that may impact your tasks and reduces

    he likelihood that an unexpected surprise will occur during your project.

    According to Dr. Bennett, the critical path method also has three main benefits for project managers:

    dentifies the Most Important Tasks: First, it clearly identifies the tasks that you will have to closely manage. If any of the tasks on the critical path take more time

    han their estimated durations, start later than planned, or finish later than planned, then your whole project will be affected.

    Helps Reduce Timelines: Secondly, if, after the initial analysis predicts a completion time, there is interest in completing the project in a shorter time frame, it is

    lear which task or tasks are candidates for duration reduction, said Dr. Bennett. When the results from a critical path method are displayed as a bar chart, like a

    Gantt chart, it is easy to see where the tasks fall in the overall timeframe. You can visualize the critical path activities (they are usually highlighted), as well as task

    urations and their sequences. This provides a new level of insight into your projects timeline, giving you more understanding about which task durations you can

    modify, and which must stay the same.

    Compares Planned with Actual: And lastly, Dr. Bennett says the critical path method can also be used to compare planned progress with actual progress. As the

    roject proceeds, the baseline schedule developed from the initial critical path analysis can be used to track schedule progress. Throughout a project, a manager

    an identify tasks that have already been completed, the predicted remaining durations for in-progress tasks, and any planned changes to future task sequences

    nd durations. The result will be an updated schedule, which, when displayed against the original baseline, will provide a visual means of comparing planned with

    ctual progress.

    Experts Share the #1 Advantage of Critical Path

    For me, the biggest advantage of the critical path method is that it makes risk assessment easy. If Ive got dependencies laid out and plans change, its very easy

    o say, 'Because you missed that deadline, the next deliverable is going to be late by X days, and that puts us beyond our plan by Y days.' Simple. That said, I dont

    hink you have to fully adopt a method like critical path to do this on projects. Its best to adopt the parts of any method that work for your project and your team

    eing adaptable as a PM will help you find true success."

    Brett Harned, digital project management consultant (http://brettharned.com/), writer, speaker, and community builder.

    Twitter: @BrettHarned (https://twitter.com/brettharned)

    https://twitter.com/brettharnedhttp://brettharned.com/
  • 7/25/2019 The Ultimate Guide to the Critical Path Method (CPM)

    4/17

    Two issues that continue to plague projects are the competing priorities of cross functional team members and distractions from 'noise' on the project. With somuch activity, the critical path enables a clear, pointed view of what must happen next and 'who is on the clock' for meeting project commitments."

    Robert Kelly, co-founder of @PMChat (https://twitter.com/PMChat) and managing partner of Kelly Solutions (http://kellyprojectsolutions.com/), a project management

    rm.

    Twitter: @rkelly976 (https://twitter.com/rkelly976)

    especially like the 'unintended benefits' critical path (CP) analysis brings, including discoveries of hidden dependencies and resource conflicts. CP analysis also

    ften leads to better prioritization and redistribution of team-members. And CP can expose the needs / opportunities for inserting lags / leads to further improve

    he schedule."

    eff Furman, PMP, author of "The Project Management Answer Book" (http://www.amazon.com/Project-Management-Answer-Book-

    Second/dp/1567264468/ref=sr_1_2?ie=UTF8&qid=1417492519&sr=8-2&keywords=JEFF+FURMAN)

    Twitter: @PMAnswerBook (https://twitter.com/pmanswerbook)

    The critical path method brings an important level of clarity to your project. It is a visual depiction of the fragility of the balance of your constraints: If one of the

    ctivities on the path gets delayed, your project gets delayed. It is also a great way to determine where to invest resources if the project has fallen behind

    chedule."

    Cesar Abeid, host of the Project Management for the Masses Podcast (http://pmforthemasses.com/)

    Twitter: @PM4TM (https://twitter.com/pm4tm)

    Key Steps in the Critical Path Method

    There are six steps in the critical path method:

    Step 1: Specify Each Activity

    Using the work breakdown structure, you need to identify each activity (or task) involved in the project. This activity specification list should only include higher-

    evel activities. When detailed activities are used, the critical path analysis may become too complex to manage and maintain.

    https://twitter.com/pm4tmhttp://pmforthemasses.com/https://twitter.com/pmanswerbookhttp://www.amazon.com/Project-Management-Answer-Book-Second/dp/1567264468/ref=sr_1_2?ie=UTF8&qid=1417492519&sr=8-2&keywords=JEFF+FURMANhttps://twitter.com/rkelly976http://kellyprojectsolutions.com/https://twitter.com/PMChathttps://www.smartsheet.com/abouthttp://help.smartsheet.com/https://www.smartsheet.com/enterprisehttps://www.smartsheet.com/solution-centerhttps://www.smartsheet.com/product-tourhttps://www.smartsheet.com/contacthttps://www.smartsheet.com/pricinghttps://www.smartsheet.com/customers
  • 7/25/2019 The Ultimate Guide to the Critical Path Method (CPM)

    5/17

    A work breakdown structure breaks down projects into manageable sections.

