8
Work package Work package 2 2 Performance of naturally ventilated buildings NatVent 19 19 naturally naturally ventilated ventilated buildings buildings The The monitoring monitoring campaigns campaigns The The monitoring monitoring results results Select a Select a building... building... Objectives Objectives of WP 2 of WP 2 The The NatVent NatVent Buildings Buildings JOULE Final Final conclusions conclusions

Work package 2 Performance of naturally ventilated buildings NatVent 19 naturally ventilated buildings 19 naturally ventilated buildings The monitoring

Embed Size (px)

Citation preview

Page 1: Work package 2 Performance of naturally ventilated buildings NatVent 19 naturally ventilated buildings 19 naturally ventilated buildings The monitoring

Work package 2Work package 2Work package 2Work package 2

Performance of naturally ventilated buildings

Performance of naturally ventilated buildings

NatVent

19 naturally 19 naturally ventilated ventilated buildingsbuildings

The monitoring The monitoring campaignscampaigns

The monitoring The monitoring resultsresults

Select a Select a building...building...

Objectives of Objectives of WP 2WP 2

The NatVent The NatVent BuildingsBuildings

JOULE

Final Final conclusionsconclusions

Page 2: Work package 2 Performance of naturally ventilated buildings NatVent 19 naturally ventilated buildings 19 naturally ventilated buildings The monitoring

NatVent

19 naturally 19 naturally ventilated ventilated buildingsbuildings

The monitoring The monitoring campaignscampaigns

The monitoring The monitoring resultsresults

Select a Select a building...building...

Objectives of Objectives of WP 2WP 2

The NatVent The NatVent BuildingsBuildings

JOULE

Final Final conclusionsconclusions

WP2 - ObjectivesWP2 - Objectives

The aim of this work package was:

To evaluate the performance of existing ad-hoc buildings designed and constructed specifically as energy-efficient naturally ventilated buildings

To identify the advantages and shortcomings of natural ventilation strategies

To specify the overall design and construction conditions required for achieving successful natural ventilation

The aim of this work package was:

To evaluate the performance of existing ad-hoc buildings designed and constructed specifically as energy-efficient naturally ventilated buildings

To identify the advantages and shortcomings of natural ventilation strategies

To specify the overall design and construction conditions required for achieving successful natural ventilation

Page 3: Work package 2 Performance of naturally ventilated buildings NatVent 19 naturally ventilated buildings 19 naturally ventilated buildings The monitoring

NatVent

19 naturally 19 naturally ventilated ventilated buildingsbuildings

The monitoring The monitoring campaignscampaigns

The monitoring The monitoring resultsresults

Select a Select a building...building...

Objectives of Objectives of WP 2WP 2

The NatVent The NatVent BuildingsBuildings

JOULE

Final Final conclusionsconclusions

19 Monitored Buildings...19 Monitored Buildings... 19 naturally ventilated buildings were selected from seven

EU countries.

Overview of the 19 buildings:

Belgium: BE1 - BE2 - BE3 Switzerland: CH1 - CH2 - CH3 Denmark: DK1 -DK2 - DK3 Great Britain: GB1- GB2 -GB3 Norway: NO1 - NO2 The Netherlands: NL1 - NL2 - NL3 Sweden: SE1 - SE2

19 naturally ventilated buildings were selected from seven EU countries.

Overview of the 19 buildings:

Belgium: BE1 - BE2 - BE3 Switzerland: CH1 - CH2 - CH3 Denmark: DK1 -DK2 - DK3 Great Britain: GB1- GB2 -GB3 Norway: NO1 - NO2 The Netherlands: NL1 - NL2 - NL3 Sweden: SE1 - SE2

An overview of 19 buildings is given in the document overview.pdf (\Reports\Monitoring\...)

An overview of 19 buildings is given in the document overview.pdf (\Reports\Monitoring\...)

Page 4: Work package 2 Performance of naturally ventilated buildings NatVent 19 naturally ventilated buildings 19 naturally ventilated buildings The monitoring

NatVent

19 naturally 19 naturally ventilated ventilated buildingsbuildings

The monitoring The monitoring campaignscampaigns

The monitoring The monitoring resultsresults

Select a Select a building...building...

