18
Update on Laser Heating at the ALS Simon Clark Laser heating workshop Saturday March 20 th 2004

Update on Laser Heating at the ALS Simon Clark Laser heating workshop Saturday March 20 th 2004

Embed Size (px)

Citation preview

Update on Laser Heating at the ALS

Simon Clark

Laser heating workshopSaturday March 20th 2004

Who’s who at the ALS?

Who’s who in the high-pressure consortium?

UC Academics

LBNL

COMPRES

LLNL

Paul AlivisatosUCB Chemistry

Raymond JeanlozUCB E&PS

Sarah TolbertUCLA Chemistry

Elise Knittle & Quentin WilliamsUCSC Earth Sciences

Raymond JeanlozUCB E&PS

Abby KavanerUCLA Earth Sciences

Li MingUniv. Hawaii

Elise KnittleUCSC Earth Sciences

Tom SharpeASU

Lou TerminelloLLNL

Patrick AllenLLNL

Joe ZaugLLNL

BL12.2.2

Storage ring tunnel

High Pressure BL Hutch 12.2.2 Sibyls BL Hutch 12.3.1

Control / Analysis Workstations

Facility BL Instrum. Racks

External Walkway Door

Future High Pressure BL Hutch 12.2.1

BL12.2.2 optics overview (end station 1)

Hutch wallanvil

detector

Nanoscience / mat. chemendstation

Nanoscience / mat. chemendstation

BL12.2.2 optics overview (end station 2)

Hutch wall

Solid State Physics /Geoscience end station

End station layout

End station 1: Chemical dynamics

Refocus optics

End station 2: Laser heating

Laser heating optics table

Current end station configuration

Example data

LaB6 ambient in dac

0

5000

10000

15000

20000

25000

0 5 10 15 20 25 30 35

Two-Theta (deg)

Inte

ns

ity

(a

.u.)

LaB6 ambient in dac

0

1000

2000

3000

4000

5000

6000

7000

8000

20 21 22 23 24 25 26

Two-Theta (deg)

Inte

ns

ity

(a

.u.)

P at 21.4GPa

0

500

1000

1500

2000

2500

3000

3500

4000

4500

2 4 6 8 10 12 14 16

Two-Theta (deg)

Inte

nsi

ty (

a.u

.)

Laser heating system in lab.

Schematic of laser heating system

Laser heating goes live!

Heating fluids

Time line for completion of construction

• Jan-Feb 2004: Commission beamline• Beginning March: Install temporary end station equipment• March-April: Collect high-P data and commission beam line• May shutdown: Install end station 1• April-July: Collect P/T data on end station 1• end-July: Install laser heating system and end station 2• August: Commission on line laser heating with Mike Walter• September: Begin operations with consortium members• September 2005: Begin general user program