UNITED STATES DISTRICT COURT DISTRICT COURT OF THE VIRGIN ISLANDS DIVISION OF ST. THOMAS AND ST. JOHN UNITED STATES OF AMERICA, ) ) Plaintiff, ) ) v. ) Civil Action No. 3:14-cv-00086-CVG-RM ) VIRGIN ISLANDS WATER AND ) POWER AUTHORITY ) ) Defendant. ) ) CONSENT DECREE Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 1 of 91

UNITED STATES DISTRICT COURT DISTRICT COURT OF THE …

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

UNITED STATES DISTRICT COURT DISTRICT COURT OF THE VIRGIN ISLANDS

DIVISION OF ST. THOMAS AND ST. JOHN UNITED STATES OF AMERICA, )

) Plaintiff, )

) v. ) Civil Action No. 3:14-cv-00086-CVG-RM

) VIRGIN ISLANDS WATER AND ) POWER AUTHORITY )

) Defendant. )

)

CONSENT DECREE

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 1 of 91

-ii-

TABLE OF CONTENTS

I. JURISDICTION AND VENUE ......................................................................................... 6

II. APPLICABILITY ............................................................................................................... 6

III. DEFINITIONS .................................................................................................................... 7

IV. CIVIL PENALTY ............................................................................................................. 11

V. COMPLIANCE REQUIREMENTS ................................................................................. 12

VI. REPORTING REQUIREMENTS .................................................................................... 42

VII. STIPULATED PENALTIES ............................................................................................ 46

VIII. FORCE MAJEURE .......................................................................................................... 57

IX. DISPUTE RESOLUTION ................................................................................................ 60

X. INFORMATION COLLECTION AND RETENTION ................................................... 62

XI. EFFECT OF SETTLEMENT/RESERVATION OF RIGHTS ......................................... 64

XII. COSTS .............................................................................................................................. 66

XIII. NOTICES .......................................................................................................................... 66

XIV. EFFECTIVE DATE .......................................................................................................... 68

XV. RETENTION OF JURISDICTION .................................................................................. 68

XVI. MODIFICATION ............................................................................................................. 68

XVII. TERMINATION ............................................................................................................... 69

XVIII. PUBLIC PARTICIPATION ............................................................................................. 70

XIX. SIGNATORIES/SERVICE............................................................................................... 70

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 2 of 91

-iii-

XX. INTEGRATION ............................................................................................................... 70

XXI. FINAL JUDGMENT ........................................................................................................ 71

XXII. APPENDICES .................................................................................................................. 71

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 3 of 91

4

WHEREAS, Plaintiff United States of America, on behalf of the United States

Environmental Protection Agency (“EPA”), filed a complaint on October 30, 2014, pursuant to

Sections 113, 110, 111, and 112, 114, 167, 502(a), of the Clean Air Act (“CAA” or “Act”),

42 U.S.C. §§ 7413, 7410, 7411, and 7412, 7477, 7661(a), alleging that Defendant Virgin

Islands Water and Power Authority (“VIWAPA”), violated the Virgin Island Air Pollution

Control Act Rules and Regulations (“VI-APCAR&R”) Section 204-22(a) and (b) that EPA

approved pursuant to Section 110 of the Act, 42 U.S.C. § 7410, requirements of the New Source

Performance Standards (“NSPS”) promulgated pursuant to Sections 111(b)(1)(B) and 114(a) of

the Act, 42 U.S.C. §§ 7411(b)(1)(B) and 7414(a), conditions in a permit issued pursuant to

Section 206-20 of the VI-APCAR&R, conditions in permits issued pursuant to the Prevention of

Significant Deterioration (“PSD”) regulations and provisions of Part C of Subchapter I of the

Act, 42 U.S.C. §§ 7470 – 7492, conditions in permits issued pursuant to provisions of the VI-

APCAR&R Sections 206-51 through 206-92, which is the EPA-approved U.S. Virgin Islands’

(“VI”) Title V Operating Permit Program, and provisions of Title V of the Act, § 7661a of the

Act, 42 U.S.C. § 7661a at its Randolph Harley Generating Facility on the Island of St. Thomas in

the U.S. Virgin Islands (“St. Thomas Facility”); and alleging VIWAPA violated National

Emission Standards for Hazardous Air Pollutants and permits issued pursuant to 206-61(d) of the

VI-APCAR&R and Title V of the Act, 42 U.S.C. § 7661a at its Cruz Bay Facility on the Island

of St. John in the U.S. Virgin Islands (“St. John Facility”).

WHEREAS, EPA issued two Notices of Violation (“NOV”) for the St. Thomas Facility

pursuant to Section 113(a)(1) of the Act, 42 U.S.C. § 7413(a)(1), on November 10, 2010 and

May 7, 2014 for violations of permits issued pursuant to the PSD provisions of Part C of

Subchapter I of the Act, 42 U.S.C. §§ 7470 – 7492.

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 4 of 91

5

WHEREAS, the Complaint against Defendant alleges failures to operate required

emission controls and monitoring systems, comply with emissions limits, perform required tests

and audits, operate monitoring devices, maintain sufficient data availability, and accurately

report noncompliance at the St. Thomas Facility; and alleges failures to perform required tests,

comply with the St. Thomas Title V Operating Permit, and timely submit a Title V Operating

Permit renewal application at the St. John Facility.

WHEREAS, on July 25, 2013, Defendant entered into a contract with Vitol Virgin

Islands Corp. (“Vitol”) with respect to the supply and storage of LPG and the conversion of

Units 15, 18 and 23 to enable VIWAPA to burn LPG in addition to oil.

WHEREAS, the Vitol contract, subject to certain exceptions set forth therein, requires

that after the conversion of a Unit is completed, when LPG is available, the units capable of

burning LPG collectively shall burn LPG to generate no less than eighty-five percent (85%) of

all kilowatt hours from converted units over the course of any given calendar year.

WHEREAS, the Unit 22 combustion turbine is not currently operational and will not

Startup unless and until a replacement engine is installed, which will occur no earlier than May,

2016. If the Defendant elects to replace Unit 22 with a new unit, that unit will be required to be

independently permitted.

WHEREAS, if Defendant purchases Unit 25, it will convert the Unit to enable it to burn

LPG as the primary fuel.

WHEREAS, Defendant does not admit any liability to the United States arising out of the

transactions or occurrences alleged in the Complaint. The United States and the Defendant agree

that settlement without further litigation and without admission or adjudication of any issue of

fact or law is the most appropriate means of resolving the action.

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 5 of 91

6

WHEREAS, the Parties agree, and the Court by entering this Consent Decree finds, that

this Consent Decree has been negotiated by the Parties in good faith and will avoid litigation

between the Parties regarding the St. Thomas Facility and the St. John Facility, and that this

Consent Decree is fair, reasonable, and in the public interest.

NOW, THEREFORE, before the taking of any testimony, without the adjudication or

admission of any issue of fact or law, and with the consent of the Parties, IT IS HEREBY

ADJUDGED, ORDERED, AND DECREED as follows:

I. JURISDICTION AND VENUE

1. This Court has jurisdiction over the subject matter of this action, pursuant to 28

U.S.C. §§ 1331, 1345, and 1355 and 1367 and Sections 113(b) and 304(a) of the CAA, 42 U.S.C.

§§ 7413(b) and 7604(a), and over the Parties. Venue lies in this District pursuant to Sections

113(b) and 304(c) of the Act, 42 U.S.C. §§ 7413(b) and 7604(c) and 28 U.S.C. §§ 1391 (b) and

(c) and 1395(a), because the violations alleged in the Complaint occurred in this District. For

purposes of this Decree, or any action to enforce this Decree, Defendant consents to the Court’s

jurisdiction over this Decree and any such action over Defendant and consents to venue in this

judicial district.

2. For purposes of this Consent Decree, Defendant agrees that the Complaint states

claims upon which relief may be granted pursuant to Sections 113, 502(a), 167, 111 and 112 of

the CAA, 7413, 7661(a), 7477, 7411 and 7412.

II. APPLICABILITY

3. The obligations of this Consent Decree apply to and are binding upon the United

States and upon Defendant and any successors, assigns, or other entities or persons otherwise

bound by law.

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 6 of 91

7

4. No transfer of ownership or operation of the St. Thomas Facility or the St. John

Facility, whether in compliance with the procedures of this Paragraph or otherwise, shall relieve

Defendant of its obligation to ensure that the terms of the Decree are implemented. At least 30

Days prior to such transfer, Defendant shall provide a copy of this Consent Decree to the

proposed transferee and shall simultaneously provide written notice of the prospective transfer,

together with a copy of the proposed written agreement, to EPA Region 2, the United States

Attorney for the District of the Virgin Islands, and the United States Department of Justice, in

accordance with Section XIII (Notices). Any attempt to transfer ownership or operation of the

St. Thomas Facility or the St. John Facility without complying with this Paragraph constitutes a

violation of this Decree.

5. Defendant shall provide a copy of this Consent Decree to all officers, employees,

and agents whose duties might reasonably include compliance with any provision of this Decree,

as well as to any contractor retained to perform work required under this Consent Decree.

Defendant shall condition any such contract upon performance of the work in conformity with

the terms of this Consent Decree.

6. In any action to enforce this Consent Decree, Defendant shall not raise as a

defense the failure by any of its officers, directors, employees, agents, or contractors to take any

actions necessary to comply with the provisions of this Consent Decree.

III. DEFINITIONS

7. Terms used in this Consent Decree that are defined in the CAA or in regulations

promulgated pursuant to the Act shall have the meanings assigned to them in the Act or such

regulations, unless otherwise provided in this Consent Decree. Whenever the terms set forth

below are used in this Consent Decree, the following definitions shall apply:

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 7 of 91

8

a. “Capacity Performance Testing” shall mean testing used to evaluate the

aero-thermodynamic performance of the gas turbine and to guarantee the machine’s capacity and

heat rate at specific conditions;

b. “CEMS” shall mean continuous emissions monitoring system;

c. “Clean Air Act” or “the Act” shall mean the federal Clean Air Act, 42

U.S.C. §§ 7401 – 7671q, and its implementing regulations;

d. “Complaint” shall mean the complaint filed by the United States in this

action;

e. “Consent Decree” or “Decree” shall mean this Decree and all appendices

attached hereto which are listed in Section XXII (Appendices);

f. “Converted Units” shall mean Unit 15, Unit 18, Unit 23 and any other unit

at the St. Thomas Facility that has achieved Substantial Completion.

g. “COMS” shall mean continuous opacity monitoring system;

h. “CGAs” shall mean cylinder gas audits as defined in 40 C.F.R. Part 60,

Appendix F, Condition 5.1.2;

i. “Date of Lodging” shall mean the date on which this Consent Decree is

filed for lodging with the Clerk of the Court for the United States District Court for the District

of the Virgin Islands Division of St. Thomas and St. John;

j. “Day” shall mean a calendar day unless expressly stated to be a business

day. In computing any period of time under this Consent Decree, where the last day would fall

on a Saturday, Sunday, federal or U.S. Virgin Island holiday, the period shall run until the close

of business of the next business day;

k. “Defendant” and “VIWAPA” shall mean the Virgin Islands Water And

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 8 of 91

9

Power Authority;

l. “EPA” shall mean the United States Environmental Protection Agency

and any of its successor departments or agencies;

m. “Effective Date” shall have the definition provided in Section XIV

(“Effective Date”);

n. “HRSG 21” shall mean the heat recovery steam generator that recovers

exhaust heat from Unit 15 and/or Unit 18 to produce steam;

o. “Malfunction” shall mean, as specified in 40 C.F.R. § 60.2, “any sudden,

infrequent, and not reasonably preventable failure of air pollution control equipment, process

equipment, or a process to operate in a normal or usual manner. Failures that are caused in part

by poor maintenance or careless operation are not malfunctions.”

p. “Paragraph” shall mean a portion of this Decree identified by an Arabic

numeral;

q. “Parties” shall mean the United States and Defendant;

r. “PSD Permits” refer to the St. Thomas Consolidated PSD Permit, issued

by EPA on February 20, 2007 and modified on June 18, 2007 and September 23, 2013, for Units

15, 18, 22 and the Unit 23 PSD Permit, issued by EPA on September 8, 2004 and amended on

October 21, 2004;

s. “Renewables” shall mean electricity produced from solar, wind, biogas,

geothermal, biomass, low-impact hydro and any other emerging technologies that VIWAPA

meters and that is fed to the St. Thomas power grid. Renewables shall not mean electricity

produced from waste to energy facilities.

t. “RATAs” shall mean Relative Accuracy Test Audits;

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 9 of 91

10

u. “Section” shall mean a portion of this Decree identified by a roman

numeral;

v. “Shutdown” shall mean the cessation of operation of equipment for any

purpose;

w. “St. John Facility” shall mean Defendant’s Cruz Bay Facility located on

the island of St. John, U.S. Virgin Islands;

x. “St. John Title V Operating Permit” shall mean the Title V Operating

Permit issued to the St. John Facility by the Virgin Islands Department of Planning and Natural

Resources (“VIDPNR”) on March 3, 2015;

y. “St. Thomas Facility” shall mean Defendant’s Krum Bay Generating

Facility located on the island of St. Thomas, U.S. Virgin Islands;

z. “St. Thomas Title V Operating Permit” shall mean the Title V Operating

Permit issued to the St. Thomas Facility by VIDPNR on December 31, 2003 and/or any renewal

Title V Operating Permit(s) issued to the St. Thomas Facility subsequently;

aa. “Startup” shall mean the setting in operation of equipment for any

purpose.

bb. “Substantial Completion” shall mean that a Converted Unit is capable and

mechanically able to burn LPG, which shall be deemed to occur when: 1) storage tanks have

been loaded with LPG, 2) LPG can be continuously supplied to the Converted Unit, and 3) the

Converted Unit has successfully completed commissioning (as set forth in Sections 7.04 and

7.05 and Exhibit B of the July 25, 2013 contract with Vitol attached as Appendix A). Until

termination of the Vitol contract, in order for commissioning to be deemed complete, VIWAPA

and Vitol shall have certified completion, with only “non-critical” punch list items remaining to

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 10 of 91

11

be addressed, and VIWAPA shall have issued a “Certificate of Substantial Completion,” as

provided in Sections 7.04 and 7.05 of that contract.

cc. “Unit 14,” “Unit 15,” “Unit 18,” “Unit 22,” “Unit 23,” and “HRSG 21”

refer to the emission units identified as Units 14, 15, 18, 22, 23, and HRSG 21 respectively, in

the St. Thomas Title V Operating Permit and the PSD Permits. “Unit 25” refers to the emission

unit identified as Unit 25 in the Unit 25 Operating Permit;

dd. “Unit 25 Operating Permit” shall mean the permit VIDPNR issued on

March 15, 2012 authorizing VIWAPA to construct and operate Unit 25; and

ee. “United States” shall mean the United States of America, acting on behalf

of the EPA.

IV. CIVIL PENALTY

8. Within 30 Days after the Effective Date, Defendant shall pay the sum of

$1,300,000.00 as a civil penalty, together with interest accruing from the Effective Date. Interest

on the civil penalty shall accrue at the rate specified in 28 U.S.C. § 1961 as of the date of

payment.

9. Defendant provided financial information that demonstrated Defendant has a

limited ability to pay civil penalties at this time. Therefore, Defendant shall pay the penalty

amount in four installment payments plus interest. Defendant shall pay the first payment of

$400,000 within 30 days of the Effective Date, together with interest from the Effective Date.

Defendant shall pay the second, third, and fourth payments respectively, each in the amount of

$300,000, together with interest from the Effective Date no later than June 30, 2016, June 30,

2017, and January 30, 2018.

10. Defendant shall pay the civil penalty due by FedWire Electronic Funds Transfer

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 11 of 91

12

(“EFT”) to the U.S. Department of Justice, in accordance with written instructions to be provided

to Defendant, following entry of the Consent Decree, by the Financial Litigation Unit of the U.S.

Attorney’s Office for the District of Virgin Islands. At the time of payment, Defendant shall

send a copy of the EFT authorization form and the EFT transaction record, together with a

transmittal letter, which shall state that the payment is for the civil penalty owed pursuant to the

Consent Decree in United States v. Virgin Islands Water and Power Authority, and shall

reference the civil action number 3:14 cv – 00086 and DOJ case number 90-5-2-1-10424, to the

United States in accordance with Section XIII (Notices); by email to

[email protected]; and by mail to:

EPA Cincinnati Finance Office 26 Martin Luther King Drive Cincinnati, Ohio 45268

11. Defendant shall not deduct any penalties paid under this Decree pursuant to this

Section or Section VII (Stipulated Penalties) in calculating its federal income tax.

V. COMPLIANCE REQUIREMENTS

12. St. Thomas Facility

a. With respect to the St. Thomas Facility, Defendant shall comply with all

applicable provisions of the Act, all applicable requirements of the NSPS, and the Virgin Island

State Implementation Plan (“VI SIP”), as well as conditions in the Unit 25 Operating Permit, the

PSD Permits and the St. Thomas Title V Operating Permit.

b. If VIWAPA purchases Unit 25, which requires a water injection system,

and VIWAPA is then required to install CEMS and/or COMS, Unit 25 shall be subject to the

relevant requirements of Paragraphs 14, 15, 16, 17, 18 and 19 and relevant requirements in

Sections VI (Reporting Requirements) and VII (Stipulated Penalties).

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 12 of 91

13

c. If VIWAPA refurbishes Unit 14 and the refurbishment triggers PSD

review or NSPS applicability and the refurbishment results in Unit 14 becoming subject to a

requirement to install a water injection system, CEMS and/or COMS, then Unit 14 shall be

subject to the relevant requirements of Paragraphs 14, 15, 16, 17, 18 and 19 and relevant

requirements in Sections VI (Reporting Requirements) and VII (Stipulated Penalties).

d. If VIWAPA replaces Unit 14, 22 and/or 25, with a similar unit(s), and the

replacement triggers PSD review or NSPS applicability and the replacement results in the

requirement to install a water injection system, CEMS, and/or COMS, the replacement unit(s)

shall be subject to the relevant requirements of Paragraphs 14, 15, 16, 17, 18 and 19 and relevant

requirements in Sections VI (Reporting Requirements) and VII (Stipulated Penalties).

e. If VIWAPA refurbishes or purchases a unit that burns LPG/LNG, that

unit(s) shall be subject to the requirements of Paragraph 13.

f. Within 30 days of VIWAPA’s decision to either purchase, refurbish or

replace Units 14, 22 and/or 25, VIWAPA shall a) send written notice to the United States in

accordance with Section XIII (Notices), of the decision and b) include in Quarterly Reports

required under Section VI (Reporting Requirements), documentation pertaining to bids,

contracts, scheduling and implementation.

