PACS IQR 13 Jan 2005

Warm Electronics Qualification Warm Electronics Qualification StatusStatus

Martin von Berg

PACS IQR

Page 2: Warm Electronics Qualification Status

Warm Electronics Qualification Status 2

PACS IQR 13 Jan 2005

Warm Electronics Overview

Page 3: Warm Electronics Qualification Status

Warm Electronics Qualification Status 3

PACS IQR 13 Jan 2005

Built Standard of WE Items I

Page 4: Warm Electronics Qualification Status

Warm Electronics Qualification Status 4

PACS IQR 13 Jan 2005

Built Standard of WE Items IIPACS AVM WE integrated on SVM Panel Simulator at Astrium (QM1 BOLC ext. PSU not shown)

Status: 21.12.2004

Page 5: Warm Electronics Qualification Status

Warm Electronics Qualification Status 5

PACS IQR 13 Jan 2005

Thermal Qualification Status

• AVM / STM WE Unit testing

- STM BOLC: TV test for design validation : OK

- BOLC PSU sub-unit thermally tested : OK- As agreed, no tests were done with other units

• CQM / AVM ILT- No tests were foreseen and done

• QM / PFM WE Units- Simulations and Analysis done for all units- Full qualification programs are currently ongoing- First results for QM SPU available

Page 6: Warm Electronics Qualification Status

Warm Electronics Qualification Status 6

PACS IQR 13 Jan 2005

Electrical Interface Qualification Status : AVM

• AVM WE Unit testing by sub-contractor

- No qualification tests foreseen on sub-contractor level for delivered units- no VCD available as no test foreseen

• AVM WE Unit testing by MPE

- Inrush current measurements for DPU, SPU : compliant

- Spectrometer Groundings tested during ILT- ICC data analysis still missing for final decisions

Page 7: Warm Electronics Qualification Status

Warm Electronics Qualification Status 7

PACS IQR 13 Jan 2005

Electrical Interface Qualification Status : QM / PFM

• QM WE Units testing

- Full applicable testing on sub-unit level contractually agreed

- First results for QM SPU available : NCRs for Bonding R and PROM contents- Nothing available yet for other units- Qualification Test Programs are ongoing- NA for WIH

• PFM WE Units testing

- Full applicable testing on sub-unit level contractually agreed

- All testing necessary and required prior to delivery to MPE- PFM WE Units should not be accepted without completed Test Reports

Page 8: Warm Electronics Qualification Status

Warm Electronics Qualification Status 8

PACS IQR 13 Jan 2005

Electrical Interface Qualification Status : Power

• Power Budget

Maximum average power

demand (EOL, incl. margins)

E² Writing

Maximum average power

demand (EOL, incl. margins)

Spectroscopy

Maximum average power

demand (EOL, incl. margins)

Photometry

Short Peak power

demand

Long Peak power

demand

PROJECT CODE (W) (W) (W) (W) (W)

FPDECMEC

22.0 63.0

(70.0)

25.9

(28.5) 67.1 79.5

FPBOLC (Including Cooler control)

6.6 6.6 48.6 48.6

(no short peak)

51.0

(less than 4ms)

FPDPU 24.0

(18 goal)

24.0

(18 goal)

24.0

(18 goal)

43.2

(inrush - less than 0.5 ms)

28.8

FPSPU 30.3

33.2

(30.3)

33.2

(30.3)

33.23

(no short peak) 35.04

TOTAL 82.9

(76.9 goal)

126.9

(130.9)

(124.9goal)

131.7

(131.4)

(125.4 goal)

N/A N/A

Is DECMEC Power Consumption final? Possible changes due to Heater / Flasher Implementation.

Slight Increase of SPU Power. CR released 12.01.2005

Page 9: Warm Electronics Qualification Status

Warm Electronics Qualification Status 9

PACS IQR 13 Jan 2005

EMC / ESD Qualification Status : AVM

• AVM WE Unit testing

- No tests conducted on sub-contractor level for delivered units of DPU, SPU, DECMEC and BOLC, NA for WIH

• CQM / AVM ILT

- Full applicable test program done, given in EMC test specification PACS- ME-PL-015, Issue 1.2- As run Test procedure PACS-ME-PL-015, Issue 1.2 available via CR-0020v2- EMC Draft Test Report available, ICC Data analysis still missing- Some NCRs, RfW raised or re-issued- ESD testing not done (high risk)- Test and Compliance Matrix : see next transparency (extract of available Draft Test Report, PACS-ME-TR-038, chapter 3)

Page 10: Warm Electronics Qualification Status

Warm Electronics Qualification Status 10

PACS IQR 13 Jan 2005

EMC / ESD Qualification Status : AVM Matrix

Page 11: Warm Electronics Qualification Status

Warm Electronics Qualification Status 11

PACS IQR 13 Jan 2005

EMC / ESD Qualification Status : EQM /QM

• EQM IST Testing

- Only RS tests foreseen, acc. HP-2-ASED-PL-0037

- ESD testing omission still under discussion and not agreed

• QM WE Units testing

- ALL QM models are NOT deliverable items

- Full applicable testing on sub-unit level contractually agreed and expected- First results for QM SPU available, NCRs for RE-E- Nothing available yet for other units- NA for WIH

Page 12: Warm Electronics Qualification Status

Warm Electronics Qualification Status 12

PACS IQR 13 Jan 2005

EMC / ESD Qualification Status : PFM

• PFM WE Units testing

- Full applicable testing on sub-unit level contractually agreed and expected

• PFM ILT EMC testing

- full applicable testing acc. IID-A, as reflected in PACS-ME-PL-015 with exceptions for ESD and RE/RS-E/H-Field testing

• PFM IST EMC testing

- Only CE tests foreseen, acc. HP-2-ASED-PL-0037

Page 13: Warm Electronics Qualification Status

Warm Electronics Qualification Status 13

PACS IQR 13 Jan 2005

Electrical Design Status : Plans for FM

• DPU AVM to DPU CFM / PFM- Changed PL I/F Board, new design

• BOLC QM1 to BOLC QM2 / PFM- Changed Bandwidth (and other) of Read-out electronics- Several Changes in digital electronics- New PCB designs

• DECMEC AVM to DECMEC QM / PFM - Several changes during and after ILT necessary to provide

functionality and performance • SPU AVM to SPU QM / PFM

- no changes (as far as reported)

Page 14: Warm Electronics Qualification Status

Warm Electronics Qualification Status 14

PACS IQR 13 Jan 2005

Critical Qualification Items I

• WIMA MKS-2 capacitors (not part of WE, are in FPU) : not yet qualified for cryogenic use

• Distribution Board „Evaluation“(not part of WE, FPU) : visit at Board manufacturer „Waltron“ still pending

• Cryo Harness Verification and Compliance Matrix missing

• Agreement on full PFM WE Unit Qualification prior to delivery to MPE

• Risk that DECMEC functionality and performance could shorten the Qualification programme. Additionally the Heater / Flasher Electronics for Photoconductor curing has to be implemented in DECMEC.

• Solution for DPU 1553 Burst Mode Problem pending

Page 15: Warm Electronics Qualification Status

Warm Electronics Qualification Status 15

PACS IQR 13 Jan 2005

Critical Qualification Items II

• Spectrometer Grounding Decision after Data Analysis : Warm-end or Cold-end-Grounding

• Agreement on ESD Testing at the end of EQM IST open• RS-H of Photometer / Bolometer very high• BOLC QM1 with external PS not EMC ILT tested

• BOLC uncontrolled switch-off could damage the bolometers (NCR existing)