Upload
tazanna-chan
View
18
Download
0
Tags:
Embed Size (px)
DESCRIPTION
WATER RIGHTS 101: OVERVIEW OF UTAH WATER LAW. Legislative Water Task Force June 15, 2004. OBJECTIVES. ORIGIN OF UTAH WATER LAW BASIC CONCEPTS PROCESS AS IT EXISTS TODAY CASE STUDIES. Origin of the Doctrine of Prior Appropriation. Prior Appropriation Doctrine Main Features. - PowerPoint PPT Presentation
Citation preview
WATER RIGHTS 101:OVERVIEW OF UTAH WATER LAW
Legislative Water Task ForceJune 15, 2004
OBJECTIVES• ORIGIN OF UTAH WATER LAW
• BASIC CONCEPTS
• PROCESS AS IT EXISTS TODAY
• CASE STUDIES
Origin of the Doctrine of Prior Appropriation
Prior Appropriation DoctrineMain Features
• Divert water to beneficial use.
• Priority date.
• First in time, first in right.
• Loss of right.
Basic Definitions
• All water in the state is property of the public (73-1-1).
• Beneficial use shall be the basis, the measure, and the limit of all rights to the use of water in the state (73-1-3).
Major Elements of a Water Right• Priority date.• Quantity of water.
– Flow rate.– Volume.
• Source of supply.• Point(s) of diversion.• Uses.
– Irrigation, domestic, stock water, mining, municipal, etc.
• Period of use.• Place of use.
Establishing a Water Right• Diligence Claim.
– Surface water uses prior to 1903.
• Underground Water Claim.
– Ground-water uses prior to 1935.
• Court Decreed.
• Applications filed with State Engineer.
Mutual Irrigation Companies
• Water Right held by Company
• Individuals own shares of stock
• Water Distributed – Hours, Acres or Quantity
• Shareholders have certain rights / obligations
• 73-3-3.5, Change Application by shareholder
Filing a Water Right Application
• File application in proper form.• Advertise for 2 consecutive weeks in local
newspaper.• 20 day protest period.• Protested?
– Hearing.
• Approval or rejection.– If approved, proof due date given, proof of
beneficial use, certificate.
• Judicial Review.
Approval Criteria (73-3-8)
• Unappropriated water in source.
• Will not impair existing rights.
• Physically and economically feasible.
• Not monopolistic / speculation.
• In the public interest / welfare.
• Won’t effect the natural stream environment or public recreation.
WaterAppropriation
Policy
Change ApplicationsSec. 73-3-3 UCA
• Owner may change:
– Point of diversion.
– Place of use.
– Nature of use.
– Period of use.
• Pertinent facts:
– Can’t impair existing rights
– Can’t enlarge the underlying water right
Example # 1Distribution of Water By Priority• 45 Distribution Systems
41 River System 4 Ground-Water Basins
• Water (River) Commissioner
• Times of shortage – cut by priority date
• Cost paid by water users
• Annual report prepared and submitted
Water Distribution by Priority Date
0
50
100
150
200
250
1-J
an
15-J
an
29-J
an
12-F
eb
26-F
eb
12-M
ar
26-M
ar
9-A
pr
23-A
pr
7-M
ay
21-M
ay
4-J
un
18-J
un
2-J
ul
16-J
ul
30-J
ul
13-A
ug
27-A
ug
10-S
ep
24-S
ep
8-O
ct
22-O
ct
5-N
ov
19-N
ov
3-D
ec
17-D
ec
31-D
ec
Day
CF
S
Streamflow
1st priority-1873
2rd priority-1922
3th priority-1949
Example # 2Beneficial Use
Evaluation of a Water Right
• Major ElementsFlow: 2.50 CFSSource: Spring CreekUse: Irrigation of 100 acresPeriod of Use: April 1 – Oct 31
• What is the beneficial use?• What are the diversion and depletion
limitations?
Irrigation Diversion Requirementfor Alfalfa at Logan, Utah
• Crop Consumptive Use (Alfalfa) = 31.35”
• Effective Precipitation = 7.73”
• Net Irrigation Requirement = 23.62”
• Irrigation Practices / Efficiency Flood 50%
• Irrigation Diversion Requirement = 47.24”Use 48” or 4.0 AF/A
Irrigation Return Flow
Diversion = 4.0 Ac Ft/Ac
ET = 2.0 Ac Ft/Ac
Return Flow = 2.0 Ac Ft/Ac
Changing an Irrigation Water Right to Industrial Uses
• Water right is for 100 acre of irrigation
• 100 ac x 4.0 ac ft /ac = 400 ac ft• Historical Depletion = 200 ac ft• Industrial use is 100% consumptive
Therefore, diversion & depletion limited to 200 ac ft.
Federal Reserved Water Rights
• Indian Reservations, National Forest, National Parks and other lands
• 1908 Winters decision
• 1963 Arizona v. California
• Quantification – primary purposes of the reservation
• Priority Date – date of reservation
The State Engineer has - “general administrative supervision of the
waters of the state, and of the measurement, appropriation, apportionment and
distribution thereof.” (Section 73-2-1)
State Engineer meets
with a water user
STATE ENGINEER
Thank You
Questions?