13. LPG/LNG Requirements at the St. Thomas Facility

a. Requirements for all Converted Units

i. Beginning on the first Day of the first full month after Substantial

Completion of more than one Converted Unit, for each 12-month rolling average period, the

kilowatt hours (“kWh”) VIWAPA generates from all Converted Units while burning LPG/LNG

and the kWh VIWAPA generates from Renewables shall be a minimum of eighty-five percent

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 13 of 91

14

(85%) of the total kWh generated from the Converted Units and the kWh generated from

Renewables.

ii. Beginning on the first Day of the first full month after Substantial

Completion of more than one Converted Unit, VIWAPA shall calculate monthly, the 12-month

rolling average percent kWh generated by the Converted Units while burning LPG/LNG, and the

kWh generated by Renewables. From the first day of the first full month after an additional

Converted Unit has achieved Substantial Completion and has begun to burn LPG/LNG,

VIWAPA shall include the kWh generated from the additional Converted Unit when calculating

the 12-month rolling average percent.

iii. VIWAPA shall use the following equation to calculate the 12-

month rolling average percent kWh from all Converted Units while burning LPG/ LNG and the

kWh from Renewables:

Where:

P = Percent kWh generated from Renewables and from all Converted Units while burning LPG/ LNG for the past 12 months

kWhlpg = Total kWh generated from all Converted Unit(s) while burning LPG/LNG during the past 12 months.

kWhfuel oil = Total kWh generated from all Converted Unit(s) while burning fuel oil during the past 12 months.

kWhr= Total kWh generated from Renewables during the past 12 months.

b. Requirement for each Converted Unit

i. Beginning on the first Day of the first full month after Substantial

Completion of each Converted Unit, for each 12-month rolling period, VIWAPA shall generate a

minimum of sixty-five percent (65%) of kWh generated from each Converted Unit while burning

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 14 of 91

15

LPG/LNG.

ii. Beginning on the first full month after Substantial Completion of

each Converted Unit, VIWAPA shall calculate, monthly, the 12-month rolling average percent

kWh generated by each Converted Unit while burning LPG/LNG.

iii. VIWAPA shall use the following equation to calculate the 12-

month rolling average percent kWh generated from each Converted Unit while burning

LPG/LNG:

Where:

P = Percent kWh generated from each Converted Unit while burning LPG/ LNG for the past 12 months.

kWhlpg = Total kWh generated from each Converted Unit while burning LPG/LNG during the past 12 months.

kWhfuel oil = Total kWh generated from each Converted Unit(s) while burning fuel oil during the past 12 months. c. Requirement for website identification. At the fifteenth Day of each

month until termination of this Consent Decree, on its website accessible through a link on its

home page, VIWAPA shall identify the kWh of power generated by Renewables and the kWh of

power generated while LPG/LNG and while burning fuel oil during the preceding month at the

St. Thomas Facility.

d. Requirement for request to permitting authority. No later than 150 Days

after the Date of Lodging, VIWAPA shall:

i. Submit a request to the permitting authority, VIDPNR, to include

in the Title V Operating Permit:

(1) the requirements included in 13.a and b above, until

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 15 of 91

16

termination of the Consent Decree;

(2) the requirement that Units 15, 18, 22, and 23 be limited to

burn 40 million gallons of fuel oil each 12-month rolling period after termination of the Consent

Decree as a state operating permit Title I requirement subject to force majeure and in a force

majeure event, subject to other applicable permit limits; and

ii. Concurrently submit copies of the request, required by Paragraph

d.i above, to the United States in accordance with Paragraph 78.

14. St. Thomas Spare Parts Inventory Program for the Water Injection Systems and Continuous Monitoring Systems

a. VIWAPA submitted, and on August 19, 2015 EPA approved, the St.

Thomas Spare Parts Inventory Program for the water injection systems for Units 15, 18, and 23

and for the continuous monitoring systems (CEMS/COMS) for Units 15, 18, 23 and the HRSG

21.

b. On or before the Startup of Unit 22, Defendant shall notify the United

States in accordance with Section XIII (Notices) of its intent to Startup Unit 22. Within 60 Days

of Startup, Defendant shall submit amendments to the Spare Parts Inventory Program, obtain

spare parts for Unit 22 and comply with this Paragraph.

c. The St. Thomas Spare Parts Inventory Program1 identifies spare parts

necessary to be kept at VIWAPA’s St. Croix Facility or St. Thomas Facility to enable the St.

Thomas Facility to properly operate and maintain the water injection systems and the continuous

monitoring systems.

1 The St. Thomas Spare Parts Inventory Program is similar to the St. Croix Spare Parts Inventory Program required by the consent decree in Civil Action No. 2013-CV-00028 for VIWAPA’s St. Croix Facility.

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 16 of 91

17

d. The St. Thomas Spare Parts Inventory Program is designed to ensure

minimum downtime in the event of a water injection system or continuous monitoring system

failure.

e. The St. Thomas Spare Parts Inventory Program shall contain, at a

minimum, the following: a computerized Spare Parts Inventory Tracking System ("SPITS") that

indicates, for each Unit, the following information for each hardware component included in the

St. Thomas Spare Parts Inventory Program:

i. the location of replacement components in the St. Thomas Spare

Parts Inventory;

ii. the identification of the manufacturer(s) from whom each

component can be procured;

iii. the lead time (which includes the delivery time) for procurement of

the replacement component in the St. Thomas Spare Parts Inventory;

iv. the minimum quantity of each replacement component maintained

in the St. Thomas Spare Parts Inventory at which the part must be reordered. This number shall

be determined by evaluating, at the very least, the lead time for procurement and the frequency at

which each component is required to be replaced in the equipment. VIWAPA shall procure spare

parts at the time or before the inventory reaches this minimum quantity; and

v. VIWAPA shall also ensure that all necessary parts are always on

hand at VIWAPA’s St. Croix or St. Thomas Facilities. For purposes of this paragraph and

Paragraph 14.i, a spare part shall be deemed to be “procured” when VIWAPA has placed the

order for the part with the vendor, and has made all payments required by the vendor before the

vendor will ship the part to VIWAPA.

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 17 of 91

18

f. By the Date of Lodging and thereafter until termination of the Consent

Decree, VIWAPA shall develop, maintain, and retain the following lists and/or logs with respect

to the components in the St. Thomas Spare Parts Inventory:

i. a list/log of the frequency at which such hardware components are

required to be replaced;

ii. a list/log of the dates of procurement and dispatch for each

component replaced from the Date of Lodging until termination of the Consent Decree. Such

list/log shall specify the reason for replacement (e.g., preventive maintenance, excessive wear,

etc.);

iii. a list indicating components that may only be replaced during an

outage;

iv. a list indicating components that can be replaced without

conducting an outage of a Unit and specifying which of those components can be replaced

without interference with a Unit's ability to comply with all applicable requirements during the

process of replacement; and

v. a list of all spare part components covered under the St. Thomas

Spare Parts Inventory Program that are maintained at VIWAPA’s St. Croix or St. Thomas

Facilities, which are required to maintain the water injection systems and continuous monitoring

systems; and a list of which spare part components are not maintained at or above the minimum

required by the St. Thomas Spare Parts Inventory Program at either the St. Croix or St. Thomas

Facilities and the reasons why they are unable to be maintained at or above the minimum at

either the St. Croix or St. Thomas Facilities.

g. By the Date of Lodging, VIWAPA shall maintain and track a spare parts

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 18 of 91

19

inventory and provide training, as follows:

i. VIWAPA shall implement two modules of the IBM Maximo

system, version 7.5, for the issuance of work orders for maintenance and inventory management

for the spare parts for the water injection systems relating to Units 15, 18, 22 and 23 and the

CEMS/COMS relating to Units 15, 18, 22, 23 and HRSG 21;

ii. VIWAPA shall include basic data on the number and location of

the components identified in Appendix B (spreadsheets containing essential parts for the water

injection systems and the CEMS/COMS) in the Maximo Inventory Management module, which

shall be available to EPA in electronic form upon request;

iii. VIWAPA shall ensure that the Maximo Work Order module

accesses the Inventory Management module and records the spare part components that have

been removed from the inventory;

iv. VIWAPA shall retain a contractor to train VIWAPA personnel on

the two modules of the IBM Maximo system, Version 7.5, to help populate the Inventory

Management module with the CEMS/COMS and NOX water injection system parts data from the

warehouse and storage yards inside of the plant(s) on either St. Croix or St. Thomas;

v. VIWAPA shall ensure that the part number/stock number, part

description and combined quantity on hand as tracked in the water injection system Spare Parts

Inventory Program and the CEMS/COMS Spare Parts Inventory Program spreadsheets (attached

as Appendix B) are also tracked in Maximo;

vi. In each Quarterly Report required under Section VI (Reporting

Requirements), VIWAPA shall report on its compliance with the Spare Parts Inventory Program

requirements based upon the information being tracked in the spreadsheets (attached as

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 19 of 91

20

Appendix B) and provide the spreadsheets for the quarter in electronic form to EPA upon

request;

vii. In instances, if any, where the Maximo tracking and spreadsheets

(attached as Appendix B) are in disagreement, the data from the Maximo modules relevant to the

discrepancy shall be provided in the Quarterly Reports required under Section VI (Reporting

Requirements) along with the spreadsheets and an explanation as to the discrepancy; and

viii. VIWAPA shall continue the use of its SunGard software package

or a comparable program for requisitions and purchase orders. The screen shots from SunGard

on requisitions and purchase orders shall be available to EPA upon request in electronic format.

h. By signing this Consent Decree, VIWAPA certifies under penalty of law

to EPA that, except for those parts identified in Appendix C, all the replacement parts identified

in the Spare Parts Inventory Program are on-site on either St. Croix or St. Thomas and are

available for use on St. Thomas. The parts identified in Appendix C shall be on-site on either St.

Croix or St. Thomas by the date specified in Appendix C.

i. VIWAPA shall procure, at a minimum, replacement parts to ensure that

each part is maintained at or above the minimum amount identified in the Spare Parts Inventory

Program no later than sixty Days of the date when the part fell below the minimum.

j. VIWAPA shall maintain compliance with its EPA approved St. Thomas

Spare Parts Inventory Program for the duration of this Consent Decree.

k. In each Quarterly Report required under Section VI (Reporting

Requirements), VIWAPA shall report on its compliance with the St. Thomas Spare Parts

Inventory Program, identify the date any part fell below the minimum amount identified in the

Spare Parts Inventory Program, and identify each instance and duration of time in which

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 20 of 91

21

VIWAPA failed to procure a spare part within the sixty Days of the date when the part fell below

the minimum amount, as required by the St. Thomas Spare Parts Inventory Program and this

Paragraph.

15. St. Thomas Water Injection Systems

a. VIWAPA shall operate its water injection systems as required by the PSD

Permits and the St. Thomas Title V Operating Permit. By no later than 15 days after the Date of

Lodging, VIWAPA shall submit a request to the permitting authority to include the water to fuel

ratios established during EPA approved performance testing and approved by EPA for Units 15,

18 and 23 as enforceable standards in the St. Thomas Title V Operating Permit.

b. Before the Startup of Unit 22, Defendant shall submit, for EPA approval, a

Performance Test protocol for Unit 22. Within 90 Days of the Startup of Unit 22, Defendant

shall conduct Performance Testing in accordance with the EPA approved protocol.

c. By signing this Consent Decree, VIWAPA certifies under penalty of

perjury to EPA that it uses, and intends to continue to use, industrial grade water on its water

injection systems.

d. In each Quarterly Report required under Section VI (Reporting

Requirements), VIWAPA shall:

i. report on any periods when industrial grade water was not

available for the water injection system at any of the Units in operation;

ii. identify which unit, if any, was not utilizing industrial grade water

during the reporting period;

iii. identify which unit, if any, that is not currently receiving industrial

grade water;

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 21 of 91

22

iv. explain why industrial grade water was or is not available; and

v. identify and explain the actions VIWAPA has or will take to make

the industrial grade water available.

e. VIWAPA submitted to EPA for review and approval a Water Injection

System Training Program for employees on the operation and maintenance of the water injection

systems. EPA approved the Water Injection System Training Program on February 27, 2014,

and the training program includes the following:

i. the frequency of training, which shall be no less than annual, for all

employees who will be operating and/or maintaining the water injection systems, including plans

to train any new employees hired during the calendar year;

ii. incorporation of the requirements of the Water Injection System

Preventative Operation and Maintenance Plan developed pursuant to Paragraph 15.j below; and

iii. provision that requires that training be provided within thirty (30)

days of any employee being assigned to operate and maintain the water injection systems.

f. No later than the Date of Lodging, VIWAPA shall provide periodic

training (at least annually) pursuant to the Water Injection System Training Program for all

employees who will be operating and/or maintaining the water injection systems. VIWAPA

shall thereafter provide training for all employees operating and/or maintaining the water

injection systems pursuant to the schedule outlined in the Water Injection System Training

Program.

g. By signing this Consent Decree, VIWAPA certifies under penalty of law

that it has available, on-site at the St. Thomas Facility at all times that the facility is operating, at

least one technical person or engineer who has completed the Water Injection System Training

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 22 of 91

23

Program and who is trained and experienced in operating and maintaining the water injection

systems. Such person shall be able to respond by either i) correcting deficiencies, ii) shutting

down the Unit, or iii) obtaining on-site, within two hours, a trained technical person,

maintenance person, or engineer to correct deficiencies.

h. In each Quarterly Report required under Section VI (Reporting

Requirements), VIWAPA shall report any instances when a trained technical person or engineer

is not available to correct any deficiencies or remove a unit from service, or obtain on-site,

within two hours, a trained technical person, maintenance person, or engineer to initiate efforts to

correct deficiencies, as required by sub-paragraph 15.g above, and provide an explanation as to

why a trained technical person or engineer was not available to correct deficiencies.

i. In each Quarterly Report required under Section VI (Reporting

Requirements), VIWAPA shall:

i. report on the training that it has provided pursuant to the Water

Injection System Training Program;

ii. identify the employees who have been trained pursuant to the

Water Injection System Training Program in that reporting period;

iii. identify any employees, required to be trained that reporting

period, who have not yet received their required training and indicate the dates that training for

these employees is scheduled to occur; and

iv. indicate what training materials were utilized in the training

conducted pursuant to the Water Injection System Training Program and make these materials

available upon request.

j. On February 26, 2015, VIWAPA submitted the NOX Control Water

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 23 of 91

24

Injection System Preventative Operation and Maintenance Plan (“O&M Plan”) for the St.

Thomas Facility. EPA approved the O&M Plan on August 19, 2015. The purpose of the St.

Thomas O&M Plan is to ensure that proper procedure and maintenance is followed in order to

maintain the water injection systems and comply with the Act, the PSD Permits and the St.

Thomas Title V Operating Permit, and all applicable regulations. The St. Thomas O&M Plan

provides standard operating procedures and addresses the items listed in Appendix D.

k. VIWAPA shall maintain compliance with the St. Thomas O&M Plan.

Any changes VIWAPA proposes to the St. Thomas O&M Plan shall be submitted to EPA, for

EPA review and approval, indicating the proposed change and the rationale for the proposed

change.

l. In each Quarterly Report required under Section VI (Reporting

Requirements), VIWAPA shall submit to EPA a Water Injection System Data Sheet (similar in

form to the data sheet attached to this Decree as Appendix E), which shall include, at a

minimum, the following information for the previous quarter:

i. hours of water injection system downtime;

ii. water injection system downtime as a percent of total source

operating time (for the quarter);

iii. explanations for any water injection system downtime; and

iv. proposed corrective actions for any water injection system

downtime.

m. By January 1, 2016, and continuing every 24 months thereafter until the

Consent Decree is terminated, a third party audit of the water injection systems shall be

conducted for Units 15, 18, 22 and 23, when operable, and where necessary when not operable

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 24 of 91

25

(“Water Injection System Third Party Audit”). For any unit that is not operable at the time of a

scheduled audit, Defendant shall conduct an audit of that Unit’s operation within three months of

Startup. The Water Injection System Third Party Audit shall mean a system wide audit to be

conducted by a third party auditor, who could be, for this matter, a representative of the

manufacturer of the turbine(s), if approved by EPA, that includes, but is not limited to, the

following: determination of the integrity of the water injection system; evaluate, at a minimum,

each component that is identified in Appendix F; identification of the causes of any system

failure; and incidences, if any, in which VIWAPA operators switch the water injection pumps

due to mechanical problem with a pump or when there has been a failure to meet the water

injection limits.

n. At least 60 days before an audit is scheduled to commence, VIWAPA

shall submit, to EPA for review and approval, the name and credentials of a proposed third party

auditor who has experience in operation and maintenance of water injection systems for turbines

at power plants. To satisfy the Water Injection System Third Party Audit requirements of this

Consent Decree, VIWAPA shall ensure that a third party auditor is approved by EPA at least

forty-five days prior to commencement of the audit

o. VIWAPA shall ensure compliance with, and include in its contract with

the water injection system third party auditor, a condition requiring the auditor to concurrently

submit to EPA any Water Injection System Third Party Audit Reports, including drafts, that it

submits to VIWAPA. In addition, VIWAPA shall ensure that all correspondence between

VIWAPA and the Third Party Auditor regarding any disagreements and a summary of any oral

resolution of any disagreement is submitted to EPA.

p. By no later than 30 days after completion of a Water Injection System

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 25 of 91

26

Third Party Audit, a Water Injection System Third Party Audit Report shall be submitted

concurrently to VIWAPA and EPA.

q. Each Water Injection System Third Party Audit Report shall include, at a

minimum, the following information:

i. auditor’s recommendations for correcting system failure issues,

including deadlines by which each corrective action will be implemented;

ii. any water injection system integrity issues identified by the third

party audit and the auditor’s recommendations to address these water injection system integrity

issues;

iii. any issues with the redundant water injection pumps identified as a

result of the audit; and

iv. a certification by the project manager for the audit, in accordance

with Paragraph 32.

r. By no later than 60 days after completion of the Water Injection System

Third Party Audit, VIWAPA shall submit, to EPA for review and approval, VIWAPA’s

responses to the Water Injection System Third Party Audit Report recommendations.

VIWAPA’s responses shall include dates that recommendations were implemented; plans to

implement the recommendations and/or alternatives to the recommendations and/or any

alternative dates for implementation.

s. Where VIWAPA provides alternatives to the auditor’s recommendations,

it must provide, to EPA, for review and approval, an explanation and rationale for why VIWAPA

believes the recommendation should be modified and/or is not necessary and/or not feasible for

compliance with CAA requirements, applicable permits and/or this Consent Decree.

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 26 of 91

27

t. VIWAPA shall either implement the third party auditor

recommendation(s) and/or VIWAPA’s alternative measure(s) by the date(s) recommended by the

auditor or provided by VIWAPA, or if EPA does not approve of the recommendation(s) and/or

alternative measure(s) and/or date(s) proposed, VIWAPA shall implement in accordance with

EPA’s comments, unless successfully challenged in Dispute Resolution.

u. No later than January 1, 2017, and continuing every 24 months thereafter

until the Consent Decree is terminated, VIWAPA shall conduct a self-audit of the water injection

systems for each of Units 15, 18, 22 and 23 that is operable (Water Injection System Self-Audit).