    The first step is to identify the main deliverables of a project. Then you can start breaking down the high-level activities into smaller chunks of work.

    You can choose how to display your work breakdown structure. Some people use a tree structure, while others use lists or tables. An outline is one of the easiest

    ways to represent a work breakdown structure.

    Step 2: Establish Dependencies (Activity Sequence)

    Some activities will depend on the completion of others. Listing the immediate predecessors of each activity will help you identify the correct order. To correctly

    dentify activities and their precedence, ask yourself these three questions for each activity on your list from step one:

    Which task should take place before this task happens?

    Which tasks should be finished at the same time as this task?

    Which tasks should happen right after this task?

    Step 3: Draw the Network Diagram

    Once you have identified the activities and their dependencies, you can draw the critical path analysis chart (CPA), known as the network diagram. The networkiagram is a visual representation of the order of your activities based on dependencies.

    This critical path diagram used to be drawn by-hand, but there are now software programs that can create this diagram for you.

    Step 4: Estimate Activity Completion Time

    Using past experience or the knowledge of an experienced team member, you must now estimate the time required to complete each activity. If you are managing

    smaller project, you will most likely estimate time in days. If you are working with a complex project, you may have to measure time in weeks.

    f you dont feel comfortable using your best-guess estimates, you can use the 3-point estimation method, which is designed to put more weight on the most

    ealistic timeframe.

    n three-point estimation, you must come up with three time estimates for every task, based on prior experience or best guesses. The estimation method is

    resented in formulas in order to calculate the time duration more accurately.

    = the best-case estimate

    m = the most likely estimate = the worst-case estimate

    These three values identify what happens in an optimal state, what is the most likely, and what happens in the worst case scenario.

    Once youve identified these values, you can use them in two different formulas. The first is used to find the Weighted Average, which puts more weight on the

    Most Likely value. The formula is as below. E stands for Estimate, and the 4 and 6 represent the standard method to place more weight on the most realistic

    alue.

    = (a + 4m + b) / 6

  • 7/25/2019 The Ultimate Guide to the Critical Path Method (CPM)

    6/17

    The second way of using these values is known as Triangular Distribution. The main difference is that this method doesnt put more weight on the Most Likely

    alue. The formula is as below. E stands for Estimate, and the 3 represents the standard method.

    = (a + m + b)/3

    Step 5: Identify the Critical Path

    There are two ways you can now identify the critical path. You can eyeball your network diagram and simply identify the longest path throughout the network -- the

    ongest sequence of activities on the path. Be sure to look for the longest path in terms of longest duration in days, not the path with the most boxes or nodes.

    You can also identify critical activities with the Forward Pass/Backward Pass technique, identifying the earliest start and finish times, and the latest start and finishmes for each activity.

    f you have multiple critical paths, you will run into network sensitivity. A project schedule is considered sensitive if the critical path is likely to change once the

    roject begins. The more critical paths in a project, the higher the probability of a change in schedule.

    Step 6: Update the Critical Path Diagram to Show Progress

    As the project progresses, you will learn the actual activity completion times. The network diagram can then be updated to include this information (rather than

    ontinuing to use estimations).

    By updating the network diagram as new information emerges, you may recalculate a different critical path. You will also have a more realistic view of the project

    ompletion due date and will be able to tell if you are on track or falling behind.

    Other Scenarios in the Critical Path Method

    One of the biggest benefits of the critical path method is identifying the crucial tasks that, if missed, will impact your projects completion date. It will also provideisibility into your projects status, allowing you to see if you are on track.

    Shortening Your Schedule

    As youre going through the critical path method, you may find that you want to intentionally shorten the duration of your project or that you need to compress

    our project schedule in order to meet the deadline. There are two ways to do this: fast tracking or crashing.

    ast Tracking

    n fast tracking, you look at the critical path and decide which activities can be done parallel to each other, to move the project along faster. You only need to

    eview the activities on the critical path because all the other activities have float (if you shorten the duration of those activities, youre only giving them more

    oat).

