1
LAND USE 50’ LOTS 55’ LOTS 60’ LOTS GREENBELT AND OPEN SPACE 70’-80’ LOTS NATURAL TRAILS CONCRETE TRAILS Acres: 858.70 Lots: 2,077 OLD STAGECOACH OLD STAGECOACH CYPRESS ROAD F .M. 150 1 2 3 4 5a 5b 6 7 9 10 11 17 16 12 14 13 15 18 19 20 21 8a 8b SCHOOL SITE AMENITY SITE AMENITY SITE GARDEN HOMES GARDEN HOMES POND POND POND POND POND POND POND POND POND POND LIFT STATION POND POND POND POND POND POND POND POND POND MAY 5, 20 20 This illustration is for planning purposes only and subject to change without notice PHARIS DESIGN PLANNING LANDSCAPE ARCHITECTURE 700 0 0 350 90 33 65 62 29 27 2,073 94 89 A B 55 31

This illustration is for planning purposes only and ... · 5/5/2020  · SITE AMENITY SITE GARDEN HOMES GARDEN HOMES POND POND POND POND POND POND POND POND POND POND LIFT STATION

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: This illustration is for planning purposes only and ... · 5/5/2020  · SITE AMENITY SITE GARDEN HOMES GARDEN HOMES POND POND POND POND POND POND POND POND POND POND LIFT STATION

LAND USE

50’ LOTS

55’ LOTS

60’ LOTS

GREENBELT AND OPEN SPACE

70’-80’ LOTS

NATURAL TRAILS

CONCRETE TRAILS

Acres: 858.70

Lots: 2,077

OLD

ST

AG

EC

OA

CH

OLD

STA

GECO

ACH

CYPRESS ROAD

F.M. 150

1

2

3

4

5a

5b

6

7

9

10

11

17

16

12

14

13

15

18

19

20

21

8a

8b

SCHOOLSITE

AMENITYSITE

AMENITYSITE

GARDEN HOMES

GARDEN HOMES

POND

POND

POND

POND

POND

PONDPOND

PONDPOND

POND

LIFT STATION

POND

POND

POND

POND

POND

POND

POND

POND

POND

MAY 5, 2020

This illustration is for planning purposes only and subject to change without notice

PHARIS DESIGNPLANNING LANDSCAPE ARCHITECTURE

70000 350

90

33

6562

2927

2,073

9489

AB

55

31