12
Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01 Page 1 of 12 Installation and Operating Instructions Zip Hydroboil Instant boiling water HS001 Zip Hydroboil 1.5 Litre White HS003 Zip Hydroboil 3.0 Litre White HS005 Zip Hydroboil 5.0 Litre White HS105 Zip Hydroboil 5.0 Litre Stainless Steel HS007 Zip Hydroboil 7.5 Litre White HS107 Zip Hydroboil 7.5 Litre Stainless Steel ®

Zip Hydroboil

  • Upload
    others

  • View
    10

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Zip Hydroboil

Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01 Page 1 of 12

Installation and Operating Instructions

Zip Hydroboil Instant boiling water

HS001 Zip Hydroboil 1.5 Litre White HS003 Zip Hydroboil 3.0 Litre White HS005 Zip Hydroboil 5.0 Litre White HS105 Zip Hydroboil 5.0 Litre Stainless Steel HS007 Zip Hydroboil 7.5 Litre White HS107 Zip Hydroboil 7.5 Litre Stainless Steel

®

Page 2: Zip Hydroboil

Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01 Page 2 of 12

Installation Checklist

Before Installation:A. Read the instructions.

B. Note:Allfittingsaresuppliedwiththeappliancekitexceptisolation valveandpressurereductionvalve,whicharenotsupplied.

C. Checkthewaterqualitytodetermineifextrafiltrationwillbe required.Apotablemainswatersupplymustbeused.

Tocombatthebuildupoflimescale,ahighperformanceinline filter(notsuppliedasstandardequipment)maybeorderedfrom yourZipserviceprovider.(SeeProductAccessoriespage4)

D. Checktheapplianceratingplateandensurecorrectpoweris available for the appliance.

E. Checkthewallsupportingtheapplianceisadequateforthetotal weightoftheappliance,whenfullofwater.

Before Commissioning:1. Checktheunithasbeeninstalledcorrectly.

2. Checkallplumbingfittingshavebeentightened.

3. Ensure the vent pipe is positioned to drain correctly.

4. Checkallelectricalconnectionsarecorrectandtherearenoloose wires.

Commission:7. Flush the supply line before connecting.

8. Turnonthewater,allowtofillandcheckforleaks.

9. Turnonthepower.

WallmountedOver-sinkapplianceforinstantboilingwater.

Features:• Designedtooperatewithin1°Cofboilingpoint.

• Temperaturecontrolsautomaticallycutoffthepowerintheeventoftemperaturecontrolfailure,boildrycutoutorablockedventpipe.

• Incorporatingapulldowntapforprecisionfillingofcups,italsolocks‘ON’ for filling pots.

• Separatesthecoldwatersupplyfromtheboilingchamberandtheinternalcondensingsystemretainssteamwithintheheater.

• Astainlesssteelcrevicefree,boilingchamberwithserviceaccessportstopandbottom.

• Hightemperaturethermalinsulationwithprovisionforserviceaccesstotheboilingchamber.

• Concealedplumbingandelectricalconnections.

• Choiceofstainlesssteelorwhiteenamelledsteelcase.

Description

Page 3: Zip Hydroboil

Page 3 of 12 Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01

Contents

Product Specifications / Accessories ...........................................................................................................................4

Read These Warnings First ..................................................................................................................................... 4 - 5

Installation Requirements .............................................................................................................................................5

Installation Procedures ........................................................................................................................................... 6 - 8

Step 1 – Positioning .................................................................................................................................6

Step 2 – Fastening ...................................................................................................................................6

Step 3 – Connecting ................................................................................................................................7

a)Plumbing ................................................................................................................................7

b)Venting...................................................................................................................................7

c)Electrical ................................................................................................................................7

Step4–Assembling ................................................................................................................................8

Tap Fitting ..................................................................................................................................8

Step5–Commissioning .........................................................................................................................8

Operating Procedures ..................................................................................................................................................8

Wall Mounting Template Dimensions ..........................................................................................................................9

Earth Continuity Verification / Wiring Diagram. ................................................................................................ 10 - 11

Problem Solving...........................................................................................................................................................11

Maintenance ................................................................................................................................................................11

Spare Parts ..................................................................................................................................................................11

End of life disposal ......................................................................................................................................................12

Warranty / Contact Details ..........................................................................................................................................12

NOTE:

Read all instructions and precautions before proceeding. If in doubt, or need further guidance, please call Zip on 0845 6 005 005.