    While fast tracking reduces your project timeframe, it also involves risk because you are performing parallel activities that were originally planned to be performed

    n sequence.

    Crash Duration

    Crash duration, or crashing, refers to the shortest possible time for which an activity can be scheduled. This happens by adding more resources to completing that

    ertain activity. However, crashing the critical path results in lower quality of work because the goal in crash duration is speed.

    Managing Resource Constraints

    As you manage your project, you may also run into resource constraint issues that could change the critical path. If you try to schedule certain activities at the

    ame time, you may find that you need more people than are available. As a result, those activities will need to be rescheduled. Resource leveling is the process of

    esolving these conflicts.

    Resource Leveling and Expansion

    With resource leveling, you can resolve conflicts over allocating resources. A resource-leveled schedule may include delays due from resource bottlenecks (a

    esource being unavailable at the necessary time).

    Resource leveling may also result in a previously shorter path becoming the longest or most resource critical path. This happens when the tasks on the critical

    ath are affected by resource constraints.

    A similar concept is called the critical chain, which protects activity and project durations from unexpected delays due to resource constraints.

    Assessing the Final Project

    These scenarios demonstrate all the unexpected changes that can occur when managing a project, and how they can affect the critical path. While things are

    lways subject to change, the good news is that you can measure the variance from your original project schedule and track how it impacted your final project.

    lexibility and Assessing Delays

  • 7/25/2019 The Ultimate Guide to the Critical Path Method (CPM)

    7/17

    A schedule created from the critical path method naturally involves a lot of fluctuation because you have to use best-guess estimates to calculate time. If one

    mistake is made in activity completion time, your whole critical path schedule could change. Or, you may need to purposefully delay project activities due to

    esource constraints.

    Sorting out these delays and determining what caused them can help you avoid similar issues in the future. An important part of your post-project plan is the As

    Built Critical Path, which analyzes the specific causes and impacts of changes between the planned schedule and actual schedule implemented. The As-Built

    Critical Path is a schedule that shows the dates that the activities actually occurred and allocates time by determining the responsibility for the delays on the critical

    ath.

    How to Use PERT in the Critical Path Method

    f you recall the history of the critical path method described earlier in this article, youll remember that the PERT (Program Evaluation and Review Technique),

    eveloped by the Navy in the late 1950s to help produce missiles faster, is a variation on the critical path method that takes a more skeptical view of activity time

    stimates.

    What is PERT?

    Critical path method and PERT are often used in the same contexts and scenarios. Although they are similar, you should understand each concept and their

    ifferences.

    A PERT chart, or activity-on-arrow diagram, is a visual representation of your projects schedule, showing the sequence of tasks and which can be completed at the

    ame time. A PERT chart is made with a lot of the same information that is used in the critical path method, like earliest and latest start dates, earliest and latest

    nish dates, and slack (or float) between activities.

    But, the biggest difference between the critical path method and PERT is in time estimation. In the critical path method, time variance is not accounted for. Youre

    sing best-guess estimates for completion time, and those times may change. With PERT, youre putting more weight on the most realistic completion time.

    Critical Path Method and PERT

    You can use PERT in your critical path method in step four of the process, when you have to estimate activity completion times. The purpose of using PERT is to

    ias time estimates toward the most likely scenario and move away from unrealistically short timeframes.

    To use PERT, you must estimate the shortest possible time each activity will take, the most likely length of time, and the longest time it might take if the activity lasts

    onger than expected.

    With that information, you can use this formula when you have to estimate activity completion times in the critical path method (step four).

    Shortest time + 4x likely time + longest time / 6 = expected activity completion time

    How to Find the Critical Path on a PERT Chart

    You can identify the critical path on a PERT chart because the chart includes the same information needed for the network diagram in the critical path method.

    A PERT chart is drawn with circles for each activity, with the name of the activity and estimated duration in each circle. Arrows represent the paths that relate to

    ependencies.

    To find the critical path on the PERT chart, first identify how many paths you can take from start to finish. Then, add up the total duration of activities on that path.

    or example,

    Path 1 duration: 12 days (task 1 and task 3)

    Path 2 duration: 11 days (task 2 and task 3)

    Path 3 duration: 10 days (task 4)

    n this case, the critical path is task 1 and task 3 because it has the longest duration.

