PROBLEMS ON TIME AND WORK Q. 1. A completes a work in 12 days and B complete the same work in 24 days. If both of them work together, then the number of days required to complete the work will be (a) 8 (b) 6 (c) 7 (d) 5 (e) None of these Ans: (a) 8 Explanation: If A can complete a work in x days and B can complete the same work in y days, then, both of them together can complete the work in x y/ x+ y days. Therefore, here, the required number of days = 12 × 24/ 36 = 8 days. Ans. Q. 2. If 4 men can colour 48 m long cloth in 2 days, then 6 men can colour 36 m long cloth in (a) 1 day (b) 1 ½ days (c) ¾ day (d) ½ day (e) None of these Ans: (a) 1 day Explanation: The length of cloth painted by one man in one day = 48 / 4 × 2 = 6 m No. of days required to paint 36 m cloth by 6 men = 36/ 6 × 6 = 1 day. Ans. Q. 3. If 3 persons can do 3 times of a particular work in 3 days, then, 7 persons can do 7 times of that work in (a) 7 days (b) 6 days (c) 4 days (d) 3 days (e) None of these Ans: (d) 3 days. Explanation: That is, 1 person can do one time of the work in 3 days. Therefore, 7 persons can do 7 times work in the same 3 days itself. Ans. Gr8AmbitionZ.com

Time and Work Practice Problems

  • Upload
    akvyas

  • View
    32

  • Download
    4

Embed Size (px)

DESCRIPTION

Very Easy method to solve "time and work " problems

Citation preview

  • PROBLEMS ON TIME AND WORK

    Q. 1. A completes a work in 12 days and B complete the same work in 24 days. If both of them

    work together, then the number of days required to complete the work will be

    (a) 8 (b) 6 (c) 7 (d) 5 (e) None of these

    Ans: (a) 8

    Explanation:

    If A can complete a work in x days and B can complete the same work in y days, then, both

    of them together can complete the work in x y/ x+ y days.

    Therefore, here, the required number of days = 12 24/ 36 = 8 days. Ans.

    Q. 2. If 4 men can colour 48 m long cloth in 2 days, then 6 men can colour 36 m long cloth in

    (a) 1 day (b) 1 days (c) day (d) day (e) None of these

    Ans: (a) 1 day

    Explanation:

    The length of cloth painted by one man in one day = 48 / 4 2 = 6 m

    No. of days required to paint 36 m cloth by 6 men = 36/ 6 6 = 1 day. Ans.

    Q. 3. If 3 persons can do 3 times of a particular work in 3 days, then, 7 persons can do 7 times of

    that work in

    (a) 7 days (b) 6 days (c) 4 days (d) 3 days (e) None of these

    Ans: (d) 3 days.

    Explanation:

    That is, 1 person can do one time of the work in 3 days.

    Therefore, 7 persons can do 7 times work in the same 3 days itself. Ans. Gr8Amb

    itionZ.com

  • Q. 4. Mangala completes a piece of work in 10 days, Raju completes the same work in 40 days.

    If both of them work together, then the number of days required to complete the work is

    (a) 15 (b) 10 (c) 9 (d) 8 (e) None of these

    Ans: ( d) 8

    Explanation:

    If A can complete a work in x days and B can complete the same work in y days, then, both

    of them together can complete the work in x y/ x+ y days.

    That is, the required No. of days = 10 40/50 = 8 days. Ans.

    Q. 5. 12 men work 8 hours per day to complete the work in 10 days. To complete the same work

    in 8 days, working 15 hours a day, the number of men required

    (a) 4 (b) 5 (c) 6 (d) 8 (e) None of these

    Ans: (d) 8

    Explanation:

    That is, 1 work done = 12 8 10

    Then, 12 8 10 = ? 15 8

    ? (i.e. No. of men required) = 12 8 10/15 10 = 8 days. Ans.

    Q. 6. If 5 people undertook a piece of construction work and finished half the job in 15 days. If

    two people drop out, then the job will be completed in

    (a) 25 days (b) 20 days (c) 15 days (d) 10 days (e) None of these

    Ans: (a) 25 days

    Explanation:

    That is, half the work done = 5 15

    Then, 5 15 = 3 ? 1/2 Gr8Amb

    itionZ.com

  • i.e. 5 15 = 3 ?

    therefore, ? (No. days required) = 5 15/3 = 25 days. Ans.

    Q. 7. 30 labourers working 7 hours a day can finish a piece of work in 18 days. If the labourers

    work 6 hours a day, then the number of labourers required to finish the same piece of work in 30

    days will be

    (a) 15 (b) 21 (c) 25 (d) 22 (e) None of these

    Ans: (b) 21

    Explanation:

    That is, 1 work done = 30 7 18 = ? 6 30

    ? (No. of labourers) = 30 7 18/6 30

    = 21. Ans.

    Q. 8. If 5 girls can embroider a dress in 9 days, then the number of days taken by 3 girls will be

    (a) 20 days (b) 10 days (c) 14 days (d) 15 days (e) None of days

    Ans: (d) 15 days

    Explanation:

    That is, 5 9 = 3 ?

    ? = 5 9/3 = 15 days. Ans.

    Q. 9. A and B together can plough a field in 10 hours but by himself A requires 15 hours. How

    long would B take to plough the same field?

    (a) 10 hours (b) 20 hours (c) 30 hours (d) 40 hours (e) None of these

    Ans: (c) 30 hours

    Explanation:

    Gr8Amb

    itionZ.com

  • If A and B together can do a piece of work in x days and A alone can do the same work in y

    days, then B alone can do the same work in x y/ y x days.

    Therefore, the No. of hours required by B = 10 15/ 15 10 = 150/5 = 30 hours. Ans.

    Q. 10. 16 men or 20 women can finish a work in 25 days. How many days 28 men and 15

    women will take to finish this job?

    (a) 19 13/43 days (b) 11 27/43 days (c) 8 days (d) 10 days (e) None of these

    Ans: (d) 10 days

    Explanation:

    16 men = 20 women

    Therefore, 1 women = 16/20 men = 4/5 men

    15 women = 4/5 15 men = 12 men

    i.e. 28 men + 15 women = 28 men + 12 men = 40men

    1 work done by men = 16 25

    16 25 = 40 ?

    ? ( no. of days) = 16 25/40 = 10 days. Ans.

    Q. 11. A can do a piece of work in 5 days and B can do the same work in 10 days. How many

    days will both take to complete the work?

    (a) 5 days (b) 3 1/3 days (c) 3 days (d) 6 days (e) None of these

    Ans: (b) 3 1/3 days

    Explanation:

    If A can complete a work in x days and B can complete the same work in y days, then, both

    of them together can complete the work in x y/ x+ y days.

    That is, the required No. of days = 5 10/15 = 3 1/3 days. Ans. Gr8Amb

    itionZ.com

  • Q. 12. If 12 men can do a piece of work in 24 days, then in how many days can 18 men do the

    same work?

    (a) 36 (b) 20 (c) 18 (d) 16 (e) None of these

    Ans: (d) 16

    Explanation:

    1 work done = 12 24

    Then, 12 24 = 18 ? days

    ? days = 12 24/18 = 16. Ans.

    Q. 13. A group of workers accepted to do a piece of work in 25 days. If 6 of them did not turn

    for the work and the remaining workers did the work in 40 days, then the original number of

    workers was

    (a) 22 (b) 20 (c) 18 (d) 16 (e) None of these

    Ans: (d) 16

    Explanation:

    Let the original number of workers be x

    Then, x 25 = (x 6) 40

    25x = 40x -240

    240 = 40x -25x = 15x

    x = 240/15 = 16. Ans.

    Q. 14. If 8 men or 12 women can do a piece of work in 10 days, then the number of days

    required by 4 men and 4 women to finish the work is

    (a) 8 (b) 10 (c) 12 (d) 4 (e) None of these

    Ans: (c) 12 Gr8Amb

    itionZ.com

  • Explanation:

    8 men = 12 women

    1 woman = 8/12 men = 2/3 men

    4 women = 2/3 4 men = 8/3 men

    4 men + 4 women = 4 + 8/3 men = 20/3 men

    1 work done = 8 10

    8 10 = 20/3 ?days

    ?days = 8 10 3/20 = 12 days. Ans.