For any unit that is not operable at the time of a scheduled audit, Defendant shall conduct an

audit of that Unit’s operation within three months of Startup. The Water Injection System Self-

Audit shall include, at a minimum, the following information:

i. evaluation of the integrity of the water injection system;

ii. evaluation of the integrity of, at a minimum, each component that

is identified in Appendix F;

iii. identification of the causes of any system failure; and

iv. identification of incidences, if any, in which VIWAPA operators

switch the water injection pumps and the reasons for, and circumstances behind, such incidences.

v. By no later than 45 days after completion of the Water Injection System

Self-Audit, VIWAPA shall submit, a Water Injection System Self-Audit Report to EPA. Each

Water Injection System Self-Audit Report shall include, at a minimum, the following

information:

i. any water injection system integrity issues identified during the

audit;

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 27 of 91

28

ii. any issues with the redundant water injection pumps identified as a

result of the audit;

iii. recommendations to implement remedial actions to address any

integrity issues with the water injection system or issues with the redundant water injection

pumps. Such recommendations shall include, for EPA review and approval, proposed dates to

implement the recommendations; and

iv. a certification in accordance with Paragraph 32.

w. VIWAPA shall either implement the self-audit recommendation(s) by the

date(s) recommended, or if EPA does not approve of the recommendation(s) and/or date

proposed, VIWAPA shall implement in accordance with EPA’s comments, unless successfully

challenged in Dispute Resolution.

16. St. Thomas NOX and CO CEMS and COMS

a. VIWAPA shall maintain and operate NOX and CO CEMS and COMS at

Units 15, 18, 22, 23 and HRSG 21 where required by permit.

b. No later than the Date of Lodging for Units 15, 18, 23 and HRSG 21, and

within seven days of Startup of Unit 22, VIWAPA shall use the CEMS daily calibration data

sheet (“CEMS Daily Calibration Data Sheet”) for each CEMS. The CEMS Daily Calibration

Data Sheet shall include daily calibrations for the zero and high range for each CEMS.

c. By January 1, 2016, and continuing every 24 months thereafter until the

Consent Decree is terminated, a system wide third-party audit of the NOX and CO CEMS and

COMS (“CEMS/COMS Third Party Audit”) shall be conducted for each of the Units that is

operable. For any unit that is not operable at the time of a scheduled audit, the CEMS/COMS

Third Party Audit shall be conducted within three months of Startup of the Unit. The

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 28 of 91

29

CEMS/COMS Third Party Audit shall be conducted by a third party auditor approved by EPA,

who has an expertise in operating, maintaining and repairing CEMS/COMS, and shall include, at

a minimum, the following information:

i. identification and determination of the causes of any

CEMS/COMS system failure, including Data Acquisition and Handling System (“DAHS”)

failures;

ii. evaluations of the integrity of, at a minimum, each component that

is identified in Appendix G;

iii. identification of any untimely performance of any QA procedure

(i.e., PS1 for COMS, CGA and RATAs for CEMS, daily calibration drifts);

iv. evaluations of whether all personnel involved in the operation of

CEMS and COMS operations have been timely trained on CEM/COMS procedures; and

v. evaluations of all technician/operator journals on daily operational

status and maintenance to determine if it is maintained and up to date.

d. At least 60 days before an audit is scheduled to commence, VIWAPA

shall submit, to EPA for review and approval, the name and credentials of a proposed third party

auditor who has expertise in operation, maintenance and repair of CEMS/COMS. To satisfy the

CEMS/COMS Third Party Audit requirements, VIWAPA shall ensure that a third party auditor

is approved by EPA at least forty-five days prior to commencement of the audit.

e. VIWAPA shall ensure compliance with, and include in its contract with

the CEMS/COMS third party auditor, a condition requiring the auditor to concurrently submit, to

EPA, any CEMS/COMS Third Party Audit Report, including drafts, that it submits to VIWAPA.

In addition, VIWAPA shall ensure that all correspondence between VIWAPA and the Third

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 29 of 91

30

Party Auditor regarding any disagreements and a summary of any oral resolution of any

disagreement is submitted to EPA.

f. By no later than 30 days after completion of a CEMS/COMS Third Party

Audit, a CEMS/COMS Third Party Audit Report shall be submitted concurrently to VIWAPA

and EPA.

g. Each CEMS/COMS Third Party Audit Report shall include, at a

minimum, the following information:

i. recommendations for correcting system failures, including

deadlines by which each corrective action will be implemented;

ii. identification of any integrity issues with components of the

CEMS/COMS identified by the third party audit and recommendations to address the integrity

issues; and

iii. a certification by the project manager for the audit, in accordance

with Paragraph 32.

h. By no later than 60 days after completion of a CEMS/COMS Third Party

Audit, VIWAPA shall submit to EPA for review and approval, VIWAPA’s responses to the

CEMS/COMS Third Party Audit Report recommendations. VIWAPA’s responses shall include

dates that recommendations were implemented; plans to implement the recommendations and/or

alternatives to the recommendations and/or any alternative dates for implementation.

i. Where VIWAPA provides alternatives to the auditor’s recommendations,

it must provide, to EPA, for review and approval, an explanation and rationale for why VIWAPA

believes the auditor’s recommendation should be modified and/or is not necessary and/or not

feasible for compliance with Clean Air Act requirements, applicable permits and/or this Consent

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 30 of 91

31

Decree.

j. VIWAPA shall either implement the third party auditor recommendations

and/or VIWAPA’s alternative measure(s) by the date(s) recommended by the auditor or provided

by VIWAPA, or if EPA does not approve of the recommendation(s) and/or alternative

measure(s) and/or date(s) proposed, VIWAPA shall implement in accordance with EPA’s

comments, unless successfully challenged in Dispute Resolution.

k. By January 1, 2017, and continuing every 24 months thereafter until the

Consent Decree is terminated, VIWAPA shall conduct a self-audit of the NOX and CO CEMS

and COMS (“CEMS/COMS Self -Audit”) for each of the Units that is operable. For any Unit

that is not operable at the time of a scheduled audit, Defendant shall conduct an audit of that

Unit’s operation within three months of Startup. The CEMS/COMS Self-Audit shall include, at

a minimum, the following information:

i. identification and determination of the causes of any

CEMS/COMS system failure, including DAHS failures;

ii. evaluation of the integrity of, at a minimum, each component that

is identified in Appendix G;

iii. identification of any untimely performance of QA procedures (i.e.,

PS1 for COMS, CGA and RATAs for CEMS, daily calibration drifts);

iv. evaluation of whether all personnel involved in the operation of

CEMS/COMS have been timely trained on CEMS/COMS procedures; and

v. evaluation of all technician/operator journals on daily operational

status and maintenance to determine if it is maintained and up to date.

l. By no later than 45 days after completion of a CEMS/COMS Self-Audit,

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 31 of 91

32

VIWAPA shall submit a CEMS/COMS Self-Audit Report to EPA. Each CEMS/COMS Self-

Audit Report shall include, at a minimum, the following information:

i. identification of any integrity issues with components of the

CEMS/COMS system components;

ii. identification of systems failures and evaluation(s) of the causes for

such failures;

iii. recommendations, for EPA review and approval, to address the

CEMS/COMS system integrity issues identified and recommendations to implement remedial

actions to address the issues identified. Such recommendations shall include, for EPA review

and approval, proposed dates to implement remedial actions to address the issues identified; and

iv. a certification in accordance with Paragraph 32.

m. VIWAPA shall either implement the self-audit recommendation(s) by the

date(s) recommended, or if EPA does not approve the recommendation(s) and/or dates proposed,

VIWAPA shall implement in accordance with EPA’s comments, unless successfully challenged

in Dispute Resolution.

n. VIWAPA shall submit to EPA for review and approval a preventative

maintenance and operations plan for its NOX and CO CEMS, and COMS entitled Quality

Assurance Plan for CEMS and COMS (hereinafter referred to as “QAP”) no later than June 30,

2015. Compliance with the QAP is designed to ensure the proper and continual operation and

maintenance of the NOX and CO CEMS and COMS.

o. VIWAPA shall maintain compliance with the QAP. In each Quarterly

Report required under Section VI (Reporting Requirements), VIWAPA shall report on its

compliance with the QAP, and identify any instances where VIWAPA failed to comply with the

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 32 of 91

33

QAP.

p. At all times the St. Thomas Facility is in operation, VIWAPA shall

operate an audible alarm in the St. Thomas Facility’s control room for the CEMS that indicates

when any CEMS records emissions at levels that are approaching an emission limit. In each

Quarterly Report required under Section VI (Reporting Requirements), VIWAPA shall identify

each instance when the audible alarm was not operating as required by this sub-paragraph.

q. By the Date of Lodging, at all times the St. Thomas Facility is in

operation, VIWAPA shall operate, in the St. Thomas Facility’s control room, an audible alarm

for the water injection systems that is automatically activated to operate whenever any NOX

CEMS is not operating and manually activated to operate whenever any NOX CEMS has not

passed required CGAs and/or RATAs. The water injection system alarm will cause an audible

alarm to sound whenever the water to fuel ratio is approaching the established water to fuel ratio

for the unit for which the CEMS is not operating and/or for which the CEMS has not passed

required tests.

r. On May 24, 2013, VIWAPA hired a qualified outside entity to provide on-

site training for VIWAPA’s employees on the proper operation and maintenance of the CEMS

and COMS for a period of no less than three years. If after this three year period VIWAPA is

not able to demonstrate to EPA that its employees can maintain ongoing substantial compliance

with its CEMS and COMS requirements, VIWAPA shall continue its retention of a qualified

outside entity to provide training to its employees as described above until EPA determines that

VIWAPA is operating its CEMS and COMS in substantial compliance with all applicable

requirements.

s. By the Date of Lodging, VIWAPA shall have at least one trained and

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 33 of 91

34

experienced technician and/or engineer who is dedicated to properly operating and maintaining

the CEMS and COMS, that is available on-site at the St. Thomas Facility, 24 hours per day, 7

days per week, 365 days per year to operate and maintain the CEMS and COMS at the St.

Thomas Facility. A person shall be on-site at all times who shall be able to within two hours

respond either i) by correcting deficiencies on the CEMS or COMS, or ii) by obtaining on-site, a

trained technical person, maintenance person, or engineer to correct deficiencies with the CEMS

or COMS.

t. In each Quarterly Report required under Section VI (Reporting

Requirements), VIWAPA shall report any instances when a technician or engineer trained in

proper operation and maintenance of the CEMS and COMS was not available on-site at the St.

Thomas Facility, as required by sub-Paragraph 16.s. VIWAPA shall also provide an explanation

in the Quarterly Report as to why a trained technician or engineer was not available.

u. In each Quarterly Report required under Section VI (Reporting

Requirements), VIWAPA shall:

i. report on the training that it has provided to employees on the

proper operation and maintenance of the CEMS and COMS pursuant to sub-paragraph 16.r;

ii. identify the employees who have been trained in the proper

operation and maintenance of the CEMS and COMS that reporting period;

iii. identify any employees, required to be trained that reporting

period, who have not yet received their required training and indicate the dates that training for

these employees is scheduled to occur; and

iv. indicate what training materials were utilized in the training on the

proper operation and maintenance of the CEMS and COMS and make these materials available

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 34 of 91

35

upon request.

v. If VIWAPA’s PSD Permits and the St. Thomas Title V Operating Permit

are modified or amended to no longer require a COMS to be operated on one or more of the

Units, the requirements in this Decree relating to the operation of COMS on such Units shall no

longer be applicable.

17. Video Camera System

a. Within 60 Days of the Date of Lodging, VIWAPA shall install a video

camera system that includes multiple video cameras that record and send video feeds to the

control room of the emission outlets from the stacks associated with Units 14, 15, 18 and 23 and

each of the HRSGs, to ensure that any visible emissions are observed and further evaluated for

compliance with applicable SIP Opacity Rule.

b. The video camera system shall:

i. record the emission outlet of each of the stacks;

ii. record in digital format at a rate of no less than 10 frames per

second; and

iii. date and time stamp the recordings.

c. On any day on which the video system documents visible emissions from

a stack, VIWAPA shall conduct visible emission readings for that stack, in accordance with

Method 9, at least once that day for thirty (30) consecutive minutes. Readings shall be made at

the emission outlet of the stack on any day that a video camera documents visible emissions from

that stack for greater than three (3) minutes and when a video camera is not operable and there

are any visible emissions from that stack for greater than three (3) minutes:

i. In the event that any Method 9 reading indicates opacity levels

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 35 of 91

36

averaging 20% or greater (excluding periods aggregating 3 minutes or less with opacities at or

below 40% opacity), VIWAPA shall conduct Method 9 readings at least every three (3) hours for

thirty (30) consecutive minutes, until Method 9 readings indicate opacity levels that do not

exceed the applicable permit and SIP opacity limits, or for the remainder of that day it shall be

presumed that opacity levels remained in excess of permit limits until Method 9 readings taken

over thirty (30) consecutive minutes have averaged no more than the applicable permit and SIP

opacity limits.

ii. In the event that a Method 9 reading indicates opacity levels in

compliance with opacity limits, no further Method 9 readings need to be taken unless opacity

levels increase during the day, in which case VIWAPA shall conduct additional Method 9

readings of at least thirty (30) consecutive minutes.

d. VIWAPA shall maintain recordings from the video camera system for at

least 6 rolling months and make recordings available to EPA upon request.

18. St. Thomas Facility Quality Assurance/Quality Control Evaluations

a. Each calendar quarter, VIWAPA shall conduct either a RATA or a CGA,

in accordance with 40 C.F.R. Part 60, Appendix F, 5.1.1. and 5.1.2., on the CEMs for Unit 15,

18, 22 23 and the HRSG, provided that a RATA is conducted once per calendar year. For Unit

22, VIWAPA shall begin conducting either a RATA or CGA each calendar quarter no later than

180 Days of Substantial Completion. VIWAPA shall conduct these quarterly audits no closer

than 2 months apart and shall conduct CGAs on quarters when a RATA is not conducted.

Except as provided for Unit 22, above, if an annual RATA has not been conducted and a unit is

not operational during the 4th quarter then the RATA shall be performed in the quarter in which

the unit recommences operation. Except as provided for Unit 22, above, required CGAs must be

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 36 of 91

37

conducted even when the unit is not operational.

b. Beginning in calendar year 2015, VIWAPA shall include the results of

RATAs and CGAs in the Quarterly Reports required under Section VI (Reporting

Requirements), and indicate completion of these tests in the annual Title V certification for the

St. Thomas Facility.

19. St. Thomas Stack/Performance Testing

a. Within 180 Days of the date that Units 15, 18 and 23 are all converted to

burn LPG/LNG and LPG/LNG is available, VIWAPA shall conduct stack testing in accordance

with all applicable permits while burning LPG/LNG, in accordance with EPA approved

protocols. All subsequent stack testing shall be completed in accordance with the St. Thomas

Title V Operating Permit.

b. No later than 120 Days before stack testing is scheduled to begin,

VIWAPA shall submit a protocol for stack testing to EPA for review and approval.

c. No later than 60 Days after completion of stack testing, VIWAPA shall

submit to EPA copies of the stack test report on three compact discs.

d. No later than 90 Days after completion of stack testing, VIWAPA shall

submit to EPA for review and approval a corrective action plan (“Corrective Action Plan”) to

address any emission exceedances documented during stack testing. The Corrective Action Plan

must:

i. Propose corrective action measures (including repairs) to be made

to address any emission exceedances;

ii. Provide an explanation for the specified corrective action

measures;

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 37 of 91

38

iii. Propose a schedule for implementation of measures and repairs;

and

iv. Propose a date for follow-up stack testing to demonstrate

compliance with any emission limits that were exceeded, to occur no later than sixty days from

completion of corrective action measures and/or repairs.

e. No later than 45 Days after completion of any follow-up stack testing,

VIWAPA shall submit to EPA copies of the stack test reports on three compact discs.

f. VIWAPA shall continue to submit to EPA for review and approval

Corrective Action Plans to address any emission exceedances indicated in any follow-up stack

testing and submit compact discs, in accordance with paragraphs 19.d and 19.e, until VIWAPA

is able to demonstrate compliance.

g. If VIWAPA cannot demonstrate compliance with emission limits after the

second stack test, VIWAPA shall not operate the unit using the type of fuel for the unit for which

they have not demonstrated compliance, except for Startup, Shutdown, implementation of

Corrective Action Plan and/or re-testing.

h. Within 60 Days of stack testing that demonstrates compliance with NOX

emission limit requirements, VIWAPA shall submit to DPNR a request to modify the St. Thomas

Facility Title V Operating Permit to include the water-to-fuel ratios, established during stack

testing, for Units 15, 18 and 23. Copies of submissions shall be submitted to the EPA in

accordance with Section XIII (Notices).

20. St. Thomas Unit 25

a. VIWAPA shall submit semiannual excess emission and monitor downtime

reports to EPA for Unit 25 as required by NSPS Subpart KKKK and NSPS General Provisions.

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 38 of 91

39

21. St. Thomas Facility Unit 14

a. VIWAPA shall enter into a contract by September 30, 2015 for the

fabrication, purchase, and installation of a fuel atomizer on Unit 14.

b. VIWAPA shall install a fuel atomizer on Unit 14 no later than 45 Days

after the Substantial Completion of Unit 23, which is, at the Date of Lodging, expected to occur

on/or about February 15, 2016. At the latest, the fuel atomizer shall be installed by June 1, 2016.

c. VIWAPA shall tune-up and conduct evaluations of the fuel atomizer

operations during the first forty-five (45) Days after installation.

d. No later than 100 Days after the installation of the fuel atomizer,

VIWAPA shall submit a report (“Fuel Atomizer Progress Report”) to EPA. The Fuel Atomizer

Progress Report shall:

i. provide documentation confirming the date the fuel atomizer was

installed;

ii. report any visible emissions and any noncompliance with the

Virgin Islands State Implementation Plan, VI-APCAR&R, Title 12, Chapter 9, Section 204-22(a)

and (b) (“VI SIP Opacity Rule”) that occurred during the second forty-five Days (45) after the

installation of the fuel atomizer;

iii. provide a schedule for permanently ceasing operations of Unit 14

on a date no later than two years after installation of the fuel atomizer, in the event that Unit 14 is

unable to achieve compliance by that date; and

iv. Provide, for EPA review and approval, recommendations and a

schedule for any corrective action measures and further repairs, if needed, to achieve compliance

with the VI SIP Opacity Rule.

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 39 of 91

40

e. Upon receipt of EPA’s approval of the schedule for corrective action

measures and further repairs, if any, VIWAPA shall implement any necessary corrective action

measures and further repairs in accordance with the approved schedule.

f. In the event that Unit 14 has not achieved compliance with the SIP

Opacity Rule within two years of installation of the fuel atomizer, VIWAPA shall:

i. permanently cease operation of Unit 14, no later than the date

identified in the schedule submitted to EPA; and

ii. within 30 Days of permanently ceasing operation of Unit 14,

submit a request to DPNR to remove Unit 14 from the Title V Operating Permit.