    Critical Path Software

    When the critical path method was first developed, you had to identify the critical path by hand, drawing the network diagram with nodes to present the stages of

    project and connecting the nodes with arrows or arcs.

    However, drawing nodes, tables, and arrows can be a time-consuming, difficult task, especially when things are constantly changing at the beginning of a project.

  • 7/25/2019 The Ultimate Guide to the Critical Path Method (CPM)

    8/17

    Rather than relying on hand-draw diagrams, there are a number of project management software programs available today that will do the work for you and

    dentify the critical path with the click of a button.

    Here are two different tools with critical path features:

    Find the Critical Path with Microsoft Project

    You can display the critical path in the Gantt chart view of Microsoft Project.

    irst, you must enter all your tasks, their start and end dates, the duration of each task, and identify the predecessors. Then, you can adjust the view of your MS

    Project file to display the critical path.

    Click View> Gantt Chart.

    Click Formatand then select the Critical Taskscheck box.

    Tasks on the critical path now have red Gantt bars.

    dentify Critical Path in Other Views

    You can see the critical path in any task view by highlighting it.

    Click the Viewtab and select a view from the Task Viewsgroup.

    Staying within the Viewtab, click Criticalfrom the Highlightlist. The critical path shows up in yellow.

    To see only the tasks on the critical path, click the Filterarrow and select Critical.

    n a network diagram, tasks on the critical path automatically show up in red. No highlighting is needed.

    See the Critical Path in a Master Project

  • 7/25/2019 The Ultimate Guide to the Critical Path Method (CPM)

    9/17

    ntire subprojects can be on the critical path when youre managing a master project. To identify subprojects on the critical path, you can adjust Microsoft Project

    o treat the subprojects like summary tasks.

    Click File> Options.

    Select Scheduleand then scroll down to the Calculationoptions for this project.

    Make sure the Inserted projects are calculated like summary tasksbox is selected.

    Change the Tasks on the Critical Path

    Critical tasks typically have no slack. However, you can tell Microsoft Project to include tasks with one or more days of slack on the critical path, so you can identify

    ny potential problems that may arise.

    Click File> Options.

    Click Advanced, then scroll down to the Calculationoptionsfor this projectarea.

    Add a number to the Tasks are critical if slack is less than or equal tobox.

    dentify the Critical Path in Seconds with Smartsheet

    Keep Projects on Track ...

    Smartsheet, a work management and collaboration tool in a spreadsheet layout, offers a pre-formatted Gantt chart template (https://www.smartsheet.com/gantt-

    hart-software) to make it even easier to find the critical path.

    With this pre-made Gantt chart template, complete with sections, sub-tasks, and sub-sub-tasks already formatted, all you need to do is enter your own project

    lanning information. A Gantt chart will automatically be made for you, and with the click of a button, you can identify the critical path on the Gantt chart.

    Heres how to find the critical path in Smartsheet, using a Gantt chart template:

    . Choose a Gantt Chart Template

    Go to Smartsheet.com and login to your account (or start a free 30 day trial (https://www.smartsheet.com/try-it-2?trp=8514)).

    rom the Home screen, click Create Newand choose Browse Templates.

    Type dependencies in the Search Templatesbox and click the magnifying glass icon.

    Select the Basic Project with Gantt & Dependenciesand click on the blue Use Templatein the upper-right corner.

    Name your template, choose where to save it, and click the OKbutton.

    https://www.smartsheet.com/try-it-2?trp=8514https://www.smartsheet.com/gantt-chart-softwarehttps://www.youtube.com/watch?v=s0XWtamFBQs
  • 7/25/2019 The Ultimate Guide to the Critical Path Method (CPM)

    10/17

    2. List Your Task Information

    A pre-made, formatted template will open with sample content filled in for reference. This section is where you add your activities, or tasks, from your work

    reakdown structure. This is also where you can show the hierarchy, or relationship, between tasks.

    The yellow cells at the top are there simply for instructional reference. To delete them, right-click on each yellow box and select Delete Row.

    Add your tasks under the Task Namecolumn.

    Use the cells named Section 1, Section 2, and Section 3 to establish hierarchy (for more information on hierarchies, click herehttp://help.smartsheet.com/customer/portal/articles/504734-hierarchy-indenting-outdenting-rows)).

    f you need to delete a row, right-click on the cell in the row youd like to delete and selectDelete Row.