    Q. 15. If 8 men can dig a well in 18 days, then the number of days, 12 men will take to dig the

    same well will be

    (a) 12 days (b) 10 days (c) 8 days (d) 16 days (e) None of these

    Ans: (a) 12 days

    Explanation:

    Work done = 8 18

    Then, 8 18 = 12 ? days

    ? days = 8 18/12 = 12 days. Ans.

    Q. 16. 39 men can repair a road in 12 days working 5 hours a day. In how many days will 30

    men working 6 hours peer day complete the work?

    (a) 10 (b) 13 (c) 14 (d) 15 (e) None of these

    Ans: (b) 13

    Explanation:

    1 work done = 39 12 5

    39 12 5 = 30 6 ?days Gr8Amb

    itionZ.com

  • ? days = 39 12 5/ 30 6 = 13 days. Ans.

    Q. 17. A certain number of men can do a work in 40days. If there were 8 men more, it could be

    finished in 10 days less. How many men were there initially?

    (a) 30 (b) 24 (c) 16 (d) 20 (e) None of these

    Ans: (b) 24

    Explanation:

    Let x be the initial number of men

    Then, 1 work done = x 40

    Then, x 40 = (x + 8 ) (40 10)

    40x = 30x + 240

    10x = 240

    Therefore, x = 240/10 = 24 men. Ans.

    Q. 18. If 4 men or 6 boys can finish a work in 20 days. How long will 6 men and 11 boys take to

    finish the same work?

    (a) 10 days (b) 6 days (c) 4 days (d) 3 days (e) None of these

    Ans: (b) 6 days

    Explanation:

    4 men = 6 boys

    Then, 1 boy = 4/6 men = 2/3 men

    11 boys = 2/3 11 men = 22/3 men

    Then, 6 men + 11 boys = 6 + 22/3 men = 40/3 men

    1 work done = 4 men 20days

    That is, 4 20 = 40/3 ? days Gr8Amb

    itionZ.com

  • ? days = 4 20 3/40 = 6 days. Ans.

    Q. 19. A works twice as fast as B. if B can complete a work in 12 days independently. The

    number of days in which A and B can together finish the work?

    (a) 18 days (b) 8 days (c) 6 days (d) 4 days (e) None of these

    Ans: (d) 4 days

    Explanation:

    If B takes 12 days to finish the work, then A takes 6 days to finish the same work.

    If A can complete a work in x days and B can complete the same work in y days, then, both

    of them together can complete the work in x y/ x+ y days.

    Therefore, the Number of days taken by A and B together to finish the same work = 6 12/18

    = 4 days. Ans.

    Q. 20. A and B can do a piece of work in 4 days. If A can do it alone in 12 days, B will finish the

    work in

    (a) 4 days (b) 6 days (c) 8 days (d) 10 days (e) None of these

    Ans: (b) 6 days

    Explanation:

    If A and B together can do a piece of work in x days and A alone can do the same work in y

    days, then B alone can do the same work in x y/ y x days.

    Therefore, the number of days B will take to finish the work = 4 12/ 12 4

    = 48/8 = 6 days. Ans.

    Q. 21. 5 men can do a piece of work in 6 days while 10 women can do it in 5 days. In how many

    days can 5 women and 3 men do it?

    (a) 4 (b) 5 (c) 6 (d) 8 (e) None of these Gr8Amb

    itionZ.com

  • Ans: (b) 5

    Explanation:

    5men 6 = 10 women 5

    30 men = 50 women

    1 woman = 30/50 men = 3/5 men

    5 women = 3/5 5 men = 3 men

    5 women + 3 men = 3 + 3 = 6 men

    That is, 1 work done = 5 6

    5 6 = 6 ?days

    ? days = 5 6/6 = 5 days. Ans.

    Q. 22. A work could be completed in 100 days. However, due to the absence of 10 workers, it

    was completed in 110 days then, the original number of workers was

    (a) 100 (b) 110 (c) 55 (d) 50 (e) None of these

    Ans: (b) 110

    Explanation:

    Let x be the original number of workers

    Then, x 100 = ( x 10) 110

    100 x = 110x 1100

    1100 = 10 x

    x = 110. Ans.

    Q. 23. A particular job can be completed by a team of 10 men in 12 days. The same job can be

    completed by a team of 10 women in 6 days. How many days are needed to completed the job if

    the two teams work together? Gr8Amb

    itionZ.com

  • (a) 4 (b) 6 (c) 9 (d) 18 (e) None of these

    Ans: (a) 4

    Explanation:

    Consider mens work days as one group and womens working days as other group

    Then, the required No. of days = 12 6/18 = 4 days. Ans.

    Q. 24. A can do a piece of work in 12 days, while B can do it in 8 days with the help of C, they

    finish the work in 4 days. Then C alone can do the work in

    (a) 24 days (b) 20 days (c) 16 days (d) 4 days (e) None of these

    Ans: (a) 24 days

    Explanation:

    A and B together can do the work in 12 8/20 = 96/20 days

    A +B and C together do the work in 4 days.

    Then C alone can do the work in 96/20 4/96/20 4 days

    = 96/5/16/20 = 96/5 20/16 = 24 days. Ans.

    Q. 25. A job can be completed by 12 men in 12 days. How many extra days will be needed to

    complete the job if 6 men leave after working for 6 days?

    (a) 3 (b) 12 (c) 6 (d) 24 (e) None of these

    Ans: (c) 6

    Explanation:

    Half the work is done by 12 men in 6 days.

    Remaining half should be done by 6 men in ? days

    Then, 12 6 = 6 ?days

    36 = 3 ?days Gr8Amb

    itionZ.com

  • ? days = 36/3 =12 days

    Extra days required = 12 -6 = 6 days. Ans.

    Q. 26. Worker A takes 8 hours to do a job. Worker B takes 10 hours to do the same job. How

    long should it take, worker A and worker B, working together but independently, do the same

    job?

    (a) 4 1/9 hours (b) 4 2/9 hours (c) 4 4/9 hours (d) 4 5/9 hours (e) None of these

    Ans: (c) 4 4/9 hours

    Explanation:

    If A can complete a work in x days and B can complete the same work in y days, then, both

    of them together can complete the work in x y/ x+ y days.

    Then 8 10/18 = 4 4/9 hours. Ans.

    Q. 27. Three workers working all days can do a work in 10 days. But one of them having other

    employment can work only half time. In how many days the work can be finished?

    (a) 15 days (b) 16 days (c) 12 days (d) 12.5 days (e) None of these

    Ans: (c) 12 days.

    Explanation:

    Sum of each persons one days work = 1/3 10 + 1/3 10 + 1/3 20 = 1/30 + 1/30 + 1/60

    = 5/60 = 1/12

    Therefore, the work can be finished in 12 days. Ans.

    Q. 28. Sam, Bob and Kim can do a job alone in 15 days, 10 days and 30 days respectively. Sam

    is helped by Bob and Kim every third day. In how many days will the job be completed?

    (a) 9 days (b) 8 1/3 days (c) 8 days (d) 6 1/3 days (e) None of these

    Ans: (a) 9 days Gr8Amb

    itionZ.com

  • Explanation:

    The work done by the three persons in 3 days ( because Sam works only on every third day)

    = 3/15 + 1/10 + 1/30 = 6 + 3 + 1/30 = 10/30

    = 1/3 of the work

    Therefore, the job will be completed in 3 3 = 9 days. Ans.

    Q. 29. Prakash alone can complete a job in 12 hours, Jayant alone can complete the same job in 6

    hours. How many hours will they take together to complete the job?

    (a) 4 (b) 6 (c) 2 (d) 8 (e) None of these

    Ans: (a) 4

    Explanation:

    If A can complete a work in x days and B can complete the same work in y days, then, both

    of them together can complete the work in x y/ x+ y days.

    Here, the No. of hours required to complete the work , working together = 12 6/18

    = 4 hours. Ans.

    Q. 30. 56 men completes a work in 12 days. How many men will be required to complete the

    work in 16 days?