Pleaseleavetheseinstructionswiththeenduserafterinstallation.

Thisunitmustbeinstalledinaccordancewithwatersupplybyelaws,currentIEEregulationsandrelevantlocalauthoritybyelaws.

TheseproductsareapprovedtotheLVDandEMCdirectivesandCEendorsed.

ZipHydroboilhasbeenexamined,testedandfoundwhencorrectlyfittedtocomplywiththerequirementsoftheUnitedKingdomWaterRegulations/Byelaws(Scotland).TheproductsarelistedundertheWRAS(WaterRegulationsAdvisoryScheme)WaterFittingsandMaterialsDirectory.

ZipHeaters(UK)Ltdcannotbeheldliableforanydamagescausedbyfailuretoobservetheseinstructions.

Page 4: Zip Hydroboil

Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01 Page 4 of 12

Accessories:Inline FilterFL064 6”(Fortasteandodourremovalwithscalereduction)Drip TrayZD001 StainlessSteel(withdrain)ZD002 StainlessSteel(nodrain)Cup DispenserZE001 Stainless SteelZE002 White PlasticZE010 MugRackCounter Stand ZE004 For HS001ZE006 Fot HS003ZE007 For HS005, HS105ZE008 For HS007, HS107TundishZD100 WallMountedChromeTundishZD101 SinkMountedChromeTundishWater BlockHE45004Recommended;fittedintothesupplylinetominimisepotentialdamageintheeventofleakage.Pressure ReducerAQ3 Combinedpressurereducer(setat3.5bar)andlinestrainer.

Read These Warnings First

Product Specifications

Model Finish CapacityLitres

DeliveryCups @ any onetime

RecoveryCups per

hour

RatingkW@230V

Widthmm

Depthmm

Heightmm

WeightEmpty

Kg

WeightFilled

Kg

HS001 White 1.5 9 100 1.5 289 180 335 7.0 10.0

HS003 White 3.0 18 100 1.5 289 180 431 8.0 12.5

HS005 White 5.0 30 140 2.4 318 198 465 9.5 16.5

HS105 s/steel 5.0 30 140 2.4 318 198 465 9.5 16.5

HS007 White 7.5 45 180 2.4 318 198 578 11.0 20.5

HS107 s/steel 7.5 45 180 2.4 318 198 578 11.0 20.5Water Inlet Pressure: 0.07MPa(0.7bar)minimum/0.7MPa(7bar)maximum. Protection class IP23

WARNING: Situations that could cause injury to yourself or others.

CAUTION: Situationsthatcouldcausedamagetoyourapplianceorotherequipment.

NOTE: Notes,usagetipsoradditionalinformation.

IMPORTANT:

PLEASE READ THESE INSTRUCTIONS CAREFULLY. NOTE THE SAFE OPERATIONAL REQUIREMENTS, WARNINGS AND CAUTIONS. USE THIS PRODUCT CORRECTLY AND WITH CARE FOR THE PURPOSE FOR WHICH IT IS INTENDED. FAILURE TO DO SO MAY CAUSE DAMAGE AND/OR PERSONAL INJURY, AND WILL INVALIDATE THE WARRANTY. RETAIN THESE INSTRUCTIONS FOR FUTURE USE.

Page 5: Zip Hydroboil

Page 5 of 12 Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01

Installation Requirements

Beforeinstalling,ensurethatthefollowingareavailable:

a. Sufficientspacetopositiontheheatersothereisatleast150mmclearanceabovetheheaterforserviceaccess,65mmtoitsleftand20mmtoitsrightthetapoutletusuallyshouldbepositionedatleast200mmaboveadrainingboard or drip tray.

Read These Warnings First Continued

SafetyThisapplianceisnotintendedforusebypersons(includingchildren)withreducedphysicalsensoryormentalcapabilities,orlackofexperienceandknowledgeunlesstheyhavebeengivensupervisionorinstruction concerning use of the appliance by a person responsible for their safety. Children should be supervisedtoensurethattheydonotplaywiththeappliance.