22. St. John Facility

a. By the Date of Lodging, the St. John Unit diesel engine (“St. John Unit”)

shall comply with the requirements of 40 C.F.R. Part 63, Subpart ZZZZ (“RICE NESHAP”).

b. Within 90 days of the Date of Lodging, VIWAPA shall use diesel fuel at

the St. John Unit that meets the requirements of 40 C.F.R. § 80.510(b) for nonroad diesel fuel.

c. By no later than 150 Days of the Date of Lodging, VIWAPA shall submit

to the permitting authority: 1) a request to withdraw the St. John Facility Title V Operating

Permit and 2) a request to issue the St. John Facility a minor source state operating permit that

provides for:

i. operation of the St. John Unit as an emergency unit, subject to SIP

limitations;

ii. incorporation of 40 C.F.R. Part 63 Subpart ZZZZ as an applicable

requirement, and

iii. a condition that requires the St. John Unit to use diesel fuel that

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 40 of 91

41

meets the requirements of 40 C.F.R. § 80.510(b) for nonroad diesel fuel.

23. Approval of Deliverables. VIWAPA shall immediately begin implementation of

any plan, report, or other item submitted to EPA for review and approval. After EPA review of

any plan, report, or other item that is required to be submitted pursuant to this Consent Decree,

EPA shall in writing: a) approve the submission; b) approve the submission upon specified

conditions; c) approve part of the submission and disapprove the remainder; or d) disapprove the

submission.

24. If the submission is approved pursuant to Paragraph 24.a, Defendant shall take all

actions required by the plan, report, or other document, in accordance with the schedules and

requirements of the plan, report, or other document, as approved. If the submission is

conditionally approved or approved only in part, pursuant to Paragraph 24.b or 24.c, Defendant

shall, upon written direction from EPA, take all actions required by the approved plan, report, or

other item that EPA determines are technically severable from any disapproved portions, subject

to Defendant’s right to dispute only the specified conditions or the disapproved portions, under

Section IX (Dispute Resolution).

25. If the submission is disapproved in whole or in part pursuant to Paragraph 24.c or

24.d, Defendant shall, if required, within 45 Days or such other time as the Parties agree to in

writing, correct all deficiencies and resubmit the plan, report, or other item, or disapproved

portion thereof, for approval, in accordance with the preceding Paragraphs. If the resubmission

is approved in whole or in part, Defendant shall proceed in accordance with the preceding

Paragraph.

26. Any stipulated penalties applicable to the original submission, as provided in

Section VII (Stipulated Penalties), shall accrue during the 45 Day period or other specified

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 41 of 91

42

period, but shall not be payable unless the resubmission is untimely or is disapproved in whole or

in part; provided that, if the original submission was so deficient as to constitute a material

breach of Defendant’s obligations under this Decree, the stipulated penalties applicable to the

original submission shall be due and payable notwithstanding any subsequent resubmission.

27. If a resubmitted plan, report, or other item, or portion thereof, is disapproved in

whole or in part, EPA may again require Defendant to correct any deficiencies, in accordance

with the preceding Paragraphs, subject to Defendant’s right to invoke Dispute Resolution and the

right of EPA to seek stipulated penalties as provided in the preceding Paragraphs.

28. Permits. Where any compliance obligation under this Section requires Defendant

to obtain a federal, state, or local permit or approval, Defendant shall submit timely and complete

applications and take all other actions necessary to obtain all such permits or approvals.

Defendant may seek relief under the provisions of Section VIII (Force Majeure) for any delay in

the performance of any such obligation resulting from a failure to obtain, or a delay in obtaining,

any permit or approval required to fulfill such obligation, if Defendant has submitted timely and

complete applications and has taken all other actions necessary to obtain all such permits or

approvals.

VI. REPORTING REQUIREMENTS

29. Defendant shall submit the following reports:

a. Within 30 Days after the end of each quarter (i.e., by April 30, July 30,

October 30, and January 30) after lodging of this Consent Decree, until termination of this

Decree pursuant to Section XVII (Termination), Defendant shall submit to EPA, in accordance

with Paragraph 78, a Quarterly Report for the preceding quarter that shall include all obligations

required under this Decree including the following:

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 42 of 91

43

i. the amount of LPG/LNG used on an hourly basis;

ii. the amount of fuel oil used on an hourly basis;

iii. the number of operating hours of each converted Unit on a hourly

basis;

iv. the calculations VIWAPA used to determine the 12-Month Rolling

Average Percent kWh generated from individual Converted Unit burning LPG/LNG;

v. the calculations VIWAPA used to determine the combined 12-

Month Rolling Average Percent kWh from Renewables and kWh generated by Converted Units

burning LPG/LNG;

vi. records of periods when LPG/LNG is or was not available and

explanations;

vii. status of compliance with the St. Thomas Spare Parts Inventory

Program required by Paragraph 14;

viii. records of periods when industrial grade water is or was not

available for the water injection system at any unit and explanations as required by Paragraph

15.d;

ix. explanations of any instance when an on-site trained technical

person or engineer is not available at the St. Thomas Facility as required by in Paragraph 15.g;

x. records of training provided pursuant to the Water Injection

System Training Program, including the employees trained in that reporting period, identification

of employees who have not been trained in the Program and scheduled training dates for those

employees, and description of training materials utilized as required by Paragraph 15.i;

xi. Water Injection System Data sheet(s) as required by Paragraph

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 43 of 91

44

15.i;

xii. status of compliance with QAP and instances of failing to comply

with QAP as required by Paragraph 16.o;

xiii. instances when the audible alarm did not sound but the CEMS

indicated emissions exceedances as required by Paragraph 16.p;

xiv. explanations of any instance when an on-site technical person or

engineer trained in the proper operation and maintenance of the NOX and CO CEMS and COMS

is not available at the St. Thomas Facility to respond as required by Paragraph 16.s;

xv. records of training required by Paragraph 16.u, including the

identification of employees trained in that reporting period, identification of employees required

to be trained who have not been trained, and scheduled training dates for those employees, as

described in Paragraph 16.r;

xvi. identify any hours when a video camera and/or a video feed was

not in operation as required by Paragraph 17.b;

xvii. identification of any violations of the VI SIP Opacity Rule,

observed during Method 9 readings, as required by Paragraph 17.c;

xviii. indication of completion and results of RATAs and CGAs as

required by Paragraph 18.b;

xix. any start and end dates for Unit outages (for purposes of this

Paragraph an outage includes times when the Unit is not available to generate power and is taken

offline to complete a repair) that lasted fourteen days or longer and a brief description of the

work completed and/or anticipated to be completed on the Unit; and

xx. any anticipated start and end dates for Unit outages that are

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 44 of 91

45

expected to last fourteen days or longer on the Unit and a brief description of the work that is

planned for the Unit.

b. The Quarterly Reports shall also include a description of any non-

compliance with the requirements of this Consent Decree to the extent not previously addressed

by Paragraph 29.a above, and an explanation of the violation’s likely cause and of the remedial

steps taken, or to be taken, to prevent or minimize such violation. If Defendant violates, or has

reason to believe that it may violate, any requirement of this Consent Decree, Defendant shall

notify the United States of such violation and its likely duration, in writing, within ten working

Days of the Day Defendant first becomes aware of the violation, with an explanation of the

violation’s likely cause and of the remedial steps taken, or to be taken, to prevent or minimize

such violation. If the cause of a violation cannot be fully explained at the time the report is due,

Defendant shall so state in the report. Defendant shall investigate the cause of the violation and

shall then submit an amendment to the report, including a full explanation of the cause of the

violation, within 30 Days of the Day Defendant becomes aware of the cause of the violation.

Nothing in this Paragraph or the following Paragraph relieves Defendant of its obligation to

provide the notice required by Section VIII (Force Majeure).

30. Whenever any violation of this Consent Decree or of any applicable permits or

any other event affecting Defendant’s performance under this Decree, or the performance of its

Facility, may pose an immediate threat to the public health or welfare or the environment,

Defendant shall notify EPA orally or by electronic or facsimile transmission as soon as possible,

but no later than 24 hours after Defendant first knew of the violation or event. This procedure is

in addition to the requirements set forth in the preceding Paragraph.

31. All reports shall be submitted to the persons designated in Section XIII (Notices).

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 45 of 91

46

32. Each report submitted by Defendant under this Section shall be signed by an

official of the submitting party and include the following certification:

I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

This certification requirement does not apply to emergency or similar notifications where

compliance would be impractical.

33. The reporting requirements of this Consent Decree do not relieve Defendant of

any reporting obligations required by the Act or implementing regulations, or by any other

federal, state, or local law, regulation, permit, or other requirement.

34. Any information provided pursuant to this Consent Decree may be used by the

United States in any proceeding to enforce the provisions of this Consent Decree and as

otherwise permitted by law.

VII. STIPULATED PENALTIES

35. Defendant shall be liable for stipulated penalties to the United States for

violations of this Consent Decree as specified below, unless excused under Section VIII (Force

Majeure). A violation includes failing to perform any obligation required by the terms of this

Decree, including any work plan or schedule approved under this Decree, according to all

applicable requirements of this Decree and within the specified time schedules established by or

approved under this Decree.

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 46 of 91

47

36. Late Payment of Civil Penalty

If Defendant fails to pay the civil penalty required to be paid under Section IV

(Civil Penalty) when due, Defendant shall pay a stipulated penalty of $750 per Day for each Day

that the payment is late.

37. Excess Emission Violations

If the NOX CEMS are unavailable and/or not providing data that has been fully quality assured quality controlled (including, but not limited to, daily calibrations, CGAs, RATAs, etc.), the hours of excess emission shall be determined by the established water to fuel injection ratios. Stipulated penalties for excess emissions will not accrue where emissions occurred during Capacity Performance Testing event after major maintenance or overhaul of the gas turbine unit for a period of up to but no greater than eight hours provided that: a) VIWAPA provides notice to EPA, at least 7-days in advance, of any Capacity Performance Test being conducted; and VIWAPA reports all excess emissions that occur during Capacity Performance Testing as excess emissions. The hours of excess emissions for the PSD affected Units will be calculated in accordance with the specifications provided in the PSD Permits. Hours of excess emissions for all other Units will be determined in accordance with the specifications of the NSPS.

38. 12-month rolling average for Combined Converted Units

Failure to comply with the minimum of 85% 12-month rolling average percent kWh generated by all Converted Units burning LPG/LNG and kWh by Renewables for each rolling 12- month period, as required by Paragraph 13.a

$15,000 per 12-month rolling period

Hours of Excess Emissions per Unit per Calendar Quarter

Amount per hour

1-250 hours $50 251-750 hours $100 Greater than 750 hours $250

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 47 of 91

48

39. 12-month rolling average for each Converted Unit

Failure to comply with the minimum of 65% 12-month rolling average percent kWh generated by burning LPG/LNG for each rolling 12-month period, as required by Paragraph 13.b

$10,000 per 12-month rolling period

If in a given 12-month rolling period, stipulated penalties are paid pursuant to Paragraph

38, then stipulated penalties under Paragraph 39 do not apply.

40. VI SIP Opacity Violations at Unit 14 detected by Method 9 Visible Emissions

Readings beginning forty-six (46) Days after installation of the fuel atomizer required by

Paragraph 21.a: for each violation of the VI SIP Opacity requirement, as recorded by Method 9,

$400 per 6 minute average reading in excess of the limit up to a maximum of $6,000 per day.

41. NOX and CO CEMS Violations

42. Video Camera System

Failure to continuously operate video camera(s) and/or video feed(s) when the unit associated

with the stack emission outlet is operating, as required by Paragraph 17:

43. Compliance Milestones

a. The following stipulated penalties shall accrue per violation per Day for

Percentage of Monitor Available per Calendar Quarter per Parameter for each Monitor on each Unit

Amount per Monitor

75%-89% $2,500 50%-74% $7,500 0%-49% $15,000

Percentage of Video Camera Availability per Calendar Quarter for each Video Camera on each unit while unit is operating

Amount per Camera

90%-95% $2,000 50%-89% $4,000 0%-49% $8,000

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 48 of 91

49

each violation of the requirements identified in subparagraph b:

Penalty Per Violation Per Day Period of Noncompliance

$ 200 1st through 14th Day

$ 500 15th through 30th Day

$ 750 31st Day and beyond

b. Violation of the following compliance milestones will result in penalties

as described in the above paragraph.

i. written notification and documentation of the decision to either

purchase, refurbish or replace Units 14, 22 and/or 25, as required by Paragraph 12.f;

ii. creation of the St. Thomas Spare Parts Tracking System, including

the required lists/logs, as required by Paragraph 14;

iii. installation and utilization of two modules of the IBM Maximo

system software that provides for monitoring of spare parts, as required by the Spare Parts

Inventory Program and Paragraph 14;

iv. submission of request to permitting authority for water to fuel

ratios established during performance testing as required by Paragraph 15.a;

v. operation and utilization of an industrial grade water system to

supply the water injection system, as required by Paragraph 15.c;

vi. training of employees pursuant to the Water Injection System

Training Program, as required by Paragraph 15.e and 15.f;

vii. hiring and retention of an on-site technical person or engineer, as

required by Paragraph 15.g and 15.h;

viii. implementation of the O&M Plan, as required by Paragraph 15.j

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 49 of 91

50

and 15.k;

ix. submission of the Water Injection System Data Sheet, as required

by Paragraph 15.l;

x. completion of Water Injection System Third Party Audit every 24

months, as required by Paragraph 15.m;

xi. submission of Water Injection System Third Party Audit proposed

auditor credentials, as required by Paragraph 15.n;

xii. submission of Water Injection System Third Party Audit Reports,

including drafts, concurrently to EPA and VIWAPA, as required by Paragraphs 15.p and 15.q;

xiii. submission of VIWAPA’s responses to the Water Injection

System Third Party Audit Report, as required by Paragraph 15.r, 15.p and 15.s;

xiv. implementation of Water Injection System Third Party Audit and

EPA approved recommendations, as required by Paragraph 15.t;

xv. completion of Water Injection System Self Audit every 24 months,

as required by Paragraph 15.u;

xvi. submission of Water Injection System Self Audit Report and

Defendant’s recommendations, as required by Paragraph 15.v;

xvii. implementation of Water Injection System Self Audit and EPA

approved recommendations, as required by Paragraph 15.w;

xviii. completion of CEMS daily calibration data sheet, as required by

Paragraph 16.b;

xix. completion of CEMS/COMS Third Party Audit every 24 months,

as required by Paragraph 16.c;

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 50 of 91

51

xx. submission of CEMS/COMS Third Party Audit proposed auditor

credentials, as required by Paragraph 16.d;

xxi. submission of CEMS/COMS Third Party Audit Report, including

drafts, concurrently to EPA and VIWAPA, as required by Paragraphs 16.f and 16.g;

xxii. submission of VIWAPA’s responses to the CEMS/COMS Third

Party Audit Report, as required by Paragraph 16.h and 16.i;

xxiii. implementation of CEMS/COMS Third Party Audit and EPA

approved recommendations, as required by Paragraph 16.j;

xxiv. completion of CEMS/COMS Self Audit every 24 months, as

required by Paragraph 16.k;

xxv. submission of CEMS/COMS Self Audit Report and Defendant’s

recommendations, as required by Paragraph 16.l;

xxvi. implementation of CEMS/COMS Self Audit and EPA-approved

recommendations, as required by Paragraph 16.m;

xxvii. implementation and compliance with the QAP, as required by

Paragraph 16.n and 16.o;

xxviii. installation and operation of an audible alarm in the St. Thomas

Facility’s control room that indicates when any CEMS records emissions at levels that are

approaching an emission limit, as required by Paragraph 16.p;

xxix. installation and operation of an audible alarm in the St. Thomas

Facility’s control room that is automatically activated to operate whenever any NOX CEMS is

not operating and manually activated to operate whenever any NOX CEMS has not passed

required CGAs and/or RATAs, as required by Paragraph 16.q;

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 51 of 91

52

xxx. hiring of an outside entity to train VIWAPA employees on CEMS

and COMS, as required by Paragraph 16.r;

xxxi. hiring, retention, and availability on-site of a technical person or

engineer to properly operate and maintain CEMS and COMS and to respond, as required by

Paragraph 16.s and 16.t;

xxxii. installation of the video camera system, as required by Paragraph

17.a and b.;

xxxiii. conducting Method 9 readings, as required by Paragraph 17.c;

xxxiv. maintainance of recordings from the video camera for at least 6

rolling months and make recordings available to EPA upon request, as required by Paragraph

17.d;

xxxv. completion of CGAs and RATAs on the CEMS for each Unit, as

required by Paragraph 18;

xxxvi. completion of stack testing, and any follow-up stack testing as

necessary, as required by Paragraph 19;

xxxvii. submission of stack testing protocol to EPA, as required by

Paragraph 19.b;

xxxviii. submission of stack test results and Stack Test Corrective

Action Plan, as required by Paragraph 19.c and 19.d;

xxxix. operation of a unit using fuel types that VIWAPA demonstrated

comply with applicable emission limits, as required by Paragraph 19.g;

xl. submission of request to permitting authority for water to fuel

ratios established during performance testing as required by Paragraph 19.h;

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 52 of 91

53

xli. submission of NSPS Subpart KKKK semiannual reports for Unit

25, as required by Paragraph 20.a;

xlii. installation of Unit 14 fuel atomizer, as required by Paragraph

21.b;

xliii. submission of Fuel Atomizer Progress Report, as required by

Paragraph 21.d;

xliv. implementation of any necessary corrective action measures and

further repairs, as required by Paragraph 21.e;

xlv. ceasing operation of Unit 14, pursuant to Paragraph 21.f.ii;

xlvi. submission of request for removal of Unit 14 from the St. Thomas

Title V Operating Permit, as required by Paragraph 21.f;

xlvii. compliance with requirements of the RICE NESHAP as required

by Paragraph 22.a;

xlviii. use of diesel fuel at the St. John Unit that meets the requirements

of 40 C.F.R. § 80.510(b) for nonroad engines, as required by Paragraph 22.b;

xlix. submission of a request to VIDPNR to withdraw the St. John

Facility Title V Operating Permit and request issuance of a St. John Facility minor source state

operating permit as required by Paragraph 22.c;

c. For each instance in which a listed spare part is not procured within sixty

Days of when it fell below the minimum quantity identified in the St. Thomas Spare Parts

Inventory Program, where the failure to obtain the part did not result, after that sixty day period,

in delays in repairing either the water injection system or any of the CEMS, the following

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 53 of 91

54

stipulated penalties shall accrue per Day for each violation of the St. Thomas Spare Parts

Inventory Program’s procurement requirements as identified below:

Penalty Per Violation Per Day Period of Noncompliance

$ 75 1st through 30th Day

$ 150 31st through 90th Day

$ 300 91st Day and beyond

d. For each instance in which a listed spare part is not procured within sixty

Days of when it fell below the minimum quantity identified in the St. Thomas Spare Parts

Inventory Program, where the failure to obtain the part resulted, after that sixty (60) Day period,

in delays in repairing either the water injection system or any of the CEMS, the following

stipulated penalties shall accrue per Day of each resulting delay due to violation of the St.

