Page 1 of 2 PROJECT TITLE:PROVISION OF PRESSURE VESSEL REPLACE AND MODIFICATION FOR FPU DH01 DRYDOCK CAMPAIGN, BLOCK 05.1A, OFFSHORE VIETNAM PACKAGE NO.: TBA ALPHA PROJECT : TBA 198/PVEP POC-CPM Rev.: A Date : Drawing / Document Description SUBMITTED TO DAI HUNG RETURNED FROM DAI HUNG Manual Remark Plan Date Actual 1 TT No. Actual 2 RQ'ED DATE Actual 1 'Status Drawing - General 1 A.01-0001 General Arrangement Drawings For 2nd Stage Separator A.01 0001 3/10/2014 3/10/2014 DK 2 A.01-0002 General Arrangement Drawings For Surge Drum Separator A.01 0002 3/10/2014 3/10/2014 DK 3 A.01-0003 General Arrangement Drawings For Main Air Receiver A.01 0003 3/10/2014 3/10/2014 DK 4 A.01-0004 General Arrangement Drawings For 1st Stage Separator A.01 0004 3/10/2014 3/10/2014 DK 5 A.01-0005 General Arrangement Drawings For L.P FLARE K.O DRUM A.01 0005 3/10/2014 3/10/2014 DK 6 A.01-0006 A.01 0006 3/10/2014 3/10/2014 DK 7 A.01-0007 General Arrangement Drawings For Test Separator A.01 0007 3/10/2014 3/10/2014 DK 8 A.01-0008 General Arrangement Drawings For Nitrogen Receiver A.01 0008 3/10/2014 3/10/2014 AECC 9 A.01-0009 A.01 0009 3/10/2014 3/10/2014 AECC 10 A.01-0010 Process Drawings For 1st Stage Separator A.01 0010 3/10/2014 3/10/2014 DK 11 A.01-0011 Process Drawings For Test Separator A.01 0011 3/10/2014 3/10/2014 DK 12 A.02-0001 A.02 0001 2/24/2014 2/24/2014 DK 13 A.02-0002 A.02 0002 2/24/2014 2/24/2014 DK 14 A.02-0003 A.02 0003 2/24/2014 2/24/2014 DK 15 A.02-0004 A.02 0004 2/24/2014 2/24/2014 DK 16 A.02-0005 A.02 0005 2/24/2014 2/24/2014 DK 17 A.02-0006 A.02 0006 2/24/2014 2/24/2014 DK 18 A.02-0007 A.02 0007 2/24/2014 2/24/2014 DK 19 A.02-0008 A.02 0008 2/24/2014 2/24/2014 AECC 20 A.02-0009 A.02 0009 2/24/2014 2/24/2014 AECC 21 A.03-0001 Name Plate Drawings For 2nd Stage Separator A.03 0001 2/24/2014 2/24/2014 DK 22 A.03-0002 Name Plate Drawings For Surge Drum Separator A.03 0002 2/24/2014 2/24/2014 DK 23 A.03-0003 Name Plate Drawings For Main Air Receiver A.03 0003 2/24/2014 2/24/2014 DK 24 A.03-0004 Name Plate Drawings For For 1st Stage Separator A.03 0004 2/24/2014 2/24/2014 DK 25 A.03-0005 Name Plate Drawings For For L.P FLARE K.O DRUM A.03 0005 2/24/2014 2/24/2014 DK 26 A.03-0006 Name Plate Drawings For For Reject Oil Flash Drum A.03 0006 2/24/2014 2/24/2014 DK 27 A.03-0007 Name Plate Drawings For For Test Separator A.03 0007 2/24/2014 2/24/2014 DK 28 A.03-0008 Name Plate Drawings For Nitrogen Receiver A.03 0008 2/24/2014 2/24/2014 AECC 29 A.03-0009 Name Plate Drawings For Moon Pool Air Receiver A.03 0009 2/24/2014 2/24/2014 AECC 30 A.04-0001 Junction Box termination drawings- N/A A.04 0001 2/24/2014 2/24/2014 31 A.05-0001 Manufacturing and delivery plan/Fabrication schedule A.05 0001 2/24/2014 2/24/2014 AECC 32 A.07-0001 List of sub-Vendors and subcontracted work A.07 0001 2/24/2014 2/24/2014 AECC 33 A.08-0001 Mechanical Data Sheet For 2nd Stage Separator A.08 0001 3/10/2014 3/10/2014 DK 34 A.08-0002 Mechanical Data Sheet For Surge Drum Separator A.08 0002 3/10/2014 3/10/2014 DK 35 A.08-0003 Mechanical Data Sheet For Main Air Receiver A.08 0003 3/10/2014 3/10/2014 DK 36 A.08-0004 Mechanical Data Sheet For 1st Stage Separator A.08 0004 3/10/2014 3/10/2014 DK 37 A.08-0005 Mechanical Data Sheet For L.P FLARE K.O DRUM A.08 0005 3/10/2014 3/10/2014 DK 38 A.08-0006 Mechanical Data Sheet For Reject Oil