Upload
others
View
1
Download
0
Embed Size (px)
UCLG INTERMEDIARY CITIES
LEARNING EXCHANGE PROGRAMME:
DATE: 18th -20th of March 2013
ZIMBALI, FAIRMONT HOTEL,
KWADUKUZA MUNICIPALITY,
KWAZULU NATAL
PRESENTATION OUTLINE
1. KWADUKUZA AT A GLANCE
2. WHAT WE OFFER
3. DEVELOPMENTAL CHALLENGES
4. PUBLIC PARTICIPATION PROCESSES
5. INSTITUTIONALARRANGEMENT
6. FINANCIAL PLANNING & VIABILITY
7. STRATEGIC GOVERNANCE
8. KWADUKUZA FUTURE
KWADUKUZA AT A GLANCE
Admin. Structure: KZN & ILEMBE DM
LOCATED ALONG THE EAST OF KZN,
BORDERING ETHEKWINI METRO
(SOUTH)
HISTORICAL: AMALGAMATION OF
THREE LOCAL MUNICIPALITIES
ONE OF 4 MUN. THAT CONSTITUTE
THE ILEMBE DISTRICT MUNICIPALITY,
KWADUKUZA (KZ292): 750 KM2
6-15KM FROM KING SHAKA
INTERNATIONAL AIRPORT & DUBE
TRADE PORT
MOST SIGNIFICANT FROM AN
ECONOMIC AND DEVELOPMENT
PERSPECTIVE IN THE SUB REGION
(ILEMBE DISTRICT),
2012/13 BUDGET
TOTAL INCOME: R 932 386 Mil ($101 346m)
TOTAL EXPENDITURE:R932 346 mil ($101 342m)
ADMINISTRATIVE STRUCTURE
27 WARDS: AVERAGE POP- 8500
53 MUNICIPAL COUNCILLORS
BALLITO: COMMERCIAL NODE,
KWADUKUZA: COMMERCIAL/ ADMINISTRATION NODE
SMALL TOWNS (NEIGHBOURHOOD NODES): SHAKASKRAL/UMHLALI
KEY FUNCTIONS
SERVICE DELIVERY
ELECTRICAL SUPPLY;
WASTE REMOVAL;
ROADS & STORMWATER
OTHER
PLANNING
LOCAL ECONOMIC DEVELOPMENT
TOURISM
OTHER ROLE PLAYERS:
WATER & SANITATION: ILEMBE DM
WATER & SANITATION- CONCESSION AREA (SOUTH): SEMPCORB SIZA WATER
PROVINCIAL/ DISTRICT ROADS: DEPT. OF TRANSPORT
ELECTRICAL SUPPLY: ESKOM
HOUSING: HUMAN SETTLEMENTS
POPULATION DYNAMICS ILEMBE:
2001= 560 389 (5,8%);
2011= 606 809 (5,9%)
KWADUKUZA:
2001= 167 805
2011= 231 187
POP. GROWTH PER ANNUM (p.a):
ILEMBE 2001-2011 (0,8%)
KDM
1996-2001 (3.02%)
2001-2011 (3.2%)
YOUTHFUL POPULATION - 15-34 (65-70%)
UNEMPLOYMENT RATE :
2001= 34.3%; 2011= 25%
MONTHLY INCOME:
R0 – R1600 = 89,3%
R 1601 - R 6400 = 7,50%
R 6 401 or more = 3,8%
TROIKA CHALLENGES:
UNEMPLOYMENT/ INEQUALITY/ POVERTY
(Source Census 2011)
-15.0 -10.0 -5.0 0.0 5.0 10.0 15.0
00 - 04
05 - 09
10 - 14
15 - 19
20 - 24
25 - 29
30 - 34
35 - 39
40 - 44
45 - 49
50 - 54
55 - 59
60 - 64
65 - 69
70 - 74
75 - 79
80 - 84
85+
KwaDukuza Pyramid
SPATIAL ARRANGEMENT
KEY SPATIAL INFORMANTS ROUTES
MOVEMENT
NORTH/SOUTH LINKAGES (NATIONAL ROAD 2/ R102)
RAILWAY LINE