    (a) 38 (b) 24 (c) 42 (d) 48 (e) None of these

    Ans: (c) 42

    Explanation:

    1 work done = 56 men 12 days

    Then, 56 12 = ? men 16

    ? men = 56 12/16 = 42 men. Ans.

    Gr8Amb

    itionZ.com

  • Q. 31. Six men or tern boys can do a piece of work in fifteen days. How long would it take for

    12 men and 5 boys to do the same piece of work?

    (a) 6 days (b) 28 days (c) 25 days (d) 7 days (e) None of these

    Ans: (a) 6 days

    Explanation:

    6 men = 10 boys

    Then, 1 boy = 6/10 men = 3/5 men

    Then, 5 boys = 3/5 5 = 3 men

    12 men + 5 boys = 15 men

    1 work done = 6 men 15 days

    Therefore, 6 15 = 15 ? days

    ? days = 6 15/15 = 6 days. Ans.

    Q. 32. If 4 workers can make 42 toys in 6 days, how many toys can 12 workers make in 3 days?

    (a) 63 (b) 28 (c) 252 (d) 7 (e) None of these

    Ans: (a) 63

    Explanation:

    4 workers in 3 days make 21 toys,

    Then, 1 worker can make 21/4 toys in 3 days

    Therefore, No. of toys made by 12 workers in 3 days = 21/4 12 = 63 toys. Ans.

    Q. 33. 10 men can complete a piece of work in 15 days and 15 women can complete the same

    work in 12 days. If all the 10 men and 15 women work together, in how many days will work get

    completed?

    (a) 6 (b) 7 2/3 (c) 6 2/3 (d) 6 1/3 (e) None of these Gr8Amb

    itionZ.com

  • Ans: (c) 6 2/3

    Explanation:

    If A can complete a work in x days and B can complete the same work in y days, then, both

    of them together can complete the work in x y/ x+ y days.

    Here, mens working days can be taken as A and that of women as B

    Then, 15 12/27 = 6 2/3 days.Ans.

    Q. 34. Three men, four women and six children can complete a work in 7 days . A woman does

    double the work a man does and a child does half the work a man does. How many women can

    complete this work in 7 days?

    (a) 8 (b) 7 (c) 12 (d) 10 (e) None of these

    Ans: ( b) 7

    Explanation:

    3 men = 3/2 women

    1 child = 1/2/2 = woman

    Then, 6 children = 6 = 6/4 = 3/2 women

    Then, 3/2 women + 4 women + 3/2 women = 7 women

    7 women does the work in 7 days.

    Therefore, the No. of women required to finish the work in 7days = 7. Ans

    Q. 35. A sum of money is sufficient to pay Ps wages for 25 days or Qs wages for 30 days. The

    money is sufficient to pay the wages of both for

    (a) 13 5/11 days (b) 13 days (c) 13 6/11 days (d) 13 7/11 days (e) None of these

    Ans: (d) 13 7/11

    Explanation: Gr8Amb

    itionZ.com

  • If A can complete a work in x days and B can complete the same work in y days, then, both

    of them together can complete the work in x y/ x+ y days.

    Here, wages can be taken as days,

    Then, 25 30/ 55 = 13 7/11 days. Ans.

    Q. 36. A certain number of men complete a piece of work in 50 days. If there were 8 men more

    the work could be finished in 10 days less. How many men were originally there?

    (a) 40 (b) 50 (c) 32 (d) 25 (e) None of these

    Ans: (c) 32

    Explanation:

    Let the original No. of men = x

    Then, I work done = 50x

    Then, 50x = (x + 8) 40

    50x = 40x + 320

    10 x = 320

    x = 320/10 = 32 men. Ans.

    Q. 37. A and B together finish a work in 30 days they worked for it for 20 days and then B left.

    The remaining work was done by A alone in 20 more days. B alone can finish the work in

    (a) 48 days (b) 50 days (c) 54 days (d) 60 days (e) none of these

    Ans: ( d) 60 days

    Explanation:

    (A + B)s 1 days work = 1/30

    A+B s 20 days work = 1/30 20 = 2/3

    Remaining work = 1 -2/3 = 1/3 Gr8Amb

    itionZ.com

  • 1/3 of the work is done by A in 20 days

    Therefore, A can complete the full work in 3 20 = 60 days

    So, As 1 days work = 1/60

    Then, Bs 1 day work = 1/30 1/60 = 1/60

    Therefore, B can complete the work in 60 days. Ans.

    Q. 38. A can complete a job in 9 days, B in 10 days and C in 15 days. B and C start the work

    together and are forced to leave after 2 days. The time taken to complete the remaining work is

    (a) 13 days (b) 10 days (c) 9 days (d) 6 days (e) None of these

    Ans: (d) 6 days

    Explanation:

    As 1 day work = 1/9

    Bs 1 day work = 1/10

    Cs 1 day work = 1/15

    B + C s 1 day work = 1/10 + 1/15 = 1/6

    B + Cs 2 days work = 1/6 2 = 1/3

    The work remaining = 1 1/3 = 2/3

    A can do the full work in 9 days.

    So, the remaining 2/3 of the work is done by A in 2/3 9 days = 6 days. Ans.

    Q. 39. If 40 men working 9 hours a day can finish a work in 21 days, in how many days will 27

    men working 10 hours a day do the same work?

    (a) 20 days (b) 28 days (c) 29 days (d) 25 days (e) None of these

    Ans: (b) 28 days

    Explanation: Gr8Amb

    itionZ.com

  • That is, 1 work done = 40 9 21

    Then, 40 9 21 = 27 10 ? days

    Therefore, ? days = 40 9 21 /27 10 = 28 days. Ans.

    Q. 40. 8 children and 12 men complete a certain piece of work in 9 days. Each child takes twice

    the time taken by a man to finish the work. In how many days will 12 men finish the same work?

    (a) 8 (b) 15 (c) 9 (d) 12 (e) None o f these

    Ans: (d) 12

    Explanation:

    8 children = 4men

    Then, 4 + 12 = 16 men completes the job in 9 days

    Then, 16 9 = 12 ? days

    ? days = 16 9/12 = 12 days. Ans.

    Q. 41. Rajesh and Ajay can complete a job in 16 days. Rajesh alone can do it in 24 days. How

    long will Ajay alone take to finish the whole work?

    (a) 20 days (b) 48 days (c) 30 days (d) 36 days (e) 28 days

    Ans: (b) 48 days

    Explanation:

    If A and B together can do a piece of work in x days and A alone can do the same work in y

    days, then B alone can do the same work in x y/ y x days.

    Then, Ajay alone can finish the whole work in, 16 24/24 16 = 16 24/8 = 48 days.Ans.

    Q. 42. Ram, Shyam and Mohan can do a piece of work in 12, 15 and 20 days respectively. How

    long will they take to finish it together?

    (a) 10 days (b) 12 days (c) 14 days (d) 8 days (e) 5 days Gr8Amb

    itionZ.com

  • Ans: (e) 5 days

    Explanation:

    When A, B and C can do a work in x, y and z days respectively. Then, the three of them

    together can finish the work in xyz/ x y + y z + x z days

    Therefore, the No. of days taken by them together to finish the whole work

    = 12 15 20/12 15 + 15 20 + 12 20

    = 12 15 20/720 = 5 days. Ans.

    Q. 43. Tapas works twice as much as Mihir. If both of them finish the work in 12 days, Tapas

    alone can do it in:

    (a) 20 days (b) 24 days (c) 18 days (d) 20 days (e) None of these

    Ans: (c)18 days

    Explanation:

    Mihir = 2 Tapas (Consider, Tapas as T and Mihir as M)

    So, T 2 T/ T + 2T = 12

    2 T T/3 T = 12

    2 T = 3 12 = 36

    T = 36/2 = 18 days i.e. No. of days taken by Tapas alone = 18 days. Ans.

    Q. 44. Xavier can do a job in 40 days. He worked on it for 5 days and then Paes finished it in 21

    days. In how many days Xavier and Paes can finish the work?

    (a) 10 (b) 15 (c) 20 (d) 840/61 (e) 12

    Ans: (b) 15

    Explanation:

    Xaviers one days work = 1/40 Gr8Amb

    itionZ.com

  • His 5 days work = 1/40 5 = 1/8

    The work remaining = 1 1/8 = 7/8

    7/8 of the work is done by Paes in 21 days

    Then, his 1 days work = 7/8/21 = 7/21 8 = 1/24

    Therefore, the time taken by Paes to finish the whole work = 24 days.