Flash Drum A.08 0006 3/10/2014 3/10/2014 DK 39 A.08-0007 Mechanical Data Sheet For Test Separator A.08 0007 3/10/2014 3/10/2014 DK 40 A.08-0008 Mechanical Data Sheet For Nitrogen Receiver A.08 0008 3/10/2014 3/10/2014 AECC 41 A.08-0009 Mechanical Data Sheet For Moon Pool Air Receiver A.08 0009 3/10/2014 3/10/2014 AECC 42 A.08-0009 Equipment Data Sheet For Instruments A.08 0009 3/10/2014 3/10/2014 AECC/DK 43 A.09-0001 Vendor Document register List A.09 0001 2/24/2014 2/24/2014 AECC 44 A.10-0001 A.10 0001 3/10/2014 3/10/2014 DK 45 A.10-0002 A.10 0002 3/10/2014 3/10/2014 DK 46 A.10-0003 A.10 0003 3/10/2014 3/10/2014 DK 47 A.10-0004 A.10 0004 3/10/2014 3/10/2014 DK 48 A.10-0005 A.10 0005 3/10/2014 3/10/2014 DK 49 A.10-0006 A.10 0006 3/10/2014 3/10/2014 DK 50 A.10-0007 A.10 0007 3/10/2014 3/10/2014 DK 51 A.10-0008 A.10 0008 3/10/2014 3/10/2014 AECC 52 A.10-0009 A.10 0009 3/10/2014 3/10/2014 AECC 53 A.11-0001 Weld Map Drawings For 2nd Stage Separator A.11 0001 3/10/2014 3/10/2014 AECC 54 A.11-0002 Weld Map Drawings For Surge Drum Separator A.11 0002 3/10/2014 3/10/2014 AECC 55 A.11-0003 Weld Map Drawings For Main Air Receiver A.11 0003 3/10/2014 3/10/2014 AECC 56 A.11-0004 Weld Map Drawings For 1st Stage Separator A.11 0004 3/10/2014 3/10/2014 AECC 57 A.11-0005 Weld Map Drawings For L.P FLARE K.O DRUM A.11 0005 3/10/2014 3/10/2014 AECC 58 A.11-0006 Weld Map Drawings For Reject Oil Flash Drum A.11 0006 3/10/2014 3/10/2014 AECC 59 A.11-0007 Weld Map Drawings For Test Separator A.11 0007 3/10/2014 3/10/2014 AECC 60 A.11-0008 Weld Map Drawings For Nitrogen Receiver A.11 0008 3/10/2014 3/10/2014 AECC 61 A.11-0009 Weld Map Drawings For Moon Pool Air Receiver A.11 0009 3/10/2014 3/10/2014 AECC Mechanical / Structural 62 B.01-0001 Mechanical Calculations For 2nd Stage Separator B.01 0001 2/24/2014 2/24/2014 DK 63 B.01-0002 Mechanical Calculations For Surge Drum Separator B.01 0002 2/24/2014 2/24/2014 DK PACKAGE DESCRIPTION: PROVIDE PROCESS VESSELS AND MODIFICATION OF PROCESS VESSELS PO NO./CONTRACT NO.: VENDOR: SOUTHERN PETROLEUM CONSTRUCTION J.S COMPANY Item No. Document Code Number Project Data Code Sequence No. Forecast Submission Date General Arrangement Drawings For Reject Oil Flash Drum General Arrangement Drawings For Moon Pool Air Receiver Detail Vessel Fabrication Drawings For 2nd Stage Separator Detail Vessel Fabrication Drawings For Surge Drum Separator Detail Vessel Fabrication Drawings For Main Air Receiver Detail Vessel Fabrication Drawings For 1st Stage Separator Detail Vessel Fabrication Drawings For L.P FLARE K.O DRUM Detail Vessel Fabrication Drawings For Reject Oil Flash Drum Detail Vessel Fabrication Drawings For Test Separator Detail Vessel Fabrication Drawings For Nitrogen Receiver Detail Vessel Fabrication Drawings For Moon Pool Air Receiver Sling Lifting Arrangement Drawings For 2nd Stage Separator Sling Lifting Arrangement Drawings For Surge Drum Separator Sling Lifting Arrangement Drawings For Main Air Receiver Sling Lifting Arrangement Drawings For 1st Stage Separator Sling Lifting Arrangement Drawings For L.P FLARE K.O DRUM Sling Lifting Arrangement Drawings For Reject Oil Flash Drum Sling Lifting Arrangement Drawings For Test Separator Sling Lifting Arrangement Drawings For Nitrogen Receiver Sling Lifting Arrangement Drawings For Moon Pool Air Receiver VENDOR DATA SCHEDULE