    On the left side of each row, you can attach files directly to a task or start a discussion with a colleague about a task, adding more context to your project.

    3. Provide Start and End Dates

    Add start and end dates for each task. If you click and drag either end of a green task bar on the right in the Gantt view, Smartsheet will automatically change the

    matching dates in the task table.

    Select a cell in the Start Dateor End Datecolumn.

    Click on the calendar icon and choose a date.

    http://help.smartsheet.com/customer/portal/articles/504734-hierarchy-indenting-outdenting-rows
  • 7/25/2019 The Ultimate Guide to the Critical Path Method (CPM)

    11/17

    You can also manually enter a date in the cell. Smartsheet will automatically calculate the duration of each task for you.

    4. Add % Complete and Assigned To Information

    The % Completeand Assigned Tocolumns provide more context around your project. In the Gantt view on the right side, you can quickly see how much of a task

    as been completed by the length of the thin grey bars inside the task bars.

    The Assigned Tocolumn allows you to assign the task to a particular team member, providing visibility into who is doing what.

    n the % Completecolumn, enter the percentage of work complete for that task. Enter a whole number and Smartsheet will auto-fill the percentage sign.

    n the Assigned Tocolumn, choose a name from the drop-down menu or manually enter a new name.

    5. Establish Predecessors

    Predecessors are used to create dependencies between tasks (identifying which tasks need to happen before or after another task).

    On the far-left of the sheet, each row is assigned a number. In the Predecessorcolumn, enter the row number that represents the row of the preceding task. This

    will create a link from the current row (the dependent task) to the specified row (the predecessor task).

    nter the row numbers of all other predecessors in the Predecessorcolumn.

    You can also create predecessor dependencies from the Gantt chart on the right. Drag the bottom, right-corner of a Gantt bar down to the Gantt bar of the task

    hat should follow it. The Predecessorcolumn will be automatically updated.

    6. Identify the Critical Path

    Now that you have created a Gantt chart in Smartsheet, you can identify the critical path on the Gantt chart with the click of a button.

    On the right side of the screen, where your Gantt chart is displayed, click the far-right button that depicts a critical path (the two red Gantt bars).

    On the Gantt chart, the tasks that are on the critical path will be outlined in red.

  • 7/25/2019 The Ultimate Guide to the Critical Path Method (CPM)

    12/17

    How to Import a Microsoft Project File (.MPP) into Smartsheet

    Smartsheet works with Microsoft Project, so if you already have your project planning information stored in Microsoft Project, you can easily import that directly to

    Smartsheet.

    Click the Hometab and click the grey Import button.

    Choose the Import MS Project File.

    Click Select, choose the file you would like to import, and click Open.

    Click Continueand an Import Settingsform appears. Select the row in the form that contains your column headers (it will probably be the first row) and click Import.The imported file will appear as a new sheet within Smartsheet. Click on the sheet name to open it.

    Studying for the PMP Exam? Heres What You Need to Know about the Critical Path Method

    Learn Critical Path Method (CPM) for PMP Exam

    To earn your Project Management Professional (PMP) credential, you need to pass the PMP exam, a 200-question, multiple choice test offered by the Project

    Management Institute (PMI).

    https://www.youtube.com/watch?v=aeGRKaLaO7Y
  • 7/25/2019 The Ultimate Guide to the Critical Path Method (CPM)

    13/17

    Critical path is an important part of the PMP Exam and there will certainly be questions about it on the test. Youll need to be able to draw a network diagram,

    dentify the critical path, use the Forward Pass/Backward Pass technique, and calculate slack.

    Here is an overview of the most important things to know about the critical path method to help you pass the PMP exam:

    How to Draw a Network Diagram

    On the PMP Exam, you will be asked to draw a network diagram. The exam will list all the activities in a project and will tell you when the activities can start. With

    hat information, youll be asked to identify the critical path and its duration.

    To explain how to draw a network diagram, Bennett has created a sample eight-task project:

    Design Tank Project (10 days) can start right away.

    Construct Tank Foundation (25 days) and Select Tank Supplier (8 days) can start as soon as Design Tank Project is finished.

    Manufacture Tank Components (10 days) can start as soon as Select Tank Supplier is finished.

    Deliver Tank to Jobsite (4 days) can start as soon as Manufacture Tank Components is finished.Prepare Installation Drawings (3 days) can start as soon as Select Tank Supplier is finished.

    Assemble Tank (15 days) can start as soon as Deliver Tank to Jobsite, Prepare Installation Drawings and Construct Tank Foundation are all finished.