Pleasereadallinstallationrequirements,installationproceduresandprecautionsbeforeinstallinganyZipHydroboilinstantboilingwaterheater.

NeverattempttoinstallanyZipHydroboilinstantboilingwaterheaterwithoutreadingalloftheapplicableinstructions.

Careshouldbetakentoavoidtouchingthemetalbodyofthetapwhichcanbecomeveryhot.

InsomehardwaterareaswheremineralscaleaccumulationintheboilingchamberoftheZipHydroboilmaybecomeaproblem,considerationshouldbegiventothemaintenancerequired.Asuitableformofwatertreatmentmaybenecessary.

Astheinstaller,itisyourresponsibilitytosupply(ifnecessary)andinstallallvalvesasrequiredbylocalregulationsandrelevant standards.

TheplumbinginstallationmustbedoneinaccordancewithlocalWaterAuthorityregulationsandtheseInstallationInstructions.

This appliance must be earthed.Ifthepowercableisdamageditmustberepairedonlybyaqualifiedtechnician.Toavoidhazards,allinstallationproceduresmustbecarriedoutbyasuitablyqualifiedtradesperson.Thepowercableandpoweroutletmustbeinasafevisible position for connection.

Thepowercablemustbeadequatelysecured.

Donotremovethecoveroftheheaterunderanycircumstanceswithoutfirstisolatingtheheaterfromthepowersupply.

Theappliance,itswiringandpipingmustnotbemodifiedinanyway.

Theappliancemustbecompletelyfilledwithwaterbeforebeingswitchedon.Incaseofmalfunctionisolatethepowersupplyimmediately.Incaseofleaksalsoisolatethewatersupply.RepairsmustonlybecarriedoutbyZipHeaters(UK)LtdoranauthorisedZipserviceengineer.

LiftingTakecarewhenliftingtheZipHydroboilunit.Someunitsmayexceedsafeliftinglimits.Ifyoufeelthisisbeyondyourpersonalcapabilities,pleaseseekassistancewiththelift.Seespecificationsonpage4forweights.Operating Conditions:Theambienttemperaturesthisunitshouldoperatewithinis5ºC-50ºC.Frostprotection:Ifthisheaterislocatedwhereambientairtemperaturecouldfallbelow5ºC;whentheheaterisnotinuse,donotturnofftheapplianceelectrically.Thissafeguardwillprotecttheunitfromfrostdamagebutdoesnotofferthesameprotectiontotheconnectingpipeworkandfittings.Thisheaterisintendedonlyforindooruseandshouldneverbeinstalledoutdoorsorbeexposedtotheelementsofnature.

Thisunitmustnotbepositionedinanareathatmaybecleanedbyawaterjet.Thisunitmustnotbecleanedbyawaterjet.

Cleaning: Hydroboil should only be wiped clean with a damp cloth. Never use abrasive cleaning agents or solvents on any part of the Hydroboil, particularly the tap.

Page 6: Zip Hydroboil

Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01 Page 6 of 12

Before You BeginLocatethepapermounting-holetemplatepackedwiththeheater.

Readtheinstallationandoperatinginstructionscompletely.

Decidewhethertoinstallwithconcealedorexposedplumbingand/orelectricalconnections. Concealed connections are preferred for superior appearance.

Step 1 – PositioningPositiontheheatersothetapwilldrainontoadrainingboardordriptray.

Positionthebaseofthetaptobenotlessthan200mmabovethedrainingboard(heightshouldbeincreasedonlyifessentialforfillinglargervessels).

Provideclearanceforserviceaccessofnotlessthan150mmtop,65mmleft,20mmright.

Markcornerpositionsfortheheateronthewallsoastopositionthepapermounting-holetemplate.

Step 2 – FasteningPositionmounting-holetemplateonwallanddrillholeswhereshown.

Drillholesforwaterinlet,ventoutletandwiringifrearaccessisintended.

Removecoverfasteningscrews(asshownbelow)fromheaterandliftwholecover off heater.

Installplumbingandwiringandpreparepipeendsandwiringendsasshown.

Screwheaterchassistothewallusingthesuppliedfixings,ensurethefixingsaresuitableforthesubstrate.Ifnotsupplyyourownsuitablefixings.