Vds-provide Process Vessels and Modification of Process Vessels (4)

Embed Size (px)

DESCRIPTION

fafd

Citation preview

CPROJECT TITLE:PROVISION OF PRESSURE VESSEL REPLACE AND MODIFICATION FOR FPU DH01 DRYDOCK CAMPAIGN, BLOCK 05.1A, OFFSHORE VIETNAM

PACKAGE DESCRIPTION: PROVIDE PROCESS VESSELS AND MODIFICATION OF PROCESS VESSELSPACKAGE NO.:TBA ALPHA PROJECT :TBA PO NO./CONTRACT NO.: 198/PVEP POC-CPMVENDOR: SOUTHERN PETROLEUM CONSTRUCTION J.S COMPANYRev.: A Date :ItemNo.Document Code NumberDrawing / Document DescriptionProject Data Code SequenceNo.Forecast Submission Date SUBMITTED TO DAI HUNGRETURNED FROM DAI HUNGManual RemarkPlan DateActual 1TT No.Actual 2RQ'ED DATEActual 1'StatusDrawing - General1A.01-0001General Arrangement Drawings For 2nd Stage SeparatorA.0100013/10/143/10/14DK2A.01-0002General Arrangement Drawings For Surge Drum SeparatorA.0100023/10/143/10/14DK3A.01-0003General Arrangement Drawings For Main Air ReceiverA.0100033/10/143/10/14DK4A.01-0004General Arrangement Drawings For 1st Stage SeparatorA.0100043/10/143/10/14DK5A.01-0005General Arrangement Drawings For L.P FLARE K.O DRUMA.0100053/10/143/10/14DK6A.01-0006General Arrangement Drawings For Reject Oil Flash DrumA.0100063/10/143/10/14DK7A.01-0007General Arrangement Drawings For Test SeparatorA.0100073/10/143/10/14DK8A.01-0008General Arrangement Drawings For Nitrogen ReceiverA.0100083/10/143/10/14AECC9A.01-0009General Arrangement Drawings For Moon Pool Air ReceiverA.0100093/10/143/10/14AECC10A.01-0010Process Drawings For 1st Stage SeparatorA.0100103/10/143/10/14DK11A.01-0011Process Drawings For Test SeparatorA.0100113/10/143/10/14DK12A.02-0001Detail Vessel Fabrication Drawings For 2nd Stage SeparatorA.0200012/24/142/24/14DK13A.02-0002Detail Vessel Fabrication Drawings For Surge Drum SeparatorA.0200022/24/142/24/14DK14A.02-0003Detail Vessel Fabrication Drawings For Main Air ReceiverA.0200032/24/142/24/14DK15A.02-0004Detail Vessel Fabrication Drawings For 1st Stage SeparatorA.0200042/24/142/24/14DK16A.02-0005Detail Vessel Fabrication Drawings For L.P FLARE K.O DRUMA.0200052/24/142/24/14DK17A.02-0006Detail Vessel Fabrication Drawings For Reject Oil Flash DrumA.0200062/24/142/24/14DK18A.02-0007Detail Vessel Fabrication Drawings For Test SeparatorA.0200072/24/142/24/14DK19A.02-0008Detail Vessel Fabrication Drawings For Nitrogen ReceiverA.0200082/24/142/24/14AECC20A.02-0009Detail Vessel Fabrication Drawings For Moon Pool Air ReceiverA.0200092/24/142/24/14AECC21A.03-0001Name Plate Drawings For 2nd Stage SeparatorA.0300012/24/142/24/14DK22A.03-0002Name Plate Drawings For Surge Drum SeparatorA.0300022/24/142/24/14DK23A.03-0003Name Plate Drawings For Main Air ReceiverA.0300032/24/142/24/14DK24A.03-0004Name Plate Drawings For For 1st Stage SeparatorA.0300042/24/142/24/14DK25A.03-0005Name Plate Drawings For For L.P FLARE K.O DRUMA.0300052/24/142/24/14DK26A.03-0006Name Plate Drawings For For Reject Oil Flash DrumA.0300062/24/142/24/14DK27A.03-0007Name Plate Drawings For For Test SeparatorA.0300072/24/142/24/14DK28A.03-0008Name Plate Drawings For Nitrogen ReceiverA.0300082/24/142/24/14AECC29A.03-0009Name Plate Drawings