Objectives of Objectives of WP 2WP 2

The NatVent The NatVent BuildingsBuildings

JOULE

Final Final conclusionsconclusions

The Monitoring CampaignsThe Monitoring Campaigns The 19 buildings selected were monitored under winter and summer

conditions

The following parameters were measured in all of the buildings: Temperature Internal air quality (H2O, CO2, …) Ventilation rate Wind outdoor: direction and velocity Wind indoor: velocity

The parameters were measured in 4 rooms and 1 corridor for a minimum of one week

The 19 buildings selected were monitored under winter and summer conditions

The following parameters were measured in all of the buildings: Temperature Internal air quality (H2O, CO2, …) Ventilation rate Wind outdoor: direction and velocity Wind indoor: velocity

The parameters were measured in 4 rooms and 1 corridor for a minimum of one week

The basic monitoring set-up and the monitoring

protocol is described in document

monitor_protoc.pdf (\Reports\Monitoring\…)

The basic monitoring set-up and the monitoring

protocol is described in document

monitor_protoc.pdf (\Reports\Monitoring\…)

Page 5: Work package 2 Performance of naturally ventilated buildings NatVent 19 naturally ventilated buildings 19 naturally ventilated buildings The monitoring

NatVent

19 naturally 19 naturally ventilated ventilated buildingsbuildings

The monitoring The monitoring campaignscampaigns

The monitoring The monitoring resultsresults

Select a Select a building...building...

Objectives of Objectives of WP 2WP 2

The NatVent The NatVent BuildingsBuildings

JOULE

Final Final conclusionsconclusions

WP2 - Monitoring ResultsThe results of the monitoring programmes are presented in the following

documents:

Summary Reports

(\Reports \Monitoring Reports \Summary Reports\…) global presentation of the buildings ( 4p./ building) contents: building description - ventilation strategy and technology - winter and

summer monitoring results - conclusions

Detailed Reports

(\Reports \Monitoring Reports \Detailed Reports\…) detailed reports of all 19 monitoring campaigns ( 20 p./ campaign) contents: monitoring set up - analysis of results - conclusions

The results of the monitoring programmes are presented in the following documents:

Summary Reports

(\Reports \Monitoring Reports \Summary Reports\…) global presentation of the buildings ( 4p./ building) contents: building description - ventilation strategy and technology - winter and

summer monitoring results - conclusions

Detailed Reports

(\Reports \Monitoring Reports \Detailed Reports\…) detailed reports of all 19 monitoring campaigns ( 20 p./ campaign) contents: monitoring set up - analysis of results - conclusions

You can read and print pdf-files with the Acrobat® Reader ®3.0. Program. This program is free.

Download it from the Acrobat web site: www.adobe.com OR run the installation file ar32e301(1).exe in the directory \Installation

You can read and print pdf-files with the Acrobat® Reader ®3.0. Program. This program is free.

Download it from the Acrobat web site: www.adobe.com OR run the installation file ar32e301(1).exe in the directory \Installation

Page 6: Work package 2 Performance of naturally ventilated buildings NatVent 19 naturally ventilated buildings 19 naturally ventilated buildings The monitoring

Select a Building...Select a Building...

BE2: Keppekouter BuildingBE2: Keppekouter BuildingBE2: Keppekouter BuildingBE2: Keppekouter Building

BE3: Renson HeadquartersBE3: Renson HeadquartersBE3: Renson HeadquartersBE3: Renson Headquarters

BE1: PROBE Building BE1: PROBE Building BE1: PROBE Building BE1: PROBE Building

CH1: VELUX BuildingCH1: VELUX BuildingCH1: VELUX BuildingCH1: VELUX Building

CH3: Basler Versicherungen BuildingCH3: Basler Versicherungen BuildingCH3: Basler Versicherungen BuildingCH3: Basler Versicherungen Building

CH2: EWZ Building CH2: EWZ Building CH2: EWZ Building CH2: EWZ Building

DK1: E.Pihl & Son AS HeadquartersDK1: E.Pihl & Son AS HeadquartersDK1: E.Pihl & Son AS HeadquartersDK1: E.Pihl & Son AS Headquarters

DK2: BRF Kredit HeadquartersDK2: BRF Kredit HeadquartersDK2: BRF Kredit HeadquartersDK2: BRF Kredit Headquarters

DK3: WindowMaster Office Build.DK3: WindowMaster Office Build.DK3: WindowMaster Office Build.DK3: WindowMaster Office Build.