    Test & Commission Tank (4 days) can start as soon as Assemble Tank is finished.

    After Test & Commission Tank is finished, the project is complete.

    To answer the question, youll need to draw a network diagram.

    Heres how:

    Draw a box and label it as your first activity (Design Tank Project). In the box, make sure to write the duration in days (in this case, it is 10 days).

    Begin your diagram by drawing the relationship between Design Tank Project, and Construct Tank Foundation and Select Tank Supplier. You can do this by

    rawing a box for the other activities, and drawing arrows to these boxes from Design Tank Project.

    Continue drawing boxes to represent activities, and arrows to represent when an activity can begin.

    After you have drawn the network diagram, you will be able to find the critical path. Remember: the critical path is the longest duration path throughout the

    etwork in days, not the path with the most boxes.

    n this example, the critical path is Design Tank Project, Construct Tank Foundation, Assemble Tank, and Test & Commission Tank, with a total duration of 54 days.

    You can identify the critical path by eyeballing the diagram to find the longest duration in days, or you could use the Forward Pass/Backward Pass Technique

    utlined in the next section.

    How to Use the Forward Pass/Backward Pass Technique

    The Forward Pass/Backward Pass technique is another way to find the critical path. It is best used when you have multiple branches, or multiple entry points, for an

    ctivity.

    You may also need to use the Forward Pass/Backward Pass technique if you are asked to identify the earliest start or finish times, or latest start or finish times, for

    n activity. Or, to find the slack (or float) for each activity.

    Before you start using the Forward Pass/Backward Pass technique, here are some terms that you first need to understand:

    arliest start time (ES): The earliest time an activity can start once the previous dependent activities are completed.

    arliest finish time (EF): The earliest start time for the activity plus the time required to complete the activity (the earliest an activity can be completed).

    atest finish time (LF): The latest time an activity can be completed without delaying the entire project.

    atest start time (LS): The latest finish time minus the time required to complete the activity.

    As you run the Forward Pass/Backward Pass technique through your network diagram, arrange each value according to the follow legend (SL stands for slack,

    which well cover in the next section).

  • 7/25/2019 The Ultimate Guide to the Critical Path Method (CPM)

    14/17

    How to Do the Forward Pass: Finding the Earliest Start Time and Finish Time

    There are two formulas in the Forward Pass/Backward Pass technique. The first is the Forward Pass formula for you to use as you move from beginning to end in

    our network diagram (from your first activity to your last). This formula will find the earliest start time (ES) and the earliest finish time (EF) for each activity.

    To start the Forward Pass, make the ES of the first task zero. For all other tasks, the ES is the same as its immediate predecessors EF.

    Use this formula to calculate EF:

    F = ES + Duration

    So, for Design Tank Project, the ES is zero and, the EF is 10 (10+ duration of 0). We also know that the ES for Select Tank Supplier is 10 and the EF is 18 (10 +

    uration of 8). Continue like this throughout the network diagram.

    How to Do the Backward Pass: Finding the Latest Start Time and Finish Time

    The second formula is for Backward Pass, when you are moving from the last activity to the first activity (you are moving backwards). This formula will find the

    atest start time (LS) and latest finish time (LF) for each activity.

    To start the Backward Pass, make the last activities LF the same as its EF. For all other tasks, the LF is the same as its immediate predecessors LS.

    Use this formula to calculate LS:

    S = LF - Duration

    or the Test & Commission Tank, the LF is 54 and, the LS is 50 (54 - duration of 4). For Assemble Tank, the LF is also 50 and, the LS is 35 (50 - duration of 15 days).

    Continue this formula throughout the network diagram.

    To check that youve done Backward Pass correctly, the first activity (Activity A) should have an LS (latest start time) of 0.

    Heres the completed Forward Pass/Backward Pass technique:

    Two Rules to Remember for Forward Pass/Backward Pass

    During the Forward Pass, if you find activities that join (multiple activities that flow into one activity), you must run the Forward Pass formula for each entry point and

    se the highest value from the formulas.

    During the Backward Pass, if you have activities that join, you must run the formula for each entry point and use the lowest value.

    How to Calculate Float or Slack on the PMP Exam

    Now that you have calculated ES and LS for each activity, you can find the float (or slack).

    The slack time, also known as float time, for an activity is the time between the earliest and latest start time. Critical activities, activities on the critical path, will

    lways have zero slack.