EAST- WEST ‘DIVIDE’: COASTAL & INLAND
NATURAL SYSTEM
WEST/EAST DIRECTION (TONGAAT/UMVOTI/ ZINKWAZI RIVERS)
SETTLEMENT STRUCTURE
URBAN SETTLEMENTS:
MAINLY LOCATED ALONG COAST & ALONG MAIN ROUTES -FORMALLY ESTABLISHED TOWNS (KWADUKUZA)
PERI URBAN TO SEMI-RURAL :
MAINLY LOCATED CENTRAL (ALONG R102) E.G. GROUTVILLE;
RURAL/TRADITIONAL SETTLEMENTS:
MAINLY CONCENTRATED IN THE WEST OF R102
INFORMAL SETTLEMENTS
‘DOMINANT’ NEW TREND OF SETTLEMENTS:
GATED DEVELOPMENTS: HIGH INCOME, LOW TO MEDIUM DENSITY (EAST OF N2) E.G. SIMBITHI, DUNKIRK, ZIMBALI
TYPICAL SETTLEMENT PATTERNSUrban & Rural Context
WHAT WE OFFER
WHAT WE OFFER
EXCELLENT INVESTOR DESTINATION THAT IS LESS THAN 30 MINUTES FROM
DUBE TRADE POINT ( LOGISTIC HUB),
EXCELLENT INVESTOR DESTINATION THAT IS 1 AND 30 MINUTES AWAY FROM
BIGGEST PORT IN AFRICA (DURBAN HARBOUR & RICHARDS BAY PORT),
DEVELOPMENT SPACE AND LAND
ABUNDANT LABOUR FORCE,
PRIME PROPERTY INVESTMENT DESTINATION,
PART OF THE PLANNED ‘AEROTROPOLIS’
RATES AND TARIFF CHARGES ARE VERY COMPETITIVELY PRICED
SUMMARY OF ACHIEVEMENTS
HOUSING DELIVERY AWARDS:
PROVINCIAL AND NATIONAL HOUSING AUTHORITY AWARD, 2005
PROVINCIAL INAUGURAL GOVAN MBEKI AWARD, 2007
NATIONAL INAUGURAL GOVAN MBEKI AND MEC MERIT AWARD, AWARD 2008
HOUSING DELIVERY:
+17 800 HOUSING OPPORTUNITIES- PAST 11 YRS (LOW INCOME HOUSING)
TOURISM:
CULTURE AND HERITATE (CHIEF ALBERT LUTHULI; KING SHAKA TOURISM ROUTE, MAHATMA GANDHI)
COASTAL RECREATION (BEACH)
HOLIDAY PROGRAMMES (Matric Rage, New Years Eve Party)
PARTNERSHIPS (Mr Price Pro – International Surfing Event)
GOVERNANCE/ FINANCIAL MANAGEMENT
7 CONSECUTIVE UNQUALIFIED AUDIT OPINIONS;
RATED AS THE MOST FINANCIAL SUSTAINABLE LOCAL AUTHORITY FOR 2012 IN THE COUNTRY BY AN INDEPENDENT ASSESSOR (RATINGS AFRICA)
DEVELOPMENTAL CHALLENGES
SUMMARY OF DEVELOPMENT SCENARIO OVER THE YEARS
TABLE : Value of Buildings Passed for KZN 2005 & 2011
Municipality Year 2005 Year 2011
Value (R Million
% Value (R Million)
%
Ethekwini Metro 2 748,2 57,8 5 835,5 71,7
KwaDukuza 676,6 14,2 1 076,2 13,2
Newcastle - - 528,0 4,2
TOTAL KZN 4 757,3 8 136,0
BUILDING PLAN APPROVALS (LAST 7 YRS)
FEES (MUNICIPAL REVENUE): APPROXIMATELY R23million
NO OF PLANS: APPROX. 8000
BULK PURCHASE FROM ESKOM INCREASED BY MORE THAN 500%SINCE 2000/01
Development Growth
.