Thomas Spare Parts Inventory Program’s procurement requirements as identified below:

Penalty Per Violation Per Day Period of Noncompliance

$ 150 1st through 30th Day

$ 300 31st through 90th Day

$ 600 91st Day and beyond

44. Reporting Requirements. The following stipulated penalties shall accrue per

violation per Day for each violation of the reporting requirements of Section VI (Reporting

Requirements):

Penalty Per Violation Per Day Period of Noncompliance

$ 150 1st through 14th Day

$ 300 15th through 30th Day

$ 1,000 31st Day and beyond

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 54 of 91

55

45. Except as in Paragraphs 37 – 42 above, stipulated penalties under this Section

shall begin to accrue on the Day after performance is due or on the Day a violation occurs,

whichever is applicable, and shall continue to accrue until performance is satisfactorily

completed or until the violation ceases. Stipulated penalties shall be calculated at the end of each

applicable calendar quarter and reported to the United States in the applicable Quarterly Report

required under Section VI (Reporting Requirements). Stipulated penalties shall accrue

simultaneously for separate violations of this Consent Decree.

46. VIWAPA shall self-assess, without prior demand from the United States,

stipulated penalties accrued and owing under this Section in accordance with the following

procedures:

a. On or before the 30th day following the end of each calendar quarter (i.e.,

by April 30, July 30, October 30, and January 30 after the Effective Date), VIWAPA shall

determine, and provide to EPA a detailed and accurate accounting of, the full amount of

VIWAPA’s stipulated penalty liability, pursuant to Paragraphs 38 through 45, for the preceding

quarter pursuant to Paragraph 46.

b. Provided that VIWAPA timely follows the schedule and procedures set

forth above with self-assessing and reporting its stipulated penalty liability, payment to the

United States shall be reduced to 50% of the amount specified in the accounting referenced

above. This reduced payment amount shall be deemed to discharge and settle VIWAPA’s

liability for stipulated penalties under this Section for the violations that are the subject of such

payments. Discharge and settlement as provided in this Paragraph shall be available to

VIWAPA only if VIWAPA makes timely assessment and payment with respect to a particular

violation of the Consent Decree within thirty (30) Days after the end of the quarter in question.

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 55 of 91

56

In the absence of such timely action by VIWAPA, VIWAPA shall be liable for the full amount

of the stipulated penalties for such violations for the quarter in question.

c. If any stipulated penalties are due in connection with a decision from EPA

pursuant to Paragraph 55 of Section VIII (Force Majeure), and VIWAPA elects not to pursue

dispute resolution under Paragraph 56 of Section VIII, VIWAPA may self-assess, report and pay

those stipulated penalties in accordance with Paragraph 46a. and b. above, provided that

VIWAPA makes this stipulated penalty payment within thirty (30) Days after the end of the

quarter in which it received the decision under Paragraph 55.

47. The United States may in its unreviewable exercise of its discretion, reduce or

waive stipulated penalties otherwise due it under this Consent Decree. If VIWAPA has not self-

assessed and paid stipulated penalties in accordance with Paragraph 46 above, VIWAPA shall

pay any stipulated penalty within 30 Days of receiving the United States’ written demand.

48. Stipulated penalties shall continue to accrue as provided in Paragraph 46, during

any Dispute Resolution, but need not be paid until the following:

a. If the dispute is resolved by agreement or by a decision of EPA that is not

appealed to the Court, Defendant shall pay accrued penalties determined to be owing, together

with interest, to the United States within 30 Days of the effective date of the agreement or the

receipt of EPA’s decision or order.

b. If the dispute is appealed to the Court and the United States prevails in

whole or in part, Defendant shall pay all accrued penalties determined by the Court to be owing,

together with interest, within 60 Days of receiving the Court’s decision or order, except as

provided in subparagraph c, below.

c. If any Party appeals the District Court’s decision, Defendant shall pay all

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 56 of 91

57

accrued penalties determined to be owing, together with interest, within 15 Days of receiving the

final appellate court decision.

49. Defendant shall pay stipulated penalties owing to the United States in the manner

set forth and with the confirmation notices required by Paragraph 10, except that the transmittal

letter shall state that the payment is for stipulated penalties and shall state for which violation(s)

the penalties are being paid.

50. If Defendant fails to pay stipulated penalties according to the terms of this

Consent Decree, Defendant shall be liable for interest on such penalties, as provided for in

28 U.S.C. § 1961, accruing as of the date payment became due. Nothing in this Paragraph shall

be construed to limit the United States from seeking any remedy otherwise provided by law for

Defendant’s failure to pay any stipulated penalties.

51. Subject to the provisions of Section XI of this Consent Decree (Effect of

Settlement/Reservation of Rights), the stipulated penalties provided for in this Consent Decree

shall be in addition to any other rights, remedies, or sanctions available to the United States for

Defendant’s violation of this Consent Decree or applicable law. Where a violation of this

Consent Decree is also a violation of the Clean Air Act, Defendant shall be allowed a credit, for

any stipulated penalties paid, against any statutory penalties imposed for such violation.

VIII. FORCE MAJEURE

52. “Force majeure,” for purposes of this Consent Decree, is defined as any event

arising from causes beyond the control of Defendant, of any entity controlled by Defendant, or of

Defendant’s contractors that delays or prevents the performance of any obligation under this

Consent Decree despite Defendant’s best efforts to fulfill the obligation. The requirement that

Defendant exercise “best efforts to fulfill the obligation” includes using best efforts to anticipate

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 57 of 91

58

any potential force majeure event and best efforts to address the effects of any such event (a) as it

is occurring and (b) after it has occurred to prevent or minimize any resulting delay or prevention

of performance to the greatest extent possible. “Force Majeure” does not include Defendant’s

financial inability to perform any obligation under this Consent Decree.

53. If any event occurs or has occurred that may delay or prevent the performance of

any obligation under this Consent Decree, whether or not caused by a force majeure event,

Defendant shall provide notice orally or by electronic or facsimile transmission to EPA

personnel identified in Section XIII (Notices), within 72 hours of when Defendant first knew that

the event might cause a delay. Within seven days thereafter, Defendant shall provide in writing

to EPA an explanation and description of the reasons for the delay or prevention of performance;

the anticipated duration of the delay or prevention of performance; all actions taken or to be

taken to prevent or minimize the delay or prevention of performance; a schedule for

implementation of any measures to be taken to prevent or mitigate the delay or prevention of

performance or the effect of the delay or prevention of performance; Defendant’s rationale for

attributing such delay or prevention of performance to a force majeure event if it intends to assert

such a claim; and a statement as to whether, in the opinion of Defendant, such event may cause

or contribute to an endangerment to public health, welfare or the environment. Defendant shall

include with any notice all available documentation supporting the claim that the delay or

prevention of performance was attributable to force majeure. Failure to comply with the above

requirements shall preclude Defendant from asserting any claim of force majeure for that event

for the period of time of such failure to comply, and for any additional delay or prevention of

performance caused by such failure. Defendant shall be deemed to know of any circumstance of

which Defendant, any entity controlled by Defendant, or Defendant’s contractors knew or should

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 58 of 91

59

have known.

54. If EPA agrees that the delay/prevention of performance or anticipated

delay/prevention of performance is attributable to a force majeure event, the time for

performance of the obligations under this Consent Decree that are affected by the force majeure

event will be extended by EPA for such time as is necessary to complete those obligations. An

extension of the time for performance of the obligations affected by the force majeure event shall

not, of itself, extend the time for performance of any other obligation. EPA will notify

Defendant in writing of the length of the extension, if any, for performance of the obligations

affected by the force majeure event.

55. If EPA does not agree that the delay or anticipated delay has been or will be

caused by a force majeure event, EPA will notify Defendant in writing of its decision.

56. If Defendant elects to invoke the dispute resolution procedures set forth in Section

IX (Dispute Resolution), it shall do so no later than 15 days after receipt of EPA's notice. In any

such proceeding, Defendant shall have the burden of demonstrating by a preponderance of the

evidence that the delay/prevention of performance or anticipated delay/prevention of

performance has been or will be caused by a force majeure event, that the duration of the

delay/prevention of performance or the extension sought was or will be warranted under the

circumstances, that best efforts were exercised to avoid and mitigate the effects of the delay or

prevention of performance, and that Defendant complied with the requirements of Paragraphs 54

and 55, above. If Defendant carries this burden, the delay or prevention of performance at issue

shall be deemed not to be a violation by Defendant of the affected obligation of this Consent

Decree identified to EPA and the Court.

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 59 of 91

60

IX. DISPUTE RESOLUTION

57. Unless otherwise expressly provided for in this Consent Decree, the dispute

resolution procedures of this Section shall be the exclusive mechanism to resolve disputes arising

under or with respect to this Consent Decree. Defendant’s failure to seek resolution of a dispute

under this Section shall preclude Defendant from raising any such issue as a defense to an action

by the United States to enforce any obligation of Defendant arising under this Decree.

58. Informal Dispute Resolution. Any dispute subject to Dispute Resolution under

this Consent Decree shall first be the subject of informal negotiations. The dispute shall be

considered to have arisen when Defendant sends the United States a written Notice of Dispute.

Such Notice of Dispute shall state clearly the matter in dispute. The period of informal negotia-

tions shall not exceed 20 Days from the date the dispute arises, unless that period is modified by

written agreement. If the Parties cannot resolve a dispute by informal negotiations, then the

position advanced by the United States shall be considered binding unless, within 10 Days after

the conclusion of the informal negotiation period, Defendant invokes formal dispute resolution

procedures as set forth below.

59. Formal Dispute Resolution. Defendant shall invoke formal dispute resolution

procedures, within the time period provided in the preceding Paragraph, by serving on the United

States a written Statement of Position regarding the matter in dispute. The Statement of Position

shall include, but need not be limited to, any factual data, analysis, or opinion supporting

Defendant’s position and any supporting documentation relied upon by Defendant.

60. The United States shall serve its Statement of Position within 60 Days of receipt

of Defendant’s Statement of Position. The United States’ Statement of Position shall include,

but need not be limited to, any factual data, analysis, or opinion supporting that position and any

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 60 of 91

61

supporting documentation relied upon by the United States. The United States’ Statement of

Position shall be binding on Defendant, unless Defendant files a motion for judicial review of the

dispute in accordance with the following Paragraph.

61. Defendant may seek judicial review of the dispute by filing with the Court and

serving on the United States, in accordance with Section XIII (Notices), a motion requesting

judicial resolution of the dispute. The motion must be filed within 10 Days of receipt of the

United States’ Statement of Position pursuant to the preceding Paragraph. The motion shall

contain a written statement of Defendant’s position on the matter in dispute, including any

supporting factual data, analysis, opinion, or documentation, and shall set forth the relief

requested and any schedule within which the dispute must be resolved for orderly

implementation of the Consent Decree.

62. The United States shall respond to Defendant’s motion within the time period

allowed by the Local Rules of this Court. Defendant may file a reply memorandum, to the extent

permitted by the Local Rules.

63. Standard of Review

a. Disputes Concerning Matters Accorded Record Review. Except as

otherwise provided in this Consent Decree, in any dispute brought under Paragraph 59 pertaining

to adequacy or appropriateness of plans, procedures to implement plans, schedules or any other

items requiring approval by EPA under this Consent Decree; and all other disputes that are

accorded review on the administrative record under applicable principles of administrative law,

Defendant shall have the burden of demonstrating, based on the administrative record, that the

position of the United States is arbitrary and capricious or otherwise not in accordance with law.

b. Other Disputes. Except as otherwise provided in this Consent Decree, in

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 61 of 91

62

any other dispute brought under Paragraph 59, Defendant shall bear the burden of demonstrating

that its proposal will achieve compliance with the terms and conditions of this Consent Decree,

its permits, and the Act in an expeditious manner.

64. The invocation of dispute resolution procedures under this Section shall not, by

itself, extend, postpone, or affect in any way any obligation of Defendant under this Consent

Decree, unless and until final resolution of the dispute so provides. Stipulated penalties with

respect to the disputed matter shall continue to accrue from the first Day of noncompliance, but

payment shall be stayed pending resolution of the dispute as provided in Paragraph 49. If

Defendant does not prevail on the disputed issue, stipulated penalties shall be assessed and paid

as provided in Section VII (Stipulated Penalties).

X. INFORMATION COLLECTION AND RETENTION

65. The United States and its representatives, including attorneys, contractors, and

consultants, shall have the right of entry into any facility covered by this Consent Decree, at all

reasonable times, upon presentation of credentials, to:

a. monitor the progress of activities required under this Consent Decree;

b. verify any data or information submitted to the United States in

accordance with the terms of this Consent Decree;

c. obtain samples and, upon request, splits of any samples taken by

Defendant or its representatives, contractors, or consultants;

d. obtain documentary evidence, including photographs and similar data; and

e. assess Defendant’s compliance with this Consent Decree.

66. Upon request, Defendant shall provide EPA or its authorized representatives splits

of any samples taken by Defendant. Upon request, EPA shall provide Defendant splits of any

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 62 of 91

63

samples taken by EPA.

67. Until five years after the termination of this Consent Decree, Defendant shall

retain, and shall instruct its contractors and agents to preserve, all non-identical copies of all

documents, records, or other information (including documents, records, or other information in

electronic form) in its or its contractors’ or agents’ possession or control, or that come into its or

its contractors’ or agents’ possession or control, and that relate in any manner to Defendant’s

performance of its obligations under this Consent Decree. This information-retention

requirement shall apply regardless of any contrary corporate or institutional policies or

procedures. At any time during this information-retention period, upon request by the United

States, Defendant shall provide copies of any documents, records, or other information required

to be maintained under this Paragraph.

68. At the conclusion of the information-retention period provided in the preceding

Paragraph, Defendant shall notify the United States at least 90 Days prior to the destruction of

any documents, records, or other information subject to the requirements of the preceding

Paragraph and, upon request by the United States, Defendant shall deliver any such documents,

records, or other information to EPA. Defendant may assert that certain documents, records, or

other information is privileged under the attorney-client privilege or any other privilege

recognized by federal law. If Defendant asserts such a privilege, it shall provide the following:

(1) the title of the document, record, or information; (2) the date of the document, record, or

information; (3) the name and title of each author of the document, record, or information; (4)

the name and title of each addressee and recipient; (5) a description of the subject of the

document, record, or information; and (6) the privilege asserted by Defendant. However, no

documents, records, or other information created or generated pursuant to the requirements of

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 63 of 91

64

this Consent Decree shall be withheld on grounds of privilege.

69. Defendant may also assert that information required to be provided under this

Section is protected as Confidential Business Information (“CBI”) under 40 C.F.R. Part 2. As to

any information that Defendant seeks to protect as CBI, Defendant shall follow the procedures

set forth in 40 C.F.R. Part 2.

70. This Consent Decree in no way limits or affects any right of entry and inspection,

or any right to obtain information, held by the United States pursuant to applicable federal laws,

regulations, or permits, nor does it limit or affect any duty or obligation of Defendant to maintain

documents, records, or other information imposed by applicable federal or state laws,

regulations, or permits.

XI. EFFECT OF SETTLEMENT/RESERVATION OF RIGHTS

71. This Consent Decree resolves the civil claims of the United States for the

violations alleged in the Complaint filed in this action through the Date of Lodging. As of the

Effective Date, Defendant shall no longer be required to respond to the recordkeeping and

reporting requirements created by the outstanding CAA Section 114 information requests

applicable to the St. Thomas Facility, as those obligations will be addressed through Quarterly

Reporting requirements of this Decree.

72. Except as expressly stated in Paragraph 71, the United States reserves all legal

and equitable remedies available to enforce the provisions of this Consent Decree, including but

not limited to seeking the appointment of a monitor or receiver if the United States determines

that the Defendant is not complying with the terms and/or Objectives of this Consent Decree.

This Consent Decree shall not be construed to limit the rights of the United States to obtain

penalties or injunctive relief under the Act or implementing regulations, or under other federal

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 64 of 91

65

laws, regulations, or permit conditions, except as expressly specified in Paragraph 71. The

United States further reserves all legal and equitable remedies to address any imminent and

substantial endangerment to the public health or welfare or the environment arising at, or posed

by, Defendant’s St. Thomas Facility or St. John Facility, whether related to the violations

addressed in this Consent Decree or otherwise.

73. In any subsequent administrative or judicial proceeding initiated by the United

States for injunctive relief, civil penalties, other appropriate relief relating to the St. Thomas

Facility or the St. John Facility, Defendant shall not assert, and may not maintain, any defense or

claim based upon the principles of waiver, res judicata, collateral estoppel, issue preclusion,

claim preclusion, claim-splitting, or other defenses based upon any contention that the claims

raised by the United States in the subsequent proceeding were or should have been brought in the

instant case, except with respect to claims that have been specifically resolved pursuant to

Paragraph 72 of this Section.

74. This Consent Decree is not a permit, or a modification of any permit, under any

federal, State, or local laws or regulations. Defendant is responsible for achieving and

maintaining complete compliance with all applicable federal, State, and local laws, regulations,

and permits; and Defendant’s compliance with this Consent Decree shall be no defense to any

action commenced pursuant to any such laws, regulations, or permits, except as set forth herein.

The United States does not, by its consent to the entry of this Consent Decree, warrant or aver in

any manner that Defendant’s compliance with any aspect of this Consent Decree will result in

compliance with provisions of the Act, 42 U.S.C. § 7401 et seq., or with any other provisions of

federal, State, or local laws, regulations, or permits.

75. This Consent Decree does not limit or affect the rights of Defendant or of the

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 65 of 91

66

United States against any third parties, not party to this Consent Decree, nor does it limit the

rights of third parties, not party to this Consent Decree, against Defendant, except as otherwise

provided by law.

76. This Consent Decree shall not be construed to create rights in, or grant any cause

of action to, any third party not party to this Consent Decree.

XII. COSTS

77. The Parties shall bear their own costs of this action, including attorneys’ fees,

except that the United States shall be entitled to collect the costs (including attorneys’ fees)

incurred in any action necessary to collect any portion of the civil penalty or any stipulated

penalties due but not paid by Defendant.

