5388
Current Posting Information Type 10/31/15 205000 $55.51 10/31/15 205000 $47.58 10/31/15 205000 $15.86 10/31/15 205000 $15.86 10/31/15 205000 $39.65 10/31/15 205000 $31.72 10/31/15 205000 $15.86 10/31/15 205010 $31.29 Post Date W.O. #/ S.O. # Speed Type Current Charge Current Credit Work Order # PF-180689 Credit - Labor Work Order # PF-180683 Credit - Labor Work Order # PF-185771 Credit - Labor Work Order # PF-186128 Credit - Labor Work Order # PF-186122 Credit - Labor Work Order # PF-189492 Credit - Labor Work Order # PF-189493 Credit - Labor Work Order # PF-189541 Credit - Labor

[XLS] · Web view10/31/2015 55.51 10/31/2015 47.58 10/31/2015 15.86 10/31/2015 15.86 10/31/2015 39.65 10/31/2015 31.72 10/31/2015 15.86 10/31/2015 31.29 10/31/2015 20.86 10/31/2015

  • Upload
    vankhue

  • View
    230

  • Download
    3

Embed Size (px)

Citation preview

Posted ChargesCurrent Posting InformationWork Order SummaryPost DateW.O. #/S.O. #SpeedTypeCurrentChargeCurrentCreditTypeAction RequestedBuildingLocationDescriptionLaborParts/OtherWO Total10/31/15Work Order # PF-180689205000$55.51Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180683205000$47.58Credit - LaborLIGHTS REPAIR & REPLACE LOT 26FY 15/16PDNPDN-100Vehicle Storage10/31/15Work Order # PF-185771205000$15.86Credit - LaborPM Monthly - Compressed Air DryerWHITWHIT-104-COMPAD-1Compressed Air Dryer No. 110/31/15Work Order # PF-186128205000$15.86Credit - LaborPM Monthly - Compressed Air DryerSMRHSMRH-12D-COMPAD-1Compressed Air Dryer No. 110/31/15Work Order # PF-186122205000$39.65Credit - LaborPM Monthly - Air CompressorOLINOLIN-115-COMPR-1Air Compressor No. 1 (HVAC)10/31/15Work Order # PF-189492205000$31.72Credit - LaborMENS RESTROOM ACROSS FROM 1004,CLOGGED AND OVERFLOWING SINKS,DISPATCHED 23.20SRHSRHSpanton Residence Hall10/31/15Work Order # PF-189493205000$15.86Credit - LaborFIRE ALARM ACTIVATED,GAMEWELL DIDNT TRIP,23.61BRHBRHBulger Residence Hall10/31/15Work Order # PF-189541205010$31.29Credit - LaborWED.,10/21/15 SHUT DOWN ELEVATOR 2 FOR OBAMA EVENT,START BACK UP WHEN EVENT IS OVERJARJAR-CIRC-ELEV-2Elevator No. 210/31/15Work Order # PF-189541205010$20.86Credit - LaborWED.,10/21/15 SHUT DOWN ELEVATOR 2 FOR OBAMA EVENT,START BACK UP WHEN EVENT IS OVERJARJAR-CIRC-ELEV-2Elevator No. 210/31/15Work Order # PF-190150205010$41.72Credit - LaborINVESTIGATE LEAK IN ROOM 120, MACHINE PARTIALLY COVERED WITH PLASTIC. LEAKED 10/28/2015.~ARE~ARE-NPIC-RFRoof10/31/15Work Order # PF-190046205010$62.58Credit - LaborW.O. TO CONTRACT MAINT; REPAIR ROOF OVER AUDITORIUM.LEAK INSIDE ENTRANCE 14-16 ONTO SEATING AT END OF ROW.~ARE~ARE-PAH-RFRoof10/31/15Work Order # PF-181046205010$20.86Credit - LaborELEVATOR REVIEW/REPAIRSFY 15/16LINCLINC-CIRC-ELEV-1Elevator No. 110/31/15Work Order # PF-181046205010$20.86Credit - LaborELEVATOR REVIEW/REPAIRSFY 15/16LINCLINC-CIRC-ELEV-1Elevator No. 110/31/15Work Order # PF-181046205010$20.86Credit - LaborELEVATOR REVIEW/REPAIRSFY 15/16LINCLINC-CIRC-ELEV-1Elevator No. 110/31/15Work Order # PF-181046205010$20.86Credit - LaborELEVATOR REVIEW/REPAIRSFY 15/16LINCLINC-CIRC-ELEV-1Elevator No. 110/31/15Work Order # PF-181046205010$20.86Credit - LaborELEVATOR REVIEW/REPAIRSFY 15/16LINCLINC-CIRC-ELEV-1Elevator No. 110/31/15Work Order # PF-181046205010$20.86Credit - LaborELEVATOR REVIEW/REPAIRSFY 15/16LINCLINC-CIRC-ELEV-1Elevator No. 110/31/15Work Order # PF-181046205010$20.86Credit - LaborELEVATOR REVIEW/REPAIRSFY 15/16LINCLINC-CIRC-ELEV-1Elevator No. 110/31/15Work Order # PF-181046205010$20.86Credit - LaborELEVATOR REVIEW/REPAIRSFY 15/16LINCLINC-CIRC-ELEV-1Elevator No. 110/31/15Work Order # PF-181046205010$20.86Credit - LaborELEVATOR REVIEW/REPAIRSFY 15/16LINCLINC-CIRC-ELEV-1Elevator No. 110/31/15Work Order # PF-181046205010$20.86Credit - LaborELEVATOR REVIEW/REPAIRSFY 15/16LINCLINC-CIRC-ELEV-1Elevator No. 110/31/15Work Order # PF-181046205010$20.86Credit - LaborELEVATOR REVIEW/REPAIRSFY 15/16LINCLINC-CIRC-ELEV-1Elevator No. 110/31/15Work Order # PF-181046205010$20.86Credit - LaborELEVATOR REVIEW/REPAIRSFY 15/16LINCLINC-CIRC-ELEV-1Elevator No. 110/31/15Work Order # PF-181046205010$20.86Credit - LaborELEVATOR REVIEW/REPAIRSFY 15/16LINCLINC-CIRC-ELEV-1Elevator No. 110/31/15Work Order # PF-181046205010$20.86Credit - LaborELEVATOR REVIEW/REPAIRSFY 15/16LINCLINC-CIRC-ELEV-1Elevator No. 110/31/15Work Order # PF-181046205010$20.86Credit - LaborELEVATOR REVIEW/REPAIRSFY 15/16LINCLINC-CIRC-ELEV-1Elevator No. 110/31/15Work Order # PF-181046205010$20.86Credit - LaborELEVATOR REVIEW/REPAIRSFY 15/16LINCLINC-CIRC-ELEV-1Elevator No. 110/31/15Work Order # PF-181046205010$20.86Credit - LaborELEVATOR REVIEW/REPAIRSFY 15/16LINCLINC-CIRC-ELEV-1Elevator No. 110/31/15Work Order # PF-181046205010$20.86Credit - LaborELEVATOR REVIEW/REPAIRSFY 15/16LINCLINC-CIRC-ELEV-1Elevator No. 110/31/15Work Order # PF-181046205010$20.86Credit - LaborELEVATOR REVIEW/REPAIRSFY 15/16LINCLINC-CIRC-ELEV-1Elevator No. 110/31/15Work Order # PF-181046205010$20.86Credit - LaborELEVATOR REVIEW/REPAIRSFY 15/16LINCLINC-CIRC-ELEV-1Elevator No. 110/31/15Work Order # PF-181046205010$20.86Credit - LaborELEVATOR REVIEW/REPAIRSFY 15/16LINCLINC-CIRC-ELEV-1Elevator No. 110/31/15Work Order # PF-181046205010$20.86Credit - LaborELEVATOR REVIEW/REPAIRSFY 15/16LINCLINC-CIRC-ELEV-1Elevator No. 110/31/15Work Order # PF-181046205010$20.86Credit - LaborELEVATOR REVIEW/REPAIRSFY 15/16LINCLINC-CIRC-ELEV-1Elevator No. 110/31/15Work Order # PF-181046205010$20.86Credit - LaborELEVATOR REVIEW/REPAIRSFY 15/16LINCLINC-CIRC-ELEV-1Elevator No. 110/31/15Work Order # PF-181046205010$20.86Credit - LaborELEVATOR REVIEW/REPAIRSFY 15/16LINCLINC-CIRC-ELEV-1Elevator No. 110/31/15Work Order # PF-168447205010$52.15Credit - LaborPROJECT - AUBURN SCIENCE & ENGINEERING CENTER EXTERIOR FACADE AND LOWER ROOF REPLACEMENT - UAK150004ASSIST CAPITAL PLANNING THROUGHOUT DURATION OF AUBURN EXTERIOR FACADE AND LOWER ROOF RESTORATION.PLEASE CALL JASON WEISMAN AT 330-972-6298 FOR ANY QUESTIONS.THANK YOU.~ARE~ARE-ASEC-RFRoof10/31/15Work Order # PF-168447205010$20.86Credit - LaborPROJECT - AUBURN SCIENCE & ENGINEERING CENTER EXTERIOR FACADE AND LOWER ROOF REPLACEMENT - UAK150004ASSIST CAPITAL PLANNING THROUGHOUT DURATION OF AUBURN EXTERIOR FACADE AND LOWER ROOF RESTORATION.PLEASE CALL JASON WEISMAN AT 330-972-6298 FOR ANY QUESTIONS.THANK YOU.~ARE~ARE-ASEC-RFRoof10/31/15Work Order # PF-168447205010$41.72Credit - LaborPROJECT - AUBURN SCIENCE & ENGINEERING CENTER EXTERIOR FACADE AND LOWER ROOF REPLACEMENT - UAK150004ASSIST CAPITAL PLANNING THROUGHOUT DURATION OF AUBURN EXTERIOR FACADE AND LOWER ROOF RESTORATION.PLEASE CALL JASON WEISMAN AT 330-972-6298 FOR ANY QUESTIONS.THANK YOU.~ARE~ARE-ASEC-RFRoof10/31/15Work Order # PF-168447205010$52.15Credit - LaborPROJECT - AUBURN SCIENCE & ENGINEERING CENTER EXTERIOR FACADE AND LOWER ROOF REPLACEMENT - UAK150004ASSIST CAPITAL PLANNING THROUGHOUT DURATION OF AUBURN EXTERIOR FACADE AND LOWER ROOF RESTORATION.PLEASE CALL JASON WEISMAN AT 330-972-6298 FOR ANY QUESTIONS.THANK YOU.~ARE~ARE-ASEC-RFRoof10/31/15Work Order # PF-168447205010$41.72Credit - LaborPROJECT - AUBURN SCIENCE & ENGINEERING CENTER EXTERIOR FACADE AND LOWER ROOF REPLACEMENT - UAK150004ASSIST CAPITAL PLANNING THROUGHOUT DURATION OF AUBURN EXTERIOR FACADE AND LOWER ROOF RESTORATION.PLEASE CALL JASON WEISMAN AT 330-972-6298 FOR ANY QUESTIONS.THANK YOU.~ARE~ARE-ASEC-RFRoof10/31/15Work Order # PF-168652205013$20.66Credit - LaborPM GLYCOL FOR ONATONATONATOcasek Natatorium10/31/15Work Order # PF-168870205013$62.58Credit - LaborPM Annual - Backflow PreventerASBASB-90-BFP-2Backflow Preventer No. 2 (4" Fire)10/31/15Work Order # PF-168910205013$52.15Credit - LaborPM Annual - Backflow PreventerFOLKFOLK-163-BFP-3Backflow Preventer No. 3 (1" Heating Water)10/31/15Work Order # PF-168933205013$62.58Credit - LaborPM Annual - Backflow PreventerLHLH-116-BFP-1Backflow Preventer No. 1 (4" Domestic)10/31/15Work Order # PF-168933205013$62.58Credit - LaborPM Annual - Backflow PreventerLHLH-116-BFP-1Backflow Preventer No. 1 (4" Domestic)10/31/15Work Order # PF-168934205013$62.58Credit - LaborPM Annual - Backflow PreventerLHLH-116-BFP-2Backflow Preventer No. 2 (2" Irrigation)10/31/15Work Order # PF-168936205013$62.58Credit - LaborPM Annual - Backflow PreventerLIBLIB-2-BFP-1Backflow Preventer No. 1 (2-1/2" Sand Filter)10/31/15Work Order # PF-168936205013$52.15Credit - LaborPM Annual - Backflow PreventerLIBLIB-2-BFP-1Backflow Preventer No. 1 (2-1/2" Sand Filter)10/31/15Work Order # PF-168936205013$52.15Credit - LaborPM Annual - Backflow PreventerLIBLIB-2-BFP-1Backflow Preventer No. 1 (2-1/2" Sand Filter)10/31/15Work Order # PF-168937205013$62.58Credit - LaborPM Annual - Backflow PreventerLIBLIB-2-BFP-2Backflow Preventer No. 2 (2-1/2" Irrigation)10/31/15Work Order # PF-168938205013$62.58Credit - LaborPM Annual - Backflow PreventerLINCLINC-2-BFP-1Backflow Preventer No. 1 (2" Domestic)10/31/15Work Order # PF-168941205013$52.15Credit - LaborPM Annual - Backflow PreventerOLINOLIN-115-BFP-1Backflow Preventer No. 1 (4" Domestic)10/31/15Work Order # PF-168942205013$52.15Credit - LaborPM Annual - Backflow PreventerOLINOLIN-115-BFP-2Backflow Preventer No. 2 (2" Irrigation)10/31/15Work Order # PF-168947205013$62.58Credit - LaborPM Annual - Backflow PreventerPEACPEAC-130B-BFP-1Backflow Preventer No. 1 (3" Domestic)10/31/15Work Order # PF-168948205013$62.58Credit - LaborPM Annual - Backflow PreventerPEACPEAC-130B-BFP-2Backflow Preventer No. 2 (6" Fire)10/31/15Work Order # PF-168949205013$62.58Credit - LaborPM Annual - Backflow PreventerPEACPEAC-130B-BFP-3Backflow Preventer No. 3 (3/4" Detector)10/31/15Work Order # PF-168951205013$41.72Credit - LaborPM Annual - Backflow PreventerPFOCPFOC-51-BFP-1Backflow Preventer No. 1 (3" Chilled Water)10/31/15Work Order # PF-168952205013$41.72Credit - LaborPM Annual - Backflow PreventerPFOCPFOC-51-BFP-2Backflow Preventer No. 2 (1" Heating Water)10/31/15Work Order # PF-168971205013$52.15Credit - LaborPM Annual - Backflow PreventerSISI-2-BFP-1Backflow Preventer No. 1 (3" Domestic)10/31/15Work Order # PF-168972205013$52.15Credit - LaborPM Annual - Backflow PreventerSISI-2-BFP-2Backflow Preventer No. 2 (6" Fire)10/31/15Work Order # PF-168973205013$52.15Credit - LaborPM Annual - Backflow PreventerSISI-2-BFP-3Backflow Preventer No. 3 (3/4" Detector)10/31/15Work Order # PF-168974205013$52.15Credit - LaborPM Annual - Backflow PreventerSISI-2-BFP-4Backflow Preventer No. 4 (2" Irrigation)10/31/15Work Order # PF-168977205013$62.58Credit - LaborPM Annual - Backflow PreventerTRETRE-1-BFP-1Backflow Preventer No. 1 (11/2" Domestic)10/31/15Work Order # PF-169014205013$73.01Credit - LaborPM Annual - Backflow PreventerPDEPDE-103-BFP-1Backflow Preventer No. 1 (2" Domestic)10/31/15Work Order # PF-169015205013$73.01Credit - LaborPM Annual - Backflow PreventerPDEPDE-103-BFP-2Backflow Preventer No. 2 (2" Irrigation)10/31/15Work Order # PF-169016205013$62.58Credit - LaborPM Annual - Backflow PreventerPDNPDN-108-BFP-1Backflow Preventer No. 1 (3" Domestic)10/31/15Work Order # PF-169017205013$62.58Credit - LaborPM Annual - Backflow PreventerPDNPDN-108-BFP-2Backflow Preventer No. 2 (6" Fire)10/31/15Work Order # PF-169018205013$41.72Credit - LaborPM Annual - Backflow PreventerPDNPDN-108-BFP-3Backflow Preventer No. 3 (3/4" Detector)10/31/15Work Order # PF-169035205013$83.44Credit - LaborPM Annual - Backflow PreventerRDRD-11-BFP-1*Backflow Preventer No. 1 (6" Domestic) (* 302702-57%, 300702-43%)10/31/15Work Order # PF-169036205013$83.44Credit - LaborPM Annual - Backflow PreventerRDRD-11-BFP-2*Backflow Preventer No. 2 (6" Fire) (* 302702-57%, 300702-43%)10/31/15Work Order # PF-169061205013$52.15Credit - LaborPM Annual - Backflow PreventerHOWHOW-52-BFP-2Backflow Preventer No. 2 (11/4" Irrigation)10/31/15Work Order # PF-169061205013$52.15Credit - LaborPM Annual - Backflow PreventerHOWHOW-52-BFP-2Backflow Preventer No. 2 (11/4" Irrigation)10/31/15Work Order # PF-169232205013$41.31Credit - LaborPM Water Treatment - NitratesBCCEBCCEBuckingham Building10/31/15Work Order # PF-169235205013$30.98Credit - LaborPM Water Treatment - NitratesCBACBABusiness Administration Building10/31/15Work Order # PF-169255205013$41.31Credit - LaborPM Water Treatment - NitratesPFOCPFOCPhysical Facilities Op Center10/31/15Work Order # PF-169255205013$30.98Credit - LaborPM Water Treatment - NitratesPFOCPFOCPhysical Facilities Op Center10/31/15Work Order # PF-169303205013$20.66Credit - LaborPM Annual Water Treatment Glycol SystemBRHBRHBulger Residence Hall10/31/15Work Order # PF-169305205013$30.98Credit - LaborPM Annual Water Treatment Glycol SystemORHORHOrr Resident Hall10/31/15Work Order # PF-169306205013$20.66Credit - LaborPM Annual Water Treatment Glycol SystemRDRDRobertson Dining Hall10/31/15Work Order # PF-169306205013$30.98Credit - LaborPM Annual Water Treatment Glycol SystemRDRDRobertson Dining Hall10/31/15Work Order # PF-169306205013$30.98Credit - LaborPM Annual Water Treatment Glycol SystemRDRDRobertson Dining Hall10/31/15Work Order # PF-169306205013$61.97Credit - LaborPM Annual Water Treatment Glycol SystemRDRDRobertson Dining Hall10/31/15Work Order # PF-169306205013$20.66Credit - LaborPM Annual Water Treatment Glycol SystemRDRDRobertson Dining Hall10/31/15Work Order # PF-169306205013$41.31Credit - LaborPM Annual Water Treatment Glycol SystemRDRDRobertson Dining Hall10/31/15Work Order # PF-169306205013$20.66Credit - LaborPM Annual Water Treatment Glycol SystemRDRDRobertson Dining Hall10/31/15Work Order # PF-169306205013$20.66Credit - LaborPM Annual Water Treatment Glycol SystemRDRDRobertson Dining Hall10/31/15Work Order # PF-169306205013$30.98Credit - LaborPM Annual Water Treatment Glycol SystemRDRDRobertson Dining Hall10/31/15Work Order # PF-169306205013$20.66Credit - LaborPM Annual Water Treatment Glycol SystemRDRDRobertson Dining Hall10/31/15Work Order # PF-169306205013$20.66Credit - LaborPM Annual Water Treatment Glycol SystemRDRDRobertson Dining Hall10/31/15Work Order # PF-169306205013$20.66Credit - LaborPM Annual Water Treatment Glycol SystemRDRDRobertson Dining Hall10/31/15Work Order # PF-169306205013$20.66Credit - LaborPM Annual Water Treatment Glycol SystemRDRDRobertson Dining Hall10/31/15Work Order # PF-169306205013$20.66Credit - LaborPM Annual Water Treatment Glycol SystemRDRDRobertson Dining Hall10/31/15Work Order # PF-169306205013$20.66Credit - LaborPM Annual Water Treatment Glycol SystemRDRDRobertson Dining Hall10/31/15Work Order # PF-169306205013$41.31Credit - LaborPM Annual Water Treatment Glycol SystemRDRDRobertson Dining Hall10/31/15Work Order # PF-169306205013$20.66Credit - LaborPM Annual Water Treatment Glycol SystemRDRDRobertson Dining Hall10/31/15Work Order # PF-169306205013$20.66Credit - LaborPM Annual Water Treatment Glycol SystemRDRDRobertson Dining Hall10/31/15Work Order # PF-169306205013$20.66Credit - LaborPM Annual Water Treatment Glycol SystemRDRDRobertson Dining Hall10/31/15Work Order # PF-169306205013$51.64Credit - LaborPM Annual Water Treatment Glycol SystemRDRDRobertson Dining Hall10/31/15Work Order # PF-169306205013$30.98Credit - LaborPM Annual Water Treatment Glycol SystemRDRDRobertson Dining Hall10/31/15Work Order # PF-169307205013$20.66Credit - LaborPM Annual Water Treatment Glycol SystemRRHRRHRitchie Residence Hall10/31/15Work Order # PF-169309205013$20.66Credit - LaborPM Annual Water Treatment Glycol SystemASECASECAuburn Science and Engineering Ctr.10/31/15Work Order # PF-169310205013$41.31Credit - LaborPM Annual Water Treatment Glycol SystemGDYRGDYRGoodyear Polymer Center10/31/15Work Order # PF-169311205013$20.66Credit - LaborPM Annual Water Treatment Glycol SystemLHLHLeigh Hall10/31/15Work Order # PF-169312205013$20.66Credit - LaborPM Annual Water Treatment Glycol SystemOLRCOLRCOlson Research Center10/31/15Work Order # PF-169312205013$61.97Credit - LaborPM Annual Water Treatment Glycol SystemOLRCOLRCOlson Research Center10/31/15Work Order # PF-169350205013$41.72Credit - LaborPM Annual - Backflow PreventerRDWYRDWY-13B-BFP-1Backflow Preventer No. 110/31/15Work Order # PF-169351205013$41.72Credit - LaborPM Annual - Backflow PreventerRDWYRDWY-13B-BFP-2Backflow Preventer No. 210/31/15Work Order # PF-169353205013$52.15Credit - LaborPM Annual - Backflow PreventerNPICNPIC-120-BFP-1Backflow Preventer No. 1 (1.5" Irrigation)10/31/15Work Order # PF-169354205013$52.15Credit - LaborPM Annual - Backflow PreventerNPICNPIC-120-BFP-2Backflow Preventer No. 2 (6" Fire)10/31/15Work Order # PF-169355205013$52.15Credit - LaborPM Annual - Backflow PreventerNPICNPIC-120-BFP-3Backflow Preventer No. 3 (3/4" Detector)10/31/15Work Order # PF-169363205013$41.31Credit - LaborPM Water Treatment - Water SoftenerPFOCPFOC-51-WTRC-1Water Softener/Conditioner No.110/31/15Work Order # PF-169363205013$30.98Credit - LaborPM Water Treatment - Water SoftenerPFOCPFOC-51-WTRC-1Water Softener/Conditioner No.110/31/15Work Order # PF-169364205013$20.66Credit - LaborPM Water Treatment - Water SoftenerRDRD-9-WTRC-1Water Softener Conditioner No. 1 (^ (RD))10/31/15Work Order # PF-169365205013$20.66Credit - LaborPM Water Treatment - Water SoftenerSHNSHN-20-WTRC-1Water Softener/Conditioner No. 110/31/15Work Order # PF-169365205013$30.98Credit - LaborPM Water Treatment - Water SoftenerSHNSHN-20-WTRC-1Water Softener/Conditioner No. 110/31/15Work Order # PF-169396205013$62.58Credit - LaborPM Annual - Backflow PreventerLIBLIB-2-BFP-5Backflow Preventer No. 5 (3" DOMESTIC)10/31/15Work Order # PF-169397205013$62.58Credit - LaborPM Annual - Backflow PreventerLIBLIB-2-BFP-4Backflow Preventer No. 4 (8" FIRE)10/31/15Work Order # PF-169398205013$41.72Credit - LaborPM Annual - Backflow PreventerLIBLIB-2-BFP-3Backflow Preventer No. 3 (3/4" Detector)10/31/15Work Order # PF-147094205013$72.29Credit - LaborTEST BOILER WATER, ADD CHEMICALS AS NEEDED FOR STEAM HEATING SYSTEMCHCSCHCS-405-BLR-3BOILER No. 310/31/15Work Order # PF-147094205013$41.31Credit - LaborTEST BOILER WATER, ADD CHEMICALS AS NEEDED FOR STEAM HEATING SYSTEMCHCSCHCS-405-BLR-3BOILER No. 310/31/15Work Order # PF-147094205013$30.98Credit - LaborTEST BOILER WATER, ADD CHEMICALS AS NEEDED FOR STEAM HEATING SYSTEMCHCSCHCS-405-BLR-3BOILER No. 310/31/15Work Order # PF-147094205013$41.31Credit - LaborTEST BOILER WATER, ADD CHEMICALS AS NEEDED FOR STEAM HEATING SYSTEMCHCSCHCS-405-BLR-3BOILER No. 310/31/15Work Order # PF-147094205013$41.31Credit - LaborTEST BOILER WATER, ADD CHEMICALS AS NEEDED FOR STEAM HEATING SYSTEMCHCSCHCS-405-BLR-3BOILER No. 310/31/15Work Order # PF-147094205013$41.31Credit - LaborTEST BOILER WATER, ADD CHEMICALS AS NEEDED FOR STEAM HEATING SYSTEMCHCSCHCS-405-BLR-3BOILER No. 310/31/15Work Order # PF-147094205013$72.29Credit - LaborTEST BOILER WATER, ADD CHEMICALS AS NEEDED FOR STEAM HEATING SYSTEMCHCSCHCS-405-BLR-3BOILER No. 310/31/15Work Order # PF-147960205013$10.43Credit - LaborCEILING LEAK CAUSING CEILING TO COLLAPSE #2340ASBASB-135BOffice10/31/15Work Order # PF-150133205013$41.72Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$41.72Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$20.86Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$78.85Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$41.72Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$91.99Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$41.72Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$41.72Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$62.58Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$93.87Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$41.72Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$73.01Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$83.44Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$114.73Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$41.72Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$41.72Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$292.04Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$73.01Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$73.01Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$73.01Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$31.29Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$20.86Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$73.01Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$312.90Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$73.01Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$156.45Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$73.01Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$41.72Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$41.72Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$62.58Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$83.44Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$62.58Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$83.44Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$83.44Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$156.45Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$20.86Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$156.45Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$41.72Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$83.44Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$83.44Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$41.72Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$114.73Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$31.29Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$104.30Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$20.86Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$62.58Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$20.86Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$10.43Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$156.45Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$156.45Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$20.86Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$156.45Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$312.90Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$83.44Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$177.31Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$156.45Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$41.72Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$52.15Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$312.90Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$83.44Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$73.01Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$62.58Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-150133205013$83.44Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus10/31/15Work Order # PF-152610205013$10.43Credit - LaborFUELING W/O FOR TORO~ARE~ARE-VEHPFOC Vehicle Storage10/31/15Work Order # PF-152610205013$10.43Credit - LaborFUELING W/O FOR TORO~ARE~ARE-VEHPFOC Vehicle Storage10/31/15Work Order # PF-152610205013$10.43Credit - LaborFUELING W/O FOR TORO~ARE~ARE-VEHPFOC Vehicle Storage10/31/15Work Order # PF-154786205013$83.44Credit - LaborZOOK HALL RENOVATION-PROJECT #UAK120015DELIVER 2,000 MOVING BOXES AT $1.25 EACH TO KAREN GREENE AT ZOOK HALL ROOM 219.CHARGE ACCOUNT: #772042TOTAL: $2,500.00PLEASE CONTACT JAMES HASKELL AT 330-972-6943 FOR ANY QUESTIONS.ZOOKZOOK-219Office10/31/15Work Order # PF-155422205013$31.29Credit - LaborCEILING LEAK AND TILE REPAIRPOLPOL-133AOffice10/31/15Work Order # PF-155423205013$31.29Credit - LaborCEILING LEAK AND TILE REPAIRPOLPOL-134Conference Room10/31/15Work Order # PF-155423205013$31.29Credit - LaborCEILING LEAK AND TILE REPAIRPOLPOL-134Conference Room10/31/15Work Order # PF-155426205013$20.86Credit - LaborCEILING LEAK IN UPPER GALLERY#2340FOLKFOLK-164Exhibition10/31/15Work Order # PF-156883205013$83.44Credit - LaborCBA BRIDGE,REPAIR PICNIC TABLES AND REFINISH THEM~ARE~ARE-BRBridge10/31/15Work Order # PF-156883205013$73.01Credit - LaborCBA BRIDGE,REPAIR PICNIC TABLES AND REFINISH THEM~ARE~ARE-BRBridge10/31/15Work Order # PF-156883205013$125.16Credit - LaborCBA BRIDGE,REPAIR PICNIC TABLES AND REFINISH THEM~ARE~ARE-BRBridge10/31/15Work Order # PF-156883205013$83.44Credit - LaborCBA BRIDGE,REPAIR PICNIC TABLES AND REFINISH THEM~ARE~ARE-BRBridge10/31/15Work Order # PF-157498205013$26.28Credit - LaborASSIST PC CONTRACTORS WITH ACCESS TO BUILDINGS AND ROOMS TO DO LIGHTINGAkronAkronAkron Campus10/31/15Work Order # PF-157498205013$41.72Credit - LaborASSIST PC CONTRACTORS WITH ACCESS TO BUILDINGS AND ROOMS TO DO LIGHTINGAkronAkronAkron Campus10/31/15Work Order # PF-160488205013$177.31Credit - LaborPROJECT - RESEARCH LAB RENOVATIONS #UAK140011ASSIST CAPITAL PLANNING THROUGHOUT AUBURN PROJECT.NO CHARGE.PLEASE CALL JASON WEISMAN 330-972-6298 FOR ANY QUESTIONS.ELEC. SHOP TO TRACERECEPTACLE CIRCUITS IN ROOMS 208,219 AND 224 TO SOURCE POWER PANEL,SEE ATTACHED DOCUMENTASECASECAuburn Science and Engineering Ctr.10/31/15Work Order # PF-160488205013$156.45Credit - LaborPROJECT - RESEARCH LAB RENOVATIONS #UAK140011ASSIST CAPITAL PLANNING THROUGHOUT AUBURN PROJECT.NO CHARGE.PLEASE CALL JASON WEISMAN 330-972-6298 FOR ANY QUESTIONS.ELEC. SHOP TO TRACERECEPTACLE CIRCUITS IN ROOMS 208,219 AND 224 TO SOURCE POWER PANEL,SEE ATTACHED DOCUMENTASECASECAuburn Science and Engineering Ctr.10/31/15Work Order # PF-160488205013$156.45Credit - LaborPROJECT - RESEARCH LAB RENOVATIONS #UAK140011ASSIST CAPITAL PLANNING THROUGHOUT AUBURN PROJECT.NO CHARGE.PLEASE CALL JASON WEISMAN 330-972-6298 FOR ANY QUESTIONS.ELEC. SHOP TO TRACERECEPTACLE CIRCUITS IN ROOMS 208,219 AND 224 TO SOURCE POWER PANEL,SEE ATTACHED DOCUMENTASECASECAuburn Science and Engineering Ctr.10/31/15Work Order # PF-161000205013$73.01Credit - LaborREMOVE LOOSE PAINT AND RUST, PRESERVE AND PAINT METAL ON FRAMING AND PIPING~ARE~ARE-PFOC-RF-CT-1Cooling Tower No. 110/31/15Work Order # PF-161001205013$312.90Credit - LaborREMOVE LOOSE PAINT AND RUST, PRESERVE AND PAINT METAL ON FRAMING AND PIPING~ARE~ARE-PFOC-RF-CT-2Cooling Tower No. 210/31/15Work Order # PF-161001205013$73.01Credit - LaborREMOVE LOOSE PAINT AND RUST, PRESERVE AND PAINT METAL ON FRAMING AND PIPING~ARE~ARE-PFOC-RF-CT-2Cooling Tower No. 210/31/15Work Order # PF-161003205013$73.01Credit - LaborREMOVE LOOSE PAINT AND RUST, PRESERVE AND PAINT METAL ON FRAMING AND PIPING~ARE~ARE-PFOC-RF-CT-3Cooling Tower No. 310/31/15Work Order # PF-161003205013$312.90Credit - LaborREMOVE LOOSE PAINT AND RUST, PRESERVE AND PAINT METAL ON FRAMING AND PIPING~ARE~ARE-PFOC-RF-CT-3Cooling Tower No. 310/31/15Work Order # PF-161003205013$156.45Credit - LaborREMOVE LOOSE PAINT AND RUST, PRESERVE AND PAINT METAL ON FRAMING AND PIPING~ARE~ARE-PFOC-RF-CT-3Cooling Tower No. 310/31/15Work Order # PF-161003205013$312.90Credit - LaborREMOVE LOOSE PAINT AND RUST, PRESERVE AND PAINT METAL ON FRAMING AND PIPING~ARE~ARE-PFOC-RF-CT-3Cooling Tower No. 310/31/15Work Order # PF-163868205013$41.72Credit - LaborCHECK CAMPUS BUILDINGS ENTRANCE DOORS FOR REPAIRS-WILL PUT ADDITIONAL WORK ORDERS IN IF REPAIRS ARE NEEDEDAkronAkronAkron Campus10/31/15Work Order # PF-163868205013$41.72Credit - LaborCHECK CAMPUS BUILDINGS ENTRANCE DOORS FOR REPAIRS-WILL PUT ADDITIONAL WORK ORDERS IN IF REPAIRS ARE NEEDEDAkronAkronAkron Campus10/31/15Work Order # PF-163868205013$62.58Credit - LaborCHECK CAMPUS BUILDINGS ENTRANCE DOORS FOR REPAIRS-WILL PUT ADDITIONAL WORK ORDERS IN IF REPAIRS ARE NEEDEDAkronAkronAkron Campus10/31/15Work Order # PF-163868205013$41.72Credit - LaborCHECK CAMPUS BUILDINGS ENTRANCE DOORS FOR REPAIRS-WILL PUT ADDITIONAL WORK ORDERS IN IF REPAIRS ARE NEEDEDAkronAkronAkron Campus10/31/15Work Order # PF-163868205013$20.86Credit - LaborCHECK CAMPUS BUILDINGS ENTRANCE DOORS FOR REPAIRS-WILL PUT ADDITIONAL WORK ORDERS IN IF REPAIRS ARE NEEDEDAkronAkronAkron Campus10/31/15Work Order # PF-163868205013$41.72Credit - LaborCHECK CAMPUS BUILDINGS ENTRANCE DOORS FOR REPAIRS-WILL PUT ADDITIONAL WORK ORDERS IN IF REPAIRS ARE NEEDEDAkronAkronAkron Campus10/31/15Work Order # PF-163868205013$31.29Credit - LaborCHECK CAMPUS BUILDINGS ENTRANCE DOORS FOR REPAIRS-WILL PUT ADDITIONAL WORK ORDERS IN IF REPAIRS ARE NEEDEDAkronAkronAkron Campus10/31/15Work Order # PF-163868205013$52.15Credit - LaborCHECK CAMPUS BUILDINGS ENTRANCE DOORS FOR REPAIRS-WILL PUT ADDITIONAL WORK ORDERS IN IF REPAIRS ARE NEEDEDAkronAkronAkron Campus10/31/15Work Order # PF-163868205013$41.72Credit - LaborCHECK CAMPUS BUILDINGS ENTRANCE DOORS FOR REPAIRS-WILL PUT ADDITIONAL WORK ORDERS IN IF REPAIRS ARE NEEDEDAkronAkronAkron Campus10/31/15Work Order # PF-165248205013$83.44Credit - LaborPROJECT - WOLF LEDGES ENGINEERING BUILDING #UAK100002CHECK LEAKING GLYCOL OF HEATING WATER SUPPLY PUMP #1 (P-1) IN MAIN UTILITY ROOM ON 1ST FLOOR AT AERC.CONTACT JASON WEISMAN AT 330-972-6298 AND REPORT FINDINGS.AERCAERC-104-HWP-1Heating Water Pump No. 110/31/15Work Order # PF-166306205013$156.45Credit - LaborHEATING PUMP LEAKING SEALS NEED REPLACEDPOLPOL-801-HWP-7Heating Water Pump No. 7 (Reset)10/31/15Work Order # PF-166306205013$292.04Credit - LaborHEATING PUMP LEAKING SEALS NEED REPLACEDPOLPOL-801-HWP-7Heating Water Pump No. 7 (Reset)10/31/15Work Order # PF-166306205013$312.90Credit - LaborHEATING PUMP LEAKING SEALS NEED REPLACEDPOLPOL-801-HWP-7Heating Water Pump No. 7 (Reset)10/31/15Work Order # PF-166306205013$156.45Credit - LaborHEATING PUMP LEAKING SEALS NEED REPLACEDPOLPOL-801-HWP-7Heating Water Pump No. 7 (Reset)10/31/15Work Order # PF-166306205013$156.45Credit - LaborHEATING PUMP LEAKING SEALS NEED REPLACEDPOLPOL-801-HWP-7Heating Water Pump No. 7 (Reset)10/31/15Work Order # PF-166306205013$114.73Credit - LaborHEATING PUMP LEAKING SEALS NEED REPLACEDPOLPOL-801-HWP-7Heating Water Pump No. 7 (Reset)10/31/15Work Order # PF-166306205013$135.59Credit - LaborHEATING PUMP LEAKING SEALS NEED REPLACEDPOLPOL-801-HWP-7Heating Water Pump No. 7 (Reset)10/31/15Work Order # PF-166306205013$250.32Credit - LaborHEATING PUMP LEAKING SEALS NEED REPLACEDPOLPOL-801-HWP-7Heating Water Pump No. 7 (Reset)10/31/15Work Order # PF-166306205013$250.32Credit - LaborHEATING PUMP LEAKING SEALS NEED REPLACEDPOLPOL-801-HWP-7Heating Water Pump No. 7 (Reset)10/31/15Work Order # PF-154786205013$41.72Credit - LaborZOOK HALL RENOVATION-PROJECT #UAK120015DELIVER 2,000 MOVING BOXES AT $1.25 EACH TO KAREN GREENE AT ZOOK HALL ROOM 219.CHARGE ACCOUNT: #772042TOTAL: $2,500.00PLEASE CONTACT JAMES HASKELL AT 330-972-6943 FOR ANY QUESTIONS.ZOOKZOOK-219Office10/31/15Work Order # PF-154786205013$41.72Credit - LaborZOOK HALL RENOVATION-PROJECT #UAK120015DELIVER 2,000 MOVING BOXES AT $1.25 EACH TO KAREN GREENE AT ZOOK HALL ROOM 219.CHARGE ACCOUNT: #772042TOTAL: $2,500.00PLEASE CONTACT JAMES HASKELL AT 330-972-6943 FOR ANY QUESTIONS.ZOOKZOOK-219Office10/31/15Work Order # PF-154786205013$62.58Credit - LaborZOOK HALL RENOVATION-PROJECT #UAK120015DELIVER 2,000 MOVING BOXES AT $1.25 EACH TO KAREN GREENE AT ZOOK HALL ROOM 219.CHARGE ACCOUNT: #772042TOTAL: $2,500.00PLEASE CONTACT JAMES HASKELL AT 330-972-6943 FOR ANY QUESTIONS.ZOOKZOOK-219Office10/31/15Work Order # PF-154786205013$156.45Credit - LaborZOOK HALL RENOVATION-PROJECT #UAK120015DELIVER 2,000 MOVING BOXES AT $1.25 EACH TO KAREN GREENE AT ZOOK HALL ROOM 219.CHARGE ACCOUNT: #772042TOTAL: $2,500.00PLEASE CONTACT JAMES HASKELL AT 330-972-6943 FOR ANY QUESTIONS.ZOOKZOOK-219Office10/31/15Work Order # PF-154786205013$31.29Credit - LaborZOOK HALL RENOVATION-PROJECT #UAK120015DELIVER 2,000 MOVING BOXES AT $1.25 EACH TO KAREN GREENE AT ZOOK HALL ROOM 219.CHARGE ACCOUNT: #772042TOTAL: $2,500.00PLEASE CONTACT JAMES HASKELL AT 330-972-6943 FOR ANY QUESTIONS.ZOOKZOOK-219Office10/31/15Work Order # PF-154786205013$10.43Credit - LaborZOOK HALL RENOVATION-PROJECT #UAK120015DELIVER 2,000 MOVING BOXES AT $1.25 EACH TO KAREN GREENE AT ZOOK HALL ROOM 219.CHARGE ACCOUNT: #772042TOTAL: $2,500.00PLEASE CONTACT JAMES HASKELL AT 330-972-6943 FOR ANY QUESTIONS.ZOOKZOOK-219Office10/31/15Work Order # PF-154786205013$73.01Credit - LaborZOOK HALL RENOVATION-PROJECT #UAK120015DELIVER 2,000 MOVING BOXES AT $1.25 EACH TO KAREN GREENE AT ZOOK HALL ROOM 219.CHARGE ACCOUNT: #772042TOTAL: $2,500.00PLEASE CONTACT JAMES HASKELL AT 330-972-6943 FOR ANY QUESTIONS.ZOOKZOOK-219Office10/31/15Work Order # PF-169403205013$41.72Credit - LaborPM Annual - Backflow Preventer~ARE~ARE-ICS-GS-BFP-8Backflow Preventer No. 8 (8" Fire) (^ (ICS))10/31/15Work Order # PF-169404205013$41.72Credit - LaborPM Annual - Backflow Preventer~ARE~ARE-ICS-GS-BFP-9Backflow Preventer No. 9 (3/4" Detector) (^ (ICS))10/31/15Work Order # PF-169449205013$52.15Credit - LaborPM Annual - Backflow Preventer~ARE~ARE-WBB-GS-BFP-3Back Flow Preventer No. 3 (6" Fire)10/31/15Work Order # PF-169450205013$52.15Credit - LaborPM Annual - Backflow Preventer~ARE~ARE-WBB-GS-BFP-4Backflow Preventer No. 4 (3/4" Fire)10/31/15Work Order # PF-169472205013$41.31Credit - LaborPM Annual Water Treatment Glycol SystemAERCAERCU of A Engineering Research Center10/31/15Work Order # PF-169477205013$20.66Credit - LaborPM Annual Water Treatment Glycol SystemFOLKFOLKFolk Hall10/31/15Work Order # PF-169494205013$30.98Credit - LaborPM Water Treatment - Water SoftenerCHCSCHCSCentral Hower Community School10/31/15Work Order # PF-169960205013$73.01Credit - LaborREPAIR/ REBUILD BEVERAGE STATION ON NORTH SIDE OF DINING ROOM AT ROBS.RDRD-106Food Facility Service10/31/15Work Order # PF-169960205013$312.90Credit - LaborREPAIR/ REBUILD BEVERAGE STATION ON NORTH SIDE OF DINING ROOM AT ROBS.RDRD-106Food Facility Service10/31/15Work Order # PF-169960205013$312.90Credit - LaborREPAIR/ REBUILD BEVERAGE STATION ON NORTH SIDE OF DINING ROOM AT ROBS.RDRD-106Food Facility Service10/31/15Work Order # PF-169960205013$312.90Credit - LaborREPAIR/ REBUILD BEVERAGE STATION ON NORTH SIDE OF DINING ROOM AT ROBS.RDRD-106Food Facility Service10/31/15Work Order # PF-169960205013$156.45Credit - LaborREPAIR/ REBUILD BEVERAGE STATION ON NORTH SIDE OF DINING ROOM AT ROBS.RDRD-106Food Facility Service10/31/15Work Order # PF-169960205013$31.29Credit - LaborREPAIR/ REBUILD BEVERAGE STATION ON NORTH SIDE OF DINING ROOM AT ROBS.RDRD-106Food Facility Service10/31/15Work Order # PF-169960205013$156.45Credit - LaborREPAIR/ REBUILD BEVERAGE STATION ON NORTH SIDE OF DINING ROOM AT ROBS.RDRD-106Food Facility Service10/31/15Work Order # PF-169992205013$156.45Credit - LaborREPLACE FURNACEHEISHEIS-101-GFURN-1Gas Furnace No. 110/31/15Work Order # PF-169992205013$156.45Credit - LaborREPLACE FURNACEHEISHEIS-101-GFURN-1Gas Furnace No. 110/31/15Work Order # PF-169992205013$229.46Credit - LaborREPLACE FURNACEHEISHEIS-101-GFURN-1Gas Furnace No. 110/31/15Work Order # PF-169992205013$156.45Credit - LaborREPLACE FURNACEHEISHEIS-101-GFURN-1Gas Furnace No. 110/31/15Work Order # PF-169992205013$156.45Credit - LaborREPLACE FURNACEHEISHEIS-101-GFURN-1Gas Furnace No. 110/31/15Work Order # PF-169992205013$312.90Credit - LaborREPLACE FURNACEHEISHEIS-101-GFURN-1Gas Furnace No. 110/31/15Work Order # PF-169992205013$156.45Credit - LaborREPLACE FURNACEHEISHEIS-101-GFURN-1Gas Furnace No. 110/31/15Work Order # PF-169992205013$156.45Credit - LaborREPLACE FURNACEHEISHEIS-101-GFURN-1Gas Furnace No. 110/31/15Work Order # PF-169992205013$312.90Credit - LaborREPLACE FURNACEHEISHEIS-101-GFURN-1Gas Furnace No. 110/31/15Work Order # PF-170093205013$83.44Credit - LaborTUBE BUNDLE LEAKINGELEC.:HOOK UP WELDERAUTO:CALIBRATE CONTROL VALVESONATONAT-103-DWH-1Domestic Water Heater No. 110/31/15Work Order # PF-170262205013$156.45Credit - LaborINSTALL COMPRESSED AIR LINE TO STAND ALONE HOOD IN NPIC 109. HOOD IS ON SOUTH SIDE OF ROOM.NPICNPIC-109Research/Nonclass Laboratory10/31/15Work Order # PF-171067205013$156.45Credit - LaborPM Quarterly - Steam Generator Inspection ServiceSHNSHN-20-STGEN-2Steam Generator No. 2 (Hoods) (SID: 270584)10/31/15Work Order # PF-171102205013$41.72Credit - LaborPM Annual - Backflow PreventerRDWYRDWY-CIRC-BFP-1Backflow Preventer No. 110/31/15Work Order # PF-171251205013$82.62Credit - LaborPM Annual - Chilled Water PumpONATONAT-103-CHWF-1Chilled Water Filter No. 1 (205050 IN ONAT)10/31/15Work Order # PF-171251205013$82.62Credit - LaborPM Annual - Chilled Water PumpONATONAT-103-CHWF-1Chilled Water Filter No. 1 (205050 IN ONAT)10/31/15Work Order # PF-171251205013$20.66Credit - LaborPM Annual - Chilled Water PumpONATONAT-103-CHWF-1Chilled Water Filter No. 1 (205050 IN ONAT)10/31/15Work Order # PF-171251205013$20.66Credit - LaborPM Annual - Chilled Water PumpONATONAT-103-CHWF-1Chilled Water Filter No. 1 (205050 IN ONAT)10/31/15Work Order # PF-171251205013$82.62Credit - LaborPM Annual - Chilled Water PumpONATONAT-103-CHWF-1Chilled Water Filter No. 1 (205050 IN ONAT)10/31/15Work Order # PF-171251205013$92.95Credit - LaborPM Annual - Chilled Water PumpONATONAT-103-CHWF-1Chilled Water Filter No. 1 (205050 IN ONAT)10/31/15Work Order # PF-171251205013$20.66Credit - LaborPM Annual - Chilled Water PumpONATONAT-103-CHWF-1Chilled Water Filter No. 1 (205050 IN ONAT)10/31/15Work Order # PF-171251205013$20.66Credit - LaborPM Annual - Chilled Water PumpONATONAT-103-CHWF-1Chilled Water Filter No. 1 (205050 IN ONAT)10/31/15Work Order # PF-171251205013$20.66Credit - LaborPM Annual - Chilled Water PumpONATONAT-103-CHWF-1Chilled Water Filter No. 1 (205050 IN ONAT)10/31/15Work Order # PF-171251205013$30.98Credit - LaborPM Annual - Chilled Water PumpONATONAT-103-CHWF-1Chilled Water Filter No. 1 (205050 IN ONAT)10/31/15Work Order # PF-171251205013$61.97Credit - LaborPM Annual - Chilled Water PumpONATONAT-103-CHWF-1Chilled Water Filter No. 1 (205050 IN ONAT)10/31/15Work Order # PF-171251205013$82.62Credit - LaborPM Annual - Chilled Water PumpONATONAT-103-CHWF-1Chilled Water Filter No. 1 (205050 IN ONAT)10/31/15Work Order # PF-171251205013$82.62Credit - LaborPM Annual - Chilled Water PumpONATONAT-103-CHWF-1Chilled Water Filter No. 1 (205050 IN ONAT)10/31/15Work Order # PF-171251205013$20.66Credit - LaborPM Annual - Chilled Water PumpONATONAT-103-CHWF-1Chilled Water Filter No. 1 (205050 IN ONAT)10/31/15Work Order # PF-171251205013$82.62Credit - LaborPM Annual - Chilled Water PumpONATONAT-103-CHWF-1Chilled Water Filter No. 1 (205050 IN ONAT)10/31/15Work Order # PF-171251205013$82.62Credit - LaborPM Annual - Chilled Water PumpONATONAT-103-CHWF-1Chilled Water Filter No. 1 (205050 IN ONAT)10/31/15Work Order # PF-171251205013$41.31Credit - LaborPM Annual - Chilled Water PumpONATONAT-103-CHWF-1Chilled Water Filter No. 1 (205050 IN ONAT)10/31/15Work Order # PF-171251205013$20.66Credit - LaborPM Annual - Chilled Water PumpONATONAT-103-CHWF-1Chilled Water Filter No. 1 (205050 IN ONAT)10/31/15Work Order # PF-171251205013$61.97Credit - LaborPM Annual - Chilled Water PumpONATONAT-103-CHWF-1Chilled Water Filter No. 1 (205050 IN ONAT)10/31/15Work Order # PF-171251205013$41.31Credit - LaborPM Annual - Chilled Water PumpONATONAT-103-CHWF-1Chilled Water Filter No. 1 (205050 IN ONAT)10/31/15Work Order # PF-171252205013$20.66Credit - LaborPM Annual - Chilled Water PumpLIBLIB-2-CHWF-1Chilled Water Filter No. 110/31/15Work Order # PF-171252205013$20.66Credit - LaborPM Annual - Chilled Water PumpLIBLIB-2-CHWF-1Chilled Water Filter No. 110/31/15Work Order # PF-171252205013$20.66Credit - LaborPM Annual - Chilled Water PumpLIBLIB-2-CHWF-1Chilled Water Filter No. 110/31/15Work Order # PF-171252205013$20.66Credit - LaborPM Annual - Chilled Water PumpLIBLIB-2-CHWF-1Chilled Water Filter No. 110/31/15Work Order # PF-171252205013$20.66Credit - LaborPM Annual - Chilled Water PumpLIBLIB-2-CHWF-1Chilled Water Filter No. 110/31/15Work Order # PF-171252205013$20.66Credit - LaborPM Annual - Chilled Water PumpLIBLIB-2-CHWF-1Chilled Water Filter No. 110/31/15Work Order # PF-171252205013$30.98Credit - LaborPM Annual - Chilled Water PumpLIBLIB-2-CHWF-1Chilled Water Filter No. 110/31/15Work Order # PF-171252205013$20.66Credit - LaborPM Annual - Chilled Water PumpLIBLIB-2-CHWF-1Chilled Water Filter No. 110/31/15Work Order # PF-171252205013$20.66Credit - LaborPM Annual - Chilled Water PumpLIBLIB-2-CHWF-1Chilled Water Filter No. 110/31/15Work Order # PF-171252205013$41.31Credit - LaborPM Annual - Chilled Water PumpLIBLIB-2-CHWF-1Chilled Water Filter No. 110/31/15Work Order # PF-171252205013$30.98Credit - LaborPM Annual - Chilled Water PumpLIBLIB-2-CHWF-1Chilled Water Filter No. 110/31/15Work Order # PF-171252205013$20.66Credit - LaborPM Annual - Chilled Water PumpLIBLIB-2-CHWF-1Chilled Water Filter No. 110/31/15Work Order # PF-171252205013$20.66Credit - LaborPM Annual - Chilled Water PumpLIBLIB-2-CHWF-1Chilled Water Filter No. 110/31/15Work Order # PF-171252205013$30.98Credit - LaborPM Annual - Chilled Water PumpLIBLIB-2-CHWF-1Chilled Water Filter No. 110/31/15Work Order # PF-171253205013$30.98Credit - LaborPM Annual - Chilled Water PumpCBACBA-53-CHWF-1Chilled Water Filter No. 110/31/15Work Order # PF-171253205013$20.66Credit - LaborPM Annual - Chilled Water PumpCBACBA-53-CHWF-1Chilled Water Filter No. 110/31/15Work Order # PF-171253205013$20.66Credit - LaborPM Annual - Chilled Water PumpCBACBA-53-CHWF-1Chilled Water Filter No. 110/31/15Work Order # PF-171253205013$20.66Credit - LaborPM Annual - Chilled Water PumpCBACBA-53-CHWF-1Chilled Water Filter No. 110/31/15Work Order # PF-171253205013$20.66Credit - LaborPM Annual - Chilled Water PumpCBACBA-53-CHWF-1Chilled Water Filter No. 110/31/15Work Order # PF-171253205013$20.66Credit - LaborPM Annual - Chilled Water PumpCBACBA-53-CHWF-1Chilled Water Filter No. 110/31/15Work Order # PF-171253205013$20.66Credit - LaborPM Annual - Chilled Water PumpCBACBA-53-CHWF-1Chilled Water Filter No. 110/31/15Work Order # PF-171253205013$30.98Credit - LaborPM Annual - Chilled Water PumpCBACBA-53-CHWF-1Chilled Water Filter No. 110/31/15Work Order # PF-171253205013$20.66Credit - LaborPM Annual - Chilled Water PumpCBACBA-53-CHWF-1Chilled Water Filter No. 110/31/15Work Order # PF-171253205013$20.66Credit - LaborPM Annual - Chilled Water PumpCBACBA-53-CHWF-1Chilled Water Filter No. 110/31/15Work Order # PF-171253205013$20.66Credit - LaborPM Annual - Chilled Water PumpCBACBA-53-CHWF-1Chilled Water Filter No. 110/31/15Work Order # PF-171253205013$30.98Credit - LaborPM Annual - Chilled Water PumpCBACBA-53-CHWF-1Chilled Water Filter No. 110/31/15Work Order # PF-171253205013$20.66Credit - LaborPM Annual - Chilled Water PumpCBACBA-53-CHWF-1Chilled Water Filter No. 110/31/15Work Order # PF-171253205013$20.66Credit - LaborPM Annual - Chilled Water PumpCBACBA-53-CHWF-1Chilled Water Filter No. 110/31/15Work Order # PF-171686205013$41.72Credit - LaborPM Annual - Backflow PreventerPFOCPFOC-51C-BFP-9Backflow Preventer No. 910/31/15Work Order # PF-171831205013$62.58Credit - LaborCLEAN MECHANICAL ROOMSASECASECAuburn Science and Engineering Ctr.10/31/15Work Order # PF-171831205013$62.58Credit - LaborCLEAN MECHANICAL ROOMSASECASECAuburn Science and Engineering Ctr.10/31/15Work Order # PF-171948205013$31.29Credit - LaborPM - Steam BoilerRDRD-11-BLR-4Boiler No. 4 (SID: 276622) (^ (RD))10/31/15Work Order # PF-174383205013$156.45Credit - LaborPM Annual - Chiller~ARE~ARE-ICS-RF-CH-1Chiller No. 1 (^ (ICS))10/31/15Work Order # PF-174383205013$177.31Credit - LaborPM Annual - Chiller~ARE~ARE-ICS-RF-CH-1Chiller No. 1 (^ (ICS))10/31/15Work Order # PF-174383205013$62.58Credit - LaborPM Annual - Chiller~ARE~ARE-ICS-RF-CH-1Chiller No. 1 (^ (ICS))10/31/15Work Order # PF-174385205013$73.01Credit - LaborPM Annual - Chiller~ARE~ARE-ICS-RF-CH-3Chiller No. 3 (^ (ICS))10/31/15Work Order # PF-174507205013$41.72Credit - LaborPM Quarterly - BoilerHCPXHCPX-138-BLR-1*Boiler No. 1 (SID: 266964) (* 300902-80%, 205013-20%)10/31/15Work Order # PF-174508205013$41.72Credit - LaborPM Quarterly - BoilerHCPXHCPX-138-BLR-2*Boiler No. 2 (SID: 266965) (* 300902-80%, 205013-20%)10/31/15Work Order # PF-174512205013$83.44Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASEC-GS-ACCU-15Air Cooled Condensing Unit No. 1510/31/15Work Order # PF-174512205013$198.17Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASEC-GS-ACCU-15Air Cooled Condensing Unit No. 1510/31/15Work Order # PF-174513205013$62.58Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASEC-RF-ACCU-10Air Cooled Condensing Unit No. 10 (ACU-10 RM 212)10/31/15Work Order # PF-174514205013$62.58Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASEC-RF-ACCU-11Air Cooled Condensing Unit No. 11 (ACU-11 RM 212)10/31/15Work Order # PF-174515205013$229.46Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASEC-RF-ACCU-2Air Cooled Condensing Unit No. 210/31/15Work Order # PF-174515205013$114.73Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASEC-RF-ACCU-2Air Cooled Condensing Unit No. 210/31/15Work Order # PF-174515205013$135.59Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASEC-RF-ACCU-2Air Cooled Condensing Unit No. 210/31/15Work Order # PF-174516205013$177.31Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASEC-RF-ACCU-3 (RETIRED)Air Cooled Condensing Unit No. 3 (RETIRED)10/31/15Work Order # PF-174517205013$62.58Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASEC-RF-ACCU-4Air Cooled Condensing Unit No. 410/31/15Work Order # PF-174517205013$73.01Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASEC-RF-ACCU-4Air Cooled Condensing Unit No. 410/31/15Work Order # PF-174518205013$52.15Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASEC-RF-ACCU-5Air Cooled Condensing Unit No. 510/31/15Work Order # PF-174519205013$114.73Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASEC-RF-ACCU-6Air Cooled Condensing Unit No. 610/31/15Work Order # PF-174519205013$83.44Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASEC-RF-ACCU-6Air Cooled Condensing Unit No. 610/31/15Work Order # PF-174520205013$62.58Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASEC-RF-ACCU-7Air Cooled Condensing Unit No. 710/31/15Work Order # PF-174520205013$62.58Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASEC-RF-ACCU-7Air Cooled Condensing Unit No. 710/31/15Work Order # PF-174520205013$93.87Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASEC-RF-ACCU-7Air Cooled Condensing Unit No. 710/31/15Work Order # PF-174520205013$41.72Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASEC-RF-ACCU-7Air Cooled Condensing Unit No. 710/31/15Work Order # PF-174520205013$41.72Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASEC-RF-ACCU-7Air Cooled Condensing Unit No. 710/31/15Work Order # PF-174520205013$135.59Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASEC-RF-ACCU-7Air Cooled Condensing Unit No. 710/31/15Work Order # PF-174520205013$83.44Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASEC-RF-ACCU-7Air Cooled Condensing Unit No. 710/31/15Work Order # PF-174520205013$41.72Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASEC-RF-ACCU-7Air Cooled Condensing Unit No. 710/31/15Work Order # PF-174521205013$41.72Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASEC-RF-ACCU-9Air Cooled Condensing Unit No. 910/31/15Work Order # PF-174523205013$62.58Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-CAS-RF-ACCU-11Air Cooled Condensing Unit No.1110/31/15Work Order # PF-174523205013$62.58Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-CAS-RF-ACCU-11Air Cooled Condensing Unit No.1110/31/15Work Order # PF-174524205013$41.72Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-CAS-RF-ACCU-2Air Cooled Condensing Unit No. 210/31/15Work Order # PF-174524205013$146.02Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-CAS-RF-ACCU-2Air Cooled Condensing Unit No. 210/31/15Work Order # PF-174525205013$20.86Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-CAS-RF-ACCU-4Air Cooled Condensing Unit No. 410/31/15Work Order # PF-174525205013$83.44Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-CAS-RF-ACCU-4Air Cooled Condensing Unit No. 410/31/15Work Order # PF-174526205013$104.30Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-CAS-RF-ACCU-7Air Cooled Condensing Unit No. 710/31/15Work Order # PF-174526205013$62.58Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-CAS-RF-ACCU-7Air Cooled Condensing Unit No. 710/31/15Work Order # PF-174526205013$83.44Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-CAS-RF-ACCU-7Air Cooled Condensing Unit No. 710/31/15Work Order # PF-174530205013$41.72Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-COMP-RF-ACCU-1Air