Town of Greentown 112 N. Meridian St. ~ P.O. Box 247 Greentown, IN 46936 Phone (765) 628-3263 Fax (765) 628-4002 5 February 2016 Subject: Statement on IDEM Action Letter Dated 30 September 2015 To: All Interested Parties The Town Council of the Town of Greentown which ultimately oversees the Greentown Municipal Water Utility (GMWU) takes water quality and resident health very seriously. As a result of spot residential sampling results for the period 1 June 2015 to 30 September 2015, the GMWU was notified by IDEM that these samples exceeded allowable limits and additional samples would be required by 30 October 2015. In addition, an action plan selecting from allowable options to reduce lead exceedance levels would be required by 31 December 2015. Finally, the selected option is to be in place by 1 January 2020 and start with the sampling of 20 locations and then may be reduced after two consecutive six month periods of compliant samples. It is important to note that these samples were taken from locations throughout Greentown and that at no time has the water leaving the GMWU treatment facility exceeded allowable limits. The Town of Greentown and the GMWU have actively complied with all elements of the IDEM letter. In fact, the GMWU is ahead of schedule. Residents were notified as required and IDEM was notified of the selection to pursue phosphate injection as the remediation method. Any changes to the GMWU treatment process must be approved by IDEM and the required permit has already been applied for and is currently in the public comment phase as required by Indiana Code. The current public comment period runs through 27 February 2016. However, based on issues raised in the community, GMWU has requested emergency approval which was received 5 February 2016. The equipment will be installed and operational by Friday February 12 th . All of the above actions are indicative of a Town Council responding proactively to this issue and exceeding the required timeframe by over three years. Thank you for your time. Scott A. Deyoe Town of Greentown, Board President Attachment: IDEM Lead Action Level Exceedance Letter Attachment: IDEM Emergency Approval for Public Water Supply Construction

Town of Greentown Water Statement Feb. 5

Embed Size (px)

DESCRIPTION

IDEM found elevated levels of lead in Greentown's water during routine testing.

Citation preview

Page 1: Town of Greentown Water Statement Feb. 5

Town of Greentown

112 N. Meridian St. ~ P.O. Box 247 Greentown, IN 46936

Phone (765) 628-3263 Fax (765) 628-4002

5 February 2016 

Subject:  Statement on IDEM Action Letter Dated 30 September 2015 

To:  All Interested Parties 

The Town Council of the Town of Greentown which ultimately oversees the Greentown Municipal Water 

Utility (GMWU) takes water quality and resident health very seriously.  As a result of spot residential 

sampling results for the period 1 June 2015 to 30 September 2015, the GMWU was notified by IDEM 

that these samples exceeded allowable limits and additional samples would be required by 30 October 

2015.  In addition, an action plan selecting from allowable options to reduce lead exceedance levels 

would be required by 31 December 2015.  Finally, the selected option is to be in place by 1 January 2020 

and start with the sampling of 20 locations and then may be reduced after two consecutive six month 

periods of compliant samples.  It is important to note that these samples were taken from locations 

throughout Greentown and that at no time has the water leaving the GMWU treatment facility 

exceeded allowable limits. 

The Town of Greentown and the GMWU have actively complied with all elements of the IDEM letter.  In 

fact, the GMWU is ahead of schedule.  Residents were notified as required and IDEM was notified of the 

selection to pursue phosphate injection as the remediation method.  Any changes to the GMWU 

treatment process must be approved by IDEM and the required permit has already been applied for and 

is currently in the public comment phase as required by Indiana Code.  The current public comment 

period runs through 27 February 2016.  However, based on issues raised in the community, GMWU has 

requested emergency approval which was received 5 February 2016.  The equipment will be installed 

and operational by Friday February 12th. 

All of the above actions are indicative of a Town Council responding proactively to this issue and 

exceeding the required timeframe by over three years. 

Thank you for your time. 

Scott A. Deyoe 

Town of Greentown, Board President 

Attachment: IDEM Lead Action Level Exceedance Letter 

Attachment: IDEM Emergency Approval for Public Water Supply Construction 

Page 2: Town of Greentown Water Statement Feb. 5
Page 3: Town of Greentown Water Statement Feb. 5
Page 4: Town of Greentown Water Statement Feb. 5
Page 5: Town of Greentown Water Statement Feb. 5
Page 6: Town of Greentown Water Statement Feb. 5