    Then. The No. of days two of them together take to finish the work = 40 24/40 + 24

    = 40 24/64 = 15 days. Ans.

    Q. 45. A can finish a work in 18 days and B can do the same work in half the time taken by A.

    Then, working together, what part of the same work they can finish in a day?

    (a) 1/6 (b) 1/9 (c) 2/5 (d) 2/7 (e) None of these

    Ans: (a) 1/6

    Explanation:

    B alone can do the same work in 9 days

    So, the No. of days both of them together take to do the work = 18 9/ 18 + 9

    =18 9/27 = 6 days.

    The part of the work, they together finish in one day = 1/6. Ans.

    Q. 46. A, B and C can complete a piece of work in 24, 6 and 12 days respectively. Working

    together, they will complete the same work in:

    (a) 1/24 day (b) 7/24 day (c) 3 3/7 days (d) 4 days (e) None of these

    Ans: (c) 3 3/7 days

    Explanation:

    When A, B and C can do a work in x, y and z days respectively. Then, the three of them

    together can finish the work in xyz/ x y + y z + x z days Gr8Amb

    itionZ.com

  • Therefore, the No. of days taken by them together = 24 6 12/24 6 + 6 12 + 24 12

    = 24 6 12/ 504 = 3 3/7 days. Ans.

    Q. 47. A man can do a piece of work in 5 days, but with the help of his son, he can do it in 3

    days. In what time can the son do it alone?

    (a) 6 days (b) 7 days (c) 7 days (d) 8 days (e) None of these

    Ans: (c) 7 days

    Explanation:

    If A and B together can do a piece of work in x days and A alone can do the same work in y

    days, then B alone can do the same work in x y/ y x days.

    Therefore, his son alone can do the work in 3 5/ 5 3 = 15/2 = 7 days. Ans.

    Q. 48. A works twice as fast as B. if B can complete a work in 12 days independently, the

    number of days in which A and B can together finish the work is:

    (a) 4 days (b) 6 days (c) 8 days (d) 18 days (e) None of these

    Ans: (a) 4 days

    Explanation:

    That is, if b alone can finish the work in 12 days,

    A alone can finish the work in 6 days.

    If A can complete a work in x days and B can complete the same work in y days, then, both

    of them together can complete the work in x y/ x+ y days.

    Therefore,

    A and B can together finish the work in 6 12/18 days = 4 days. Ans.

    Q. 49. A is twice as good a workman as B and together they finish a piece of work in 14 days.

    The number of days taken by A alone to finish the work is: Gr8Amb

    itionZ.com

  • (a) 11 (b) 21 (c) 28 (d) 42 (e) None of these

    Ans: (b) 21

    Explanation:

    As work is twice as Bs work

    So, we can consider 2A = B

    Then, A 2A/ A+ 2A = 14

    2A A/ 3A = 14

    2 A = 14 3

    A = 21 days. i.e. A alone can finish the work in 21 days. Ans.

    Q. 50. A is thrice as good a workman as B and therefore is able to finish a job in 60 days less

    than B. Working together, they can do it in:

    (a) 20 days (b) 22 days (c) 25 days (d) 30 days (e) None of these

    Ans: (b) 22 days

    Explanation:

    That is, 3A = B, replacing 3 A in place of B, we get

    3A A = 60 days

    A = 30 days, i.e. A alone can finish the work in 30 days

    Then, B alone can finish the work in 3 30 = 90 days

    Therefore, working together they can finish it in 30 90/ 120 days. = 22 days. Ans.

    Q. 51. A and B can do a job together in 7 days. A is 1 times as efficient as B. the same job can

    be done by A alone in:

    (a) 9 1/3 days (b) 11 days (c) 12 days (d) 16 1/3 days (e) None of these

    Ans: (b) 11 days Gr8Amb

    itionZ.com

  • Explanation:

    1 = 7/4

    7/4 A = B, replacing B by 7/4 A, we get

    A 7/4 A/ A + 7/4 A = 7days

    7 A A/4 / 11A/4 = 7 A A/ 11 A = 7A /11 = 7

    A = 77/7 = 11, So, A alone can finish the work in 11 days. Ans.

    Q. 52. Sakshi can do a piece of work in 20 days. Tanya is 25% more efficient than Sakshi. The

    number of days taken by Tanya to do the same piece of work is:

    (a) 15 (b) 16 (c) 18 (d) 25 (e) None of these

    Ans: (b) 16

    Explanation:

    The ratio of their efficiency, i.e. Sakshi : Tannya = 100 : 125 = 4 : 5

    Therefore, ratio of time taken by them = 5 : 4

    That is, No. of days taken by Sakshi is 5 units of ratio = 20 days

    So, 1 unit of ratio = 20/5 = 4 days

    Therefore, No. of days taken by Tannya = 4 4 = 16 days. Ans.

    Q. 53. A is 30% more efficient than B. How much time will they, working together, take to

    complete a job which A alone could have done in 23 days?

    (a) 11 days (b) 13 days (c) 20 3/17 days (d) 14 days (e) None of these

    Ans: (b) 13 days

    Explanation:

    The ratio of their efficiency = A : B = 130 : 100 = 13 : 10

    Therefore, the ratio of the time taken by them = 10 : 13 Gr8Amb

    itionZ.com

  • A takes 23 days = 10 units of ratio

    So, 1 unit of ratio = 23/10

    Time taken by B alone to finish the work = 23/10 13 = 29.9 = 30 days

    Therefore, the No. of days taken to finish the work working together = 23 30/ 53

    = 13 days. Ans.

    Q. 54. A does half as much work as B in three-fourth of the time. If together they take 18 days to

    complete the work, how much time shall B take to do it ?

    (a) 30 days (b) 35 days (c) 40 days (d) 36 days (e) None of these

    Ans: (a) 30 days

    Explanation:

    That is , A = 3B/2/1/2 = 3B/2

    Replacing A by 3B/2, we get

    3B/2 B/3B/2 + B = 18 days

    3 B B/5B =18

    3B = 90

    B = 30 days, B alone can finish the work in 30 days. Ans.

    Q. 55. A can do a work in 15 days and B in 20 days. If they work on it together for 4 days, then

    the fraction of the work that is left is:

    (a) (b) 1/10 (c) 7/15 (d) 8/15 (e) None of these

    Ans: (d) 8/15

    Explanation:

    Working together, the No. of days taken by them to finish the work = 15 20/35

    = 60/7 days. Gr8Amb

    itionZ.com

  • Then, their 1 days work = 7/60

    Their, 4 days work = 7 4/60 = 7/15 of the total work

    Therefore, the fraction of the work, that is left = 1- 7/15 = 8/15. Ans.

    Q. 56. A can finish a work in 18 days and B can do the work in 15 days. B worked for 10 days

    and left the job. In how many days, A alone can finish the remaining work

    (a) 5 (b) 5 (c) 6 (d) 8 (e) None of these

    Ans: (c) 6 days

    Explanation:

    Bs one days work = 1/15

    Bs 10 days work = 1/15 10 = 2/3

    Remaining work = 1/3

    As 1 day work = 1/18

    No. of days A take to finish 1/3 of the work = 1/3/1/18 = 1/3 18 = 6 days. Ans.

    Q. 57. A and B can complete a work in 15 days and 10 days respectively. They started doing the

    work together but after 2 days B had to leave and A alone completed the remaining work. The

    whole work was completed in:

    (a) 8 days (b) 10 days (c) 12 days (d) 15 days (e) None of these

    Ans: (c) 12 days

    Explanation:

    No. of days taken by them working together = 15 10/25 = 6 days

    Their 1 days work = 1/6

    Their 2 days work = 1/6 2 = 1/3

    The work remaining = 2/3 Gr8Amb

    itionZ.com

  • As 1 day work = 1/15

    Time taken by A to finish 1/3 of the work = 2/3/1/15 = 2/3 15 = 10 days

    Therefore, the total number of days taken to finish the whole work = 10 +2 = 12 days. Ans.