Cooled Condensing Unit No. 1 (Room 151)10/31/15Work Order # PF-174531205013$41.72Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-COMP-RF-ACCU-2Air Cooled Condensing Unit No. 2 (For AC Room 151)10/31/15Work Order # PF-174532205013$41.72Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-COMP-RF-ACCU-3Air Cooled Condensing Unit No. 310/31/15Work Order # PF-174533205013$31.29Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-COMP-RF-ACCU-4Air Cooled Condensing Unit No. 4 (Room 127)10/31/15Work Order # PF-174533205013$31.29Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-COMP-RF-ACCU-4Air Cooled Condensing Unit No. 4 (Room 127)10/31/15Work Order # PF-174534205013$41.72Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-COMP-RF-ACCU-5Air Cooled Condensing Unit No. 510/31/15Work Order # PF-174535205013$41.72Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-COMP-RF-ACCU-6Air Cooled Condensing Unit No. 610/31/15Work Order # PF-174536205013$41.72Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-COMP-RF-ACCU-7Air Cooled Condensing Unit No. 710/31/15Work Order # PF-174536205013$41.72Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-COMP-RF-ACCU-7Air Cooled Condensing Unit No. 710/31/15Work Order # PF-174549205013$31.29Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-GDYR-RF-ACCU-1Air Cooled Condensing Unit No. 1 (Room 824)10/31/15Work Order # PF-174550205013$83.44Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-GDYR-RF-ACCU-2Air Cooled Condensing Unit No. 210/31/15Work Order # PF-174664205013$41.72Credit - LaborPM Quarterly - BoilerGALUGALU-CIRC-BLR-1Boiler No. 1 (SID: 203158)10/31/15Work Order # PF-174667205013$312.90Credit - LaborPM Quarterly - BoilerSMRHSMRH-12D-BLR-1Boiler No. 1 (SID: 240329)10/31/15Work Order # PF-174902205013$41.72Credit - LaborPM Monthly - Air CompressorSHNSHN-20-COMPR-2Air Compressor No. 210/31/15Work Order # PF-174903205013$41.72Credit - LaborPM Monthly - Air CompressorSHNSHN-20-COMPR-3Air Compressor No. 310/31/15Work Order # PF-174943205013$73.01Credit - LaborPM Semi Annual - Roof~ARE~ARE-BRH-RFRoof10/31/15Work Order # PF-174943205013$198.17Credit - LaborPM Semi Annual - Roof~ARE~ARE-BRH-RFRoof10/31/15Work Order # PF-174943205013$114.73Credit - LaborPM Semi Annual - Roof~ARE~ARE-BRH-RFRoof10/31/15Work Order # PF-180689205013$156.45Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$93.87Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$198.17Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$198.17Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$41.72Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$73.01Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$20.86Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$20.86Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$396.34Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$396.34Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$104.30Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$104.30Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$41.72Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$73.01Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$73.01Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$114.73Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$73.01Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$396.34Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$93.87Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$73.01Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$125.16Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$20.86Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$93.87Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$52.15Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$396.34Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$135.59Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$239.89Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$62.58Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$73.01Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$93.87Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$62.58Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$114.73Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$114.73Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$146.02Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$239.89Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$83.44Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$52.15Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$114.73Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$114.73Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$41.72Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$93.87Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$41.72Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$104.30Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$41.72Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$239.89Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$41.72Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$41.72Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$41.72Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$114.73Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$52.15Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$146.02Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$52.15Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$302.47Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$73.01Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$302.47Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$73.01Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$62.58Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$41.72Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$41.72Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$73.01Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$31.29Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$114.73Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$31.29Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180689205013$156.45Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180690205013$135.59Credit - LaborREPAIR LIGHTS IN OUTSIDE AREAS (NOT TO INCLUDE PARKING DECKS,LOTS OR FIELDS)FY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180690205013$62.58Credit - LaborREPAIR LIGHTS IN OUTSIDE AREAS (NOT TO INCLUDE PARKING DECKS,LOTS OR FIELDS)FY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180690205013$41.72Credit - LaborREPAIR LIGHTS IN OUTSIDE AREAS (NOT TO INCLUDE PARKING DECKS,LOTS OR FIELDS)FY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180690205013$62.58Credit - LaborREPAIR LIGHTS IN OUTSIDE AREAS (NOT TO INCLUDE PARKING DECKS,LOTS OR FIELDS)FY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180690205013$135.59Credit - LaborREPAIR LIGHTS IN OUTSIDE AREAS (NOT TO INCLUDE PARKING DECKS,LOTS OR FIELDS)FY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180690205013$52.15Credit - LaborREPAIR LIGHTS IN OUTSIDE AREAS (NOT TO INCLUDE PARKING DECKS,LOTS OR FIELDS)FY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180690205013$187.74Credit - LaborREPAIR LIGHTS IN OUTSIDE AREAS (NOT TO INCLUDE PARKING DECKS,LOTS OR FIELDS)FY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180690205013$93.87Credit - LaborREPAIR LIGHTS IN OUTSIDE AREAS (NOT TO INCLUDE PARKING DECKS,LOTS OR FIELDS)FY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180690205013$62.58Credit - LaborREPAIR LIGHTS IN OUTSIDE AREAS (NOT TO INCLUDE PARKING DECKS,LOTS OR FIELDS)FY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180690205013$31.29Credit - LaborREPAIR LIGHTS IN OUTSIDE AREAS (NOT TO INCLUDE PARKING DECKS,LOTS OR FIELDS)FY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180691205013$52.15Credit - LaborREPLACE LIGHTS IN LOT 70, LOT BEHIND QSIFY 15/16~ARE~ARE-PLALLParking Lot10/31/15Work Order # PF-180691205013$41.72Credit - LaborREPLACE LIGHTS IN LOT 70, LOT BEHIND QSIFY 15/16~ARE~ARE-PLALLParking Lot10/31/15Work Order # PF-180692205013$93.87Credit - LaborCITY LIGHTSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180692205013$41.72Credit - LaborCITY LIGHTSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180692205013$198.17Credit - LaborCITY LIGHTSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180692205013$198.17Credit - LaborCITY LIGHTSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180692205013$156.45Credit - LaborCITY LIGHTSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180692205013$31.29Credit - LaborCITY LIGHTSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180692205013$20.86Credit - LaborCITY LIGHTSFY 15/16~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary10/31/15Work Order # PF-180693205013$93.87Credit - Labor^ (QSI) REPLACE EXTERIOR LIGHTS TO BE SPLIT ACCORDINGLY FY 15/16QSIQSIThe Quaker Square Inn at The U of A10/31/15Work Order # PF-180693205013$31.29Credit - Labor^ (QSI) REPLACE EXTERIOR LIGHTS TO BE SPLIT ACCORDINGLY FY 15/16QSIQSIThe Quaker Square Inn at The U of A10/31/15Work Order # PF-180693205013$62.58Credit - Labor^ (QSI) REPLACE EXTERIOR LIGHTS TO BE SPLIT ACCORDINGLY FY 15/16QSIQSIThe Quaker Square Inn at The U of A10/31/15Work Order # PF-180693205013$62.58Credit - Labor^ (QSI) REPLACE EXTERIOR LIGHTS TO BE SPLIT ACCORDINGLY FY 15/16QSIQSIThe Quaker Square Inn at The U of A10/31/15Work Order # PF-180694205013$83.44Credit - LaborREPLACE LIGHTSFY 15/16WCPDWCPDWest Campus Parking Deck10/31/15Work Order # PF-180694205013$135.59Credit - LaborREPLACE LIGHTSFY 15/16WCPDWCPDWest Campus Parking Deck10/31/15Work Order # PF-180694205013$41.72Credit - LaborREPLACE LIGHTSFY 15/16WCPDWCPDWest Campus Parking Deck10/31/15Work Order # PF-180695205013$20.86Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16POLPOL-CIRCCirculation10/31/15Work Order # PF-180695205013$52.15Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16POLPOL-CIRCCirculation10/31/15Work Order # PF-180695205013$20.86Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16POLPOL-CIRCCirculation10/31/15Work Order # PF-180695205013$20.86Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16POLPOL-CIRCCirculation10/31/15Work Order # PF-180695205013$41.72Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16POLPOL-CIRCCirculation10/31/15Work Order # PF-180695205013$20.86Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16POLPOL-CIRCCirculation10/31/15Work Order # PF-180695205013$20.86Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16POLPOL-CIRCCirculation10/31/15Work Order # PF-180696205013$31.29Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16CBACBA-CIRCCirculation10/31/15Work Order # PF-180696205013$52.15Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16CBACBA-CIRCCirculation10/31/15Work Order # PF-180696205013$52.15Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16CBACBA-CIRCCirculation10/31/15Work Order # PF-180696205013$52.15Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16CBACBA-CIRCCirculation10/31/15Work Order # PF-180696205013$52.15Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16CBACBA-CIRCCirculation10/31/15Work Order # PF-180696205013$31.29Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16CBACBA-CIRCCirculation10/31/15Work Order # PF-180696205013$31.29Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16CBACBA-CIRCCirculation10/31/15Work Order # PF-180696205013$41.72Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16CBACBA-CIRCCirculation10/31/15Work Order # PF-180696205013$52.15Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16CBACBA-CIRCCirculation10/31/15Work Order # PF-180696205013$41.72Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16CBACBA-CIRCCirculation10/31/15Work Order # PF-180696205013$52.15Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16CBACBA-CIRCCirculation10/31/15Work Order # PF-180696205013$73.01Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16CBACBA-CIRCCirculation10/31/15Work Order # PF-180696205013$73.01Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16CBACBA-CIRCCirculation10/31/15Work Order # PF-180698205013$41.72Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16BCCEBCCE-CIRCCirculation10/31/15Work Order # PF-180698205013$62.58Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16BCCEBCCE-CIRCCirculation10/31/15Work Order # PF-180698205013$62.58Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16BCCEBCCE-CIRCCirculation10/31/15Work Order # PF-180698205013$31.29Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16BCCEBCCE-CIRCCirculation10/31/15Work Order # PF-180698205013$41.72Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16BCCEBCCE-CIRCCirculation10/31/15Work Order # PF-180698205013$73.01Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16BCCEBCCE-CIRCCirculation10/31/15Work Order # PF-180698205013$41.72Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16BCCEBCCE-CIRCCirculation10/31/15Work Order # PF-180698205013$41.72Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16BCCEBCCE-CIRCCirculation10/31/15Work Order # PF-180698205013$20.86Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16BCCEBCCE-CIRCCirculation10/31/15Work Order # PF-180698205013$41.72Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16BCCEBCCE-CIRCCirculation10/31/15Work Order # PF-180698205013$20.86Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16BCCEBCCE-CIRCCirculation10/31/15Work Order # PF-180698205013$20.86Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16BCCEBCCE-CIRCCirculation10/31/15Work Order # PF-180698205013$31.29Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16BCCEBCCE-CIRCCirculation10/31/15Work Order # PF-180698205013$41.72Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16BCCEBCCE-CIRCCirculation10/31/15Work Order # PF-180699205013$31.29Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16TRETRE-CIRCCirculation10/31/15Work Order # PF-180699205013$31.29Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16TRETRE-CIRCCirculation10/31/15Work Order # PF-180699205013$20.86Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16TRETRE-CIRCCirculation10/31/15Work Order # PF-180699205013$31.29Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 15/16TRETRE-CIRCCirculation10/31/15Work Order # PF-180701205013$62.58Credit - LaborCHANGE LIGHTS IN COMMON AREAS.FY 15/16FOLKFOLK-CIRCCirculation10/31/15Work Order # PF-180701205013$20.86Credit - LaborCHANGE LIGHTS IN COMMON AREAS.FY 15/16FOLKFOLK-CIRCCirculation10/31/15Work Order # PF-180701205013$41.72Credit - LaborCHANGE LIGHTS IN COMMON AREAS.FY 15/16FOLKFOLK-CIRCCirculation10/31/15Work Order # PF-180701205013$73.01Credit - LaborCHANGE LIGHTS IN COMMON AREAS.FY 15/16FOLKFOLK-CIRCCirculation10/31/15Work Order # PF-180701205013$62.58Credit - LaborCHANGE LIGHTS IN COMMON AREAS.FY 15/16FOLKFOLK-CIRCCirculation10/31/15Work Order # PF-180701205013$62.58Credit - LaborCHANGE LIGHTS IN COMMON AREAS.FY 15/16FOLKFOLK-CIRCCirculation10/31/15Work Order # PF-176207205013$73.01Credit - LaborPM Quarterly - BoilerRDRD-11-BLR-1Boiler No. 1 (SID: 135270) (^ (RD))10/31/15Work Order # PF-176210205013$156.45Credit - LaborPM Quarterly - BoilerRDRD-11-BLR-4Boiler No. 4 (SID: 276622) (^ (RD))10/31/15Work Order # PF-176261205013$156.45Credit - LaborPM Annual - Heat ExchangerRRHRRH-5-HEX-1Heat Exchanger No. 1 (Chilled Water)10/31/15Work Order # PF-176373205013$156.45Credit - LaborPM Annual - BoilerSHSH-105-BLR-1Boiler No. 1 (SID:288087)10/31/15Work Order # PF-176373205013$73.01Credit - LaborPM Annual - BoilerSHSH-105-BLR-1Boiler No. 1 (SID:288087)10/31/15Work Order # PF-176373205013$41.72Credit - LaborPM Annual - BoilerSHSH-105-BLR-1Boiler No. 1 (SID:288087)10/31/15Work Order # PF-176373205013$312.90Credit - LaborPM Annual - BoilerSHSH-105-BLR-1Boiler No. 1 (SID:288087)10/31/15Work Order # PF-176375205013$312.90Credit - LaborPM Annual - BoilerSHSH-105-BLR-3Boiler No. 3 (SID:288085)10/31/15Work Order # PF-176375205013$312.90Credit - LaborPM Annual - BoilerSHSH-105-BLR-3Boiler No. 3 (SID:288085)10/31/15Work Order # PF-176377205013$114.73Credit - LaborPM Annual - BoilerSHSH-105-BLR-5Boiler No. 5 (SID:288083)10/31/15Work Order # PF-176377205013$312.90Credit - LaborPM Annual - BoilerSHSH-105-BLR-5Boiler No. 5 (SID:288083)10/31/15Work Order # PF-176692205013$114.73Credit - LaborPM Semi-Annual: Air CompressorPAHPAH-CIRC-COMPR-3Air Compressor No. 3 (Fire Suppression)10/31/15Work Order # PF-176692205013$83.44Credit - LaborPM Semi-Annual: Air CompressorPAHPAH-CIRC-COMPR-3Air Compressor No. 3 (Fire Suppression)10/31/15Work Order # PF-176692205013$312.90Credit - LaborPM Semi-Annual: Air CompressorPAHPAH-CIRC-COMPR-3Air Compressor No. 3 (Fire Suppression)10/31/15Work Order # PF-176702205013$41.72Credit - LaborPM Annual - BoilerICSICS-823-BLR-1Boiler No. 1 (SID: 803635) (^ (ICS))10/31/15Work Order # PF-176703205013$41.72Credit - LaborPM Annual - BoilerICSICS-823-BLR-2Boiler No. 2 (SID: 803634) (^ (ICS))10/31/15Work Order # PF-176709205013$73.01Credit - LaborPM Annual - BoilerSPCRSPCR-9-BLR-6Boiler No. 6 (SID:279974)10/31/15Work Order # PF-176709205013$135.59Credit - LaborPM Annual - BoilerSPCRSPCR-9-BLR-6Boiler No. 6 (SID:279974)10/31/15Work Order # PF-176709205013$156.45Credit - LaborPM Annual - BoilerSPCRSPCR-9-BLR-6Boiler No. 6 (SID:279974)10/31/15Work Order # PF-177009205013$52.57Credit - Labor2015 FIRE INSPECTION AND TESTINGCASCASCollege of Arts and Sciences10/31/15Work Order # PF-177014205013$312.90Credit - Labor2015 FIRE INSPECTION AND TESTINGGALLGALLGallucci Hall (South)10/31/15Work Order # PF-177014205013$312.90Credit - Labor2015 FIRE INSPECTION AND TESTINGGALLGALLGallucci Hall (South)10/31/15Work Order # PF-177014205013$83.44Credit - Labor2015 FIRE INSPECTION AND TESTINGGALLGALLGallucci Hall (South)10/31/15Work Order # PF-177014205013$41.72Credit - Labor2015 FIRE INSPECTION AND TESTINGGALLGALLGallucci Hall (South)10/31/15Work Order # PF-177026205013$73.01Credit - Labor2015 FIRE INSPECTION AND TESTINGSHNSHNSchrank Hall (North)10/31/15Work Order # PF-177026205013$78.85Credit - Labor2015 FIRE INSPECTION AND TESTINGSHNSHNSchrank Hall (North)10/31/15Work Order # PF-177027205013$312.90Credit - Labor2015 FIRE INSPECTION AND TESTINGSISISimmons Hall10/31/15Work Order # PF-177027205013$312.90Credit - Labor2015 FIRE INSPECTION AND TESTINGSISISimmons Hall10/31/15Work Order # PF-177027205013$271.18Credit - Labor2015 FIRE INSPECTION AND TESTINGSISISimmons Hall10/31/15Work Order # PF-177027205013$229.46Credit - Labor2015 FIRE INSPECTION AND TESTINGSISISimmons Hall10/31/15Work Order # PF-177027205013$156.45Credit - Labor2015 FIRE INSPECTION AND TESTINGSISISimmons Hall10/31/15Work Order # PF-177027205013$156.45Credit - Labor2015 FIRE INSPECTION AND TESTINGSISISimmons Hall10/31/15Work Order # PF-177027205013$83.44Credit - Labor2015 FIRE INSPECTION AND TESTINGSISISimmons Hall10/31/15Work Order # PF-177039205013$41.72Credit - Labor2015 FIRE INSPECTION AND TESTINGPDNPDNParking Deck North10/31/15Work Order # PF-177112205013$156.45Credit - LaborREPAIR OR REPLACE ANY OUTSIDE GFCI OUTSIDEAkronAkronAkron Campus10/31/15Work Order # PF-177112205013$271.18Credit - LaborREPAIR OR REPLACE ANY OUTSIDE GFCI OUTSIDEAkronAkronAkron Campus10/31/15Work Order # PF-177112205013$198.17Credit - LaborREPAIR OR REPLACE ANY