XIII. NOTICES

78. Unless otherwise specified herein, whenever notifications, submissions, or

communications are required by this Consent Decree, they shall be made in writing and

addressed as follows:

To the United States: Chief, Environmental Enforcement Section Environment and Natural Resources Division U.S. Department of Justice Box 7611 Ben Franklin Station Washington, D.C. 20044-7611 Re: DOJ No. 90-5-2-1-10424 and Robert Buettner Air Compliance Branch Division of Enforcement and Compliance Assistance U.S. Environmental Protection Agency, Region 2 290 Broadway, 21st Floor New York, New York 10007-1866 (212) 637-5031

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 66 of 91

67

[email protected] and Flaire Mills Associate Regional Counsel U.S. Environmental Protection Agency, Region 2 Office of Regional Counsel 290 Broadway, 17th Floor New York, New York 10007-1866 (212) 637-3198 [email protected] To Defendant(s): Kevin Smalls Director of Plant Production Virgin Islands Water and Power Authority Richmond Power Plant #1 Penitentiary Land St. Croix, VI 00821 (340) 773-2796 [email protected] John Woodson St. Thomas Plant Superintendent Virgin Islands Water and Power Authority P.O. Box 1450 St. Thomas, VI 00804-1450 (340) 774-3553 Ext. 2204 [email protected] Maxwell George Environmental Affairs Manager Virgin Islands Water and Power Authority P.O. Box 1450 St. Thomas, VI 00804-1450 (340) 774-3553 Ext. 2274 [email protected] Lorelei Farrington, Esq. General Counsel Virgin Islands Water and Power Authority P.O. Box 1450 St. Thomas, VI 00804-1450 (340) 715-6561

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 67 of 91

68

[email protected]

79. Any Party may, by written notice to the other Parties, change its designated notice

recipient or notice address provided above.

80. Notices submitted pursuant to this Section shall be deemed submitted upon

mailing, unless otherwise provided in this Consent Decree or by mutual agreement of the Parties

in writing.

XIV. EFFECTIVE DATE

81. The Effective Date of this Consent Decree shall be the date upon which this

Consent Decree is entered by the Court or a motion to enter the Consent Decree is granted,

whichever occurs first, as recorded on the Court’s docket; provided, however, that Defendant

hereby agrees that it shall be bound to perform duties scheduled to occur prior to the Effective

Date. In the event the United States withdraws or withholds consent to this Consent Decree

before entry, or the Court declines to enter the Consent Decree, then the preceding requirement

to perform duties scheduled to occur before the Effective Date shall terminate.

XV. RETENTION OF JURISDICTION

82. The Court shall retain jurisdiction over this case until termination of this Consent

Decree, for the purpose of resolving disputes arising under this Decree or entering orders

modifying this Decree, pursuant to Sections IX (Dispute Resolution) and XVI (Modification), or

effectuating or enforcing compliance with the terms of this Decree.

XVI. MODIFICATION

83. The terms of this Consent Decree, including any attached appendices, may be

modified only by a subsequent written agreement signed by all the Parties. Where the

modification constitutes a material change to this Decree, it shall be effective only upon approval

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 68 of 91

69

by the Court.

84. Any disputes concerning modification of this Decree shall be resolved pursuant to

Section IX (Dispute Resolution), provided, however, that, instead of the burden of proof

provided by Paragraph 63, the Party seeking the modification bears the burden of demonstrating

that it is entitled to the requested modification in accordance with Federal Rule of Civil

Procedure 60(b).

XVII. TERMINATION

85. After Defendant has completed the requirements of Section V (Compliance

Requirements), has maintained satisfactory compliance with its applicable permits for a period of

three years, has satisfactorily complied with all other requirements of this Consent Decree, and

has paid the civil penalty and any accrued stipulated penalties as required by this Consent

Decree, Defendant may serve upon the United States a Request for Termination, stating that

Defendant has satisfied those requirements, together with all necessary supporting

documentation.

86. Following receipt by the United States of Defendant’s Request for Termination,

the Parties shall confer informally concerning the request and any disagreement that the Parties

may have as to whether Defendant has satisfactorily complied with the requirements for

termination of this Consent Decree. If the United States agrees that the Decree may be

terminated, the Parties shall submit, for the Court’s approval, a joint stipulation terminating the

Decree.

87. If the United States does not agree that the Decree may be terminated, Defendant

may invoke Dispute Resolution under Section IX (Dispute Resolution). However, Defendant

shall not seek Dispute Resolution of any dispute regarding termination, under Paragraph 59 of

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 69 of 91

70

Section IX (Dispute Resolution), until 90 days after service of its Request for Termination.

XVIII. PUBLIC PARTICIPATION

88. This Consent Decree shall be lodged with the Court for a period of not less than

30 Days for public notice and comment in accordance with 28 C.F.R. § 50.7. The United States

reserves the right to withdraw or withhold its consent if the comments regarding the Consent

Decree disclose facts or considerations indicating that the Consent Decree is inappropriate,

improper, or inadequate. Defendant consents to entry of this Consent Decree without further

notice and agrees not to withdraw from or oppose entry of this Consent Decree by the Court or to

challenge any provision of the Decree, unless the United States has notified Defendant in writing

that it no longer supports entry of the Decree.

XIX. SIGNATORIES/SERVICE

89. Each undersigned representative of Defendant and the Assistant Attorney General

for the Environment and Natural Resources Division of the Department of Justice certifies that

he or she is fully authorized to enter into the terms and conditions of this Consent Decree and to

execute and legally bind the Party he or she represents to this document.

90. This Consent Decree may be signed in counterparts, and its validity shall not be

challenged on that basis. Defendant agrees to accept service of process by mail with respect to

all matters arising under or relating to this Consent Decree and to waive the formal service

requirements set forth in Rules 4 and 5 of the Federal Rules of Civil Procedure and any

applicable Local Rules of this Court including, but not limited to, service of a summons.

XX. INTEGRATION

91. This Consent Decree constitutes the final, complete, and exclusive agreement and

understanding among the Parties with respect to the settlement embodied in the Decree and

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 70 of 91

71

supersedes all prior agreements and understandings, whether oral or written, concerning the

settlement embodied herein. Other than deliverables that are subsequently submitted and

approved pursuant to this Decree, no other document, nor any representation, inducement,

agreement, understanding, or promise, constitutes any part of this Decree or the settlement it

represents, nor shall it be used in construing the terms of this Decree.

XXI. FINAL JUDGMENT

92. Upon approval and entry of this Consent Decree by the Court, this Consent

Decree shall constitute a final judgment of the Court as to the United States and Defendant. The

Court finds that there is no just reason for delay and therefore enters this judgment as a final

judgment under Fed. R. Civ. P. 54 and 58.

XXII. APPENDICES

93. The following appendices are attached to and part of this Consent Decree:

“Appendix A” is a copy of Sections 7.04 and 7.05 and Exhibit B of the July 25,

2013 contract with Vitol;

“Appendix B” are examples of the spreadsheets required to be used to track the

Spare Parts Inventory Program for the water injection systems and continuous monitoring

systems;

“Appendix C” is the list of spare parts currently on order;

“Appendix D” is a list of items required to be included in the St. Thomas O&M

Plan;

“Appendix E” is an example of the Water Injection System Data Sheets;

“Appendix F” is the list of water injection system components to evaluate during

audits; and

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 71 of 91

72

“Appendix G” is the list of continuous monitoring system components relating to

evaluate during audits.

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 72 of 91

73

Dated and entered this day of __________, ____.

__________________________ CURTIS V. GÓMEZ UNITED STATES DISTRICT JUDGE DISTRICT OF THE VIRGIN ISLANDS

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 73 of 91

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 74 of 91

FOR PLAINTIFF UNITED STATES OF AMERICA:

Dated:

istant Attorney General nvironment and Natural Resources Division

United States Department of Justice

Senior Counsel LAURA ROWLEY Senior Counsel Environmental Enforcement Section Environment and Natural Resources Division United States Depaiiment of Justice P.O. Box 761 J Ben Franklin Station Washington, D.C. 20044-7611 [email protected] [email protected]

RONALD W. SHARPE United States Attorney District of the Virgin Islands

JOYCELYN HEWLETT Assistant United States Attorney Federal Building and U.S. Courthouse 5500 Veterai1s Drive Room 260 St. Thomas, Virgin Islands 00802 j oycel yn.hewl [email protected]

74

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 75 of 91

FOR PLAINTIFF UNITED STA TES OF AMERICA:

E Regional Counsel U.S. Environmental Protection Agency, Region 2

DENISE LEONG Assistant Regional Counsel FLAIR£ MILLS Associate Regional Counsel Office of Regional Counsel U.S. Environmental Protection Agency, Region 2 290 Broadway New York, New York 10007

75

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 76 of 91

FOR DEFENDANT VIRGIN ISLANDS WATER AND POWER AUTHORITY:

Virgin Islands Water and Power Authority P.O. Box 1450 St. Thomas. VI 00804·1450

76

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 77 of 91

Appendix A EXECUTION VERSION

AGREEMENT FOR (1) THE CONSTRUCTION, OWNERSHIP, OPERATION, MAINTENANCE AND TRANSFER OF LPG FACILITIES, {2) LPG SUPPLY

ANO (3) MANAGING THE REPOWERING OF CERTAIN COMBUSTION TURBINE UNITS

between

VIRGIN ISLANDS WATER ANO POWER AUTHORITY

and

VITOL VIRGIN ISLANDS CORP.

Dated July 25, 2013

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 78 of 91

Appendix A

Article 7 CONSTRUCTION SCHEDULE

Section 7.01 Commencement of Work. After satisfaction of all of the Construction Conditions and WAPA's delivery of the written notice to proceed with the Work, Seller shall commence performing the Work.

Section 7.02 Creation of Punchlist. When Seller believes that the Constructed and Converted Facilities are ready for Commissioning and Testing and the Project Facilities are capable of delivering LPG to the Delivery Point at the Harley Plant and the Richmond Plant, Seller will prepare and submit to WAPA a working outstanding items list, which list (a 'Working Outstanding Items List''), may include those items of Work remaining to be completed with respect to the Constructed and Converted Facilities. Initially, such Working Outstanding Items List may serve as a working tool for Seller to track all outstanding Work for the Constructed and Converted Facilities. Following receipt of the Working Outstanding Items List, Seller and WAPA shall jointly walk-down the Constructed and Converted Facilities and confer together as to the items from the Working Outstanding Items List which should be included on the finalized punchlist. Seller shall then update the Working Outstanding Items List or create a new list to reflect the result of such joint walk down and deliver the same to WAPA for its review and approval, which submitted list shall be explicitly designated as the "Proposed Punchlist" tor the Constructed and Converted Facilities. If WAPA does not deliver any changes to the Proposed Punchlist to Seller within five (5) Business Days after receipt from the Seller, then such Proposed Punchlist shall be deemed approved. The Proposed Punchlist that is ultimately approved or deemed to have been approved by WAPA shall be referred to as the "Punchlist". If the Punchlist is not finalized by the Substantial Completion Deadline, the Proposed Punchlist as modified by WAPA shall be deemed the Punchlist for the Constructed and Converted Facilities for all purposes hereunder until the Parties resolve such dispute and otherwise finalize the Punchlist. Seller shall note on such Punchlist the items under dispute.

Section 7.03 Completion of Punchlist. Seller shall proceed promptly to complete and correct all items on the Punchlist. On a monthly basis after Substantial Completion, Seller shall revise and update the Punchlist to include the date(s) that items listed on such Punchlist are completed by Seller and accepted by WAPA. Notwithstanding any of the foregoing, the items listed on such Punchlist shall not be considered complete until WAPA shall have inspected such items and acknowledged, by notation on the updated Punchlist, that such item of Work is complete. If WAPA does not so inspect and deliver such notations on the updated Punchlist to Seller (or dispute completion of the applicable items of Work if not accepted) within a reasonable period of time, and Seller has actually compreted and corrected any Punchlist item listed on such Punchlist, such Punchlist item shall be deemed completed on the date that is ten (10) days after Seller submits the updated Punchlist containing such Punchtist item to WAPA.

Section 7.04 Substantial Completion. The following are the conditions precedent tor the Constructed and Converted Facilities to achieve Substantial Completion:

(a) the Constructed and Converted Facilities have achieved Mechanical Completion;

(b) Commissioning and Testing has been completed successfully as certified by duly authorized representatives of WAPA and Seifer;

2'7

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 79 of 91

Appendix A

(c) the Constructed and Converted Facilities have been constructed in accordance with Seller's Specifications, other than Punchlist items;

(d) the Punchlist shall be in final form or be deemed approved as provided for in Section 7.02 and only Non-Critical Deficiencies remain on the Punchlist;

(e) all storage tanks in the Delivery Infrastructure have been loaded with the necessary quantity of LPG to enable Seller to comply with its obligations hereunder;

(f} Seller is capable of commencing the continual delivery of WAPA's requirements of LPG to the Delivery Points and vaporized LPG to the headers of the turbines as set forth herein;

(g) Seller shall have delivered the Notice of Substantial Completion to WAPA.

Section 7.05 Notice of Substantial Comeletion. When Seller believes that it has satisfied the provisions of Section 7.04, Seller shall deliver to WAPA written notice that it has achieved Substantial Completion (a "Notice of Substantial Completion"). WAPA shall, as promptly as reasonably practicable but in no case no longer than three {3) business days after receipt of such Notice of Substantial Completion, issue a certificate confirming achievement of

·Substantial Completion (the "Certificate of Substantial Completionn) dated to reflect the Substantial Completion Date, or if WAPA rejects Seller's Notice of Substantial Completion, respond in writing giving its reasons for such rejection and Seller shall take the appropriate corrective action. Upon completion of such corrective action, Seller shall provide to WAPA a new Notice of Substantial Completion for approval. This process shall be repeated on an iterative basis until WAPA accepts the Notice of Substantial Completion and issues a Certificate of Substantial Completion at which point "Substantial Completion" shall have been achieved.

Section 7.06 Final Completion. "Final Completion" shall be deemed to have occurred only if all of the following have occurred:

(a) Substantial Completion shall have been achieved;

(b) all items on the Punchlist shall have been completed by Seller;

(c) all Seller's and Subcontractor's personnel shall have left WAPA's Facilities, and all surplus materials, waste materials and rubbish shall have been removed from therefrom;

(d) Seller shall have delivered the Notice of Final Completion to WAPA;

(e) all final lien waivers have been obtained; and

(f) all red and blue versions of manuals, drawings and other documents expressly required to be delivered by Seller hereunder have been delivered to WAPA.

Section 7.07 Notice of Final Completion. Seller shall deliver to WAPA written notice that it has achieved Final Completion (a "Notice of Final Completion") that it has achieved Final Completion. Within two (2) Business Days after receipt of the Notice of Final Completion, WAPA shall issue a certificate confirming achievement of Final Completion ("Certificate of Final

28

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 80 of 91

Appendix A

Exhibit B Commissioning and Testing Standards and Procedures

[TO BE COMPLETED AS AN IMMEDIATE CONDITION]

8-1

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 81 of 91

Appendix A

Draft - Exhibit B

Commissioning and Testing Standards and Procedures for the LPG Terminal facilities scope

The Seller will be responsible for the commissioning of the terminal. Commissioning will be undertaken by the Sellers operational team after the facilities have been handed over by the Sellers project team upon mechanical completion and commissioning readiness check as described below.

Commissioning Readiness Check

Upon reaching Mechanical Completion a Commissioning Readiness Check will be conducted as per VTTI procedure VTTl-21. l O.PR.00 I

The objective of this audit is to verify that the terminal is ready for commissioning and any shortcomings have been properly addressed. A positive result from the commissioning readiness audit is required to proceed with the actual commissioning. The "independent" audit teams make use of standardized checklists that cover all required items and hold points; this provides an effective and efficient assessment.

Among other the following subjects are covered by the checklists: >-- Roles and Responsibilities ,- Planning and Schedule ).- Preparation ).- Process Safety Management r Safety systems > Risk Mitigation r HAZOP implementation > License to operate '>-- Technical completion 'r Punch items ,- As-built documentation r Operator training r Operational philosophy I Work instructions ,_ Maintenance of critical elements ,_ Spares I Operational equipment ).- Commissioning Plan ,- Handover 'r Procedures r Minin1al required docun1entation f.. Reporting 'r Communication

A full version of VTTI procedure VTTI-21.00.PR.001 can be made available on request.

Handover and Commissioning Plan

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 82 of 91

Appendix A

Handover and Commissioning will be carried out as per VITI procedure VITI-21.IO.PROOl.

This document lays out VITI requirements for developing a proper Handover and Commissioning Plan. For developing this plan the terminal operating party will appoint a Commissioning Manager (which in turn will be responsible of setting up a commissioning team). Th commissioning plan shall be developed as soon as possible but no later than 1 month prior to start up. The plan must be approved by the Terminal Manager and the Project Director.

The commissioning plan describes in detail roles and responsibilities and procedures throughout the commissioning process. The followings subjects are covered:

General Manager

Commissioning Manager

Operational Commissioning Team

Handover and Commissionin g Plan

" .. "",, Operations """ ,.-~~~~~~--,·~~Q~aasss~~~aa~~~$

Maintenance Commissioning Team

r Con11nissioning teatn ,- Roles and Responsibilities ,_ Commissioning Organization > Preparation r Progress overvievv ,- Training of terminal personnel ,- Mechanical Completion (MC) and Handover :;... Work sequence from MC to Handover >- Operations witnessed testing and MC activities > Punch list > Commissioning sequence per (sub )system ;;.. Handover schedule ;... As-built documentation ,- Commissioning procedures for:

Technical Director

Project Team

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 83 of 91

Appendix A

o Buildings o CCR o Substation o Electrical & Instrumentation o Automation o Utilities o Sewer system o Potable water o Service water o Nitrogen system o LPG o Secondary systems o Fire Fighting system o Communication

,_ Contractor assistance during commissioning 3 ,_ Start-up procedures >-- Performance tests '>-- Emission tests

A full version of VTTI procedure VTTI-21.1 O.PR.00 I can be made available on request.

Commissioning and Testing Standards and Procedures for the Turbine modification scope:

After mechanical completion has been achieved and all punch items related to safe operation of the plant cold commissioning can commence, once cold commissioning is successfully completed hot commissioning will take place.

Commissioning will be executed based on a commissioning planning which will be composed by the subcontractor in close alignment with Vito! Project and operations, WAPA and other stakeholders. Manufacturers and subcontractors commissioning procedures will be taken into account complemented by W APA power plant procedures. All commissioning the results are recorded in a commissioning report.

During the cold commissioning the following activities take place:

,- From the instrument cables, instruments. and control cables all loops arc tested from the faceplate/object till the instrument. A record is kept to have the overview and expedite progress.

J.- The power cables are Mega Ohm (M.Q) checked and a bump test of the electrical motors will be done.

,- A motor Uncoupled Running Test (MURT) will be done. Items such as , power consumption per phase, temperatures of the bearing housing, vibration will be monitored and recorded.

>-- Pipelines will be flushed in order to remove debris from the construction/lay down time or removal of corrosion preventive measures.

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 84 of 91

Appendix A

> Valves will be stroke tested. > Interface communications will be tested.

During the Hot Commissioning the following activities take place:

> All trips and interlocks are tested from the operating system (Some of them will be life tested in a later stage as well).