    Q. 58. A can finish a work in 24 days, B in 9 days and C in 12 days. B and C start the work but

    are forced to leave after 3 days. The remaining work was done by A in:

    (a) 5 days (b) 6 days (c) 10 days (d) 10 days (e) None of these

    Ans: (c) 10 days

    Explanation:

    No. of days taken by B and C together to finish the work = 9 12/21 = 36/7 days

    Their 1 day work = 7/36

    So, their 3 days work = 7/36 3 = 7/12

    The remaining work = 5/12

    As 1 days work = 1/24

    To finish the remaining 5/12 of the work, the No. of days taken by A = 5/12/1/24

    = 5/12 24= 10 days. Ans.

    Q. 59. A machine P can print one lakh books in 8 hours, machine Q can print the same number

    of books in 10 hours while machine R can print them in 12 hours. All the machines are started at

    9 a.m. while machine P is closed at 11 a.m. and the remaining two machines complete the work.

    Approximately at what time will the work be finished?

    (a) 11: 30 a.m. (b) 12 noon (c) 12:30 p.m. (d) 1 p.m. (e) None of these

    Ans: (d) 1 p.m.

    Explanation:

    The three machines 1 hours work = 1/8 + 1/10 + 1/12 = 37/120 Gr8Amb

    itionZ.com

  • Their, work from 9 a.m. to 11 a.m. = 2 hours work = 37/120 2= 27/60

    The remaining work = 23/60

    Machines Q and Rs 1 hours work = 1/10 + 1/12 = 11/60

    Therefore, the time taken by Q and R to finish the remaining 23/60 work = 23/60/11/60

    = 23/60 60/11 = 23/11 = 2 hours approx.

    Therefore, the approximate time at which the work is finished = 11 + 2 = 1 p.m. Ans.

    Q. 60. A and B can do a piece of work in 30 days, while B and C can do the same work in 24

    days and C and A in 20 days. They all work together for 10 days when B and C leave. How

    many days more will A take to finish work?

    (a) 18 days (b) 24 days (c) 30 days (d) 36 days (e) None of these

    Ans: (a) 18 days

    Explanation:

    i.e. 2 ( A + B + C) s 1 days work = 1/30 + 1/24 + 1/20 = 1/8

    their 1 days work = 1/8/2 = 1/16

    their 10 days work = 1/16 10 = 5/8

    the remaining work = 3/8

    As 1 days work = 1/16 1/24 = 1/48

    Therefore, the No. of days A alone will take to complete 3/8 of the work = 3/8/ 1/48

    = 3/8 48 = 3 6 = 18 days. Ans.

    Q. 61. X and Y can do a piece of work in 20 days and 12 days respectively. X started the work

    alone and then after 4 days Y joined him till the completion of the work. How long did the work

    last?

    (a) 6 days (b) 10 days (c) 15 days (d) 20 days (e) None of these Gr8Amb

    itionZ.com

  • Ans: (b) 10 days

    Explanation:

    Xs 1 days work = 1/20

    Xs 4 days work = 1/20 4 = 1/5

    The remaining work = 4/5

    X and Ys 1 day work = 1/20 + 1/12 = 4/30 = 2/15

    Therefore, Both together finish the remaining work in 4/5/2/15 days

    = 4/5 15/2 = 6 days

    Therefore, the total number of days taken to finish the work = 4 + 6 = 10 days. Ans.

    Q. 62. A and B can together finish a work in 30 days. They worked together for 20 days and then

    B left. After another 20 days, A finished he remaining work. In how many days A alone can

    finish the job?

    (a) 40 (b) 50 (c) 54 (d) 60 (e) None of these

    Ans: (d) 60

    Explanation:

    A + B s 1 days work = 1/30

    Their 20 days work = 1/30 20 = 2/3

    Remaining work = 1/3

    1/3 of the work is done by A in 20 days.

    Then, whole work can be done by A in 3 20 = 60 days. Ans.

    Q. 63. X can do a piece of work in 40 days. He works at it for 8 days and then Y finished it in 16

    days. How long will they together take to complete the work?

    (a) 13 1/3 days (b) 15 days (c) 20 days (d) 56 days (e) None of these Gr8Amb

    itionZ.com

  • Ans: (a) 13 1/3 days

    Explanation:

    As 8 days work = 1/40 8 = 1/5

    Remaining work = 4/5

    4/5 of the work is finished by Y in 16 days

    So, Y can finish the whole work alone in 16 5/4 days = 20days

    They both together can finish it in 40 20/60 =13 1/3 days. Ans.

    Q. 64. A does 4/5 of a work in 20 days. He then calls in B and they together finish the remaining

    work in 3 days. How long B alone would take to do the whole work?

    (a) 23 days (b) 37 days (c) 37 days (d) 40 days (e) None of these

    Ans: (c) 37 days

    Explanation:

    A alone can finish the work in 20 5/4 days = 25 days

    As 1 days work = 1/25

    A and B together can finish the whole work in 5 3 days = 15 days

    Their 1 days work = 1/15

    Therefore, Bs 1 days work = 1/15 1/25 = 1/37

    Therefore, B alone can finish the whole work in 37 days.Ans.

    Q. 65. A and B together can do a piece of work in 30 days. A having worked for 16 days, B

    finishes the remaining work alone in 44 days. In how many days shall B finish the whole work

    alone?

    (a) 30 days (b) 40 days (c) 60 days (d) 70 days (e) None of these

    Ans: (c) 60 days Gr8Amb

    itionZ.com

  • Explanation:

    A + Bs 1 days work = 1/30

    i.e. A + B = 1/30 --------- (i)

    16 A + 44 B = 1 ------ (ii) ( i.e. 1 = the whole work done)

    Multiplying (i) by 16 and subtracting it from (ii), we get

    i.e. 16 A + 44 B = 1

    16 A + 16B = 8/15

    28 B =7/15

    B = 1/60 i.e. Bs 1 days work = 1/60

    Therefore, B alone can finish the work in 60 days. Ans.

    Q. 66. A and B together can do a piece of work in 12 days, which B and C together can do in 16

    days. After A has been working at it for 5 days and B for 7 days, C finishes it in 13 days. In how

    many days C alone will do the work?

    (a) 16 (b) 24 (c) 36 (d) 48 (e) None of these

    Ans: (b) 24

    Explanation:

    According to the question,

    A + Bs 1 days work = 1/12

    B+ Cs 1 days work = 1/16

    A worked for 5 days, B for 7 days and C for 13 days. So, we can assume that,

    A+ B has been working for 5 days and B+ C has been working for 2 days and C alone for 11

    days.

    i.e. As 5 days work + Bs 7 days work + Cs 13 days work = 1 Gr8Amb

    itionZ.com

  • (A+ B)s 5 days work + (B + C)s 2 days work + Cs 11 days work = 1

    5/12 + 2/16 + Cs 11 days work = 1

    So, Cs 11 days work = 1 (5/12 + 2/16) = 11/24

    Cs 1 days work = 11/24/11 = 1/24

    Therefore, C alone can finish the work in 24 days. Ans.

    Q. 67. A and B can do a piece of work in 45 days and 40 days respectively. They began to do the

    work together but A leaves after some days and then B completed the remaining work in 23

    days. The number of days after which A left the work was:

    (a) 6 (b) 8 (c) 9 (d) 12 (e) None of these

    Ans: (c) 9

    Explanation:

    A and B together can finish the work in 45 40/85 = 360/17 days

    A and Bs 1 days work = 17/360

    As 1 days work = 1/45

    Bs 1 days work = 1/40

    Bs 23 days work 1/40 23 = 23/40

    Remaining work = 1 23/40 = 17/40

    17/40 of the work is done by A and B together

    17/40 of the work is done by A and B together in = 17/40/17/360 = 17/40 360/17 days

    = 9 days.

    Therefore, A left after 9 days. Ans.

    Q. 68. A can do a piece of work in 20 days which B can do in 12 days. B worked at it for 9 days.

    A can finish the remaining work in: Gr8Amb

    itionZ.com

  • (a) 3 days (b) 5 days (c) 7 days (d) 11 days (e) None of these

    Ans: (b) 5 days

    Explanation:

    A s 1 days work = 1/20

    Bs 1 days work = 1/12

    Bs 9 days work = 1/12 9 =

    Remaining work =

    A can finish the remaining work in = 1/4/1/20 = 20 = 5 days. Ans.