Ensurethemountingsurfaceiscapableofsupportingtheweightofthefilledunit,fixingsmustbecapableofsupportingtheheaterweightwhenfilled.SeeProductspecificationsforfilledweights.

Installation Procedures

COLD INLET

VENTOUTLET

INLET POSITION

VENT POSITION

MinimumClearanceinmmb. Electrical supply.

Astandard13ampdoublepolefusedspuronthewallwithin1500mmofthe heater. Isolationswitchesmusthaveacontactseparationofatleast3mminallpoles.The circuit should be protected by a suitably rated RCD. TheelectricalinstallationshouldcomplywithcurrentIEEregulationsandanyLocalAuthorityrequirements.

c. Apotablecoldwatersupplywithaminimumworkingpressureof0.07MPa(0.7bar)andamaximumworkingpressureof0.7MPa(7bar)connected via an isolation valve.

d. Outletdrainagetoasinkdrainingboardortoadriptray.

e. Accesstodrainagefromaventsituatedatthebaseoftheheater.

f. Ifthewaterpressureislikelytoexceed0.7MPa(7bar),a0.35MPa (3.5bar)pressurereducingvalvemustbeinstalledinthecoldwatersupply line.

g. Inallinstallationinstancesthewallsoftheheatermustbeverticalandthebasehorizontal,therecanbenoexceptionstothisrule.

Installation Requirements Continued

Size Kw Amps1.5 Ltr 1.5kW 13 A3.0 Ltr 2.4kW 13 A5.0 Ltr 2.4kW 13 A7.5 Ltr 2.4kW 13 A

Concealed Services

ExposedServices

Front View

Page 7: Zip Hydroboil

Page 7 of 12 Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01

Installation Procedures Continued

Step 3 – Connecting

a) PlumbingForexposedplumbingconnection,connectthecoldwaterinletpipefromthebaseoftheheaterdirectlytothe15mm(1/2”)compressionfittingswiththenutsand olives provided.

Forconcealedplumbingconnections,connectthecoldwaterpipethroughtherearofthechassisusinga15mm(1/2”)capillaryelbow.

Coldwaterpipesmustbeflushedbeforeconnectiontotheinlet.Anycloggingduetosedimentorfineswilladverselyaffecttheoperationoftheheater.

Theheatermustbeinstalledwithanisolatingvalvewhichallowsittobeisolatedfromthemainssupplyforservicing.

Water pressure requirements:Minimum-0.07MPa(0.7bar)Maximum-0.7MPa(7bar).

Caution:Ifpressureislikelytoexceed0.7MPa(7bar),apressurelimitingvalvemustbeinstalledinthecoldwatersupplyline.Ziprecommendsavalveratedat3.5bar(0.35MPa)forthisapplication(ZippartNo.AQ3).

b) VentingAventatthebaseoftheheatermustbeplumbedtoasafevisiblelocationas,undercertainconditions,itmaydischargecoldorboilingwaterand/orsteam.

Forexposedventplumbing,connectventoutletfromthebaseofheatertoa 15mmorhalfinchODpipewhichhasacontinuousfall,isnomorethan3metreslong,hasnomorethan3rightanglebends,anddischargestoawastewaterdrain.

Forconcealedventplumbing(Fig.a),connectplumbingtotheventoutletfromtheheaterrearusingacapillaryelbowprotruding45mmfromthewall.Theplumbingmustthenbedirectedtoatundishthatmustbeinavisiblelocationbeforebeingplumbedawaytowaste.

Alternativelyattachthetundishtothewall(Fig.b)andplumbawaytowaste.

c) ElectricalForconcealedelectricalconnection,runthepowercablethroughtherearaccessopeningoftheheatertotheterminalblockwithintheheater.

Forsurfacemountinstallationrunthepowercablethroughthecableentryglandatthebottomoftheunittotheterminalblockwithintheheater.Ensurethecableisfirmlysecured.

Isolationswitchesmusthaveacontactseparationofatleast3mminallpoles.

Do not turn the power ONuntilwaterflowsfromthetap.