For Moon Pool Air ReceiverA.0300092/24/142/24/14AECC30A.04-0001Junction Box termination drawings- N/AA.0400012/24/142/24/1431A.05-0001Manufacturing and delivery plan/Fabrication scheduleA.0500012/24/142/24/14AECC32A.07-0001List of sub-Vendors and subcontracted workA.0700012/24/142/24/14AECC33A.08-0001 Mechanical Data Sheet For 2nd Stage SeparatorA.0800013/10/143/10/14DK34A.08-0002 Mechanical Data Sheet For Surge Drum SeparatorA.0800023/10/143/10/14DK35A.08-0003 Mechanical Data Sheet For Main Air ReceiverA.0800033/10/143/10/14DK36A.08-0004 Mechanical Data Sheet For 1st Stage SeparatorA.0800043/10/143/10/14DK37A.08-0005 Mechanical Data Sheet For L.P FLARE K.O DRUMA.0800053/10/143/10/14DK38A.08-0006 Mechanical Data Sheet For Reject Oil Flash DrumA.0800063/10/143/10/14DK39A.08-0007 Mechanical Data Sheet For Test SeparatorA.0800073/10/143/10/14DK40A.08-0008 Mechanical Data Sheet For Nitrogen ReceiverA.0800083/10/143/10/14AECC41A.08-0009 Mechanical Data Sheet For Moon Pool Air ReceiverA.0800093/10/143/10/14AECC42A.08-0009Equipment Data Sheet For InstrumentsA.0800093/10/143/10/14AECC/DK43A.09-0001Vendor Document register ListA.0900012/24/142/24/14AECC44A.10-0001 Sling Lifting Arrangement Drawings For 2nd Stage SeparatorA.1000013/10/143/10/14DK45A.10-0002 Sling Lifting Arrangement Drawings For Surge Drum SeparatorA.1000023/10/143/10/14DK46A.10-0003 Sling Lifting Arrangement Drawings For Main Air ReceiverA.1000033/10/143/10/14DK47A.10-0004 Sling Lifting Arrangement Drawings For 1st Stage SeparatorA.1000043/10/143/10/14DK48A.10-0005 Sling Lifting Arrangement Drawings For L.P FLARE K.O DRUMA.1000053/10/143/10/14DK49A.10-0006 Sling Lifting Arrangement Drawings For Reject Oil Flash DrumA.1000063/10/143/10/14DK50A.10-0007 Sling Lifting Arrangement Drawings For Test SeparatorA.1000073/10/143/10/14DK51A.10-0008 Sling Lifting Arrangement Drawings For Nitrogen ReceiverA.1000083/10/143/10/14AECC52A.10-0009 Sling Lifting Arrangement Drawings For Moon Pool Air ReceiverA.1000093/10/143/10/14AECC53A.11-0001 Weld Map Drawings For 2nd Stage SeparatorA.1100013/10/143/10/14AECC54A.11-0002 Weld Map Drawings For Surge Drum SeparatorA.1100023/10/143/10/14AECC55A.11-0003 Weld Map Drawings For Main Air ReceiverA.1100033/10/143/10/14AECC56A.11-0004 Weld Map Drawings For 1st Stage SeparatorA.1100043/10/143/10/14AECC57A.11-0005 Weld Map Drawings For L.P FLARE K.O DRUMA.1100053/10/143/10/14AECC58A.11-0006 Weld Map Drawings For Reject Oil Flash DrumA.1100063/10/143/10/14AECC59A.11-0007 Weld Map Drawings For Test SeparatorA.1100073/10/143/10/14AECC60A.11-0008 Weld Map Drawings For Nitrogen ReceiverA.1100083/10/143/10/14AECC61A.11-0009 Weld Map Drawings For Moon Pool Air ReceiverA.1100093/10/143/10/14AECCMechanical / Structural62B.01-0001Mechanical Calculations For 2nd Stage SeparatorB.0100012/24/142/24/14DK63B.01-0002Mechanical Calculations For Surge Drum SeparatorB.0100022/24/142/24/14DK64B.01-0003Mechanical Calculations For Main Air ReceiverB.0100032/24/142/24/14DK65B.01-0004 Mechanical Calculations For 1st Stage SeparatorB.0100042/24/142/24/14DK66B.01-0005 Mechanical Calculations For L.P FLARE K.O