OUTSIDE GFCI OUTSIDEAkronAkronAkron Campus10/31/15Work Order # PF-177112205013$41.72Credit - LaborREPAIR OR REPLACE ANY OUTSIDE GFCI OUTSIDEAkronAkronAkron Campus10/31/15Work Order # PF-177112205013$41.72Credit - LaborREPAIR OR REPLACE ANY OUTSIDE GFCI OUTSIDEAkronAkronAkron Campus10/31/15Work Order # PF-177112205013$73.01Credit - LaborREPAIR OR REPLACE ANY OUTSIDE GFCI OUTSIDEAkronAkronAkron Campus10/31/15Work Order # PF-177112205013$73.01Credit - LaborREPAIR OR REPLACE ANY OUTSIDE GFCI OUTSIDEAkronAkronAkron Campus10/31/15Work Order # PF-177112205013$10.43Credit - LaborREPAIR OR REPLACE ANY OUTSIDE GFCI OUTSIDEAkronAkronAkron Campus10/31/15Work Order # PF-177321205013$52.15Credit - LaborPM Semi Annual - Roof~ARE~ARE-GH-RFRoof10/31/15Work Order # PF-177322205013$83.44Credit - LaborPM Semi Annual - Roof~ARE~ARE-GHAD-RFRoof10/31/15Work Order # PF-177420205013$41.72Credit - LaborLIGHTS FLICKERING IN TV STUDIO CONTROL ROOM AND HALLWAYKOKO-56AClass Laboratory10/31/15Work Order # PF-177925205013$41.72Credit - LaborREPAIR A/C UNIT IN AUTOMATION AREAPFOCPFOC-113A-ACU-17Air Conditioning Unit No. 1710/31/15Work Order # PF-178256205013$271.18Credit - LaborPM Annual - BoilerGALLGALL-525-BLR-2Boiler No. 2 (SID: 239140)10/31/15Work Order # PF-178262205013$312.90Credit - LaborPM Annual - BoilerHCPXHCPX-138-BLR-1*Boiler No. 1 (SID: 266964) (* 300902-80%, 205013-20%)10/31/15Work Order # PF-178262205013$312.90Credit - LaborPM Annual - BoilerHCPXHCPX-138-BLR-1*Boiler No. 1 (SID: 266964) (* 300902-80%, 205013-20%)10/31/15Work Order # PF-178262205013$83.44Credit - LaborPM Annual - BoilerHCPXHCPX-138-BLR-1*Boiler No. 1 (SID: 266964) (* 300902-80%, 205013-20%)10/31/15Work Order # PF-178262205013$312.90Credit - LaborPM Annual - BoilerHCPXHCPX-138-BLR-1*Boiler No. 1 (SID: 266964) (* 300902-80%, 205013-20%)10/31/15Work Order # PF-178263205013$73.01Credit - LaborPM Annual - BoilerHCPXHCPX-138-BLR-2*Boiler No. 2 (SID: 266965) (* 300902-80%, 205013-20%)10/31/15Work Order # PF-178263205013$312.90Credit - LaborPM Annual - BoilerHCPXHCPX-138-BLR-2*Boiler No. 2 (SID: 266965) (* 300902-80%, 205013-20%)10/31/15Work Order # PF-178263205013$156.45Credit - LaborPM Annual - BoilerHCPXHCPX-138-BLR-2*Boiler No. 2 (SID: 266965) (* 300902-80%, 205013-20%)10/31/15Work Order # PF-178263205013$312.90Credit - LaborPM Annual - BoilerHCPXHCPX-138-BLR-2*Boiler No. 2 (SID: 266965) (* 300902-80%, 205013-20%)10/31/15Work Order # PF-178263205013$312.90Credit - LaborPM Annual - BoilerHCPXHCPX-138-BLR-2*Boiler No. 2 (SID: 266965) (* 300902-80%, 205013-20%)10/31/15Work Order # PF-178263205013$312.90Credit - LaborPM Annual - BoilerHCPXHCPX-138-BLR-2*Boiler No. 2 (SID: 266965) (* 300902-80%, 205013-20%)10/31/15Work Order # PF-178263205013$312.90Credit - LaborPM Annual - BoilerHCPXHCPX-138-BLR-2*Boiler No. 2 (SID: 266965) (* 300902-80%, 205013-20%)10/31/15Work Order # PF-178263205013$83.44Credit - LaborPM Annual - BoilerHCPXHCPX-138-BLR-2*Boiler No. 2 (SID: 266965) (* 300902-80%, 205013-20%)10/31/15Work Order # PF-178263205013$292.04Credit - LaborPM Annual - BoilerHCPXHCPX-138-BLR-2*Boiler No. 2 (SID: 266965) (* 300902-80%, 205013-20%)10/31/15Work Order # PF-178269205013$73.01Credit - LaborPM Annual - BoilerRRHRRH-5-BLR-1Boiler No. 1 (SID: 264577)10/31/15Work Order # PF-178270205013$239.89Credit - LaborPM Annual - BoilerSMRHSMRH-12D-BLR-1Boiler No. 1 (SID: 240329)10/31/15Work Order # PF-178361205013$83.44Credit - LaborPM Annual - BoilerSMRHSMRH-12D-BLR-2Boiler No. 2 (SID: 246347)10/31/15Work Order # PF-178553205013$73.01Credit - LaborPM Quarterly - BoilerSPCRSPCR-9-BLR-1Boiler No. 1 (SID:279969)10/31/15Work Order # PF-178554205013$52.15Credit - LaborPM Quarterly - BoilerSPCRSPCR-9-BLR-2Boiler No. 2 (SID:279970)10/31/15Work Order # PF-178554205013$156.45Credit - LaborPM Quarterly - BoilerSPCRSPCR-9-BLR-2Boiler No. 2 (SID:279970)10/31/15Work Order # PF-178554205013$83.44Credit - LaborPM Quarterly - BoilerSPCRSPCR-9-BLR-2Boiler No. 2 (SID:279970)10/31/15Work Order # PF-178555205013$41.72Credit - LaborPM Quarterly - BoilerSPCRSPCR-9-BLR-3Boiler No. 3 (SID:279971)10/31/15Work Order # PF-178653205013$41.72Credit - LaborPM Semi-Annual: Exhaust FanBRHBRH-3-EF-1Exhaust Fan No. 1(Dryer)10/31/15Work Order # PF-172463205013$41.72Credit - LaborPLAZA ROOM ON LOBBY LEVEL CEILING TILES FALLING AND WATER COMING IN THROUGH CEILINGCONTRACT MAINT.:ROOF REPAIRQSIQSI-141Meeting Room10/31/15Work Order # PF-172463205013$20.86Credit - LaborPLAZA ROOM ON LOBBY LEVEL CEILING TILES FALLING AND WATER COMING IN THROUGH CEILINGCONTRACT MAINT.:ROOF REPAIRQSIQSI-141Meeting Room10/31/15Work Order # PF-172611205013$41.72Credit - LaborPM Monthly - Compressed Air DryerFOLKFOLK-163-COMPAD-1Compressed Air Dryer No. 110/31/15Work Order # PF-172701205013$239.89Credit - LaborPM Annual - BoilerORHORH-18A-BLR-2Boiler No. 2 (SID: 218491)10/31/15Work Order # PF-172715205013$83.44Credit - LaborPM Quarterly - BoilerSPCRSPCR-9-BLR-7Boiler No. 7 (SID:279975)10/31/15Work Order # PF-172862205013$156.45Credit - LaborPM Annual - Heat ExchangerBRHBRH-3-HEX-1Heat Exchanger No. 110/31/15Work Order # PF-172895205013$83.44Credit - LaborPM Quarterly - Steam Generator Inspection ServiceSHNSHN-20-STGEN-1Steam Generator No. 1 (Hoods) (SID: 270583)10/31/15Work Order # PF-172896205013$239.89Credit - LaborPM Quarterly - Steam Generator Inspection ServiceSHNSHN-20-STGEN-2Steam Generator No. 2 (Hoods) (SID: 270584)10/31/15Work Order # PF-154786205013$73.01Credit - LaborZOOK HALL RENOVATION-PROJECT #UAK120015DELIVER 2,000 MOVING BOXES AT $1.25 EACH TO KAREN GREENE AT ZOOK HALL ROOM 219.CHARGE ACCOUNT: #772042TOTAL: $2,500.00PLEASE CONTACT JAMES HASKELL AT 330-972-6943 FOR ANY QUESTIONS.ZOOKZOOK-219Office10/31/15Work Order # PF-168248205013$10.43Credit - LaborLEAK AND CEILING REPAIRASBASB-130Office Service10/31/15Work Order # PF-168312205013$20.86Credit - LaborIN ALARM~ARE~ARE-AERC-RF-ACCU-4Air Cooled Condensing Unit No. 410/31/15Work Order # PF-168399205013$41.72Credit - LaborMOTOR BADASECASEC-E31A-EF-72Exhaust Fan No. 7210/31/15Work Order # PF-172974205013$41.72Credit - LaborPM Annual - Backflow Preventer~ARE~ARE-AERC-GS-BFP-3Backflow Preventer No. 3 (3/4'' Detector Check)10/31/15Work Order # PF-173088205013$20.86Credit - LaborREPAIR WELL KNOWN LEAKS AT SCHUMACHERS,CONTACT STEPHANIE BROTHERS AT 330-972-7347.QSIQSI-144Unfinished/Inactive Area10/31/15Work Order # PF-175160205013$312.90Credit - Labor* BETWEEN AYER AND ASEC NEAR SUMNER CIRCLE AN EMERGENCY PERSONNEL SIGN WAS HIT AND NEEDS REPLACEDZ3-SIGN IS IN THE WELD SHOP~ARE~ARE-SWSidewalks/Walkways/Commons10/31/15Work Order # PF-175160205013$312.90Credit - Labor* BETWEEN AYER AND ASEC NEAR SUMNER CIRCLE AN EMERGENCY PERSONNEL SIGN WAS HIT AND NEEDS REPLACEDZ3-SIGN IS IN THE WELD SHOP~ARE~ARE-SWSidewalks/Walkways/Commons10/31/15Work Order # PF-175204205013$52.15Credit - LaborPM Semi Annual - Roof~ARE~ARE-GDYR-RFRoof10/31/15Work Order # PF-175275205013$83.44Credit - LaborCLEAN WELD SHOP FY15/16PFOCPFOC-65Shop10/31/15Work Order # PF-175382205013$41.72Credit - LaborSUMP PUMPS (NOT IN TMA) IN THE ELEVATOR PIT ARE NOT WORKINGCHECK SUMP PUMPPAHPAH-22Mechanical10/31/15Work Order # PF-175463205013$271.18Credit - LaborREPLACE FLOATS AND PUMPSELEC.:UPDATE ELECTRIC SERVICE TO NEW CONDENSATE TANK AND PUMPS WILL NEED NEW DISCONNECTS AS WELLASECASEC-CIRC-CRP-4Condensate Return Pump No. 4 (Tunnel Access)10/31/15Work Order # PF-175463205013$93.87Credit - LaborREPLACE FLOATS AND PUMPSELEC.:UPDATE ELECTRIC SERVICE TO NEW CONDENSATE TANK AND PUMPS WILL NEED NEW DISCONNECTS AS WELLASECASEC-CIRC-CRP-4Condensate Return Pump No. 4 (Tunnel Access)10/31/15Work Order # PF-175463205013$62.58Credit - LaborREPLACE FLOATS AND PUMPSELEC.:UPDATE ELECTRIC SERVICE TO NEW CONDENSATE TANK AND PUMPS WILL NEED NEW DISCONNECTS AS WELLASECASEC-CIRC-CRP-4Condensate Return Pump No. 4 (Tunnel Access)10/31/15Work Order # PF-175463205013$292.04Credit - LaborREPLACE FLOATS AND PUMPSELEC.:UPDATE ELECTRIC SERVICE TO NEW CONDENSATE TANK AND PUMPS WILL NEED NEW DISCONNECTS AS WELLASECASEC-CIRC-CRP-4Condensate Return Pump No. 4 (Tunnel Access)10/31/15Work Order # PF-175463205013$41.72Credit - LaborREPLACE FLOATS AND PUMPSELEC.:UPDATE ELECTRIC SERVICE TO NEW CONDENSATE TANK AND PUMPS WILL NEED NEW DISCONNECTS AS WELLASECASEC-CIRC-CRP-4Condensate Return Pump No. 4 (Tunnel Access)10/31/15Work Order # PF-175463205013$104.30Credit - LaborREPLACE FLOATS AND PUMPSELEC.:UPDATE ELECTRIC SERVICE TO NEW CONDENSATE TANK AND PUMPS WILL NEED NEW DISCONNECTS AS WELLASECASEC-CIRC-CRP-4Condensate Return Pump No. 4 (Tunnel Access)10/31/15Work Order # PF-175463205013$114.73Credit - LaborREPLACE FLOATS AND PUMPSELEC.:UPDATE ELECTRIC SERVICE TO NEW CONDENSATE TANK AND PUMPS WILL NEED NEW DISCONNECTS AS WELLASECASEC-CIRC-CRP-4Condensate Return Pump No. 4 (Tunnel Access)10/31/15Work Order # PF-175463205013$156.45Credit - LaborREPLACE FLOATS AND PUMPSELEC.:UPDATE ELECTRIC SERVICE TO NEW CONDENSATE TANK AND PUMPS WILL NEED NEW DISCONNECTS AS WELLASECASEC-CIRC-CRP-4Condensate Return Pump No. 4 (Tunnel Access)10/31/15Work Order # PF-175463205013$73.01Credit - LaborREPLACE FLOATS AND PUMPSELEC.:UPDATE ELECTRIC SERVICE TO NEW CONDENSATE TANK AND PUMPS WILL NEED NEW DISCONNECTS AS WELLASECASEC-CIRC-CRP-4Condensate Return Pump No. 4 (Tunnel Access)10/31/15Work Order # PF-175463205013$73.01Credit - LaborREPLACE FLOATS AND PUMPSELEC.:UPDATE ELECTRIC SERVICE TO NEW CONDENSATE TANK AND PUMPS WILL NEED NEW DISCONNECTS AS WELLASECASEC-CIRC-CRP-4Condensate Return Pump No. 4 (Tunnel Access)10/31/15Work Order # PF-175463205013$198.17Credit - LaborREPLACE FLOATS AND PUMPSELEC.:UPDATE ELECTRIC SERVICE TO NEW CONDENS