250mmWiringFig. a

Concealed VentConcealed

Inlet

45mm

Fig. b

VisibleTundishVentline

Surfacemountcable entry

TerminalBlock

Concealed cable entry

Approximate Weights When Filled

1.5Litremodels 10kg

3.0Litremodels 12.5kg

5.0Litremodels 16.5kg

7.5Litremodels 20.5kg

Page 8: Zip Hydroboil

Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01 Page 8 of 12

Installation Procedures Continued

Step 4 – AssemblingPositionthecasingbackontotheheaterandsecurewiththetwotopandtwobottomTorxscrews.

Tap Fitting

Caution! To ensure correct fitment of the tap assembly, follow the instruction a to c below carefully.

Removetheblackplasticcapfromthehotoutlettube.PTFEtapehasbeen pre-appliedtothehotoutlettube(checkitisingoodconditionbeforeproceeding). IfnotremovethedamagedPTFEtapeandcarefullyapplytwotothreecompleteturnsofnewPTFEtapeontothethreadsinaclockwisedirectionasshownalongside.

a. Screwthetapassemblyclockwiseontothetapoutlettube.

b. Continueturningclockwiseuntilthetapassemblyjusttouchesthefasciawithoutpressure.

c. Continuetoturnthetapuptoonefullturnmaximumuntilthetapleverisintheuprightposition.(Donotforcethetapupright;ifyoucannotgetthetaptotheuprightpositionwithoutapplyingundueforce,removethetap,startthethreadinanewpositionorapplyafewmoreturnsofPTFEandrepeat the procedure.

Step 5 – Commissioning

Checkprevioussteps.TurnwatersupplyON.Waterisnowflowingintotheheater,checkallconnectionsforleaks.Waitapproximately5minutesandcheckoutlettapforwater.Thisisachievedbypullingthetaphandleforward.

Do Not turnonthepoweratthisstage.Ensurethetaphandleiscorrectlyadjustedtoitsoptimumposition.

• Screwtheredknurledcapclockwiseuntilhandtightwithoutusingexcessiveforceoratoolofanykind.

• Slowlyunscrewtheknurledcapanti-clockwiseuntilthetapstartstodrip.

• Tightentheknurledcapahalfaturnclockwise.Thedrippingwillstopandthetapwillbesetattheoptimumposition.

Whenthetaphasbeenadjustedandtheunitisfullofwaterturnthepoweron.Thelightinthetapfasciawilllighttoshowpowerison.

Afterashortperiod,boilingwaterwillbeavailableandwillbemaintainedclosetoboilingpointthereafter.Initialheatingperiodsareshowninthetableontheleft.

Tap Operation

ZipHydroboilisfittedwithatwo-waytapforinstantboilingwater.

Care should be taken not to touch the metal body of the tap which can become very hot.

Forinstantboilingwater,gentlypullthetapleverforward.Boilingwaterwillflowuntilthetaphandleisreleased.

Thisoperationgivesfingertipflowcontrolforsafefillingofcupsandmugs.

To fill larger vessels such as teapots and saucepans, rotate the lever 180 degreesanddepressituntilitlocksintoahorizontalposition.

Boilingwaterwillflowuntiltheleverisreturnedtoitsnormalverticalposition.Thisoperationallowsthevesseltobefilledwithoutholdingyourhandwhereitmaybeaffectedbysteam.

Operating Procedures

Inletwatertemperature

15°C 10°C

1.5Litremodels 10min 11min

3.0Litremodels 16min 17min

5.0Litremodels 16min 17min

7.5Litremodels 23min 24min

o-ring

Page 9: Zip Hydroboil

Page 9 of 12 Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01

Template Dimensions

38mm 1.5-3.0L53mm

5.0-7.5L

65mmClearance

56mmPOSITIONING PIN

ELECTRICAL WIRING POSITIONCOLD INLET POSITION

CONCEALEDVENTPOSITION

72mm

15

25

35mm 42mm

COLDINLET VENT

BENCH TOP

38mm 1.5-3.OL53mm

5.0-7.5L

19mm

20mmClearance200mmClearance

150mmClearance

274mm(1.5&3.0L)304mm(5.0&7.5L)

318mm1.5L 416mm3.0L 448mm5.0L 561mm7.5L

Warning:Thisappliancemustbeearthed.Followingremedialservicetheearthingcontinuityoftheheatermustbecheckedbyaqualifiedtechnicianusinganappliancetester,orcontinuitytesterofaccuracyClass5 or better. Class 5 denotes an accuracy of 5% full scale deflection.1. Isolatepowersupply.2. Setmeterto0ohmwithleadsconnectedtogether.3. Connect one test lead to the earth pin on the three pin plug.4. Connect the other test lead to a bare patch of metal (preferably on the

edge) of the top of the cover, then to the front cover of the unit, andthen to the tap top under the plastic paddle. This can be achieved by inserting the probe up from behind the paddle without losing water. Warning:Thewatermaybeboiling-showextracare.

