scaffolding & formwork
Excel lence Committed . . .
Unifix Scaffolding LLC
scaffolding & formwork
UNIFIX sca�olding LLC are the leading supplier of sca�olding and formwork systems for past 25 years with primary objective to provide value added and cost e�ective formwork & sca�olding solutions to our valued clients in the construction industry in United Arab Emirates and GCC.
Our vast experience in sca�olding and formwork industry supported with experience sta�, high standard of manufacturing, quali�ed vendors , product quality, design services enable us to provide best services to our valued clients withwork safety standard and procedures.
We pride in our self in fundamental business principal to provide reliability, uncompromising commitment to our customers in each and every job we take and execute.
The mission of UNIFIX sca�olding LLC to is to serve the construction industry with dedication, excellence, hight standard of quality control , safety procedures, providing cost e�ective and customized solution to site requirement in line with client satisfaction.
www.unifixscaffolding.com
scaffolding & formworkCuplock Support & Formwork
Cuplock Standard
Base Jack660 / 760 / 860 mm
All Jacks available in black and galvanized finish
Adj. Forkhead660 / 760 / 860 mm
Univ. Jack660 / 760 / 860 mm
www.unifixscaffolding.com
Cuplock Ledger
2.5 M
1.8 M
1.6 M
1.3 M
1.2 M
1.0 M
Cuplock Support Formwork:
Cuplock Components
1.00
1.50
2.00
57.0
45.0
33.0
Main Lift (m) Vertical Load (kN)
Internal Verticals
57.0
44.5
31.5
1.0
1.5
2.0
57.0
45.0
33.0
57.0
43.5
30.5
57.0
43.0
29.0
57.0
42.0
28.5
Bay Length (mm)Lift(m) 600 900 1200 1800 2500
External Verticals
Fixed Forkhed
200x186mm / 150x162mm
Socket Base / Adaptor
110x110mmx6mm
Spigot Connector
300mm Long
Cantilever Frame Beam BracketL : 1.5 m / 1.0 m L : 1.5 m / 1.0 m
1.3m
‘L’
1.25m1.2m
‘L’
350
3.0 M
2.5 M 2.0
M 1.5 M
1.0 M
Wt. kg 14.25 11.85 9.50 7.20 4.60
Is a traditional staging system wherein cuplock support components are deck with Aluminum primary and secondary beams or alternatively with H20 timber beams or combination of Aluminum primary and H20 secondary. The system is simple , robust and versatile and can be design for any slab soffit height and slab thickness, easy to erect and dismantle with safety. the system offers cost effective solution to high soffit slab to commerical and residential projects
Pair of top & bottom cups provided at every 500mm intervals , the captive mobile top cups are malleable casting which endures rough site handling whilst bottom cup are pressed from high quality steel. cuplock standardavailable in eight standard sizes from 3.0m to 0.8m
The forge blade ends fits in the standard top & bottom cup, the robust design of blades need minimum maintenance.ledgers available in eight standard sizes from 2.5m to 0.6m
scaffolding & formwork Decking Beam Formwork
www.unifixscaffolding.com
Length (m)
Weight (kg.)
2.5
26.4
1.8
18.0
1.2
11.9
Decking Beams (Primary)Includes 100mm wide top flange, which eliminates the necessity of a plywood infill,whereby maintenance costs are cut down.
Decking Steel Beams Fromwork
1.5
7.4
1.2
6.1
0.9
4.8
Length (m)
Weight (kg.)
1.7
8.3
Infill Beams (Secondry)Infill beams have been designed to be used with primary Decking beams Used to provied skeletal support for plywood decking.
Early Striking Technique
Dropheads
Drophead Raised Drophead Struck
Length (m)
Weight (kg.)
1.2
5.5
1.8
7.3
2.5
9.5
Intermediate Transoms
Built in simplicity with its resulting speed of erection striking and dismantling is one of the key features of the system, used with cuplock support wherein drop-head is struck in early afterpouring of the slab ( subject to achieving minimum concrete strength ) keeping the support legs intact with the slab soffit enabling secondary infills & primary beams to be removed and re-used. the system is cost effective and avoid use of timber
The quick action drophead supplied along with adaptor and nutsbolts, is designed to fit on standrad Legs, They allow primary and Secondry beams to be struck and re-used after 3-4 days, of pouring of the slab and leave the support in position.