Greater Ballito Area 2002 Greater Ballito Area 2012
Shakashead Area 2002 Shakashead Area 2011
Development Growth
.
Ethafeni Area 2006 Ethafeni Area 2012
KEY CHALLENGES
IN MIGRATION PEOPLE LOOKING FOR OPPORTUNITIES RESULTING IN PRESSURE ON MUNICIPALITY
SLUMS - HOUSING DELIVERY,
COMMUNITY/ SOCIAL AMENITIES,
ILLEGAL INVASION OF MUNICIPAL LAND
LACK OF BULK INFRASTRUCTURE (NORTH)/ CAPACITY TO HANDLE GROWTH (SOUTH)
INADEQUATE POLICY PLANS TO DIRECT DEVELOPMENT
FRAGMENTED DEVELOPMENT
UNREGULATED/ILLEGAL DEVELOPMENT (REVENUE COLLECTION)
CONTRIBUTIONS TO BE PAID BY PRIVATE DEVELOPERS AND NODES WHERE THE LOCAL
MUNICIPALITY WISHES TO PROMOTE DEVELOPMENT.
LACK OF MAINTAINANCE OF EXISTING INFRASTRUCTURE
ENERGY MASTER PLAN (2011) – R1 Billion
ROADS & STORMWATER MASTER PLAN (2011) – R2 Billion
ALIGNMENT BETWEEN DISTRICT & LOCAL MUNICIPALITY ITO PLANNING AND PRIORITIES;
SERVICING BACKLOGS vs FUNDING AVAILABILITY
UNDERDEVELOPED PUBLIC TRANSPORTATION SYSTEM
KEY INSTITUTIONAL CHALLENGES
INTERGOVERNMENTAL RELATIONS – (LOCAL/DISTRICT/PROVINCE)
e.g. ROADS MANY LEVELS OF AUTHORITY (SANRAL/ KZN DOT)
INADEQUATE WORKFLOW SYSTEMS BETWEEN DEPARTMENTS;
STAFF CAPACITY –
HIGH VACANCY RATES,
HIGH TURNOVER RATES,
EXPERIENCE
LACK OF RELEVANT SKILLS AND COMPETENCIES (ENGINEERING DEPARTMENT)
e.g. ELECTRICAL: 72% Of Qualified/Skilled Staff Are 40+
39% Of Qualified/Skilled Staff Are 50+)
RELIANCE ON OUTSIDE CONSULTANTS/SERVICE PROVIDERS
e.g. Housing, Civil & Electrical Engineering
OVER-REGULATED OPERATING ENVIRONMENT THAT FORCES SENIOR MANAGEMENT TO FOCUS MORE ON OPERATIONS RATHER THAN ON STRATEGY.
RELIABILITY OF STATISTICAL INFORMATON (BACKLOGS ETC.)