> Software will be functionally tested. ,- Systems are tested. > Test operations starts > Performance testing > Emission Testing

APPENDIX B - SPARE PARTS INVENTORY PROGRAM for VIWAPA CEMs and COMs in St. Croix and St. Thomas

Page 1 of 9

System Parts Number Name Part DescriptionManufacturer/

Supplier

Storage Location

(STX, STT, or STX/STT)

Replacement Frequency

OrderLead Time

Days

MinimumRequired Inventory Quantity

St. CroixFacility

St. ThomasFacility

TotalDetermination DateRe-Order Required?

Minimum Re-Order Quantity?

(to > min.)Requisition No.

Date PO/Contract Required?

(End Next Month)

Date PO/Contract Issued

Date PO/Contract Accepted by Vendor

PO/Contract No.

No.Parts on

Order

No. of Parts Ordered

Adequate?

Date Part Required?(before < minimum)

Date Parts Expected

No.Parts

Received

Date Parts Received

No.Parts Dispatched

DateParts Dispatched

Unit ServicedReason

for Service

Replacement Requires Unit

Outage?(Yes/No)

Compliance Maintained During

Replacement?(Yes/No)

1 NOx 58020100 Motherboard PCA, Motherboard, E Series, Gen 5-1 Tel. ML/QA Support STX/STT As Needed 63 1 1 1 2 NO AC20479-1 06/29/15 RN006360.001 1 07/30/152 NOx 42680100 A-zero Valve Assy Valve Tel. ML/QA Support STX/STT As Needed 63 1 2 3 5 NO3 NOx OR0000039 O-Ring 39 O-ring, For Flow Control, OR 39 Tel. ML/QA Support STX/STT As Needed 63 3 3 4 7 NO4 NOx 940500 7 Mil Orifice Orifice, 7 Mil, Ozone Flow/Exhaust Manifold Tel. ML/QA Support STX/STT As Needed 63 3 0 6 6 NO5 NOx 940100 3- MilOrifice Orifice, 3 Mil, By Pass Flow Manifold Tel. ML/QA Support STX/STT As Needed 63 3 1 8 9 NO6 NOx 2730000 Optical Filter Optical Filter, 665nm Tel. ML/QA Support STX/STT As Needed 63 1 2 2 4 NO7 NOx 940400 4 Mil Orifice Orifice, 4 Mil, Perma Pure Dryer Tel. ML/QA Support STX/STT As Needed 63 3 1 6 7 NO8 NOx 1761800 Ozone Dryer Assy, Flow Ctl, 90CC, Ozone Dryer Tel. ML/QA Support STX/STT As Needed 63 2 1 3 4 NO9 NOx 40030800 Sensor Board Flow/Pressure Sensor PCA Tel. ML/QA Support STX/STT As Needed 63 3 3 1 4 NO 1 6/26/2015 U19 Failure NO YES

10 NOx 45230200 Relay Board Relay Card W/Relays, Relay Board Tel. ML/QA Support STX/STT As Needed 63 2 1 3 4 NO11 NOx 41800500 Pre Amp Board PCA, PMT Pre Amp, TML41 Tel. ML/QA Support STX/STT As Needed 63 3 1 2 3 YES 1 AC20479-1 06/29/15 RN006360.0018 2 YES 07/30/1512 NOx 14080100 HVPS Assy, High Voltage Power Supply Tel. ML/QA Support STX/STT As Needed 63 2 1 4 5 NO13 NOx 11930000 PMT Photo Multiplier Tube Tel. ML/QA Support STX/STT As Needed 63 2 1 3 4 NO

14 NOx KIT000019 Cooler Assembly Replacement Cooler Assy Tel. ML/QA Support STX/STT As Needed 63 2 0 3 3 NO 01/14/15 NAAC20479-1

2/28/2015 2/27/2015 2/27/157/29/15

20148REVRN006360.0018

21

4/10/157/30/15

2 4/7/15

15 NOx 40420200 Ozone Generator Assy, O3 Generator Tel. ML/QA Support STX/STT As Needed 63 2 1 6 7 NO16 NOx 18720100 Moly Converter Moly Converter, w/O3 Destructor Tel. ML/QA Support STX/STT 3 years 63 3 0 5 5 NO17 NOx 884-017300 NOx Pump Pump Assy, External, 115V/60 HZ, Thomas Tel. ML/QA Support STX/STT As Needed 63 2 3 2 5 NO18 NOx 98000242 NOx Pump Rebuild Kit KIT, Pump Service, Thomas Pump Tel. ML/QA Support STX/STT Quarterly/As Needed 63 3 0 3 3 YES 1 AC20479-1 06/29/15 RN006360.0018 2 YES 07/30/1519 NOx 13140000 Cooler Fan Assy, Cooler Fan Tel. ML/QA Support STX/STT As Needed 63 2 1 3 4 NO20 NOx 10003894 A Power Supply 5,+-15 VDC Power Supply Tel. ML/QA Support STX/STT As Needed 63 2 1 3 4 NO21 NOx 10003546 F Power Supply 12 VDC Power Supply Tel. ML/QA Support STX/STT As Needed 63 2 1 3 4 NO22 NOx 49310100 TCE Control Board PCA, TCE Control, E Series Tel. ML/QA Support STX/STT As Needed 70 2 3 1 4 NO23 NOx QT-TML-RBK NOx Rebuild Kit NOx Rebuild Kit Tel. ML/QA Support STX/STT Quarterly/As Needed 63 3 0 3 3 YES 1 AC20479-1 06/29/15 RN006360.0018 2 YES 07/30/15

24 CO 58021100 Motherboard PCA, Motherboard, E Series, Gen 5-1 Tel. ML/QA Support STX/STT As Needed 63 1 1 4 5 NO25 CO 37860000 O-ring 58 OR 58 Viton O-Ring, for Particulate Filter Tel. ML/QA Support STX/STT As Needed 63 3 2 8 10 NO26 CO 9560301 Filter Wheel Gas Filter Wheel Tel. ML/QA Support STX/STT As Needed 63 2 1 3 4 NO27 CO 40030100 Sensor Board PCA Flow/Pressure Sensor Board Tel. ML/QA Support STX/STT As Needed 63 3 1 8 9 NO28 CO 41350000 Relay Board PCA Relay Board M300E Tel. ML/QA Support STX/STT As Needed 63 2 1 3 4 NO29 CO PS0000025 Power Supply Power Supply, +12V Tel. ML/QA Support STX/STT As Needed 63 2 1 3 4 NO30 CO 9550500 IR Source IR Source,TML 30 S/N > 65 Tel. ML/QA Support STX/STT As Needed 63 3 1 7 8 NO31 CO KIT000178 Sync Dmod Retrofit, Sync Dmod with Detector, TML30 Tel. ML/QA Support STX/STT As Needed 63 3 7 1 8 NO32 CO PS0000011 Power Supply Power Supply, +5/+-15V Tel. ML/QA Support STX/STT As Needed 63 2 1 3 4 NO 1 1/29/2015 U18 Repairs NO YES33 CO PU0000022 Internal Pump Rebuild kit Internal Pump, Sensor E Series, Rebuild kit PU022 Tel. ML/QA Support STX/STT As Needed 63 3 3 12 15 NO

34 CO PU1752-N05-5.05 Internal Motor Internal Motor, 100-230/50-60Hz, 115/60Hz Tel. ML/QA Support STX/STT As Needed 63 2 1 1 2 YES 01/14/15 1 NAAC20479-1

02/28/15 02/27/15 2/27/201506/29/15

20148REVRN006360.0018

22

YES 4/10/1507/30/15

2 4/7/2015

35 CO 52830100 Motor Assy Motor(MR7) E Series Tel. ML/QA Support STX/STT As Needed 63 2 1 3 4 NO36 CO OP0000030 O2 Sensor O2 Transducer Tel. ML/QA Support STX/STT As Needed 63 1 2 2 4 NO

37 Opacity 528873 Purge Filter Purge Filter Tel. ML/QA Support STX/STT As Needed 63 3 0 5 5 NO38 Opacity 528312SP Purge Switch Purge Switch Tel. ML/QA Support STX/STT As Needed 63 3 8 2 10 NO39 Opacity 980536 Purge Hose 1 Inch Diameter, Purge Hose, feet Tel. ML/QA Support STX/STT As Needed 63 10 5 33 38 NO40 Opacity 980142 Blower motor Blower Motor Tel. ML/QA Support STX/STT As Needed 63 2 0 6 6 NO 1 5/21/2015 H21 Repairs NO YES41 Opacity 1860-0400-01 Optical Amp Board Optical Amp PCB Tel. ML/QA Support STX/STT As Needed 63 2 2 4 6 NO42 Opacity 1860-0600-01 Display Board Display Control Board Tel. ML/QA Support STX/STT As Needed 63 2 0 5 5 NO43 Opacity 1860-0500-01SP Mother Board 560 Mother Board PCB Tel. ML/QA Support STX/STT As Needed 70 2 0 3 3 NO 01/14/15 NA 02/28/15 02/27/15 02/27/15 20148REV 3 04/10/15 3 04/07/1544 Opacity 1860-0190-01 Key Pad Key Pad Tel. ML/QA Support STX/STT As Needed 63 3 2 2 4 NO AC20479-1 06/29/15 RN006360.0018 1 1 07/15/1545 Opacity 527418 1.25A, Fuse 1.25A, Fuse Tel. ML/QA Support STX/STT As Needed 63 2 0 8 8 NO46 Opacity 527438 2.0A, Fuse 2.0A, Fuse Tel. ML/QA Support STX/STT As Needed 63 2 0 6 6 NO47 Opacity 1860-1100-02 Power Supply Power Supply PCB Tel. ML/QA Support STX/STT As Needed 63 2 2 1 3 NO AC20479-1 06/29/15 RN006360.0018 1 1 07/15/1548 Opacity 545441 Control Module Flash Control Module, Communication Module Tel. ML/QA Support STX/STT As Needed 63 2 6 3 9 NO

49 Sample Plate Q740-SCD_DIL_PT_PCB Pressure Board Pressure Transducer Board Tel. ML/QA Support STX/STT As Needed 42 2 1 2 3 NO AC20479-1 06/29/15 RN006360.0018 1 09/30/1550 Sample Plate Q740-AD-SSR6M12-DC-200D Solid State Relay 2 Relay, Solid State, 100 VDC Tel. ML/QA Support STX/STT As Needed 42 2 2 3 5 NO51 Sample Plate Q740-AD-SSR810-DC-28Z Solid State Relay 1 Relay, Solid State, 280 VDC Tel. ML/QA Support STX/STT As Needed 42 2 1 3 4 NO52 Sample Plate Q740-52X01061GM-24VDC CVx Calibration Gas 2-Way Solenoid 24VDC, 100 PSI Tel. ML/QA Support STX/STT As Needed 42 2 13 7 20 NO53 Sample Plate Q740-56LJ8XGM-24VDC GBV,CPV,GDV Gas Direct 3-Way Solenoid 24 VDC, 50 PSI Tel. ML/QA Support STX/STT As Needed 42 2 3 10 13 NO54 Sample Plate UA 1050 Sample Chiller Mini Chiller, Sample Chiller Tel. ML/QA Support STX/STT As Needed 42 2 4 4 8 NO55 Sample Plate Q740-9464K17 012 Viton O-ring O-ring, -012 Viton, CG Solenoid Bank Tel. ML/QA Support STX/STT As Needed 42 6 1 15 16 NO56 Sample Plate Q740-LPH-125-0A-A-NO-A9011 Flow Switch 50 CC Flow Switch, 50CC/Min (Block Bleed) Tel. ML/QA Support STX/STT As Needed 42 2 1 4 5 NO57 Sample Plate Q740-8286-179A CG Pressure Regulator CG Pressure Regulator 3 PSID Tel. ML/QA Support STX/STT As Needed 42 2 1 3 4 NO58 Sample Plate Q740-74C-123G081-113810 Sample/bypass Flow Meter Flow Meter Cal Sample/Bypass, 2 SLPM Tel. ML/QA Support STX/STT As Needed 42 2 12 3 15 NO59 Sample Plate Q740-74C-214G021-213810 Cal Gas Flow Meter Flow Meter Cal Gas, 9.2 SLPM Tel. ML/QA Support STX/STT As Needed 42 2 9 3 12 NO60 Sample Plate Q130-005-K Membrane Filter Membrane Filter Tel. ML/QA Support STX/STT As Needed 42 2 1 20 21 NO61 Sample Plate Q90P1008 Peristaltic Tube Peristaltic Tube for PP1-1 Tel. ML/QA Support STX/STT As Needed 42 6 7 22 29 NO62 Sample Plate Q01P1300 Peristaltic Pump Peristaltic Pump Tel. ML/QA Support STX/STT As Needed 42 2 3 4 7 NO63 Sample Plate 29000204-52 Probe Filter Sample Probe Filter Tel. ML/QA Support STX/STT As Needed 42 3 7 0 7 NO64 Sample Plate Q740-J161-BP-PJ0 Single Head DC Pump(Sample Pump) Single Head brushless DC Pump Tel. ML/QA Support STX/STT As Needed 42 2 6 3 9 NO65 Sample Plate Q740-11711 Mini DC Pump Kit Rebuild kit for Mini Single Brushless DC Pump Tel. ML/QA Support STX/STT As Needed 42 3 0 3 3 YES 1 AC20479-2 06/29/15 RN006360.0018 2 YES 07/30/1566 Sample Plate Q02F1500 WCOF WCOF Tel. ML/QA Support STX/STT As Needed 42 2 3 7 10 NO 7/7/2015 U15 Replaced NO YES67 Sample Plate Q9F0016 Water Slip Filter Water Slip Filter Tel. ML/QA Support STX/STT As Needed 42 3 3 8 11 NO68 Sample Plate Q03E1001 Water Slip Electrode Water Slip Filter Electrode (LA 1S) Tel. ML/QA Support STX/STT As Needed 42 2 3 6 9 NO69 Sample Plate Q740-70105523 Fan Fan, 115VAC, 172X150mm, rnd, 230CFM Tel. ML/QA Support STX/STT As Needed 42 2 1 3 4 NO70 Sample Plate Q740-70104889 Axial Fan Axial Fan 2.4W , 27.1 CFM Tel. ML/QA Support STX/STT As Needed 42 2 1 3 4 NO71 Sample Plate Q03E2006D Water Slip Electronics Water Slip Electronics, Model LA 1.4, 24VDC Tel. ML/QA Support STX/STT As Needed 42 2 1 5 6 NO72 Sample Plate Q740-WMZT1C10 10A Circuit Breaker Breaker, Circuit 120VAC 10A, DIN Tel. ML/QA Support STX/STT As Needed 42 2 1 3 4 NO73 Sample Plate Q740-70069759 24VDC Supply Power Supply, 24VDC @ 20A Tel. ML/QA Support STX/STT As Needed 42 2 7 3 10 NO74 Sample Plate Q740-70160887 15VDC Supply Power Supply, 15VDC @ 0.5A Tel. ML/QA Support STX/STT As Needed 42 2 1 3 4 NO76 PLC 1769-IF 16C Allen & Bradley Analog Input Module AB 1769-Analog Input 16 Ch Tel. ML/QA Support STX/STT As Needed 42 1 0 1 1 YES 1 AC20479-2R 06/30/15 RN006360.0018 1 YES 1 07/15/1577 PLC 1769-OW16 Allen & Bradley Relay Module Micro800, Expansion Module, 16 Ch Relay Tel. ML/QA Support STX/STT As Needed 42 1 3 4 7 NO AC20479-2R 06/30/15 RN006360.0018 1 YES 1 07/15/1578 PLC 1769-IQ32 Allen & Bradley Digital Input Module AB 1769-Digital Input 32 Ch Tel. ML/QA Support STX/STT As Needed 42 1 1 1 2 NO AC20479-2R 06/30/15 RN006360.0018 1 YES 1 07/15/1579 PLC None Spare Al & Br PLC Process Prog. Flash Card 1 GB SD Chip Tel. ML/QA Support STX/STT As Needed 42 1 1 1 2 NO

Column Key

PurchasesRe-Order Determination

Re-Order Required?(Yes/No)

Actual Qty On Hand Parts Replacements

Spare Parts Inventory Program - list of critical parts maintained in-stock supporting timely repairs and preventive maintenance of CEMS and COMs. Parts are maintained at both plants for use at either plant. Reference to specific sections of draft Consent Decree in column headings. Spreadsheet will be updated each week and saved. Inventory will be updated as purchased parts are received and as inventory parts are dispatched.

Date Updated: 7/24/2015Inventory Edits in YellowTHIS WEEK'S CHANGES IN BLUE

Date Updated - date inventory updated based physical count from weekly inventory check, purchase data, and use/dispatch data

Manufacturer/Supplier - source for parts purchased or to be purchased

Storage Location - physical location of parts - either at St. Croix Plant (STX), at St. Thomas Plant (STT) or parts stored at both plants. Parts can be transferred from plant to the other within four working hours if needed.

System - CEMS or COMs monitoring system requiring partParts Number - number assigned to part as unique identifierParts Name - shorthand name for partParts Description - identity of part based on name, size, material of construction, or other specification

Replacement Frequency - Expected frequency of repair or replacement of the individual components; "As Needed" indicates replaced at point of failure

Order Lead Time - Expected lead time for the ordering, purchasing, and delivery of parts, i.e., from initiation of procurement to receipt onsite

Minimum Required Inventory Quantity - minimum number of units required to be in stock to ensure parts are always on-hand; when actual inventory on both Islands is at or below minimum, re-order initiated

Actual Quantity On-Hand - at each Plant and in Total - Verification of inventory of parts in storage based purchase and usage records and check by physical inventory at each plant

Re-Order Required - Spreadsheet determination as to whether re-ordering is required: "YES" if TOTAL quantity on-hand is equal to/less than the Minimum Inventory Quantity TOTAL for both Plants

Determination Date Re-Order Required - date when deficiency determined and re-order required

Minimum Re-Order Quantity - Spreadsheet determination as to the number of parts that must be ordered to increase the inventory level to above the minimum required

Requisition Number - WAPA Number for Requisition requesting issuance of Purchase Order

Date PO/Contract Required - Based on Consent Decree 14.e for inventory deficiency determination in previous month allows for purchase to be completed - within 60 days in St. Thomas/end of next month in St. Croix

Date PO/Contract Issued - date purchase order issued for ordering of parts OR repairing of parts, i.e., purchase dateDate PO/Contract Accepted by Vendor - date vendor receives contract, funding is in place, and proceeds with filling order, i.e., no contractual issuesPO/Contract Number - identification number assigned to Purchase OrderNo. Parts on Order - Number of replacement parts on order listed separately for each PO date

No. of Parts Ordered Adequate? - Spreadsheet determination as to whether a sufficient number of parts were ordered to eliminate the inventory deficiency; basis for issuance of penalties. "YES" means sufficient parts were ordered

Date Parts Required - estimated date that parts must be received to avoid inventory falling below minimumDate Parts Expected - date when parts expected to be delivered

Reason for Service - reason for unit servicing and parts replacement; e.g., parts failure, maintenance Replacement Requires Unit Outage? - Must the unit be taken out of service to complete parts replacement - YES or NO?Compliance Maintained During Replacement? - Can compliance with all requirements be maintained during parts replacement - YES or NO?