Maximum Axial Load : 40kN
Transom provides intermediate support to wooden scaffold boardsplatform for easy accessibility and safe working.
Early striking is a teachnique whereby the formwork is removed 3 to 4 days after pouring a slab, the supporting legs of scaffolding remains undistrubed until the concrete is strong enought to support its own weight. the complete support to be removed after about 10 to 14 days, depending on the temperature and cube strength tests.
All Props available in Painted and galvanized finish
scaffolding & formwork
www.unifixscaffolding.com
Prop Formwork System
Heavy Duty Adjustable Prop Max. permitted Load 20kN & 30kN
S150 Aluminium Beam T150 Aluminium Beam
Secondry Beam Primary Beam
H20 Timber Beam Four Way Forkhead 8/20 Tripod Stand
Primary/ Secondry Timber Beam
200
80
150
80
150
75
Multi Clamps H20. to H20 Multi Clamps Alu. to H20 Universal Clamps Assembly Fork Rod Guard Post Bracket
Prop formwork system (H20 Timber / Aluminum Beams)
Benefits of the system No rigid system grid dimension Flexible and versatile system ,Fewer components making system cost effective
Is a advance propping system , heavy duty adjustable props deck withprimary & secondary H20 timber beams or alternatively with Aluminum beams or combination of Aluminum primary and H20 beam secondary, the system enables to pour any slab length x width or thickness with ease, and offers versatility and speed with minimum manpower. the system suitable for soffit height up to 4.0m max.
Design parameters governing the system Distance between Props range between 2.50m to 2.90m Distance between primary beams range between 3m to 4m Distance between secondary beams range between 0.50 to 0.75m
Heavy Duty Prop 20kN Load specification
Size
No.1
No.2
No.3
No.4
1.75m
2.10m
2.50m
3.20m
2.90m
3.50m
3.95m
4.90m
16.70kg
18.50kg
20.00kg
24.00kg
Height Closed Height Open Weight
Stabilizer/P.P Prop Push Pull Prop(Open End)
easily attached to base of the soldier, to plumb and stabilize the shutter for extra
safety , the base must be anchored to ground for uplift . A minimum two stabilizers required
per shutter. PP Prop available in four standard sizes but can bhe manufactured custom-made
Lifiting Bracketsbolted to the top of soldiers,they provide facilities for lifiting the shutter by crane
2.70m 3.15m 3.60m1.80m0.90m
scaffolding & formwork
www.unifixscaffolding.com
Soldier Wall Form System
LENGTH:LENGTH:Wt. Kg 73.00 65.00 55.80 37.00 22.50
Wt. Kg 21.00 36.50 53.50 61.00 69.00
3.60m 3.15m 2.70m 1.80m 1.20m
170m
m
150m
m
150mm225mm
Soldier Wallform System
Corner Soldiers Soldiers
Internal Corner Stripping Unit
Lifting Bracket
Swivel Shoring base
Universal Clamp
Hop-up Access Bracket Threaded Shoring Adaptor
Tubular Shoring AdaptorUniversal Clamps
conect aluminum to soldiers
Timber Waling Clampsconect timber 6”x 2” to soldiers
Heavy Duty P.P Prop Specifications
Size
No.1
No.2
No.3
No.4
1.75m
2.10m
2.50m
3.20m
2.90m
3.50m
3.95m
4.90m
15.70kg
17.00kg
18.50kg
22.50kg
Height Closed Height Open Weight
Use of strong back soldiers with aluminum beams walers can take high concrete pressure, allowing spacing of walings to be maximized and ties to be reduced result in significant cost saving , assembly and erection are minimized with fast fixing clamp and plywood nailed to the timber insert provided with Aluminum walers.
scaffolding & formwork
www.unifixscaffolding.com
Column Forms
Aluminum Beams Column Forms ( Ply faced )
Special Steel Column Forms
Column Form Work Plan layout
Special Steel Column Forms
S150 Aluminum beam walers supported by horizontal strong back steel channels tied at the corners with end bracket eliminates use of ties for column up to 1000 x1000mm, system assembly and erection are minimized with light weight components and fast fixing clamp, plywood nailed to the timber insert provided with S150 walers. forms supplied with lifting hooks, P.P brackets, corner ties.Ply supplied by customer.