    Q. 69. A and B together can complete a work in 3 days. They start together. But, after 2 days, B

    left the work. If the work is completed after 2 more days, B alone could do the work in

    (a) 5 days (b) 6 days (c) 9 days (d) 10 days (e) None of these

    Ans: (b) 6 days

    Explanation:

    A and Bs 1 days work = 1/3

    Their 2 days work = 1/3 2 = 2/3

    Remaining work = 1/3

    1/3 of the work is finished by A in 2 days

    Then, the whole work can be finished by A alone in 3 2 = 6 days

    So, As 1 days work = 1/6

    Therefore, Bs 1 days work = 1/3 1/6 = 1/6

    Therefore, the whole work can be done B alone in 6 days. Ans.

    Gr8Amb

    itionZ.com

  • Q. 70. A man, a woman and a boy together complete a piece of work in 3 days. If a man alone

    can do it in 6 days and a boy alone in 18 days, how long will a woman take to complete the

    work?

    (a) 9 days (b) 21 days (c) 24 days (d) 27 days (e) None of these

    Ans: (a) 9 days

    Explanation:

    (Man + Boy + Woman)s 1 days work = 1/3

    Mans 1days work = 1/6

    Boys 1 days work = 1/18

    Then, Woman 1 days work = 1/3 ( 1/6 + 1/18) = 1/3 4/18 =2/18 = 1/9

    Therefore, the Woman alone can finish the work in 9 days. Ans.

    Q. 71. A can do 1/3 of a work in 5 days and B can do 2/5 of the work in 10 days. In how many

    days both A and B together can do the work?

    (a) 7 (b) 8 4/5 (c) 9 3/8 (d) 10 (e) None of these

    Ans: (c) 9 3/8

    Explanation:

    A can do finish the whole work in 3 5 days = 15 days

    B can finish the whole work in 5 /2 10 days = 25 days

    A and B together can finish the work in 15 25/ 40 days = 9 3/8 days. Ans.

    Q. 72. A and B can do a piece of work in 12 days; B and C can do it in 15 days and C and A can

    do it in 20 days. A alone can do the work in:

    (a) 15 2/3 days (b) 24 days (c) 30 days (d) 40 days (e) None of these

    Ans: (c) 30 days Gr8Amb

    itionZ.com

  • Explanation:

    2 (A + B + c)s 1 days work = 1/12 + 1/15 + 1/20 = 12/60 = 1/5

    A + B + Cs 1 days work = 1/5/2 = 1/10

    As 1 days work = 1/10 (B + C)s 1 days work = 1/10 1/15 = 1/30

    Therefore, A alone can finish the work in 30 days. Ans.

    Q. 73. A and B together can complete a piece of work in 8 days while B and C together can do it

    in 12 days. All the three together can complete the work in 6 days. In how much time will A and

    C together complete the work?

    (a) 8 days (b) 10 days (c) 12 days (d) 20 days (e) None of these

    Ans: (a) 8 days

    Explanation:

    As 1 days work = A + B + Cs 1 days work B + Cs 1 days work = 1/6 1/12

    = 1/12

    Bs 1 days work = A + Bs 1 days work As 1 days work = 1/8 1/12= 1/24

    Cs 1 days work = B+ Cs 1 days work Bs 1 days work = 1/12 1/24 = 1/24

    A +B 1 days work = 1/12 + 1/24 = 3/24

    Therefore, A and C together will finish the whole work in 24/3 = 8 days. Ans.

    Q. 74. A can do a work in 4 days, B can do it in 5 days and C can do it in 10 days. A, B and C

    together can do the work in

    (a) 1 3/5 days (b) 1 9/11 days (c) 2 5/6 days (d) 3 days (e) None of these

    Ans: (b) 1 9/11 days

    Explanation:

    Gr8Amb

    itionZ.com

  • When A, B and C can do a work in x, y and z days respectively. Then, the three of them

    together can finish the work in xyz/ x y + y z + x z days

    That is, A, B and C together ca do the work in 4 5 10/ 20 + 50 + 40

    = 4 5 10/110 = 20/11 = 1 9/11 days. Ans.

    Q. 75. 3 men or 5 women can do a work in 12 days. How long will 6 men and 5 women take to

    finish the work?

    (a) 4 days (b) 10 days (c) 15 days (d) 20 days (e) None of these

    Ans: (a) 4 days

    Explanation:

    3 men = 5 women

    1 woman = 3/5 men

    So, 5 women = 3/5 5 = 3 men

    6 men and 5 women = 6 + 3 = 9 men

    1 work done = 3 men 12 days

    3 12 = 9 ? days

    ? days = 3 12/9 = 4 days. Ans.

    Q. 76. Kamal can do a work in 15 days. Bimal is 50% more efficient than Kamal. The number of

    days, Bimal will take to do the same piece of work, is

    (a) 10 (b) 10 (c) 12 (d) 14 (e) None of these

    Ans: (a) 10

    Explanation:

    Kamals 15 days is 150% of No. days taken by Bimal to finish the job.

    Therefore, the No. of days taken by Bimal = 15/150 100 = 10 days. Ans. Gr8Amb

    itionZ.com

  • Q. 77. A does 20% less work than B. if A can complete a piece of work in 7 hours, then B can

    do it in

    (a) 5 hours (b) 5 hours (c) 6 hours (d) 6 hours (e) None of these

    Ans: (c) 6 hours

    Explanation:

    B can finish the work in 80% of 7 hours of time

    7 = 15/2

    Therefore, time taken by B = .8 15/2 = 30/5 = 6 hours. Ans.

    Q. 78. Ram and Shyam together can finish a job in 8 days. Ram can do the same job on his own

    in 12 days. How long will Shyam take to do the job by himself?

    (a) 16 days (b) 20 days (c) 24 days (d) 30 days (e) None of these

    Ans: (c) 24 days

    Explanation:

    If A and B together can do a piece of work in x days and A alone can do the same work in y

    days, then B alone can do the same work in x y/ y x days.

    Therefore, the No. of days Shyam take to finish the job alone = 8 12/12 8

    = 8 12/4 = 24 days. Ans.

    Q. 79. The rates of working of A and B are in the ratio 3 : 4. The number of days taken by them

    to finish the work are in the ratio:

    (a) 3 : 4 (b) 9 : 16 (c) 4 : 3 (d) 3 : 2 (e ) None of these

    Ans: (c) 4 : 3

    Explanation:

    The No. of days taken by them = inverse ratio = 4 : 3. Ans. Gr8Amb

    itionZ.com

  • Q. 80. A certain number of men complete a piece of work in 60 days. If there were 8 men more,

    the work could be finished in 10 days less. How many men were originally there?

    (a) 30 (b) 40 (c) 32 (d) 36 (e) None of these

    Ans: (b) 40

    Explanation:

    Let x be the original number of men

    Then 1 work done = x 60

    Then, 60x = (x + 8) 50

    60x = 50x + 400

    10 x = 400

    x = 40. Ans.

    Q. 81. A does half as much work as B in three- fourth of the time. If together they take 18 days

    to complete the work, how much time shall B take to do it?

    (a) 30 days (b) 35 days (c) 40 days (d) 42 days (e) None of these

    Ans: (a) 30 days

    Explanation:

    Let x be the number of days taken by B alone to finish the whole work

    Then, A alone will finish the whole work in 3x/4 2 days = 3x/2 days.

    Then, working together,

    3x/2 x/3x/2 + x = 18 days

    3x x/5x = 18

    3x/5 = 18

    Therefore, the number of days taken by B = x = 18 5/3 = 30 days. Ans. Gr8Amb

    itionZ.com

  • Q. 82. A and B can finish a piece of work in 12 days and 18 days respectively. A begins to do

    the work and they work alternately one at a time for one day each. The whole work will be

    completed in

    (a) 14 1/3 days (b) 15 2/3 days (c) 16 1/3 days (d) 18 2/3 days (e) None of these

    Ans: (a) 14 1/3 days

    Explanation:

    Both of them together can finish the work (daily working) in 12 18/30 days = 36/5

    = 7 1/5 days.