MISMATCH BETWEEN DEVELOPMENT GROWTH MUNICIPAL CAPACITY;
KEY CHALLENGES: ‘TOWN PLANNING’
KEY LEGISLATION/ POLICIES
PLANNING AND DEVELOPMENT ACT (2008),
TOWN PLANNING ORDNANCE (1949)
TOWN PLANNING SCHEMES (9)
DEVELOPMENT PLANNING SECTION
DEVELOPMENT CONTROL (STATUTORY PLANNING),
BUILDING CONTROL ,
STRATEGIC PLANNING,
ENVIRONMENT MANAGEMENT
INTEGRATED DEVELOPMENT PLANNING SECTION
PREPARATION OF INTEGRATED DEVELOPMENT PLAN
DEVELOPMENT APPLICATION PROCESS SUMMARY:
PRE SUBMISSION;
FORMAL SUBMISSION
ASSESSMENT (PUBLIC INPUT)
DECISION
DEVELOPMENT APPLICATION COORDINATIONS MECHANISMS:
DEVELOPMENT REVIEW PROCESS (DRC)
MUNICIPAL INPUT PRIOR TO SUBMISSION
DEVELOPMENT RELATED ISSUES;
TECHNICAL COMMITTEE (TOWN PLANNING) –
ENSURE CONSISTENCY IN ASSESSMENT & DECISION MAKING);
OTHER: HOUSING TECHNICAL COMMITTEE (HOUSING PROJECTS)
DECISION MAKING:
DELEGATIONS BY COUNCIL;
COUNCIL DECISION (RESOLUTION)
CAPACITY (STATUTORY PLANNING & STRATEGIC PLANNING):
13x TOWN PLANNING OFFICIALS
INCLUDE MANAGEMENT,
2x SHARED SERVICES PROGRAMME
3x PROFESSIONAL PLANNERS
2 SHARED SERVICES
OTHER:
ENVIRONMENTAL/GIS UNIT:
2x Snr ENVIRO OFFICER
2x GIS OFFICERS
CHALLENGES: ‘TOWN PLANNING’
PRIVATE SECTOR LED DEVELOPMENT
IN ADEQUATE ‘SERVICING’ OF PREVIOUSLY DISADVANTAGED AREAS I.E. ‘NON SCHEME AREAS’
INADEQUATE/ LACK OF CAPACITY IN KEY AREAS (ENVIRONMENT)
INADEQUATE ENFORCEMENT AND COMPLIANCE MONITORING
DEVELOPMENT APPLICATION PROCESS - INPUT FROM DEPARTMENTS
NEW LEGISLATION (PDA, 2008) - TRAINING
INADEQUATE WORKFLOW SYSTEMS BETWEEN DEPARTMENTS;
PUBLIC PARTICIPATION:PLANNING & BUDGETING
PARTICIPATION
LEGISLATED PARTICIPATION
BUDGETING & INTEGRATED DEVELOPMENT PLAN
PDA PROCESS (ADVERTISE MEDIA, REGISTERED POST)
ENVIRONMENTAL INTEGRATED ASSESSMENT (EIA)
COMMUNITY PARTICIPATION STRUCTURES
WARD COMMITTEE SYSTEM
INTEGRATED DEVELOPMENT FORUM
MAYORAL IZIMBIZO (GATHERINGS);
PROJECT SPECIFIC
PROJECT STEERING COMMITTEES
INSTITUTIONAL ARRANGEMENT
ADMINISTRATION
MUNICIPAL MANAGER
(ACCOUNTING OFFICER)
• CORPORATE GOVERNANCE
• COMMUNICATION AND MARKETING
• LEGAL
ECONOMIC DEVELOPMENT &
PLANNING
• DEVELOPMENT PLANNING
• HUMAN SETTLEMENT
• LOCAL ECONOMIC DEVELOPMENT
FINANCE
• EXPENDITURE
• REVENUE
• SUPPLY CHAIN MANAGEMENT
TECHNICAL SERVICES
• CIVIL ENGINEERING
• ELECTRICAL ENGINEERING
• PROJECT MNAGEMENT
MUNICIPAL SERVICES
• TRAFFIC & CRIME PREVENTION
• OPERATIONS (REFUSE REMOVAL /PARKS & GARDENS)
CORPORATE SERVICES
• ESTATES
• ADMINISTRATION
• HUMAN RESORCES
POLITICAL