Benefits of the system suitable for various sizes and columns and pour height can take high concrete pressure up to certain pour height system with minimum components is easy & fast to erect and dismantle the system is simple , versatile ,and robust in-use
Reduced cycle time Quality concrete finish Cost effective for high reuse
Custom made special steel formwork is manufactured in our purpose made factory with experience fabricators & welders in accordance with quality & inspection procedures to ensure finished products complies with design parameters and meets site and customer requirements forms supplied with lifting hooks,P.P brackets to align P.P Props
Benefits of the system High Reuse Elimination of plywood and timber costs Elimination of down time to replace form face
Stabilizer
Frame With Inbuilt Ladder
Platform
Handrails
DiagonalBrace
Four Rung Frame
8” Castor Wheels
scaffolding & formwork
www.unifixscaffolding.com
Aluminum Tower & Access Scaffold
Light Duty Access Scaffolding
Cross brace 3.0m & 2.5m length
Horizontal Brace 3.0m & 2.5m length
Aluminum Mobile Towers
Frames design for interior and exterior light access work including maintenance, system has only three major components Frames, cross brace & horizontal brace to provide speed, convenience and durability, frames provided with in-built ladders and spigots connector.
System available in 'H' Frame and Korean frame type
Korean Frame 1m x 2m
2m
1m
2m
1m
H Frame 1m x 2m
Heavy Duty Access Scaffolding Cuplok components are design and supplied for heavy duty access scaffolding , the system can be used for any heavy access work for greater working heights with ease. The system is fast and versatile to be erected and dismantle for all kind of structure with minimum man power and safety. The access system supplied with additional safty components like intermediate transom , toe board clamps , board retaining couplers, hand rail post , Guard rails and scaffold platforms to enhance safe working and performance.Benefits system very versatile and safe for site working condition Cuplock components can be used mobile tower for internal & external access work Cuplock components can be design & used for static staircase tower for site access
‘H’ Frame Assembly
Cuplock HD Access ScaffoldingAssembly
Cuplock Staircase Tower Access Assembly
Aluminum mobile tower scaffolding is light weight, fast and easy to assemble, system manufactured with advance technology & finish ,to allow tower free standing up to 12m height with support of stabilizer
Tower availabe in 2m to 12m heightSingle width : 90 cm ( width ) x 190 cm ( length )Double width: 135 cm ( width ) x 250cm ( length )
Key Features: high strength and light weight interchangeable frames with in- built ladders strong wheels with brakes Adjustable legs for quick leveling ( 40mm ) lightweight platform ( with trap door option ) Towers provided with all safety features Easier to handle , erect and dismantle
scaffolding & formwork
www.unifixscaffolding.com
Couplers & Accessories
FORGED SWIVEL COUPLER
OD 48.3 mm (EN 74 / BS - 1139)
FORGED DOUBLE COUPLEROD 48.3 mm (EN 74 / BS - 1139)
FORGED PUTLOG (Single) COUPLEROD 48.3 mm (EN 74 / BS - 1139)
UNIVERSIL CLAMP