    There are two formulas to calculate slack based on the values you identified in the Forward Pass/Backward Pass technique.

    Slack = LF - EF

    Slack = LS - ES

    You will have to use this process if you are asked to identify an activitys slack on the PMP exam. Or, if youre not sure which activities are on the critical path, you

    ould find the slack of each activity, knowing that activities on the critical path always have zero slack.

  • 7/25/2019 The Ultimate Guide to the Critical Path Method (CPM)

    15/17

    The final figure below shows the slack values for each task. You can see that the four tasks on the critical path have zero slack -- Design Tank Project, Construct

    Tank Foundation, Assemble Tank, and Test & Commission Tank.

    Key Critical Path Terms for the PMP Exam

    Here are the most important terms related to the critical path method that you should understand before taking the PMP exam.

    Critical path method (CPM):The critical path method is a step-by-step project management technique for process planning that identifies critical and noncritical

    asks, preventing timeframe problems and process bottlenecks.

    Critical Path DRAG (Devauxs Removed Activity Gauge):The amount of time that an activity on the critical path is adding to the projects duration. Or,

    lternatively, the amount of time the project completion date would be reduced by decreasing a critical path activitys duration to zero.

    Criticality Index:Used in risk analysis, the Criticality Index shows how often a particular task was on the critical path during analysis. Tasks with a high Criticality

    ndex are more likely to cause delay to the project since theyre more likely to be on the critical path.

    Earliest start time:The earliest time an activity can start once the previous dependent activities are completed.

    Earliest finish time:The earliest start time for the activity plus the time required to complete the activity.

    atest finish time:The latest time an activity can be completed without delaying the entire project.

    atest start time:The latest finish time minus the time required to complete the activity.

    Total float:The amount of time an activity can be delayed from its early start date without delaying the entire project.

    Free float:The amount of time an activity can be delayed without delaying the early start date of a successor activity.

    Forward pass:The process to determine the early start or early finish times for activities in the critical path method.

    Backward pass:The process to determine the late start or late finish times for activities in the critical path method.

    Network diagram:A schematic display of the relationships between project activities, always drawn from left to right to reflect the order of the project.

    Network analysis:The process of breaking down a complex project into components (activities, durations, etc) and plotting them to show their interdependencies

    nd interrelationships.

    The Easiest Way to Find the Critical Path

    The critical path method is one of the most frequently used and most effective techniques in project planning. When youre managing dozens of tasks,

    ependencies, and people, the critical path method helps you keep your project on track and on budget, providing visibility into the most important tasks of your

    roject.

  • 7/25/2019 The Ultimate Guide to the Critical Path Method (CPM)

    16/17

    The good news is that finding the critical path in your project continues to get easier and easier. Traditionally drawn by hand, you can now find the critical path in

    econds with project management software.

    When it comes to the right tools, Smartsheet is the easiest, fastest way to identify critical path. Smartsheet is a cloud-based work collaboration tool that is powerful

    nough for project managers, yet easy enough for anyone to use. Built with a familiar, spreadsheet-inspired layout, Smartsheet enables you to coordinate

    nything: creating project plans, sharing content, providing visibility, and of course, finding the critical path.

    xperience firsthand how easy it is to use Smartsheet in your project planning and sign up for a free 30-day trial (https://www.smartsheet.com/try-it?trp=8514).

    There is no obligation and trial users have access to a number of templates, training, and support resources to get started in minutes.

    f you liked this article, visit our Resources page (http://www.smartsheet.com/resources) for more tips and best practices in project management.

    Comments

    Risk and Change (https://www.smartsheet.com/comment/37756#comment-37756)

    Submitted by Dave Schnell (not verified) (https://www.smartsheet.com/blog/author/dave-schnell) on Mon, 08/31/2015 - 09:12

    Permalink (https://www.smartsheet.com/comment/37756#comment-37756)

    rom a "battle-scarred veteran," CPM is a great tool, I've used it on almost all of my projects. However, some additional considerations for the novice-on any large

    nd/or complex, especially long duration projects, the CP will change, sometimes weekly. The CPM is only as good as the estimates of the task resources and

    ffort, so it's critical to continuously reevaluate the CP and task estimates and not just chase the initial critical path. Especially on technology projects, where

    ercent complete is often a matter of speculation. Also, consider task risk. Some high risk tasks may not show up on the CP until the risk is realized, so be sure to

    ag these high risk tasks and watch them as well. Finally, I've also encountered some PMs who thought, if a task wasn't on the CP, it didn't need to be completed

    go figure)...if you're thinking this, then ask why are you doing the task at all?