    By working in alternate days, their 2 days work = 5/36

    Their, 14 days work (because they take more than double of 7 days) = 5/36 7

    = 35/36

    Remaining work = 1 35/36 = 1/36

    Because A started the work, the remaining work is finished by A

    As 1 days work = 1/12

    Therefore, the No. of days taken by A to finish 1/36 work = 1/36/1/12 = 1/3 days.

    Therefore, the total work is completed in 14 + 1/3 = 14 1/3 days. Ans.

    Q. 83. A can do a piece of work in 14 days which B alone can do in 21 days. They begin

    together but 3 days before the completion of the work, A leaves off. The total number of days for

    the work to be completed is

    (a) 6 3/5 days (b) 8 days (c) 10 1/5 days (d) 13 days (e) None of these

    Ans: (c) 10 1/5 days

    Explanation:

    Bs 1 days work = 1/21 Gr8Amb

    itionZ.com

  • Bs 3 days work = 1/21 3 = 1/7

    The remaining work finished by both of them = 1 1/7 = 6/7

    Both together can finish it in 14 21/35 days = 42/5 days

    Their, 1 days work = 5/42

    Therefore, the No. of days taken by them together to finish 6/7 work

    = 6/7/5/42 = 6/7 42/5 = 36/5 = 7 1/5 days

    Therefore, the total No. of days for the work to be completed = 3 + 7 1/5 = 10 1/5 days. Ans.

    Q. 84. A and B can finish a piece of work in 30 days. They worked at it for 20 days and then B

    left. The remaining work was done by A alone in 20 more days. A alone can finish the work in

    (a) 48 days (b) 50 days (c) 54 days (d) 60 days (e) None of these

    Ans: (d) 60 days

    Explanation:

    (A + B)s 1 days work = 1/30

    Their 20days work = 1/30 20 = 2/3

    Remaining 1/3 work is done by A in 20 days

    Therefore, A alone can finish the work in 3 20 = 60 days. Ans.

    Q. 85. 10 women can complete a work in 8 days and 10 children take 12 days to complete the

    work. How many days will 6 women and 3 children together take to complete the work?

    (a) 7 (b) 8 (c) 9 (d) 12 (e) None of these

    Ans: (e) None of these

    Explanation:

    1 womens 1 days work = 1/8/10 = 1/80

    1 childs 1 days work = 1/12/10 = 1/120 Gr8Amb

    itionZ.com

  • 6 womens 1 days work = 1/80 6 = 3/40

    3 childrens 1 days work = 1/120 3 = 1/40

    6 womens + 3 childrens 1 days work = 3 /40 + 1/40 = 1/10

    Therefore, they will finish the whole work in 10 days. Ans.

    Q. 86. 9 children can complete a piece of work in 360 days; 18 men can complete the same piece

    of work in 72 days and 12 women can complete it in 162 days. In how many days can 4 men, 12

    women and 10 children together complete the piece of work?

    (a) 68 days (b) 81 days (c) 96 days (d) 124 days (e) None of these

    Ans: (b) 81 days

    Explanation:

    1 childs 1 days work = 1/360 9 = 1/3240

    10 childrens 1 days work = 1/324

    1 mans 1 days work = 1/72 18 = 1/1296

    4 mens 1 days work = 1 4/1296 = 1/324

    12 womens 1 days work = 1/162 given

    Then, (4 men + 12 women + 10 children)s 1 days work = 1/324 + 1/162 + 1/324

    = 1/324 + 2/324 + 1/324 = 4/324 = 1/81

    Therefore, the required No. of days = 81 days. Ans.

    Q. 87. 9 men working 7 hours a day can complete a piece of work in 15 days. How many days

    can 6 men working for 9 hours a day, complete the same piece of work?

    (a) 15 days (b) 16 days (c) 16 days (d) 17 days (e) None of these

    Ans: (d) 17 days

    Explanation: Gr8Amb

    itionZ.com

  • 1 work done = 9 7 15

    9 7 15 = 6 9 ? days

    ? days = 9 7 15/6 9

    = 35/2 = 17 days. Ans.

    Q. 88. A man, a woman and a boy can together complete a piece of work in 3 days. If a man

    alone can do it in 6 days and a boy alone in 18 days, how long will a woman take to complete the

    work?

    (a) 9 days (b0 21 days (c) 24 days (d) 27 days (e) None of these

    Ans: (a) 9 days

    Explanation:

    (1 Man + 1 woman + 1 boy)s 1days work = 1/3

    1 mans 1 day work = 1/6

    1boys 1 days work = 1/18

    (1 Man + 1 boy) s 1 days work = 1/6 + 1/18 = 2/9

    Therefore, 1 womans 1 days work = 1/3 2/9 = 3-2/9 = 1/9

    Therefore, the woman alone can finish the work in 9 days. Ans.

    Q. 89. 8 men can do a piece of work in 12 days. 4 women can do it in 48 days and 10 children

    can do it in 24 days. In how many days can 10 men, 4 women and 10 children together complete

    the piece of work?

    (a) 5 days (b) 15 days (c) 28 days (d) 6 days (e) None of these

    Ans: (d) 6 days

    Explanation:

    1 mans 1 days work = 1/8 12 = 1/96 Gr8Amb

    itionZ.com

  • 10 mens 1 days work = 1 10/96 = 5/48

    1 womans 1 days work = 1/192

    4 womens 1 days work = 1/192 4 = 1/48

    1 childs 1 days work = 1/240

    10 childrens 1 days work = 1/24

    Therefore, (10 men + 4 women + 10 children)s 1 days work = 5/48 + 1/48 + 1/24

    = 8/48 =1/6

    The required No. of days = 6 days. Ans.

    Q. 90. 8 men can dig a pit in 20 days. If a man works half as much again a s a boy, then 4 men

    and 9 boys can dig a similar pit in:

    (a) 10 days (b) 12 days (c) 15 days (d) 16 days (e) None of these

    Ans: (d) 16 days

    Explanation:

    1 work done = 8 20

    1 man = 3/2 Boys

    1 boy = 2/3 men

    Then, 9 boys = 9 2/3 men = 6 men

    Then, 4 men + 9 boys = 10 men

    Then, 8 20 = 10 ?days

    ? days = 8 20/10 = 16 days. Ans.

    Q. 91. A man and a boy complete a work together in 24 days. If for the last 6 days man alone

    does the work then it is completed in 26 days. How long the boy will take to complete the work

    alone? Gr8Amb

    itionZ.com

  • (a) 72 days (b) 20 days (c) 24 days (d) 36 days (e) None of these

    Ans: (a) 72 days

    Explanation:

    (man + boy)s 1 days work = 1/24

    Their 20 days work = 1/24 20 = 5/6

    The remaining 1/6 work is done by the man in 6days

    Therefore, the man alone will finish the work in 6 6 days = 36 days

    Mans 1 days work = 1/36

    Therefore, boys 1 days work = 1/24 1/36 = 3 2 /72 = 1/72

    Therefore, the Boy alone will finish the work in 72 days. Ans.

    Q. 92. A, B and C completed a piece of work costing Rs.1800. A worked for 6 days, B for 4 days

    and C for 9 days. If their daily wages are in the ratio 5 : 6 : 4, how much amount will be received

    by A?

    (a) Rs.800 (b) Rs. 600 (c) Rs.900 (d) Rs.750 (e) None of these

    Ans: (b) Rs. 600

    Explanation:

    The new ratio = wages ratio No. of days

    A = 5 6 = 30

    B = 6 4 = 24

    C = 4 9 = 36

    Therefore, the ratio of the amount received = 30 : 24 : 36 = 5 : 4 :6

    Total ratio = 15

    1 unit of ratio = 1800/15 = Rs. 120 Gr8Amb

    itionZ.com

  • Therefore, amount received by A = 5 units = 5 120 = Rs.600. Ans.

    Q. 93. 12 men take 36 days to do a work while 12 women complete 3/4th

    of the same work in 36

    days. In how many days 10 men and 8 women together will complete the same work?