PRESSED SLEEVE COUPLEROD 48.3 mm
(EN 74 / BS - 1139)
PROP BRACING COUPLER60mmX48mm DIA
(EN 74 / BS - 1139)
OD 48.3 mm (EN 74 / BS - 1139)
8 “ Castor Wheel with Brake8 “ Castor Wheel
Castor Wheel with adj. Jack 40cm
OD 48.3 mm (BS - 1139)
FORGED BOARD RETAINING COUPLER (BRC)
RAPID CLAMP
FORGED GRAVALOK GIRDER COUPLER(Beam Clamp)
scaffolding & formwork
www.unifixscaffolding.com
Adj.Props & Wall Ties Accessories
Heavy Duty Tie System
Adjustable Steel Props
Wing Nut
Tie Rod
Waler Plate
Plastic Reducer
Plastic Tube
Cast-iron Water BarrierPlastic Cone
Tie Assembly
Tie Rod16mm Dia / 20mm Dia
Wing Nut16mm Dia / 20mm Dia
Waler Plate 120x120mm6mm / 8mm / 10mm Thk
Dywi-dag Tie Rod (SWL) 95kn16mm Dia / 20mm Dia
Two Wing Waler Plate
Thread Water Barrier16mm Dia
Cast-Iron Water Barrier16mm Dia / 20mm Dia
Plastic Cone16mm Dia
Plastic Reducerfor Water Barrier
16mm Dia
Anchor Screw KeyExtractor
Recoverable Anchor ScrewM24 X 200 / M24 X 280
16mm Dia
Tie Rod Connector ( Hex Nut)
16mm Dia
Props available in medium and heavy duty category , heavy duty props are available in five different sizes and are manufactured in accordance with BS-1139 part 1 , all props supplied in painted and galvanized finish.
Medium duty Props Inner 48mm OD, 2mm thk & Outer pipe 60mm OD, 2mm thk. Available in One standard size 4.0m ( min 2.5m to max 4.0m ) weight 11.5Kg
H D Props Max. 15 KN loadInner 48mm OD, 3.2mm & Outer pipe 60mm OD, 3.0mm thk. supplied with heavy Duty prop sleeve and nut & G’ Type pin
H D Props Max. 20KN & 30KN LoadInner pipe 60mm OD, 3.0mm thk & Outer pipe 76mm OD, 3.0mm thk. with sp. heavy duty prop sleeve and nut. & G’ Type pin
Prop Sleeve
G Type Pin
Prop Nut With Handle
Heavy Duty Prop Max 15 kN Specification
Size
No.1
No.2
No.3
No.4
1.75m
2.10m
2.50m
3.20m
2.90m
3.50m
3.95m
4.90m
15.50kg
16.75kg
18.00kg
21.00kg
Height Closed Height Open Weight
The most popular tie system , the rapid ties are available with complete range of accessories including waler plates, wing nuts, cast iron water barrier anchors, plastic tubes and cones.The 16mm diameter tie rod has robust, self cleaning thread and safe working load (SWL) 95KN.
scaffolding & formwork
www.unifixscaffolding.com
Scaffolding Boards & Tubes
Timber Scaffold Boards
Steel Scaffold Planks
H20 Timber Beams
with anti-skids
with End steel bands
Available in 2m/3m/4m lengthin painted and Galvanised Finish
Available in 3.9m length
Size 80x200mm
Black Tubes Galvanised Tubes48mm Dia 48mm Dia
Available In 6m Length Available In 6m Length
S150 Aluminium Beam
T150 Aluminium Beam
Available lengths
H 20 Beam 1.90
H 20 Beam 2.45
H 20 Beam 2.65
H 20 Beam 2.90
H 20 Beam 3.30
H 20 Beam 3.60
H 20 Beam 3.90
H 20 Beam 4.50
H 20 Beam 4.90
H 20 Beam 5.90
H 20 Beam 11.90
Available lengths
Alu. Beam 1.50Alu. Beam 2.40Alu. Beam 2.70Alu. Beam 3.00Alu. Beam 3.60Alu. Beam 4.20Alu. Beam 4.80Alu. Beam 5.40Alu. Beam 6.00Alu. Beam 7.20
Size 75x150mm
Size 80x150mm
P.O. Box: 2627 Sharjah, U.A.E.Tel: +971-6-5216630Fax: +971-6-5216680E-mail: info@uni�xsca�olding.com Web: www.uni�xsca�olding.com for any sales enquiry please contactMob: 052 5651219, email: sales@uni�xsca�olding.com
scaffolding & formwork
Unifix Scaffolding LLC
Unifix Scaffolding LLC