ECONOMIC DEVELOPMENT & PLANNING PORTFOLIO
COMMITTEE
•CHAIRED BY MEMEBR OF EXCO
•SITS ONCE A MONTH
FINANCE
•CHAIRED BY MEMBER OF EXCO
•SITS ONCE A MONTH
TECHNICAL SERVICES
•CHAIRED BY MEMBER OF EXCO
•SITS ONCE A MONTH
MUNICIPAL SERVICES
•CHAIRED BY MEMBER OF EXCO
•SITS ONCE A MONTH
CORPORATE SERVICES
•CHAIRED BY MEMBER OF EXCO
•SITS ONCE A MONTH
KWADUKUZA COUNCIL
(53 COUNCILLORS)
• CHAIRED BY MUNICIPAL SPEAKER
• POLICY DECISIONS
• SITS ONCE A QUARTER (SPECIAL MEETINGS)
EXECUTIVE COMMITTEE
(10 COUNCILLORS)
• CHAIRED BY MUNICIPAL MAYOR
• DAY TO DAY RUNNING OF MUNICIPALITY (DECISION)
• SITS TWICE A MONTH
OTHER: GOVERNANCE COMMITTEES
AUDIT COMMITTEE
SCOPA
FINANCIAL PLANNING AND VIABILITY
FINANCIAL MODELING
ASSESS THE VIABILITY OF TAKING UP LOAN DEBT (CAPITAL
PROJECTS).
ASSESSMENT INVOLVES:
PROJECTING INCOME AND EXPENDITURE OVER A 10 YEAR PERIOD USING TRENDS AND CERTAIN PARAMETERS;
PROJECTING FINANCIAL POSITION (ASSETS & LIABILITIES);
ANTICIPATED ACQUISITION OF ASSETS WHILST SERVICING DEBT;
ANTICIPATED COLLECTION RATES;
FROM THESE PROJECTIONS WE PERFORM RATIO ANALYSIS AND PLOT TRENDS ONTO GRAPHS
ANALYSIS WILL PROVIDE FINANCIAL LEVERAGE, SOLVENCY,
LIQUIDITY, PROFITABILITY AND GROWTH IN REVENUE VERSUS
OPERATING EXPENDITURE.
SOURCES OF FUNDING
EXTERNAL LOAN FUNDING
DEVELOPMENT CHARGES
DEMAND BASED
CONTRIBUTIONS –ELECTRICITY
SOURCE OF INCOME
PRIMARILY RATES ASSESSMENT,
ELECTRICITY SALES AND REFUSE COLLECTION CHARGES.
OTHER SMALLER STREAMS SUCH AS BUILDING PLAN FEES, TRAFFIC FINES, ETC
–
50,000
100,000
150,000
200,000
250,000
300,000
350,000
400,000
450,000
500,000
1 2 3 4 5
Property rates
Service charges
Investment revenue
Transfers recognised -operational
Other own revenue
COUNCIL OWN FUNDING
GRANT FUNDING (CONDITIONAL/ UNCONDITIONAL)
NATIONAL E.G. EQUITABLE SHARE (BASED ON POPULATION)
PROVINCIAL E.G. MUNICPAL INFRASTRUCTURE GRANT(ROADS,
HALLS ETC.), CORRIDOR FUNDING
07/08 08/09 09/10 10/11 11/12
STRATEGIC GOVERNANCE
STRUCTURES IN PLACE
POLITICAL STRUCTURES: MAYORS FORUM,
SPEAKERS FORUM,
COMMUNITY STRUCTURES YOUTH FORUMS,
ENVIRONMENTAL FORUM,
BUSINESS FORUMS
DEVELOPERS FORUM (DEFUNCT)
ADMINISTRATIVE STRUCTURES MANAGEMENT COMMITTEE
IDP STEERING COMMITTEE
KWADUKUZA FUTURE
VISION AND MISSION
INTEGRATED DEVELOPMENT PLAN 5 YEAR PLAN REVIEWED ANNUALLY
SECTOR PLANS
SPATIAL DEVELOPMENT FRAMEWORK SPATIAL REPRESENTATION OF THE IDP
BY 2030, VIBRANT CITY COMPETING IN THE GLOBAL VILLAGE - ECONOMICALLY,
SOCIALLY,
POLITICALLY AND
IN A SUSTAINABLE MANNER.’