    reply (https://www.smartsheet.com/comment/reply/3717/37756)

    RE: Risk and Change (https://www.smartsheet.com/comment/37758#comment-37758)

    Submitted by Emily Esposito (https://www.smartsheet.com/blog/author/emily-esposito) on Mon, 08/31/2015 - 13:48

    Permalink (https://www.smartsheet.com/comment/37758#comment-37758)

    Hi Dave -- Great points! Those are important things to remember when developing the critical path. Thanks for reading. -Emily

    reply (https://www.smartsheet.com/comment/reply/3717/37758)

    Critical Path Conventions (https://www.smartsheet.com/comment/38399#comment-38399)

    Submitted by Dr. Paul D. Gia... (not verified) (https://www.smartsheet.com/blog/author/dr.-paul-d.-giammalvo) on Wed, 12/02/2015 - 04:39

    Permalink (https://www.smartsheet.com/comment/38399#comment-38399)Question Dave...... Why do we continue to contravene standard mathematical convention by putting the Early dates (the subtrahend) on the TOP and the Late

    ates (Minuend) on the bottom? I've done some research and it appears that the only reason John Fondahl did it this way is because it was how the US Navy did it

    o schedule their ships. Other than that, there is no logical or rational reason so why should we continue to perpetuate a practice that totally contravenes

    mathematical convention?

    reply (https://www.smartsheet.com/comment/reply/3717/38399)

    CPM (https://www.smartsheet.com/comment/38437#comment-38437)

    Submitted by Bahara Muradi (not verified) (https://www.smartsheet.com/blog/author/bahara-muradi) on Wed, 12/09/2015 - 16:41

    Permalink (https://www.smartsheet.com/comment/38437#comment-38437)

    was really useful video and explained in a great way thank you very much.

    reply (https://www.smartsheet.com/comment/reply/3717/38437)

    Add new comment

    https://www.smartsheet.com/comment/reply/3717/38437https://www.smartsheet.com/comment/38437#comment-38437https://www.smartsheet.com/blog/author/bahara-muradihttps://www.smartsheet.com/comment/38437#comment-38437https://www.smartsheet.com/comment/reply/3717/38399https://www.smartsheet.com/comment/38399#comment-38399https://www.smartsheet.com/blog/author/dr.-paul-d.-giammalvohttps://www.smartsheet.com/comment/38399#comment-38399https://www.smartsheet.com/comment/reply/3717/37758https://www.smartsheet.com/comment/37758#comment-37758https://www.smartsheet.com/blog/author/emily-espositohttps://www.smartsheet.com/comment/37758#comment-37758https://www.smartsheet.com/comment/reply/3717/37756https://www.smartsheet.com/comment/37756#comment-37756https://www.smartsheet.com/blog/author/dave-schnellhttps://www.smartsheet.com/comment/37756#comment-37756http://www.smartsheet.com/resourceshttps://www.smartsheet.com/try-it?trp=8514
  • 7/25/2019 The Ultimate Guide to the Critical Path Method (CPM)

    17/17

    Save

    Contact Us (https://www.smartsheet.com/contact)

    or call +1 (844) 324-2360 (tel:18443242360)

    (http://www.facebook.com/smartsheet)

    (http://twitter.com/smartsheet)

    (https://plus.google.com/+smartsheet/posts)

    (https://www.linkedin.com/company/smartsheet-com)

    (http://www.youtube.com/user

    Follow Us

    Download our Mobile App

    Language: English

    (//privacy.truste.com/privacy-seal/Smartsheet,-Inc-/validation?rid=fc25c0bf-a7a4-425b-a6c0-77cb0b376cf2)2016. All Rights Reserved Smartsheet.com

    https://privacy.truste.com/privacy-seal/Smartsheet,-Inc-/validation?rid=fc25c0bf-a7a4-425b-a6c0-77cb0b376cf2https://play.google.com/store/apps/details?id=com.smartsheet.android&hl=enhttps://itunes.apple.com/app/smartsheet/id568421135http://www.youtube.com/user/SmartSheethttps://www.linkedin.com/company/smartsheet-comhttps://plus.google.com/+smartsheet/postshttp://twitter.com/smartsheethttp://www.facebook.com/smartsheethttps://www.smartsheet.com/contact