18
Enbridge Inc. Providing New Market Access for North American Crude Al Monaco President & CEO CIBC Whistler Institutional Investor Conference January 24, 2013

Whistler Presentation - Jan 2013 v2/media/Enb/Documents/Investor Relations/2013/Whistler...CIBC Whistler Institutional Investor Conference January 24, 2013 . This presentation includes

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Whistler Presentation - Jan 2013 v2/media/Enb/Documents/Investor Relations/2013/Whistler...CIBC Whistler Institutional Investor Conference January 24, 2013 . This presentation includes

Enbridge Inc.

Providing New Market Access for

North American Crude

Al Monaco President & CEO

CIBC Whistler Institutional Investor Conference January 24, 2013

Page 2: Whistler Presentation - Jan 2013 v2/media/Enb/Documents/Investor Relations/2013/Whistler...CIBC Whistler Institutional Investor Conference January 24, 2013 . This presentation includes

This presentation includes certain forward looking information (FLI) to provide Enbridge shareholders and potential

investors with information about Enbridge and management's assessment of its future plans and operations, which

may not be appropriate for other purposes. FLI is typically identified by words such as "anticipate", "expect",

"project", "estimate", "forecast", "plan", "intend", "target", "believe" and similar words suggesting future outcomes or

statements regarding an outlook. Although we believe that our FLI is reasonable based on the information available

today and processes used to prepare it, such statements are not guarantees of future performance and you are

cautioned against placing undue reliance on FLI. FLI inherently involves a variety of assumptions, risks,

uncertainties and other factors which may cause actual results, levels of activity and achievements to differ

materially from those expressed or implied in our FLI. Material assumptions include: expected supply and demand

for crude oil, natural gas and natural gas liquids; prices of crude oil, natural gas and natural gas liquids; expected

exchange rates; inflation; interest rates; availability and price of labour and pipeline construction materials;

operational reliability; customer project approvals; maintenance of support and regulatory approvals for Enbridge’s

projects; anticipated in-service dates and weather.

Our FLI is subject to risks and uncertainties pertaining to operating performance, regulatory parameters, project

approval and support, construction schedules, weather, economic and competitive conditions, exchange rates,

interest rates, commodity prices and supply and demand for commodities, including but not limited to those

discussed more extensively in our filings with Canadian and US securities regulators. The impact of any one risk,

uncertainty or factor on any particular FLI is not determinable with certainty as these are interdependent and our

future course of action depends on management's assessment of all information available at the relevant time.

Except to the extent required by law, we assume no obligation to publicly update or revise any FLI, whether as a

result of new information, future events or otherwise. All FLI in this presentation is expressly qualified in its entirety

by these cautionary statements.

This presentation may make reference to certain financial measures, such as adjusted net income, which are not

recognized under GAAP. Reconciliations to the most closely related GAAP measures are included in the MD&A

filings and/or Supplementary Financial Information available on our website or in the slides that accompany this

presentation, if applicable.

Legal Notice

2

Page 3: Whistler Presentation - Jan 2013 v2/media/Enb/Documents/Investor Relations/2013/Whistler...CIBC Whistler Institutional Investor Conference January 24, 2013 . This presentation includes

Toronto

Quebec City

$45 Billion Energy Infrastructure Asset Base

Gas Distribution

Norman

Wells

Zama

Fort McMurray

Portland

Casper

Montreal

Salt Lake City

Patoka

Cushing

Houston

Superior

Clearbrook

Edmonton Hardisty

Toronto

Chicago

Liquids Pipelines

Edmonton

Fort St. John

Houston

Chicago

Sarnia

Gas Pipelines

Toronto

Edmonton

Renewable Energy

2011

Adjusted

Earnings

65%

16%

17%

2011

Adjusted

Earnings

2011

Adjusted

Earnings

2011

Adjusted

Earnings

2%

62%

19%

17%

Wind Power Generation

Waste Heat Recovery

Solar Power Generation

Geothermal Power Generation

Power Transmission

3

Page 4: Whistler Presentation - Jan 2013 v2/media/Enb/Documents/Investor Relations/2013/Whistler...CIBC Whistler Institutional Investor Conference January 24, 2013 . This presentation includes