No. Parts Received - number of parts received Date Parts Received - date parts received

Date Received CD Compliant? - Spreadsheet determination whether parts were received

No. Parts Dispatched - number of parts withdrawn from inventory for repairs or maintenanceDate Parts Dispatched - date parts withdrawn from inventory for use in repairs or maintenanceUnit Serviced - Turbine or HRSG unit number for CEMs or COMs system serviced with dispatched parts

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 85 of 91

APPENDIX B - St. Thomas Water Injection Spare Parts Inventory Program

Page 1 of 1

Spare Parts Inventory Program for St. Thomas Water Injection Systems

UnitPart/

Stock #Part Description(14.c & 14.f(v))

Manufacture(14.e(ii))

Supplier(s)(14.e(ii))

STTStorageLocation(14.e(i))

Replacement Frequency(14.e(iv))

OrderLead Time

Days(14.e(iii))

Minimum Inventory Qty(14.c & e(iv))

QuantityOn Hand

(14.a)

Date Determined < minimum /

Re-Order Required to > minimum?

(14.f(ii))

Minimum Re-Order Quantity to > Minimum?

(14.f(ii))

Date PO/Contract Required?

(Within 60 days of Determination <

Minimum)(14.g)

Requisition#Date PO/Contract

Issued(14.f(ii))

DatePO/Contract

Acceptedby Vendor

(14.f(ii))

PO/ContractNo.

No.Parts on

Order(14.f(ii))

No. of Parts Ordered

Adequate?

Date Parts Expected?

(Within 30 days of leadtime)

No.Parts Received

(14.f(ii))

Date Parts Received(14.f(ii))

No.Parts Dispatched

(14f(i))

DateParts Dispatched

(14.f(i))

Unit Serviced(14.f(ii))

Reasonfor Service

(14.f(ii))

Replacement Requires Unit Outage?(Yes/No)(14.f(iii))

Compliance Maintained During

Replacement?(Yes/No)(13.f(iv))

1 15 MICRON FILTER (PUMP SUCTION) CULLIGAN ACE TRAILER AS NEEDED 28 10 159 NO2 15 MICRON FILTER (PUMP DISCHARGE) CULLIGAN ACE TRAILER AS NEEDED 28 10 24 NO3 15 ST# 281-015-70570 RELIEF VALVE (600lb) ANDERSON GREENWOOD ANDERSON GREENWOOD TRAILER / WAREHOUSE AS NEEDED 28 2 8 NO4 15 ST# 281-015-70571 RELIEF VALVE (700lb) ANDERSON GREENWOOD ANDERSON GREENWOOD TRAILER / WAREHOUSE AS NEEDED 28 2 7 NO5 15 836-C63A PRESSURE SWITCH (CPD) ALLEN BRADLEY EPS TRAILER AS NEEDED 49 1 2 NO6 15 VARIOUS PARTS INJECTION PUMP (REBUILD KIT w/multiple parts)* WHITLEY EPS TRAILER AS NEEDED 84 1 1 YES 2/20/15 1 04/21/15 30398 3/16/2015 65514 2 YES7 15 650010000701003 LUBRICATOR MODEL P55U (INJECTION AUXILIARY) PREMIER EPS/CONTROL ASSOCIATES TRAILER AS NEEDED 184 1 0 YES 2/20/15 2 04/21/15 31012# 6/29/2015 66042 2 YES 09/22/158 15 3BF1J9A0 SUPPLY PUMP (13 STORAGE) GOULDS EPS TRAILER AS NEEDED 56 1 2 NO9 15 5HP/3/60/230-460V MOTOR, SUPPLY FRAME 184JM (13 STORAGE) BALDOR EPS TRAILER AS NEEDED 56 1 2 NO

10 15 VARIOUS SPARES SUPPLY PUMP REBUILD KIT (w/multiple parts) GOULDS EPS TRAILER AS NEEDED 56 1 2 NO 5/18/15 30670 65763 1 YES 1 07/15/1511 18 MPVN40.2/5-SB532M-32TS INJECTION PUMP* ** GOULDS EPS TRAILER AS NEEDED 184 1 112 18 VARIOUS PARTS INJECTION PUMP REBUILD KIT (w/multiple parts)** GOULDS EPS TRAILER AS NEEDED 112 1 1 YES 5/18/15 1 07/17/15 30395 5/22/2015 65824 1 YES 10/07/1513 18 A00368C-4 COUPLING FOR MPV40 FRAME TSD** REXNORD EPS TRAILER AS NEEDED 56 2 3 NO 1 5/12/2015 18 broken coupling no yes14 18 50HP 3/60/230-460V INJECTION MOTOR FRAME 326TSD** BALDOR EPS/CORTES/HUDSON TRAILER AS NEEDED 184 2 3 NO15 23 FK402C640VVA2TZA 2/2 WAY 316/300# (STOP VALVE) COAX COAX TRAILER AS NEEDED 112 1 2 NO 1 YES 1 05/11/1516 23 674DE696 SWITCH, DIFFERENTIAL (PUMP SUCTION) CUSTOM CONTROL SENSORS CUSTOM CONTROL SENSORS TRAILER AS NEEDED 98 1 2 NO17 23 646GEM632 SWITCH, GAUGE (PUMP DISCHARGE) CUSTOM CONTROL SENSORS CUSTOM CONTROL SENSORS TRAILER AS NEEDED 98 1 2 NO18 23 646DZEM1009 SWITCH, DIFFERENTIAL (FILTER) CUSTOM CONTROL SENSORS CUSTOM CONTROL SENSORS TRAILER AS NEEDED 98 1 2 NO19 23 PH720-01-CGVSSN FILTER CARTRIDGE HILCO HILLARD TRAILER AS NEEDED 49 6 13 NO20 23 MODEL 23 STRAINER TYPE 304SS MUELLER EPS TRAILER AS NEEDED 49 1 2 NO

21 23 P2-EGS-60T INJECTION PUMP * SUNFLO SUNFLO/PHOENIX/ATLANTIC AER PUMP SHOP AS NEEDED 56 2 1 YES 6/15/15 2 08/14/15 30672 6/4/2015 65880 3 YES ## 1 06/15/05 23 repaired pump failed under warrenty

no yes

22 23 37kW/3565rpm INJECTION MOTOR LEROY SOMER/BALDOR CORTES AER PUMP SHOP AS NEEDED 84 2 2 YES 5/18/15 1 07/17/15 30672 6/4/2015 65880 2 YES ##23 23 EZ/CL300RF/667/30/DVC6200 CONTROL VALVE (REBUILD KIT) FISHER CONTROLS ASSOCIATES TRAILER AS NEEDED 84 1 2 NO24 23 DVC6200 FIELDvue SMART POSITIONER (VALVE AUXILIARY) FISHER CONTROLS ASSOCIATES TRAILER AS NEEDED 84 1 2 NO25 23 67CF AIR REGULATOR (VALVE AUXILLARY) FISHER CONTROLS ASSOCIATES TRAILER AS NEEDED 70 1 2 NO26 23 TopWorx LIMIT SWITCH (VALVE AUXILLARY) FISHER CONTROLS ASSOCIATES TRAILER AS NEEDED 70 1 2 NO27 15/18 EZ/CL600RF/667/34/DVC6200 CONTROL VALVE (PRESSURE AND FLOW) FISHER Controls Associates TRAILER 4-6 years 70 1 2 NO28 15/18 MK1/92295.1-1/520SERIES CONTROL VALVE: AIR TO OPEN - FAIL CLOSE VALTEK PHARMACEUTICAL PROCESSES SYSTEMS TRAILER AS NEEDED 56 1 2 NO29 15/18 MK1/92295.1-1/520SERIES CONTROL VALVE: AIR TO CLOSE - FAIL OPEN VALTEK PHARMACEUTICAL PROCESSES SYSTEMS TRAILER AS NEEDED 84 1 2 NO30 15/18 VARIOUS PARTS CONTROL VALVE (REPAIR KIT) VALTEK PHARMACEUTICAL PROCESSES SYSTEMS TRAILER AS NEEDED 49 2 4 NO31 15/18 NT3000 VALTEK BETA POSITIONER (VALVE AUXILIARY) VALTEK PHARMACEUTICAL PROCESSES SYSTEMS TRAILER AS NEEDED 49 4 6 NO32 15/18 T1200-30A7 INJECTION NOZZLE DELAVAN JOHNSTONE SUPPLIES TRAILER AS NEEDED 56 80 200 NO33 15/18 MODEL 1719 CHECK VALVE (FUEL) KEPNER KEPNER AWAITING PARTS AS NEEDED 49 10 20 NO34 15/18 1502-9 (1719 REPAIR KIT) CHECK VALVE (REBUILD KIT) KEPNER KEPNER AWAITING PARTS AS NEEDED 49 10 20 NO35 15/18 3051TG5A2B31A1A15M5Q4Q8 TRANSMITTER, PUMP DISCHARGE PRESSURE EMERSON ROSEMOUNT TRAILER AS NEEDED 56 2 3 NO36 15/18/23 9834864 Gauge, 0-200 psig WIKA EPS TRAILER AS NEEDED 49 2 9 NO37 15/18/23 9834898 Gauge, 0-600 psig WIKA EPS TRAILER AS NEEDED 49 2 8 NO38 15/18/23 9834910 Gauge, 0-1000 psig WIKA EPS TRAILER AS NEEDED 49 2 4 NO39 15/18/23 9834082 Gauge, 0-1500 psig WIKA EPS TRAILER AS NEEDED 49 2 4 NO40 15/18/23 9834090 Gauge, 0-2000 psig WIKA EPS TRAILER AS NEEDED 49 2 4 NO41 15/18/23 RCCS36-A02A1SL/BG ROTAMASS FLOW DETECTOR** YOKOGAWA MICROTECH SYSTEMS & CONTROLS TRAILER AS NEEDED 70 1 2 NO42 15/18/23 RCCF31-AH2A/BG/AP ROTAMASS FLOW CONVERTER** YOKOGAWA MICROTECH SYSTEMS & CONTROLS TRAILER AS NEEDED 70 1 2 NO43 15/18/23 10' ROTAMASS FLOW CABLE** YOKOGAWA MICROTECH SYSTEMS & CONTROLS TRAILER AS NEEDED 70 1 2 NO44 15/18/23/25 MODEL 3196 Sti SIZE 1.5x3-8 SUPPLY PUMP (22 STORAGE) GOULDS EPS TRAILER AS NEEDED 70 1 1 YES 6/17/15 1 08/16/15 31078 6/17/2015 2 YES 09/25/1545 15/18/23/25 VARIOUS PARTS SUPPLY PUMP REBUILD KIT (22 STORAGE) GOULDS EPS TRAILER AS NEEDED 70 2 4 NO46 15/18/23/25 WES4 DURAFLEX COUPLING, SUPPLY PUMP (22 STORAGE) TB WOODS EPS TRAILER AS NEEDED 70 2 2 YES 5/18/15 1 07/17/15 30803 6/19/2015 1 YES 08/26/1547 15/18/23/25 15HP/3/60/230-460V MOTOR, SUPPLY FRAME 254T (22 STORAGE) BALDOR EPS TRAILER AS NEEDED 70 2 4 NO

48 15/18/23/25 VARIOUS PARTS CONTROL VALVE RE-BUILD W/ AUX (22 STORAGE LEVEL) FISHER CONTROLS ASSOCIATES TRAILER AS NEEDED 70 1 2 NO

49 15/18/23/25 3051CG3A02A1AB1DFE5H2 TRANSMITTER, STORAGE TANK LEVEL EMERSON ROSEMOUNT TRAILER AS NEEDED 56 1 2 NO

#Restarted procurement process with new vendor as a result of issues with initial vendor.###Delay in scheduling shipment of used pumps and motor for rebuild; includes faile pump under warranty.

Column Key

Date PO/Contract Accepted by Vendor - date vendor receives contract, funding is in place, and proceeds with filling order, i.e., no contractual issuesPO/Contract Number - identification number assigned to Purchase Order

Determination Date Re-Order Required - date when deficiency determined and re-order required; default date of inventory update

Quantity On-Hand - Verification of inventory of parts in storage

Storage Location - physical location of parts

Replacement Requires Unit Outage? - Must unit be taken out of service to complete parts replacement - YES or NO?

Date PO/Contract Required - Based on draft Consent Decree allows for purchase to be completed within 60 days of determination inventory below minimumMinimum Re-Order Quantity - Spreadsheet determination as to the number of parts that must be ordered to increase the inventory level to above the minimum required

Requisition Number - WAPA Number for Requisition requesting issuance of Purchase Order

Date Parts Expected - date when parts expected to be delivered

Date Received CD Compliant? - Spreadsheet determination whether parts were as received within 30 days of order lead time from date inventory determined to be below required minimum

7/22/2015 PURCHASES

Part /Stock Number - WAPA part identification number

Manufacturer- part manufacturer

Re-Order Required? - Spreadsheet determination as to whether re-ordering is required: "YES" if TOTAL quantity on-hand is less than the Minimum Inventory Quantity

Date Parts Received - date parts received

Spare Parts Inventory Program - list of critical parts maintained in-stock supporting timely repairs and preventive maintenance of NOx Water Injection Systems for Gas Combustion Turbines. Reference to specific sections of draft Consent Decree in column headings.

Unit - Combustion turbine unit(s) requiring part

No. Parts Received - number of parts received by corresponding purchase order date

No. of Parts Ordered Adequate? - Spreadsheet determination as to whether a sufficient number of parts were ordered to eliminate the inventory deficiency; basis for issuance of penalties. "YES" means sufficient parts were ordered

Reason for Service - reason for unit servicing and parts replacement; e.g., parts failure, maintenance

Date Parts Dispatched - date parts withdrawn from inventory for use in repairs or maintenanceNo. Parts Dispatched - number of parts withdrawn from inventory for repairs or maintenance

No. Parts on Order - Number of replacement parts on order listed separately for each PO date

Date Updated:

Parts Description - identity of part based on name, size, material of construction, or other specification

*Redundant Injection pump in place on pump rack.**Spare for this component also maintained in St. Croix Spare Parts Inventory Program

Minimum Inventory Qty - minimum number of units required to be in stock to ensure parts are always on-hand; when inventory is at this level re-ordering is initiated

Parts Replacements

Unit Serviced - Turbine unit number serviced, i.e., replacement with dispatched parts

Replacement Frequency - Expected frequency of repair or replacement of the individual components; "As Needed" indicates replaced at point of failureOrder Lead Time - Expected lead time for the ordering and delivery of parts, i.e., from initiation of procurement to receipt onsite

Date Updated - date inventory and purchased quantities were updated

Supplier - source for parts purchased or to be purchased

Date PO/Contract Issued - date purchase order/contract issued

Re-Order Required?

(Yes/No)

(14.f(ii))

Below Minimum At Minimum

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 86 of 91

Appendix C - St. Thomas Water Injection Spare Parts InventoryBelow Minimum Parts On Order

June 18, 2015

SPIP No.

System Parts Number Part Description Manufacturer Supplier(s)No.

Parts Ordered

Date Parts Expected?

(Month-Year)

7 15 650010000701003 LUBRICATOR MODEL P55U (INJECTION AUXILIARY) PREMIER EPS/CONTROL ASSOCIATES 2 September-15

St. Thomas Water Injection Spare Parts Inventory < Minimum Parts on Order as of June 23, 2015

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 87 of 91

APPENDIX D

Items required to be included in the NOx Control Water Injection System Preventative Operation and Maintenance Plan (“O&M Plan”) shall include,

but is not be limited to, the following: 1. Facility Description and Use of Water Injection Systems; 2. Standard Operating Procedures; 3. Water Injection System Overview Including Descriptions of the Various Units’ NOx

Water Injection System Operations; 4. Long-Term Shutdown Check before Injection System Operation; 5. Pre-operation System Checks; 6. Operating Procedures during Startup; 7. Procedures during System Operation; 8. Procedures when abnormalities are Detected/Alarms are Triggered; 9. Notification Protocol for Observed Deviations; and 10. Maintenance Work Order Procedures including Process, Responsibilities, Work Flow,

Preventative Maintenance Work Orders, Preventative Maintenance Work Orders Procedures, Periodic Maintenance, and Troubleshooting

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 88 of 91

APPENDIX E

VIWAPA RANDOLPH HARLEY GENERATING FACILITY ST. THOMAS WATER INJECTION DATA SHEET*

MONTH ________________ YEAR ________

Unit No. Unit Op. Hrs. per Month

Water Injection System Downtime Downtime

Hours %

Downtime Downtime Cause Corrective Action Correction Schedule

*These data sheets are to be submitted to EPA as part of the quarterly reports required by the Consent Decree

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 89 of 91

APPENDIX F

LIST OF WATER INJECTION SYSTEM COMPONENTS TO EVALUATE DURING AUDITS

Units 15, 18, and 23 - On-Turbine Base Components

Water injection manifold

Ten combustors, each with water injection nozzles

Units 15, 18 and 23 - Off-Base Components on Skid

Redundant pumps and drive motors

Inlet water strainer and pressure switch (Unit 23 only)

Water filters

Differential pressure gauge

Flowmeters

Flow control valve (Unit 15 and Unit 18)

Flow pressure regulating valve (Unit 23)

Fuel nozzle assemblies

Check valves, hand operated valves, temperature gauges and pressure gauges.

The following calibrations / checks must be performed during audit

Calibration Electronic Circuits

Calibration of Control Valve Circuits

Calibration of Flowmeter Circuits

Check Flowmeter Accuracy

Check Control Valve for Leakage

Check Stop Valve Operation

Check Stop Valve for Leakage

Check Forwarding Pump Oil Level

Check that Water Flow Is per Control Specifications

Check Accumulator Precharge

Check Water Spray Nozzles for Plugging & Spray Pattern

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 90 of 91

APPENDIX G

LIST OF CONTINUOUS MONITORING SYSTEM COMPONENTS TO

EVALUATE DURING AUDIT

1. NOX, O2 and CO2 analyzers 2. External NOx Analyzer vacuum pump 3. High voltage power supply for heated sample line 4. DC power supply 5. Water Slip Filters 6. Sample Lines 7. Sample Probe Straw 8. Sample Probe Gaskets and Filters 9. Programmable Logic Controllers (PLC) 10. Flow Monitors 11. Dilution Air System 12. Calibration Gas Systems 13. Indicator Lights and Alarms 14. Sample Chiller 15. AC System 16. DAHS Server 17. Air cleaner assembly 18. Peristaltic pump 19. COMS Blower filter

Case: 3:14-cv-00086-CVG-RM Document #: 16-1 Filed: 09/24/15 Page 91 of 91