5. Testthatineveryinstancetheelectricalresistancedoesnotexceed1ohm.

Earthing Continuity Verification & Electrical DiagramIf required, an earth continuity testcanbeperformedbytestingbetweenthe earth pin on the products lead and aexposedpieceofmetalonthecaseand the tap body.

Page 10: Zip Hydroboil

Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01 Page 10 of 12

Problem Solving

Maintenance / Cleaning

SINGLE ELEMENT UPTO 3kWWITH 1 POLE THERMAL O/LOAD THERMOSTAT CONTROLLED

RESETT.O.L.

T. STAT.

ELEMENTASSY.

LIGHTFASCIA

T.O.L.

85741

BLACK

WHITE

BROWN

BLA

CK

N

WHITE

BLU

EB

LUE

Neutral wiremust be connected at Terminal blockas shown.

10-5-07: 2.4kW was originally 3.6kW. Change was as per B.C.'s mark-up.

L N

SINGLE ELEMENT UPTO 3kWWITH 1 POLE THERMAL O/LOAD THERMOSTAT CONTROLLED

RESETT.O.L.

T. STAT.

ELEMENTASSY.

LIGHTFASCIA

T.O.L.

85741

BLACK

WHITE

BROWN

BLA

CK

N

WHITE

BLU

EB

LUE

Wiring DiagramSingleElementupto3kWwith1Pole.T.O/L:ThermalOverLoad. ThermostatControlled

Symptom Possible Cause Solution

Failstodispensewater.

Water isolating valve turned off. Checkisolationvalveisturnedon.Blockedfilterormetertube.

Contact Zip authorised agent.Blockedstrainer.

Jammedballvalveassembly.Airlockintransfertube.

Water not boiling.Nopower. Checkpowersupply.

Faultythermostat,elementorcutout. Contact Zip authorised agent.Runsoutofboilingwaterandfailstorefill.

Internaladjustment. Contact Zip authorised agent.

Outlet tap drips.Overflowfromvent.Excessivesteamfromvent.Power“on”butnoheat.Overloadrepeatedlytrippingwithexcessivesteam.

Overloadrepeatedlytrippingwithoutexcessivesteam

Formaintenanceandsixmonthlysafetychecks,pleaserefertothePreventativeMaintenancesheetNo.85695includedwiththeHydroboil.

Maintenance should be carried out by a Zip authorised technician.

Cleaning Case: Do not use strong, corrosive, spray or abrasive cleaners. Cleanthecasewithasoftclothorbrushandmildsoapandwater.