Management’s Key Priorities

1. Focus on Operations

• Safety, Reliability and Environmental Protection

2. Execute Current Growth Plan

• Major Projects Execution, Capital Funding and Liquidity

3. Extend Growth Rate Beyond 2016

4

Page 5: Whistler Presentation - Jan 2013 v2/media/Enb/Documents/Investor Relations/2013/Whistler...CIBC Whistler Institutional Investor Conference January 24, 2013 . This presentation includes

The Energy Landscape

• Global Demand Growth

• US Consumption

• North American Supply

• Canadian Supply Captive to

US Market

• Transportation Bottlenecks

Canadian Canadian Canadian Canadian

U.S. U.S.

U.S. U.S.

High Shale Forecast

High Shale Forecast High Shale Case

Foreign Foreign Foreign

0

5

10

15

20

2010 2015 2020 2025

North American Demand by Supply Source

MMbpd

Source: Enbridge Internal Forecast

0

25

50

75

100

125

1990 1995 2000 2005 2010 2015 2020 2025

Middle East India China Rest of World

Global Crude Oil Demand

MMbpd

Source: EIA, Enbridge Internal Forecast

0

1

2

3

4

2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

CAPP - Forecast WCSB PIRA Energy Group - Forecast Bakken

Forecast Incremental WCSB & Bakken Production Growth

MMbpd

5

Page 6: Whistler Presentation - Jan 2013 v2/media/Enb/Documents/Investor Relations/2013/Whistler...CIBC Whistler Institutional Investor Conference January 24, 2013 . This presentation includes

Fundamentals

– Landlocked Supply Price Discounts

6

$91

WCS

Bakken

Light Brent

Maya

Pricing reflects December 2012 averages

(Crude prices are in US$ per bbl)

$106

$55

$110

LLS

WTI

$85

Light Crude

Heavy Crude

NOTE: * Brent price is a landed price on US East Coast/ US Gulf Coast. Assumed tanker freight cost of US$2.00 per bbl.

Edm Light $81

$88

Asia

Brent

$113 *

$113 *

Page 7: Whistler Presentation - Jan 2013 v2/media/Enb/Documents/Investor Relations/2013/Whistler...CIBC Whistler Institutional Investor Conference January 24, 2013 . This presentation includes

Competitive Advantage

– Footprint of the Mainline System

7

Montreal

Gretna

Regina

Hardisty

Kerrobert

Superior

Toledo

Buffalo

Edmonton

Houston

Detroit

Clearbrook

Flanagan

Oil

Sands

Cromer

Cushing

Patoka

Sarnia

Chicago

Bakken

• Largest crude oil pipeline

system in the world

• Competitive Advantage:

– Scale

– Market Diversity

– Premium Markets

– Established ROW

– Product Segregation

Page 8: Whistler Presentation - Jan 2013 v2/media/Enb/Documents/Investor Relations/2013/Whistler...CIBC Whistler Institutional Investor Conference January 24, 2013 . This presentation includes

Competitive Advantage

– Dominant Positions in Regional Gathering

Lloydminster Edmonton

Cold Lake

Hardisty Hub

Cheecham

Terminal

Nexen (Long Lake)

Suncor (MacKay River)

ConocoPhillips (Surmont)

Suncor (Firebag)

Alberta

Husky (Sunrise)

Imperial Oil (Kearl)

Waupisoo Pipeline (up to 580 kbpd)

Athabasca Pipeline (up to 600 kbpd)

Project Connections

Athabasca Twin Pipeline (initially 450 kbpd)

Cenovus (Christina Lake)

Statoil (Leismer)

Woodland Pipeline Extension

Total Secured Capital = $3.4 B 8

Athabasca

Terminal

Gretna

Saskatchewan

Minot

Lignite

Weyburn

Cromer

Berthold

Steelman

TiogaStanley

ClearbrookNorth Dakota

Enbridge Mainline System

North Dakota System (EEP)

Saskatchewan System (ENF)

Bakken Expansion Project (EEP/ENF)

