Upper Ocklawaha River Basin Interim Lake Level Analysis June 1, 2012 Harris Chain of Lakes Restoration Council Michael G. Cullum, P.E., Director Bureau of Engineering, SJRWMD

Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

  • Upload
    vudang

  • View
    217

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

Upper Ocklawaha River Basin Interim Lake Level Analysis June 1, 2012 Harris Chain of Lakes Restoration Council Michael G. Cullum, P.E., Director Bureau of Engineering, SJRWMD

Page 2: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)
Page 3: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

50

55

60

65

70

75

Lake Apopka

Burrell Lakes

Lake Griffin

Wat

er L

evel

(fee

t abo

ve s

ea le

vel)

Changes in Historic Water Levels for Lake Apopka and the Harris Chain of Lakes

Page 4: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

54

56

58

60

62

64

66

68 fe

et N

AVD8

8 Upper Ocklawaha Lake Levels 1996 - 2012 Red dashed line = minimum desired level for each lake system

Updated to 5-28-2012

Apopka

Harris Eustis Dora

Griffin

Lake Levels below minimum desired level

Griffin

Eustis

Page 5: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

Recent Drought

Relief ???

Page 6: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

36.5

46.9

50.0

33.7

56.7

50.7 49.4

52.4

49.7 50.9

0

10

20

30

40

50

60

Apopka Burrell Moss Bluff Gainesville SJID

Rain

fall

, In

. Rainfall Comparisons, 5-1-11 thru 5-29-12

Actual Rain

Normal Rain

Page 7: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)
Page 8: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)
Page 9: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)
Page 10: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

January, 2012 Projects and Land Committee Meeting - Mission Inn

• District staff recommended 0-0-0 discharge

• Citizens expressed interest in 23-23-0 rates

• 23-23-0 rates implemented through April, 2012 Lake Griffin level dropped one-half inch Burrell (Super Pond) levels dropped 6 inches Lake Apopka dropped 11 inches

Page 11: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

January, 2012 Projects and Land Committee Meeting - Mission Inn

• District staff recommended 0-0-0 discharge

• Citizens expressed interest in 23-23-0 rates

• 23-23-0 rates implemented through April, 2012

• 0-0-0 rates implemented May, 2012

Page 12: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

January, 2012 Projects and Land Committee Meeting - Mission Inn

• Public requested District review rates and levels

associated with the Operating Schedules during recession period in Spring and rising limb in Fall

• Recommend an Interim Operating Schedule

• June 2012 – June 2013

Page 13: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

Approach for implementing Interim Lake Levels in the Harris Chain of Lakes & Lake Apopka

• Added flexibility to manage Burrell sub-basin

lakes with completion of the Harris Bayou project in 2008

Page 14: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)
Page 15: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)
Page 16: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

Approach for implementing Interim Lake Levels in the Harris Chain of Lakes & Lake Apopka

• Now - Added flexibility to manage Burrell sub-basin

lakes with completion of the Harris Bayou project in 2008

• Next Year - Store water in the Lake Apopka North Shore Restoration Area (NSRA) – MFL Program – Establish higher average levels and a more

consistent flow of water – Currently resolving contamination issues and

partial re-flood NSRA by 2013.

Page 17: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

Lake Apopka North Shore Infrastructure and Flooding

Page 18: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

Approach for implementing Interim Lake Levels in the Harris Chain of Lakes & Lake Apopka

• Use Current Watershed Models from Water Supply Impact Study (WSIS) – Hydrologic Simulation Program – Fortran (HSPF) – 90 models / 11 in-house modelers – External Peer Review – National Academy of Sciences – National

Research Council review • Modeling Schedule

• General WSIS - HSPF Model Description

Page 19: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

Approach for implementing Interim Lake Levels in the Harris Chain of Lakes & Lake Apopka

• Schedule for Modeling – Started January, 2012 – Finished with Calibration/Baseline Scenario

• (1995-2006)

– Finished Modeling Scenarios for Interim Plan – May 31, 2012 – Public Meeting of Results – June 12, 2012 – SJRWMD Governing Board

Page 20: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

Land-use, reaches, and rainfall gauges

DEM LULC Soils HSPF Modeling

D.E.M. Land Cover Soils

Page 21: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

AGWO Active GroundWater Outflow

Interception Evaporation, CEPE SURO

SURface Outflow

IFWO InterFloW Outflow

Interflow Storage (IFWS)

Evaporation

Transpiration

Precipitation

Interflow Inflow, IFWI Upper Zone ET, UZET

Lower Zone ET, LZET

Active Groundwater ET, AGWET

Inactive Groundwater Inflow, IGWI

Infiltration, INFIL

Lower Zone Inflow, LZI Percolation, PERC

Active Groundwater Inflow, AGWI

Vadose Zone

Saturated Zone

Flow

Time

SURO

IFWO AGWO

Precipitation Yield, SUPY

Baseflow ET, BASET

Surface Detention Storage (SURS)

Interception Storage (CEPS)

Upper Zone Storage (UZS)

Lower Zone Storage (LZS)

Active Ground Water Storage (AGWS)

Inactive Groundwater (Does not contribute to baseflow)

Pervious Land Segment: Flow Paths

Page 22: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

Approach for implementing Interim Lake Levels in the Harris Chain of Lakes & Lake Apopka

Model Improvements – Harris Bayou – Two way flow in Dead River – Groundwater Component – 12 years of simulation 1995-2006

• Extent of Groundwater data • Historic Drought 1999, 2000, 2001 • Wet Season Floods 2004, 2005 • Dry Season El Nino Floods 95/96, 97/98

