tunnel construction method

Embed Size (px)

Citation preview

  • 7/29/2019 tunnel construction method

    1/36

    2nd Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    Tunnel Construction Methods:Conventional vs Mechanized

    March 26, 2010

    Prof. Andre P. Assis, PhD(ITACET / UnB)

    Harvey W. Parker, PhD(ITA / Consultant)

  • 7/29/2019 tunnel construction method

    2/36

    2nd Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    Huge Diverse Demand for Tunnels Worldwide Motorways & Ring Roads to reduce traffic congestion

    Long and/or Deep Road Tunnels to connect populations

    By-Pass Historic, Cultural, Scenic, & Congested Locations

    Underground Parking

    Mass Transit Systems

    Public Utilities & Flood Control

    City Center Revitalization

    Construction Method is Affected by the Purpose

    and Numerous other Factors, Especially the

    Geology

  • 7/29/2019 tunnel construction method

    3/36

    2nd Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    Factors to Consider inSelection of Construction

    Method

    Geology

    Rock or Soil

    Mountain or River Crossing

    Urban or Rural

    Number of Lanes ~ Tunnel Size

    Length

    Safety & EnvironmentalConstraints

    Schedule & Cost

    Risk Tolerance

    Two Basic Categories

    Technical Feasibility

    Cost & Schedule

  • 7/29/2019 tunnel construction method

    4/36

    2nd Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    Better Exploration & Understanding of Ground Behaviour

    Ground/Groundwater Pressures

    Evaluation & Control of Induced Movement

    Minimize Potential for Damage

    Modern Technology Results in Tunnels

    Better, Faster, Cheaper, Safer

    Quality Mechanization of the construction process

    New Generation of Pressurized TBMs TBMs now routinely used in ground conditions considered inappropriate a few years ago

    Innovations Provide our Industry with More Choices than just the traditionalChoice Between Conventional vs Mechanized. In Continuous State of Change

    Recent Tunnel Engineering Advances ImproveSelection of Construction Method

  • 7/29/2019 tunnel construction method

    5/36

    2nd Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    Geology & GeoHydrology

    Priority of surface space

    Long term (type of infrastructure)

    Short term (during construction)

    Type, cross-section size and length of the tunnel Location andsurrounding environment of the tunnel. Potential for Public Disruption

    Local tradition and experience, schedule, type of contract and

    contractual stability

    Cost & Schedule

    Must PredictProductivity

    Labor & Material Costs

    Construction Methods and Technology

  • 7/29/2019 tunnel construction method

    6/36

    2nd Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    Evaluate on RiskManagement Principles

    Select Con

  • 7/29/2019 tunnel construction method

    7/36

    2nd Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    Road Tunnel Types

    Varies 80' - 103'53'

    20'

    22

    Var

    93'+/-

    NBSB

    53'

    Different configurations,technologies, standards

  • 7/29/2019 tunnel construction method

    8/36

    2nd Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    Tunnel Size

    Alaskan Way, Seattle

    ~17m OD for Four (4) Lanes

  • 7/29/2019 tunnel construction method

    9/36

    2nd Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    Now, Several 3 LaneRoads in ~14m Tunnels

  • 7/29/2019 tunnel construction method

    10/36

    2nd Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    A86 in Paris

    11.6 m diameter for 4, possibly u ltimately, more lanes!!- small vehicles only, 3m clearance

  • 7/29/2019 tunnel construction method

    11/36

    2nd Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    Tunnelling in Soft Ground (Soils)

    Cut-and-Cover

    TunnellingMethods

    Conventional Tunnelling

    Special Methods

    Mechanized Tunnelling

    Conventional CC

    Immersed & Other

  • 7/29/2019 tunnel construction method

    12/36

    2nd Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    Cut-and-Cover vs Tunnel

  • 7/29/2019 tunnel construction method

    13/36

    2nd Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    Difficult to build from surface

    Urban constraints (alignmentsdefined by demand andinterferences)

    Cost of relocation

    Construction costs

    Cost of Public Disruption

    Cut-and-Cover

  • 7/29/2019 tunnel construction method

    14/36

    2nd Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    Door Frame Tunnel in Metro Brasilia

  • 7/29/2019 tunnel construction method

    15/36

    2nd Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    "Submerged" Cut-and-Cover:Immersed Tunnels

    Mo nt Baker Ridge

  • 7/29/2019 tunnel construction method

    16/36

    2nd Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    Mount Baker RidgeSeattle

    Stacked-Drift

    InnovativeIncrementalconstruction - small

    parallel drifts (likebarrel staves)

    Inside diameter 19m

    Five through lanes

    plus pedestrian, bike

    Ventilation and lifesafety systems

  • 7/29/2019 tunnel construction method

    17/36

    2nd Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    Conve

    ntionalT

    unnellin

    g

  • 7/29/2019 tunnel construction method

    18/36

    2nd Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    Tunnelling in Soil

    Conventional Tunnelling Sequential Excavation Methods (SEM)