Total Secured Capital = $0.8 B

Oil Sands Region Bakken Region

Page 9: Whistler Presentation - Jan 2013 v2/media/Enb/Documents/Investor Relations/2013/Whistler...CIBC Whistler Institutional Investor Conference January 24, 2013 . This presentation includes

New Market Access # 1

– Western U.S. Gulf Coast Access

Cushing

Houston

Chicago/

Flanagan

Port Arthur

3

2

4

Total Secured Capital = $6.4 B 9

1

4

1

2

3

Associated Mainline Expansion

• In-service = Various (2014 – 2015)

Flanagan South Pipeline

• In-service = mid 2014, +585 kbpd

Seaway Pipeline Acquisition & Reversal

• In-service = May 2012, +400 kbpd

Seaway Pipeline Twin & Lateral

• In-service = mid 2014, +450 kbpd

Page 10: Whistler Presentation - Jan 2013 v2/media/Enb/Documents/Investor Relations/2013/Whistler...CIBC Whistler Institutional Investor Conference January 24, 2013 . This presentation includes

New Market Access # 2

– Eastern Access

Clearbrook

Superior

Sarnia

Chicago

Patoka

Toledo

Montreal

Westover

Hardisty

Cushing

Gretna

Regina

10 Total Secured Capital = $2.7 B

4

1

5

2

3

Line 5 Expansion • In-service = early 2013, +50 kbpd

Spearhead North Expansion • In-service = early 2014, +105 kbpd

Line 6B Replacement • In-service = early 2014, +260 kbpd

Line 9 Reversal • In-service = mid 2013/mid 2014, +240 kbpd

Toledo Pipeline Partial Twin • In-service = early 2013, +100 kbpd

1

2

3 5

Page 11: Whistler Presentation - Jan 2013 v2/media/Enb/Documents/Investor Relations/2013/Whistler...CIBC Whistler Institutional Investor Conference January 24, 2013 . This presentation includes

New Market Access # 3

– Light Oil Market Access

11

Hardisty

Clearbrook

Gretna

Superior

Flanagan

Cushing

Montreal

Sarnia

Toledo

Patoka

11 Total Secured Capital = $6.2 B

Chicago

2

1

3

4

5

1

2

5

Canadian Mainline Terminal Capability • In-service = mid 2015/early 2016

Sandpiper Project

• In-service = early 2016, +225/375 kbpd

U.S. Mainline Expansion

a) Superior to Flanagan

• In-service = mid 2015/early 2016

b) Chicago Area Connectivity

• In-service = mid 2015, +570 kbpd

Eastern Access Upsize

a) Line 6B Expansion

• In-service = early 2016, +70 kbpd

b) Line 9 Reversal Expansion

• In-service = mid 2014, +80 kbpd

Southern Access Extension

• In-service = early 2015, +300 kbpd

Page 12: Whistler Presentation - Jan 2013 v2/media/Enb/Documents/Investor Relations/2013/Whistler...CIBC Whistler Institutional Investor Conference January 24, 2013 . This presentation includes

Potential New Market Access Initiatives

12

Canadian/U.S. East Coast

Refinery Markets

12

Eastern U.S. Gulf Coast

Refinery Markets

Asia Pacific/West Coast

Refinery Markets

Eddystone

Page 13: Whistler Presentation - Jan 2013 v2/media/Enb/Documents/Investor Relations/2013/Whistler...CIBC Whistler Institutional Investor Conference January 24, 2013 . This presentation includes

Project Returns & Profiles

13

Project / Program

Enbridge Inc. Investment ($ Billions)

First Full Year

Full Life

DCF ROE

Years to

Attain

Eastern Access1 $1.9 2014 low double digits 4

USGC Access2 $5.9 2015 low double digits 5

Light Oil Market Access1,2 $2.8 2016 low double digits 4

1 Inclusive of supporting Canadian mainline expansion capital and CTS effects. 2 Inclusive of 60% joint funding of U.S. mainline components and CTS effects.

