Upload
adam-jimenez
View
232
Download
1
Tags:
Embed Size (px)
Citation preview
CCOONNTTIINNGGEENNCCYY & & DDIISSAASSTTEERR RREECCOOVVEERRY Y
PPLLAAN N
YYOOUURR HHOOSSTT!!
HHOOSSTTSS
NNAAMMEE
Group Play: A selected “Game Show Host” will keep the scores of 3 individual players or 3 teams of players. Any team members can ring in. If the question is answered correctly the team member chooses the next category. If not, the individual who choose the last category chooses again.
This game follows the general format of the Jeopardy TV Show.
Select any $ dollar amount on the Jeopardy board.
You will have 10 seconds to ring in. When you hear this sound, time is up.
Answer in the form of a question. If the answer is incorrect, another team member may ring in.
Mouse click on a ? to reveal the correct answer.
ADD dollar amount for each CORRECT answer. SUBTRACT dollar amount for each INCORRECT answer.
Return to the Jeopardy Board by mouse clicking on
After the last dollar amount is selected and the question is answered, mouse click on the “FJ” to select “Final Jeopardy.”
Final Jeopardy: Click on the Final Jprdy box located in “Potpourri” box. Each team can confer on the amount of money to bet and can confer on the Final Jeopardy answer and arrive at a team response.
INTRO THINGS ACTIONS PERSONSMORE THINGS
POTPOURRI
$100 $100 $100 $100 $100 $100
$200 $200 $200 $200 $200 $200
$300 $300 $300 $300 $300 $300
$400 $400 $400 $400 $400 $400
$500 $500 $500 $500 $500 $500
Final JprdyFinal Jprdy
$100
Answer:
To ensure the prompt resumption of the Data Center operations and/or functionality after an emergency or major system disruption impacting IT functionality of an application (database, subnet, or specialized application)
? What is the purpose of a Contingency Plan?
INTRODUCTION
$200
Answer:
?
INTRODUCTIONINTRODUCTION
1. Notification/Activation 2. Recovery 3. Resumption
What are the three phases of a Contingency/Disaster recovery Plan?
$300
Answer:
?
INTRODUCINTRODUCTIONTION
All Agency personnel, contractors, service providers, and vendors that provide daily support to the Agency Data Center operations.
Who does the plan apply to?
$400
Answer:
?
INTRODUCINTRODUCTIONTION
The external network and router infrastructure serving the Data Center other than to specify who to contact regarding any disruptions of network and router service to the Data Center.
What does the Plan NOT apply to?
$500
Answer:
?
INTRODUCTIONINTRODUCTION
Minor System Failure
Major System Failure
What two scenarios are mentioned in the plan?
$100
Answer:
?
THINGSTHINGS
Notify this person if there is damage to the facility or there is a power outage.
Who is The Data Center Building Point of Contact?
$200
Answer:
?
.
THINGSTHINGS
Frequency of the Plan testing and training.
What is annually?
$300
Answer:
?
THINGSTHINGS
Frequency of the Plans review and update.
What is quarterly?
$400
Answer:
?
THINGTHINGSS
Used to assist in collecting the information required for an accurate damage assessment.
What is the Damage Assessment Report Form?
$500
Answer:
?
HARDWARE, SOFTWARE, & APPLICATION INVENTORY list and the HARDWARE COMPONENT INVENTORY list.
What do you need to perform an effective assessment?
THINGSTHINGS
$100
Answer:
?
ACTIONSACTIONS
Assists in all recovery and resumption activities, as necessary and Files an after-action report upon resumption of normal operations
What does the recovery team do?
$200
Answer:
?
ACTIONSACTIONS
Use an alternate facility for recovery until the facility/building becomes available again
What do you do when the Data Center facility is not going to be available for an extended period of time (e.g., one month)?
$300
Answer:
?
ACTIONSACTIONS
Gathers the components required to reconstruct the Data Center or critical parts of the Data Center at the alternate site (i.e., the servers, infrastructure, backup media.)
What does the recovery Team do if it is determined that recovery will need to be at an alternate site?
$400
Answer:
?
ACTIONSACTIONS
The person who the recovery team contacts to request that the appropriate vendors be contacted to provide additional support and/or components required for recovery as needed.
Who is the Agency administrative support person
$500
Answer:
?
ACTIONSACTIONS
The report that briefly describes the events that led to “Plan Implementation” and how operations were returned to normal conditions.
What is the After-Action Report?
$100
Answer:
?
Has ultimate responsibility for ensuring the development, execution, testing and maintenance of the Data Center Plans and for activation of the Plans
Who is the Disaster/Contingency Plan Director?
PERSONSPERSONS
$200
Answer:
?
The Alternate Disaster/Contingency Plan Director
Who is Captain Midnight?
PERSONSPERSONS
$300
Answer:
?
The Data Center 1 Team Leads
Who are Tinker, Evers, & Chance?
PERSONSPERSONS
$400
Answer:
?
PERSONSPERSONS
The data Center 2 Team Leads
Who are Jurgensen, Snead, & Baugh?
$500
Answer:
?
Responsible for obtaining and restoring data from the Agency backup tapes/disks/facilities.
Who is the recovery Team?
PERSONSPERSONS
$100
Answer:
?
EVENTSEVENTS
Circumstances, events, or acts that could cause harm to the Data Center by destroying, disclosing, modifying, or denying access to Agency’s information resources
What are threats?
$200
Answer:
?
EVENTSEVENTS
The Data Center physical facility has been physically damaged to an extent that requires major repair to the environment and has rendered the facility unusable for an extended period of time
What is a major disaster?
$300
Answer:
?
EVENTSEVENTS
Flood, earthquakes, lightning strikes, severe storms, hurricane, tornado, volcano
What are Natural threats?
$400
Answer:
?
EVENTSEVENTS
Fire, temperature, humidity, power loss, liquid leakage, loss of communication medium
What are Environmental threats?
$500
Answer:
?
EVENTSEVENTSAccidental system damage, theft, eavesdropping, sabotage/vandalism, improper handling of sensitive information, resource misuse and abuse, social engineering, unauthorized external access, unauthorized internal access, terrorism, impersonation, falsified input, interception, bribery, hacking, unauthorized disclosure of information, fraud, intimidation of personnel, negligence or human error, spoofing, unauthorized modification of information, system tampering, blackmail, malicious/mobile code, and password guessing
What are Human Threats?
$100
Answer:
?
POTPOURRPOTPOURRII
What is the Notification/Activation Phase?
1. To detect and assess damage, 2. Activate the plan, and 3. Notify all key personnel
$200
Answer:
?
POTPOURRIPOTPOURRI
When recovering the Data Center or any part of the Data Center, the recovery procedures should follow a logical order.
What are Recovery Priorities?
$300
Answer:
?
POTPOURRIPOTPOURRI
The data storage backups are kept here.
What are the Data Center 1 and Data Center 2?
$400
Answer:
?
POTPOURRIPOTPOURRI
What is the Reconstitution/Resumption Phase?
The phase which constitutes the activities necessary to restore the Data Center operations to its original long term processing state.
$500
Answer:
?
POTPOURRIPOTPOURRI
Person that insures that information system security is maintained.
Who is the Agency ISSO?
SECURITYDAILYDOUBLE
PERSON
CategoryCategory
MAKE YOUR WAGER
The person (Title and Name) that is responsible for coordinating the
recovery team.
Who is the recovery team Lead?
Who is Superman?