T.O/L

T.O/L

Page 11: Zip Hydroboil

Page 11 of 12 Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01

Spare Parts

Key Part No Description

1 SP90487 Cisternlidclampkit

2 SP90488 Cisternlidgasketkit

3 SP90490 Gasketkit

4 SP90083 Floatvalvekit,withfloat

5 SP90069 Jumpervalvekit,withseals

6 SP90102 Cistern float

7 SP90493 Transfertubekit–1.5kW

7 SP90494 Transfertubekit–2.4kW

7 SP90531 Transfertubekit–3kW

8 SP90495 Banjoscrew

9 SP90496 O-ringkitcomplete

10 SP90517 Fascia&lenskit

11 SP90110 Fascialightkit

12 SP90081 Thermostatkit1.5–25litres

13 SP90127 Overloadkit,otherHSmodels

14 SP90501 Taptopkit

15 SP90502 Tapassemblycomplete

16 SP90503 Strap&keykit1.5–3litres

Key Part No Description

16 SP90504 Strap&keykit5&7.5litres

17 SP90505 Tapnutkit

18 SP90506 Tapextension

19 SP80563 Elementkit1.5kW110v1.5&3litres

19 SP90485 Elementkit1.5kW240v1.5&3litres

19 SP90486 Elementkit2.4kW240v5.0&7.5litres

20 SP90491 Cleaningholecoverkit

21 SP90492 Draincap&sealkit

SP90522 Cisternjetnozzlekit

SP90132 Hottanklid&gasketsfor5&7.5litres

SP90131 Hottanklid&gasketsfor1.5&3.0litres

SP90130 Lid clips

SP81230 TapFlowrestrictor

SP88296 Cisterntank1.5–7.5litres

SP88490 CisternTankGrommetKit

SP88394 3LMaintankcomplete

SP88264 5LMaintankcomplete

SP88381 7.5LMaintankcomplete

Page 12: Zip Hydroboil

Page 12 of 12 Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01

Head Office

ZipHeaters(UK)Ltd14 Bertie Ward WayDerehamNorfolkNR191TE

Website:[email protected]: 0870 6 005 005Facsimile:01362692448

CertainwarrantiesmaybeimpliedbylawintoyourcontractwithZip.Thewarrantyprovidedbelowisadditionaltotheseimpliedwarrantiesandnothingsetoutbelowshalllimityourstatutoryrightsorrightsatlaw.ZipHeaters(UK)Ltdwarrantsthat,shouldanypartfailwithin24calendarmonthsofinstallation,thatpartwillberepairedorreplacedfreeofchargebyZiporitsDistributororServiceProvider,exceptassetoutbelow,providedtheapplianceisinstalledandusedstrictlyinaccordancewiththeinstructionssupplied,andthatfailureisnotduetoaccident,misuse,abuse,unsuitablewaterconditions,ortoanyalteration,modificationorrepairbyanypartynotexpresslynominatedbyZip.

Nocostsarepayablebythecustomerotherthananymileageortravelling-timechargesincurredbyaZipServiceProviderorthecostofremoval,cartageandre-installationofanycomponentoftheapplianceifitneedstobereturnedforrepair to Zip or its Distributor.

Thiswarrantydoesnotcoverdamageresultingfromnon-operationoftheappliance,theuseofnonauthorisedpartsorconsequentialdamagetoanyother goods, furnishings or property.

Nowarrantyappliestothelifeofanyfiltrationcartridgeinstalledwiththeapplianceascartridgelifemayvaryaccordingtowaterqualityandtherateofwaterconsumption.

Zipdoesnotexclude,restrictormodifyanyliabilitythatcannotbeexcluded,restrictedormodifiedorwhichcannot,excepttoalimitedextent,beexcluded,restrictedormodifiedasbetweentheowneroruserandZipunderthelawsapplicable.

Furthermore,thiswarrantydoesnotdisplaceanystatutorywarranty,but,totheextenttowhichZipisentitledtodoso,theliabilityofZipunderanystatutorywarrantywillbelimitedatZip’soptiontothereplacementoftheapplianceorsupplyofequivalentappliance,thepaymentofthecostofreplacingtheapplianceoracquiringanequivalentappliance,orthepaymentofthecostofhaving the appliance repaired or the repair of the appliance.

Registering Your Purchase

RegisteringyourZipinstallationontheZipwebsitemayhelptoestablishdateofinstallationshoulditbecomenecessarytoservicetheapplianceundertermsoftheZipwarranty.Toregisteryourinstallationgotowww.zipheaters.co.ukandlookundertheheading“Warranty”.

As Zip policy is one of continuous product improvement, changes tospecificationsmaybemadewithoutpriornotice.Imagesinthisbooklethavebeenmodifiedandmaynotbetruerepresentationsofthefinishedgoods.

End of life disposal

Warranty Information

Theuseofthiscrossedoutwheeledbinlogoindicatesthatthisproductneedstobedisposedofseparatelytoanyotherhouseholdwaste.WithineachoftheEuropeanUnionmembercountries,provisionshavebeenmadeforthecollectionandrecyclingofunwantedelectricalandelectronicequipment.Inordertopreserveourenvironmentweaskthatyoudisposeofthisproductcorrectly.PleasecontactZipCustomerServiceforadviceon08456005005.