Page 14: Whistler Presentation - Jan 2013 v2/media/Enb/Documents/Investor Relations/2013/Whistler...CIBC Whistler Institutional Investor Conference January 24, 2013 . This presentation includes

Major Projects Execution Status Update

14

As at December 2012

Projects Expected Cost

($ billion) In-service Date

Cost Indicator

Schedule Indicator

COMPLETED IN 2012:

Edmonton Terminal Expansion $0.3 PH1 Q3 2012; PH2 Q4 2012 Below Budget On Time

Wood Buffalo Pipeline $0.4 Q4 2012 Below Budget On Time

Woodland Pipeline $0.3 Q4 2012 Below Budget On Time

Waupisoo Capacity Expansion $0.4 PH1 In-service; PH2 Q3 2013 Below Budget On Time

IN-SERVICE IN 2013:

Liquids Pipelines

Athabasca Capacity Expansion $0.5 PH1 Q1 2013; PH2 Q1 2014 Below Budget On Time

Bakken Expansion Program $0.6 Q1 2013 Below Budget On Time

Berthold Rail $0.1 PH1 In-service; PH2 Q1 2013 On Budget On Time

Cushing Terminal Expansion Projects $0.2 2012/2013 (Phases) On Budget On Time

Eastern Access Phase 1 $2.0 CAN Q2 2013-Q1 2015; US Q2 2013-Q1 2014 On Budget On Time

Eastern Access Toledo Pipeline (Line 79) $0.2 Q2 2013 Below Budget On Time

Eddystone Rail $0.1 Q4 2013 On Budget On Time

Line 6B Replacement $0.3 Q1 2013 (MI); Q3 2013 (IN) On Budget Delay

Norealis Pipeline $0.5 Q4 2013 On Budget On Time

Seaway Reversal, Twinning and Lateral $1.2 2012 - 2014 On Budget On Time

Suncor Bitumen Blending Tanks $0.2 Q2 2013 Below Budget On Time

Natural Gas

Ajax Processing Plant $0.2 Q2 2013 On Budget On Time

Texas Express NGL Pipeline $0.4 Pipeline Q3 2013; Gathering Q2 2013 On Budget On Time

Power

MATL $0.4 PH1 Q2 2013; PH2 2014 Over Budget Delay

Lac Alfred $0.4 PH1 Q1 2013; PH2 Q3 2013 On Budget On Time

Massif du Sud $0.2 Q1 2013 On Budget On Time

Page 15: Whistler Presentation - Jan 2013 v2/media/Enb/Documents/Investor Relations/2013/Whistler...CIBC Whistler Institutional Investor Conference January 24, 2013 . This presentation includes

$35 Billion Growth Investment Plan

Enbridge Day Current

2012 – 2016 Enterprise Wide Growth Capital

Risked Unsecured

Highly Probable Unsecured

Commercially Secured

$35 B $35 B

$27 B

$18 B

$12 B

$3 B

$5 B $5 B

(Oct 2012) 15

Page 16: Whistler Presentation - Jan 2013 v2/media/Enb/Documents/Investor Relations/2013/Whistler...CIBC Whistler Institutional Investor Conference January 24, 2013 . This presentation includes

An Industry Leading Growth Outlook

* Please refer to Non-GAAP Measures disclosure in news release. All figures are based on US GAAP reporting.

$0.00

$3.00

2011 2016e

Adjusted EPS* Growth

• Tilted Return Projects

• 2016 Risked Unsecured

• New Growth Platforms

• Sponsored Vehicle Drop Downs

Commercially Secured (as at Enbridge Day)

Highly Probable Unsecured

16

Page 17: Whistler Presentation - Jan 2013 v2/media/Enb/Documents/Investor Relations/2013/Whistler...CIBC Whistler Institutional Investor Conference January 24, 2013 . This presentation includes

Growing Income Stream

17

$0.42

$1.26

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

Dividends Per Share

Page 18: Whistler Presentation - Jan 2013 v2/media/Enb/Documents/Investor Relations/2013/Whistler...CIBC Whistler Institutional Investor Conference January 24, 2013 . This presentation includes

Investment Merits Summary

• Exceptional array of attractive return investment

opportunities

• Financial risk tightly managed

• Ample access to low cost conventional funding sources

Attractive investments low cost of capital

Industry leading growth

Substantial Valuation Upside 18