    (a) 6 days (b) 12 days (c) 27 days (d) Data inadequate (e) None of these

    Ans: (c) 27 days

    Explanation:

    1 mans 1 days work = 1/ 36 12 = 1/432

    10 mens 1 days work = 10/432

    12 women can finish the whole work in 4 36/3 = 48 days

    1 womans 1 days work = 1/ 48 12 = 1/576

    8 womens 1 days work = 8/572 = 1/72

    (10 men + 8 women)s 1 days work = 10/432 + 1/72 = 10 + 6/432 = 16/432

    = 1/27

    Therefore, the required No. of days = 27 days. Ans.

    Q. 94. A is thrice as good a workman as B and therefore is able to finish a job in 60 days less

    than B. working together, they can do it in

    (a) 20 days (b) 22 days (c) 25 days (d) 30 days (e) None of these

    Ans: (b) 22 days

    Explanation:

    B = 3A

    3A A =60 days

    A = 30days

    Then, B = 90 days Gr8Amb

    itionZ.com

  • (A + B) = 30 90/ 120 = 45/2 = 22 days . Ans.

    Q. 95. A works twice as fast as B. if both of them can together finish a piece of work in 12 days,

    then B alone can do it in

    (a) 24 days (b) 27 days (c) 36 days (d) 48 days (e) None of these

    Ans: (c) 36 days

    Explanation:

    B = 2A

    2A A/3A = 12

    2A/3 = 12

    A = 18 days

    B = 2 18 = 36 days

    Therefore, B alone can finish the work in 36 days. Ans.

    Q. 96. A man, a woman and a boy can complete a job in 3 days, 4 days and 12 days respectively.

    How many boys must assist 1 man and 1 woman to complete the job in 1/4th

    of a day?

    (a) 10 (b) 14 (c) 19 (d) 41 (e) None of these

    Ans: (d) 41

    Explanation:

    1 mans 1 days work = 1/3, days work = 1/3 = 1/12

    1 womans 1 days work = , days work = = 1/16

    1 boys 1 days work = 1/12, days work = 1/12 = 1/48

    Let x be the No. of boys required.

    Then, (1 man + 1 woman + x boy)s days work 1/12 + 1/16 + x/48 = 1

    = 4 + 3 + x = 1 Gr8Amb

    itionZ.com

  • 48

    i.e. 7 + x= 48 and x = 41. Ans.

    Q. 97. A does 4/5th

    of a work in 20 days. He then calls in B and they together finish the

    remaining work in 3 days. How long B alone would take to do the whole work?

    (a) 23 days (b) 37 days (c) 37 days (d) 40 days (e) None of these

    Ans: (c) 37 days

    Explanation:

    A can finish the whole work in 20 5/4 days = 25 days

    A and B together finish the whole work in 5 3 days = 15 days

    Therefore, B can finish the whole work in 25 B/ 25 + B = 15

    25 B = 15 ( 25 + B)= 375 + 15B

    10B = 375 and B = 375/10 = 37 days. Ans.

    Q. 98. A can do 1/4th

    part of the work in 10 days, B can do 40% of the work in 40 days and C

    can do 1/3rd

    of the work in 13 days. Who will complete the work first?

    (a) A (b) B (c) C (d) A and C both (e) None of these

    Ans: (c) C

    Explanation:

    The whole work is done by A in 4 10 = 40 days

    B can do the whole work in 40/40 100 days = 100 days

    C can do the whole work in 3 13 = 39 days.

    Therefore, the 1st person to complete the work is C. Ans.

    Q. 99. A alone can finish a work in 10 days which B alone can finish in 15 days. If they work

    together and finish it, then out of a total wages of Rs.3000, A will get: Gr8Amb

    itionZ.com

  • (a) Rs.1200 (b) Rs.1500 (c) Rs. 1800 (d) Rs.2000 (e) None of these

    Ans: (c) Rs. 1800

    Explanation:

    Ratio of working days of A : B = 10 : 15

    Therefore, their wages ratio = reverse ratio = 15 : 10

    Therefore, A will get 15 units of ratio

    Total ratio = 25

    1 unit of ratio =3000/25 = 120

    So, As amount = 120 15 = Rs.1800. Ans.

    Q. 100. Directions: (Questions 1 to 5):

    Each of the following questions consists of a question followed by three statements

    I, II and III. You have to study the question and the statements and decide which of the

    statement(s) is /are necessary to answer the question.

    1. In how many days can A and B working together complete a job?

    I. A alone can complete the job in 30 days.

    II. B alone can complete the job in 40 days

    III. B takes 10 days more than A to complete the job.

    (a) I and II only (b) II and III only (c) I and III only (d) Any two of the three (e) All I , II and III

    2. In how many days can the work be completed by A and B together ?

    I. A alone can complete the work in 8 days.

    II. If A alone works for 5 days and B alone works for 6 days, the work gets completed.

    III. B alone can complete the work in 16 days.

    Gr8Amb

    itionZ.com

  • (a) I and II only (b) II and III only (c) Any two of the three (d) II and either I or III (e) None

    of these

    3. How many workers are required to complete the construction work in 10 days?

    I. 20% of the work can be completed by 8 workers in 8 days.

    II. 20 workers can complete the work in 16 days.

    III. One-eighth of the work can be completed by 8 workers in 5 days.

    (a) I only (b) II and III only (c) III only (d) I and III only (e ) Any one of the three.

    4. In how many days can the work be done by 9 men and 15 women?

    I. 6 men and 5 women can complete the work in 6 days.

    II. 3 men and 4 women can complete the work in 10 days.

    III. 18 men and 15 women can complete the work in 2 days.

    (a) III only (b) All I, II and III (c) Any two of the three (d) Any one of the three (e) None of

    these

    5. In how many days can 10 women finish the work?

    I. 10 men can complete the work in 6days

    II. 10 men and 10 women together can complete the work in 3 3/7 days.

    III. If 10 men work for 3 days and thereafter 10 women replace them, the remaining work is

    completed in 4 days.

    (a) Any two of the three (b) I and II only (c) II and III only (d) I and III only (e) None of these

    Answers with explanations:

    1. Ans: (d) Any two of the three

    Explanation:

    I. As 1days work = 1/30 Gr8Amb

    itionZ.com

  • II. Bs 1 days work = 1/40

    III. Bs 1 days work = 1/40

    I and II gives the answer,

    I and III gives the answer,

    II and III gives the answer,

    Therefore, the correct answer is (d). Ans.

    2. Ans: (c) Any two of the three

    Explanation:

    I. As 1 days work = 1/8

    II. 1 work done = As 5 days work + Bs 6 days work

    III. Bs 1 days work = 1/16

    So, I and II gives the answer,

    I and III gives the answer,

    II and III gives the answer.

    Therefore, the correct answer is (c) .Ans.

    3. Ans: (e) Any one of the three

    Explanation:

    I. 1 workers 1 days work = 1/320, required No. of workers = 320/10 =32.

    II. 1 workers 1 days work = 1/320

    III. 1 workers 1 days work = 1/320

    Therefore, I alone gives the answer

    II alone gives the answer

    III alone gives the answer Gr8Amb

    itionZ.com

  • Therefore, the correct answer is (e). Ans.

    4. Ans: (c) Any two of the three

    Explanation:

    I. Gives, the linear equation 6x + 5y = 6

    II. Gives, the linear equation 3x + 4 y = 10

    III. Gives, the linear equation 18x + 15 y = 2

    i.e. Any two of the equations gives the correct answer.

    Therefore, the correct answer is (c) Ans.

    5. Ans: (b) I and II only

    Explanation:

    I. Gives, 1 mans 1 days work = 1/60

    II. I and II gives 1 womans 1 days work = 1/80

    III. (10 men + 10 women)s 1 days work = 1/7

    Therefore, I and II gives the answer

    So, the correct answer is (b). Ans.

    Q 101 . A certain work can be done in a certain time by 25 men. With 5 men less it could have

    been done in 3 days more. In what time can it be done by 40 men.

    Solution:

    let x be the time taken by 25 men to complete the work in days.

    Then, 25 * x = 20 * (x + 3)

    25x = 20x + 60

    x = 12

    Then, 40 men will compete the work in = 25 * 12/40 = 15/2 = 7 1/2 days. Gr8Amb