    Mechanized Tunnelling Full-Face Excavation

    Open-face

    Pressured-face TBM

    Door Frame or Special Construction

    Challenge: Stability & Settlement

    Sequential Excavation

  • 7/29/2019 tunnel construction method

    19/36

    2nd Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    Sequential ExcavationMethod (SEM)

    Low Mobilization time & cost

    Rate of Advance slower than TBMbut sometimes competitive in totalproject time

    Various, flexible shapes possible

    Quality & Workmanship is Crucial

    Practice now accepted as safebut image is not universally good

    Transitions / off-ramps easier

  • 7/29/2019 tunnel construction method

    20/36

    2nd Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    TcnicasAlternativas:

    CongelamentoGround

    Improvement

    and Reinforcement

  • 7/29/2019 tunnel construction method

    21/36

    2nd Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    MechanizedTunnelling

    General Mechanized

  • 7/29/2019 tunnel construction method

    22/36

    2nd Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    General MechanizedSelection Flow Chart

    Source: ITA Working Group 14, Mechanized Tunnelling, 2000

  • 7/29/2019 tunnel construction method

    23/36

    2nd Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    Pressurized-Face TBMs:

    EPB, Slurry and Mix Shield

    Sl

  • 7/29/2019 tunnel construction method

    24/36

    2nd

    Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    EPB vs Slurry

    Selection Between

  • 7/29/2019 tunnel construction method

    25/36

    2nd

    Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    Selection BetweenEPB and Slurry

    Not an Easy Question

    Past Years: Slurry for Sands; EPB for Silts & Clays

    Must know geology and conduct soil tests

    Now newer Conditioning Agents injected at the face extend the range of bothmethods of construction

    Disk Cutters extend use of both for Boulders & Variable Rock

    Slurry TBMs commonly used for higher water pressures

    Careful not to create a blow to surface

    Face stability is generally more robust with EPB

    Other Issues Prediction of Rate of Advance

    Abrasion and/or Clogging=maintenance or repair in Interventions

    Plant Size & Muck disposal issues

  • 7/29/2019 tunnel construction method

    26/36

    2nd

    Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    Tunnelling in Rock

    Tunnelling

    Methods

    Drill and Blast

    Full-Face TBM

    - Gripper

    - Double Shield

    Partial-Face TBM

  • 7/29/2019 tunnel construction method

    27/36

    2nd

    Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    Drill and Blast Technology Has Improved Extending

    Range of Drill & Blast Projects

    Almost no mobilization time. Often Still Used forShorter Projects with variable ground & changing cross

    section in remote areas without power

  • 7/29/2019 tunnel construction method

    28/36

    2nd

    Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    Mechanized Tunnelling in Rock

    Challenge:

  • 7/29/2019 tunnel construction method

    29/36

    2nd

    Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    gCutting Tools and Power

  • 7/29/2019 tunnel construction method

    30/36

    2nd

    Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    Combined Methods:Conventional and

    Mechanized

    Tunnelling

  • 7/29/2019 tunnel construction method

    31/36

    2nd

    Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    Conventional vs. Mechanized Tunnelling Good for Geometric flexibility

    Adaptable to broad range ofground conditions

    Temporary exposure tounsupported ground

    Contractual flexibility

    Lower mobilization & plant costs

    Suitable for political risk or lack

    of contractual stability Lower costs for short tunnels &

    where labor is inexpensive

    Often slow but not expensive

    New Technology is adaptable tomore ground conditions

    Less disturbance to theremaining ground

    Better and more regular quality(industrial process)

    Mechanization better for workers

    Safer because generally under

    protective shield Faster rate of advance

    Significant mobilization & Plantincreasing Cost & Schedule

    Costs and schedule more

    favorable for longer tunnels

  • 7/29/2019 tunnel construction method

    32/36

    2nd

    Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    Final Remarks

  • 7/29/2019 tunnel construction method

    33/36

    2nd

    Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    Final Remarks

    Significant increase of the demand of underground structureseverywhere

    Two Basic Issues are

    Technical Feasibility

    Cost & Schedule

    Underground structure feasibi lity depends on global costanalyses (construction costs + indirect benefits)

    Road Tunnels demand a large cross section

    Trend is toward larger diameters

    Conclusions

  • 7/29/2019 tunnel construction method

    34/36

    2nd

    Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    Conclusions

    Construction methods and technology depend ongeology, tunnel location, size, local tradit ion etc.

    A large number of factors must be considered

    Not just a decision between conventional & mechanized

    Combination of mechanized and sequential excavationmethods or Special Methods may be beneficial

    Conclusions

  • 7/29/2019 tunnel construction method

    35/36

    2

    nd

    Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    Conclusions

    Mechanized tunnelling for long tunnels andurban areas (industrial process, quality andcontrol of costs and schedule)

    Trend is for greater innovation giving greater applicability anduse of mechanized in the future.

    Conventional tunnelling for short tunnels andvariable conditions (geometry, geology and

    political flexibility, and inexpensive labour)

  • 7/29/2019 tunnel construction method

    36/36

    2nd Seminario Internacional de Tuneles y aplicaciones ITS26 de Marzo de 2010 Buenos Aires

    Mucho Gracias