DRUMB.0100052/24/142/24/14DK67B.01-0006Mechanical Calculations For Reject Oil Flash DrumB.0100062/24/142/24/14DK68B.01-0007 Mechanical Calculations For Test SeparatorB.0100072/24/142/24/14DK69B.01-0008 Mechanical Calculations For Nitrogen ReceiverB.0100082/24/142/24/14AECC70B.01-0009Mechanical Calculations For Moon Pool Air ReceiverB.0100092/24/142/24/14AECC71B.01-0010Lifting CalculationsFor 2nd Stage SeparatorB.0100103/10/143/10/14DK72B.01-0011Lifting Calculations For Surge Drum SeparatorB.0100113/10/143/10/14DK73B.01-0012Lifting Calculations For Main Air ReceiverB.0100123/10/143/10/14DK74B.01-0013Lifting Calculations For 1st Stage SeparatorB.0100133/10/143/10/14DK75B.01-0014 Lifting Calculations For L.P FLARE K.O DRUMB.0100143/10/143/10/14DK76B.01-0015Lifting Calculations For Reject Oil Flash DrumB.0100153/10/143/10/14DK77B.01-0016 Lifting Calculations For Test SeparatorB.0100163/10/143/10/14DK78B.01-0017Lifting Calculations For Nitrogen ReceiverB.0100173/10/143/10/14AECC79B.01-0018Lifting Calculations For Moon Pool Air ReceiverB.0100183/10/143/10/14AECCQA / Certification80B.01-0019Process Utility Calculations For 1st Stage SeparatorB.0100192/24/142/24/14DK81B.01-0020Process Utility Calculations For Test SeparatorB.0100202/24/142/24/14DK82B.02-0001Reliability/Availability Data-N/AB.0200014/21/144/21/1483B.03-0001Instrument Hook-Ups- N/AB.0300015/19/145/19/1484B.04-0001Spare Parts and Interchangeably Record-N/AB.0400018WPTT/P8WPTT/P85B.05-0001Inspection and Test PlanB.0500012/24/142/24/14AECC86B.06-0001Quality PlanB.0600012/24/142/24/14AECC87B.07-0001Painting Procedure-N/AB.0700012/24/142/24/1488C.01-0001Radiographic Testing ProcedureC.0100018WPTT/P8WPTT/PAECC89C.01-0002Magnetic Particle Testing ProcedureC.0100028WPTT/P8WPTT/PAECC90C.01-0003ULTrasonic Testing ProcedureC.0100038WPTT/P8WPTT/PAECC91C.01-0004Liquid Penetrant Testing ProcedureC.0100048WPTT/P8WPTT/PAECC92C.02-0001Welding and welding repair Procedures/WPS/PQR/WQTC.0200018WPTT/P8WPTT/PAECC93C.03-0001Hydrostatic Test ProceduresC.0300018 WPTT/P8 WPTT/PAECC94C.04-0001Surface Preparation and Painting ProceduresC.0400012/24/142/24/14AECC95C.05-0001Post Weld Heat Treatment ProceduresC.0500018 WPTT/P8 WPTT/PAECC96D.01-0001Cleaning/flushing/Record-N/AD.0100012WAT/P2WAT/P97D.02-0001Certificate of ComplianceD.0200012WAT/P2WAT/PAECC98D.03-0001Hydrostatic Test RecordD.0300012WAT/P2WAT/PAECC99D.04-0001Functional Test ReportD.0400012WAT/P2WAT/PAECC100D.05-0001Equipment Hazardous Area CertificatesD.0500018WPTD8WPTDAECC101D.08-0001Welder qualification recordsD.0800018WPTT/P8WPTT/PAECC102D.09-0001NDE Technician CertificatesD.0900014 WPTT/P4 WPTT/PAECC103D.10-0001NDE's Test CertificateD.1000012WAT/P2WAT/PAECC104E.01-0001Instruction for Commissioning-N/AE.0100018WPTD8WPTD105E.02-0001User/Operating ManualsE.0200016WPTD6WPTDAECC

Abbreviation Used:MilestoneWAFOWeeks after Firm OrderWPTPWeeks Prior To ProductionFirm OrderWPTTWeeks Prior To Test 1 ProcessProduction StartWATWeeks after Test 1 ProcessTest! ProcessWPTDWeeks Prior To DeliveryTest I ProcessWADWeeks after DeliveryDeliveryFRFor ReviewFAFor Approval

Page &P of &N

VENDOR DATA SCHEDULE