Page 23: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

Approach for implementing Interim Lake Levels in the Harris Chain of Lakes & Lake Apopka

• Baseline – Current Operating Schedule • For Scenarios, Flood protection top priority:

– Don’t exceed peak levels above Baseline, or – Maximum Desirable levels

• Maximum Discharges – Harris Bayou - 1000 cfs (ADDED) – Burrell - 1600 cfs – Moss Bluff - 2460 cfs

Page 24: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

Flood Control Releases

Minimum Flows

Zero Flow Max Desirable Stage Min Desirable Stage

Min Flow 23 CFS Min Flow 28 CFS

Min Flow 30 CFS

Page 25: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

Flood Control Releases

Minimum Flows Zero Flow Max Desirable Stage Min Desirable Stage

Min Flow 23 CFS Min Flow 23 CFS

Min Flow 30 CFS

Min Flow 23 CFS Min Flow 23 CFS

Min Flow 30 CFS

Min Flow 0 CFS Min Flow 0 CFS Min Flow 0 CFS Min Flow 0 CFS

Min Flow 0 CFS Min Flow 0 CFS

Page 26: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

Approach for implementing Interim Lake Levels in the Harris Chain of Lakes & Lake Apopka

• Operating Schedule Modifications • Two Scenarios

– A : raise “recession” portion in spring

Page 27: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

Flood Control Releases Minimum Flows Zero Flow Max Desirable Stage Min Desirable Stage

Min Flow 23 CFS Min Flow 28 CFS

Min Flow 30 CFS

Min Flow 23 CFS Min Flow 28 CFS

Min Flow 30 CFS

Page 28: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

Scenario A Lake Apopka

Min Desirable Water Level

Baseline Scenario A

1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2006 2005

66.5

67.5 67.25 67.0 66.75

68

66

65

64

63

62

Operation and W

ater Levels in ft

66.5

67.5 67.25

67.0 66.75

68

66

65

64

63

62

Ope

ratio

n an

d W

ater

Leve

ls in

ft

Page 29: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

Operation and W

ater Levels in ft

Scenario A, Lake Eustis

1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2006 2005

62’

63’

62.5’

63.25’

63.5’

64’

61’

60’

Max Desirable Water Level

Min Desirable Water Level

Operation Schedule Proposed

Water Level Baseline and Scenario A

Ope

ratio

n an

d W

ater

Leve

ls in

ft

62’

63’

62.5’

63.25’

63.5’

64’

61’

60’

Baseline Scenario A

Page 30: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

Scenario A, Lake Griffin

1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2006 2005

58’

59.5’ 59.25’

58.5’

59’

59.5

57’

56’

Operation and W

ater Levels in ft O

pera

tion

and

Wat

er Le

vels

in ft

58’

59.5’

58.5’

59’

57’

56’

Baseline Scenario A

Max Desirable

Page 31: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

Approach for implementing Interim Lake Levels in the Harris Chain of Lakes & Lake Apopka

• Operating Schedule Modifications • Two Scenarios

– A : raise “recession” portion in spring – A1 : raise “recession” portion in spring , and floor in summer

Page 32: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

Flood Control Releases

Minimum Flows Zero Flow Max Desirable Stage Min Desirable Stage

Min Flow 23 CFS Min Flow 28 CFS

Min Flow 30 CFS

Min Flow 23 CFS Min Flow 28 CFS

Min Flow 30 CFS

Page 33: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

Scenario A1 Lake Apopka

Min Desirable Water Level

Baseline Scenario A

1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2006 2005

66.5

67.5 67.25 67.0 66.75

68

66

65

64

63

62

Operation and W

ater Levels in ft

66.5

67.5 67.25

67.0 66.75

68

66

65

64

63

62

Ope

ratio

n an

d W

ater

Leve

ls in

ft

Page 34: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

Scenario A1, Lake Eustis O

peration and Water Levels in ft

1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2006 2005

62’

63’

62.5’

63.25’

63.5’

64’

61’

60’

Ope

ratio

n an

d W

ater

Leve

ls in

ft

62’

63’

62.5’

63.25’

63.5’

64’

61’

60’

Max Desirable

Baseline Scenario A1

Page 35: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

Scenario A1, Lake Griffin

1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2006 2005

58’

59.25’

58.5’

59’

59.5

57’

56’

Operation and W

ater Levels in ft

58’

59.25’

58.5’

59’

59.5

57’

56’

Ope

ratio

n an

d W

ater

Leve

ls in

ft

Baseline Scenario A1

Max Desirable

Page 36: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

Approach for implementing Interim Lake Levels in the Harris Chain of Lakes & Lake Apopka

RESULTS • Two Scenarios

– A : raise “recession” portion in spring • 8 of 12 years raised average levels

– A1 : raise “recession” and floor in summer • 8 of 12 years raised average levels • Greater duration of higher levels during 8 years • Slight chance of increased levels above Max

Page 37: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

Thank YOU!

Page 38: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)
Page 39: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

Recharge and Discharge:

Between

Surfacewater & Groundwater

Page 40: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

East Central Florida Transient Model (ECFT) Simulated Upper Floridan Aquifer head at Lake Apopka

Page 41: Upper Ocklawaha River Basin Interim Lake Level Analysis · Upper Ocklawaha River Basin Interim Lake Level Analysis ... • Wet Season Floods 2004, ... 1000 cfs (ADDED)

ECFT simulated mean Upper Florida Aquifer Head (red), observed Lake Apopka level (blue), and