MISSION: TO ACHIEVE HIGHEST ECONOMIC STATUS THROUGH:
DRIVING LOCAL ECONOMIC DEVELOPMENT;
DELIVERING A HIGH STANDARD OF ESSENTIAL SERVICES;
ENCOURAGING PUBLIC PARTICIPATION;
OVERCOMING DEBT AND ACHIEVING COST RECOVERY ON SERVICES PROVIDED
REGION: ILEMBE REGIONAL SPATIAL DEVELOPMENT PLAN
SPATIAL DEVELOPMENT FRAMEWORK
INFRASTRUCTURE INVESTMENT
ROADS & STORMWATER MASTERPLAN (2011)
CAPITAL EXPENDITURE OF R2 BILLION
ENERGY MASTER PLAN (2011)
CAPITAL EXPENDITURE OF APPROXIMATELY R1 BILLION CAPEX OVER 20 YEARS (UN-ESCALATED)
IMPLEMENTATION:
KWADUKUZA LOAN FUNDING: (R276,6 million)
ILEMBE DISTRICT BULK INFRASTRUCTRE PLAN (2025)
LOWER TUGELA WATER SCHEME (R2,4 Billion)
GROUTVILLE SANITATION (R254 million)
STRENGTHEN/ BUILD PARTNERSHIPS
E.g. SWISS GOVERNEMENT PROGRAMME
LOCAL ECONOMIC DEVELOMENT
TOURISM:
VIBRANT TOURISM DESTINATION
EVENTS DRIVEN - NOT SEASONAL
STRENGTHINING CULTURAL & HERITAGE
IN LINE WITH TOURISM VISION
UPGRADING OF FACILITIES
RE ESTABLISHMENT OF TOURISM ASSOCIATIONS
UPGRADING OF KEY RECREATIONAL BEACH NODES
INDUSTRY
ATTRACT NEW INDUSTRIES (COMPENSATION/GREATERDRIEFONTEIN AREAS)
STRENGTHNING MANUFACTURING SECTOR
AGRICULTURE:
BENEFICIATION
SERVICE DELIVERY
HUMAN SETTLEMENT ACCREDITATION
GAP HOUSING DELIVERY - FOR WORKING CLASS (PEOPLE EARNING BETWEEN R3500 AND R12500), -
GREATER CONTROL OF HOUSING DELIVERY
ADDITIONAL FUNDS, ADDITIONAL HUMAN CAPACITY
SECTION 78 INVESTIGATION (REFUSE REMOVAL)
‘ROLL OUT’ OF REFUSE REMOVAL SERVICE
HUMAN RESOURCE CAPACITATION
ONGOING TRAINING (STAFF BURSARIES)
WORKSHOPS
TRANSPORTATION
IMPROVED INTEGRATED TRANSPORT SYSTEM (INTERMODAL FACILITIES)
CLIMATE CHANGE
ENERGY EFFICIENT CITY
REPLACEMENT OF STREET LIGHTS
GRANT FUNDING: R8m (ESKOM), R5m (COGTA)
CLIMATE CHANGE PROGRAMME:
PROFILE CLIMATE CHANGE IMPACTS AND RISKS
BASELINE KEY EMISSIONS
CONSULT LOCAL STAKEHOLDERS
OUTLINE OPPORTUNITIES FOR BOTH ADAPTATION AND MITIGATION ACROSS KEY THEMES
OUTLINE KEY STRATEGIES TO TAKE FORWARD IN PLANNING
ICLEI PROGRAMME (3 yrs)
BIODIVERSITY PLAN
INCOPORATE OF PART OF MAIN LINE PLANNING POLICIES
THE ENDThank You, Siyabonga