NO1: Ulleval Administration Build.NO1: Ulleval Administration Build.NO1: Ulleval Administration Build.NO1: Ulleval Administration Build.

GB1: BRE Energy Efficient OfficeGB1: BRE Energy Efficient OfficeGB1: BRE Energy Efficient OfficeGB1: BRE Energy Efficient Office

GB2: Canning Crescent CentreGB2: Canning Crescent CentreGB2: Canning Crescent CentreGB2: Canning Crescent Centre

GB3: Portland Street BuildingGB3: Portland Street BuildingGB3: Portland Street BuildingGB3: Portland Street Building

NO2: Pfizer BuildingNO2: Pfizer BuildingNO2: Pfizer BuildingNO2: Pfizer Building

NL1: European Patent OfficeNL1: European Patent OfficeNL1: European Patent OfficeNL1: European Patent Office

NL2: Town Hall of Zevenhuizen-M.NL2: Town Hall of Zevenhuizen-M.NL2: Town Hall of Zevenhuizen-M.NL2: Town Hall of Zevenhuizen-M.

NL3: Tax Office of EnschedeNL3: Tax Office of EnschedeNL3: Tax Office of EnschedeNL3: Tax Office of Enschede

SE1: Tage Møller BuildingSE1: Tage Møller BuildingSE1: Tage Møller BuildingSE1: Tage Møller Building

SE2: Technical Office of Varberg SE2: Technical Office of Varberg SE2: Technical Office of Varberg SE2: Technical Office of Varberg

NatVent

Page 7: Work package 2 Performance of naturally ventilated buildings NatVent 19 naturally ventilated buildings 19 naturally ventilated buildings The monitoring

NatVent

19 naturally 19 naturally ventilated ventilated buildingsbuildings

The monitoring The monitoring campaignscampaigns

The monitoring The monitoring resultsresults

Select a Select a building...building...

Objectives of Objectives of WP 2WP 2

The NatVent The NatVent BuildingsBuildings

JOULE

Final Final conclusionsconclusions

Final Conclusions (1...)

There were 8 key findings from the 19 building monitoring programme:There were 8 key findings from the 19 building monitoring programme:

1. The challenge is to provide comfortable conditions within an energy efficient building.

2. It is essential to understand what natural ventilation actually is.

3. Ventilation for IAQ should optimise both IAQ and energy efficiency

4. The required air flow rates for summer comfort are much higher than for IAQ control and the thermal mass of the building must be accessible

1. The challenge is to provide comfortable conditions within an energy efficient building.

2. It is essential to understand what natural ventilation actually is.

3. Ventilation for IAQ should optimise both IAQ and energy efficiency

4. The required air flow rates for summer comfort are much higher than for IAQ control and the thermal mass of the building must be accessible

Page 8: Work package 2 Performance of naturally ventilated buildings NatVent 19 naturally ventilated buildings 19 naturally ventilated buildings The monitoring

Final Conclusions (2|) 5. Achieving comfortable conditions in the summer requires more than

just high ventilation rates

6. Successful design involves more than simply estimating air flow rates

7. The creation of an attractive environment for innovation is extremely important

8. Natural ventilation can be an attractive option, but NOT the only option

You can find more information in the Final Monitoring Report (final_monitor_rep.pdf) in the directory \Reports\Monitoring

5. Achieving comfortable conditions in the summer requires more than just high ventilation rates

6. Successful design involves more than simply estimating air flow rates

7. The creation of an attractive environment for innovation is extremely important

8. Natural ventilation can be an attractive option, but NOT the only option

You can find more information in the Final Monitoring Report (final_monitor_rep.pdf) in the directory \Reports\Monitoring

NatVent

You can read and print pdf-files with the Acrobat® Reader ®3.0. Program. This program is free.

Download it from the Acrobat web site: www.adobe.com OR run the installation file ar32e301(1).exe in the directory \Installation

You can read and print pdf-files with the Acrobat® Reader ®3.0. Program. This program is free.

Download it from the Acrobat web site: www.adobe.com OR run the installation file ar32e301(1).exe in the directory \Installation

19 naturally 19 naturally ventilated ventilated buildingsbuildings

The monitoring The monitoring campaignscampaigns

The monitoring The monitoring resultsresults

Select a Select a building...building...

Objectives of Objectives of WP 2WP 2

The NatVent The NatVent BuildingsBuildings

JOULE

Final Final conclusionsconclusions