14
TIRE FIRE INCIDENT WHEN CIRCUMSTANCES AID AND DETER

TIRE FIRE INCIDENT WHEN CIRCUMSTANCES AID AND DETER

Embed Size (px)

Citation preview

TIRE FIRE INCIDENT

WHEN CIRCUMSTANCES AID AND DETER

THE THREAT

• Fire represents one of the greatest threats to those working either above or below ground in a mine environment. It takes little for a minor outbreak to escalate in minutes into a disastrous conflagration, so stopping a fire in its tracks has to be the top priority.

THE WHAT?

• JS Redpath 30 Ton Tamrock Truck Tire

THE CIRCUMSTANCE

• Hydro One scheduled a four hour power outage on March 18th from 12-4pm

• Diesel generators on site for pumps, especially during the aggressive thawing of ice/snow

INCIDENT TIMELINE

TIME ACTION         LOCATION COMMENTS

10:20TRUCK LOADED BY SCOOP HEADING UP RAMP NOTICED STRONG SMELL IN AIR 9745W JSRL 30 TON TRUCK

  SCOOP OPERATOR INFORMED DRIVER OF FLAT TIRE 9745W  

10:25 PARKED TRUCK IN WEST BYPASS-SHUT OFF MAIN SWITCHTRUCK BYPASS  

 AND PUT WHEEL CHALKS ON        

10:30WALKED DOWN RAMP TO INFORM SUPERVISOR AND MECHANIC

WEST RAMP  

11:40 WENT BY TRUCK AT END OF SHIFT AND NO SMOKE OR FLAMEWEST RAMP

MECHANIC CHECKED FLAT TIRE NO ISSUES

13-16:00 HYDRO PLANNED POWER OUTAGE-NO PERSONNEL UG    

16:00ELECTRICIANS ENTERED RAMP TO SHUT OFF DIESEL GENERATOR

MINE ACCESS FOUR ELECTRICIANS

 AND COMMENCE RE-ENERGIZING      

INCIDENT TIMELINE

16:45ELECTRICIAN CALLED ON RADIO THAT THERE WAS A FIRE UNDERGROUND   HARVEY DASTI

16:55UG PERSONNEL ACCOUNTED FOR      

17:00 UG SHIFTER ADVISED SECURITY TO RELEASE STENCH    

17:03STENCH RELEASED          

17:12SECURITY BEGAN CALLING MR PERSONNEL AND BRIGUS/REDPATH MANAGEMENT

GATEHOUSE  

17:30PIT PERSONNEL ACCOUNTED FOR      

17:35 ALL SURFACE PERSONNEL ACCOUNTED FOR    

18:00MR PERSONNEL ARRIVING ON SITE      

18:30 COMMAND CENTRE SETUP AND IN CONTROLCONF ROOM

MR OFFICERS FROM KL,SAG AND TIMMINS AIDED

INCIDENT TIMELINE

18:55MR TEAM 1 BRIEFING    

CONF ROOM  

19:07MR TEAM 1 RADIO CHECK     MR SUB  

19:17 MR TEAM 1 ENTERING PIT TWO BACK-UP TEAMS READY TO GO PIT  

19:28TEAM 1 UNDER OXYGEN     FAB  

19:31TEAM 1 ENTERING PORTAL INSTRUCTED TO PROCEED SLOWLY AND REPORT EVERY 500-1000' PORTAL

CO RANGED FROM 7-4 AND OXYGEN 20 SMOKE MEDIUM

19:47 TEAM 2 DISPATCHED        

19:49BRIEFING OFFICER REALIZED TEAM 1 HAD NO FIRE FIGHTING EQUIP AND WERE ON FOOT    

19:55 TEAM 1 ORDERED TO RETURN TO SURFACE    

20:04TEAM 2 BRIEFED          

20:26TEAM 1 OUT OF OXYGEN        

20:27TEAM 2 UNDER OXYGEN      

PROCEEDING WITH TRUCK AND EQUIPMENT

INCIDENT TIMELINE

20:55TEAM 2 TOP OF WEST RAMP HEAVY SMOKE 14+CO 21.1% OXYGEN

WEST RAMP NO HEAT VISIBLE WITH CAMERA

20:59TEAM 2 APPROACHING TRUCK WITH 4 EXTINGUISHERS HEAT 78-80 F

NEAR TRUCK  

21:02 TEAM 2 SPENT 4 EXTINGUISHERS NOW SETTING UP WATERAT TRUCK  

21:15 TEAM 2 SETTING UP AFFF EDUCTOR CO 21 OXYGEN 20.9AT TRUCK  

21:20 TEAM 2 GETTING MORE HOSE AND LADDERAT TRUCK  

21:28TEAM 2 READY TO FIGHT FIRE    

AT TRUCK  

21:41 TRUCK COOLING OFF VISIBILITY 20-50' CO 6 OXYGEN 20.9AT TRUCK  

21:49TEAM 2 REPORTED ZERO HOT SPOTS  

AT TRUCK CO 3 OXYGEN 20.9

21:57 FIRE EXTINGUISHED RETURNING TO SURFACEAT TRUCK LEFT WATER ON FOG

INCIDENT TIMELINE

22:17TEAM 3 BRIEFING      

CONF ROOM  

22:30TEAM 2 OUT OF OXYGEN     SURFACE  

22:45TEAM 3 UNDER OXYGEN     FAB  

22:47 TEAM 3 AT BUGGY PARKING NO SMOKE 0 CO 20% OXYGENBUGGY AREA  

22:53TEAM 3 PARKED TRUCK WALKED TO TRUCK FOR INSPECTION OF SURROUNDINGS

NEAR TRUCK

NO DAMAGE TO CABLES GROUND CONDITIONS GOOD

22:59TEAM 3 AT TRUCK 0 CO 20.9 OXYGEN   AT TRUCK

MASTER SWITCH WAS OFF ONE WHEEL CHALK IN FRONT

23:15WATER IS OFF RETURNING TO SURFACE  

WEST RAMP  

23:25 TEAM 3 OUT OF PIT EMERGENCY DECLARED OVER    

23:32TEAM 3 OUT OF OXYGEN     SURFACE  

0:03STENCH GAS SYSTEM RESET        

EMERGENCY TOTAL TIME 6 HOURS AND 40 MINUTES

HOW CIRCUMSTANCE AIDED

• No Ventilation to Fuel Fire• No Personnel Underground• With No Personnel UG, Provided

Invaluable Training Exercise for Mine Rescue Teams

HOW CIRCUMSTANCE HINDERED

• Prevented Mechanic from Working on Flat Tire and Preventing the Fire

WHAT WORKED?

• Our Mutual Agreement with St. Andrews Worked Astonishing Well

• Our Young MR Personnel Performed Well

• We have an Experienced Group of Emergency Managers

• Great Support from Area Mine Rescue Coordinators

IMPROVEMENT AREAS

• Radio Communications at Portal Area

• Even Though it is an UG Emergency Ensure All Surface Personnel are Aware and Accounted For

• With Transient Workforce it is Imperative ERP Plans are Reviewed More Often

THANK YOU!