Upload
others
View
10
Download
0
Embed Size (px)
Citation preview
Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01 Page 1 of 12
Installation and Operating Instructions
Zip Hydroboil Instant boiling water
HS001 Zip Hydroboil 1.5 Litre White HS003 Zip Hydroboil 3.0 Litre White HS005 Zip Hydroboil 5.0 Litre White HS105 Zip Hydroboil 5.0 Litre Stainless Steel HS007 Zip Hydroboil 7.5 Litre White HS107 Zip Hydroboil 7.5 Litre Stainless Steel
®
Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01 Page 2 of 12
Installation Checklist
Before Installation:A. Read the instructions.
B. Note:Allfittingsaresuppliedwiththeappliancekitexceptisolation valveandpressurereductionvalve,whicharenotsupplied.
C. Checkthewaterqualitytodetermineifextrafiltrationwillbe required.Apotablemainswatersupplymustbeused.
Tocombatthebuildupoflimescale,ahighperformanceinline filter(notsuppliedasstandardequipment)maybeorderedfrom yourZipserviceprovider.(SeeProductAccessoriespage4)
D. Checktheapplianceratingplateandensurecorrectpoweris available for the appliance.
E. Checkthewallsupportingtheapplianceisadequateforthetotal weightoftheappliance,whenfullofwater.
Before Commissioning:1. Checktheunithasbeeninstalledcorrectly.
2. Checkallplumbingfittingshavebeentightened.
3. Ensure the vent pipe is positioned to drain correctly.
4. Checkallelectricalconnectionsarecorrectandtherearenoloose wires.
Commission:7. Flush the supply line before connecting.
8. Turnonthewater,allowtofillandcheckforleaks.
9. Turnonthepower.
WallmountedOver-sinkapplianceforinstantboilingwater.
Features:• Designedtooperatewithin1°Cofboilingpoint.
• Temperaturecontrolsautomaticallycutoffthepowerintheeventoftemperaturecontrolfailure,boildrycutoutorablockedventpipe.
• Incorporatingapulldowntapforprecisionfillingofcups,italsolocks‘ON’ for filling pots.
• Separatesthecoldwatersupplyfromtheboilingchamberandtheinternalcondensingsystemretainssteamwithintheheater.
• Astainlesssteelcrevicefree,boilingchamberwithserviceaccessportstopandbottom.
• Hightemperaturethermalinsulationwithprovisionforserviceaccesstotheboilingchamber.
• Concealedplumbingandelectricalconnections.
• Choiceofstainlesssteelorwhiteenamelledsteelcase.
Description
Page 3 of 12 Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01
Contents
Product Specifications / Accessories ...........................................................................................................................4
Read These Warnings First ..................................................................................................................................... 4 - 5
Installation Requirements .............................................................................................................................................5
Installation Procedures ........................................................................................................................................... 6 - 8
Step 1 – Positioning .................................................................................................................................6
Step 2 – Fastening ...................................................................................................................................6
Step 3 – Connecting ................................................................................................................................7
a)Plumbing ................................................................................................................................7
b)Venting...................................................................................................................................7
c)Electrical ................................................................................................................................7
Step4–Assembling ................................................................................................................................8
Tap Fitting ..................................................................................................................................8
Step5–Commissioning .........................................................................................................................8
Operating Procedures ..................................................................................................................................................8
Wall Mounting Template Dimensions ..........................................................................................................................9
Earth Continuity Verification / Wiring Diagram. ................................................................................................ 10 - 11
Problem Solving...........................................................................................................................................................11
Maintenance ................................................................................................................................................................11
Spare Parts ..................................................................................................................................................................11
End of life disposal ......................................................................................................................................................12
Warranty / Contact Details ..........................................................................................................................................12
NOTE:
Read all instructions and precautions before proceeding. If in doubt, or need further guidance, please call Zip on 0845 6 005 005.
Pleaseleavetheseinstructionswiththeenduserafterinstallation.
Thisunitmustbeinstalledinaccordancewithwatersupplybyelaws,currentIEEregulationsandrelevantlocalauthoritybyelaws.
TheseproductsareapprovedtotheLVDandEMCdirectivesandCEendorsed.
ZipHydroboilhasbeenexamined,testedandfoundwhencorrectlyfittedtocomplywiththerequirementsoftheUnitedKingdomWaterRegulations/Byelaws(Scotland).TheproductsarelistedundertheWRAS(WaterRegulationsAdvisoryScheme)WaterFittingsandMaterialsDirectory.
ZipHeaters(UK)Ltdcannotbeheldliableforanydamagescausedbyfailuretoobservetheseinstructions.
Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01 Page 4 of 12
Accessories:Inline FilterFL064 6”(Fortasteandodourremovalwithscalereduction)Drip TrayZD001 StainlessSteel(withdrain)ZD002 StainlessSteel(nodrain)Cup DispenserZE001 Stainless SteelZE002 White PlasticZE010 MugRackCounter Stand ZE004 For HS001ZE006 Fot HS003ZE007 For HS005, HS105ZE008 For HS007, HS107TundishZD100 WallMountedChromeTundishZD101 SinkMountedChromeTundishWater BlockHE45004Recommended;fittedintothesupplylinetominimisepotentialdamageintheeventofleakage.Pressure ReducerAQ3 Combinedpressurereducer(setat3.5bar)andlinestrainer.
Read These Warnings First
Product Specifications
Model Finish CapacityLitres
DeliveryCups @ any onetime
RecoveryCups per
hour
RatingkW@230V
Widthmm
Depthmm
Heightmm
WeightEmpty
Kg
WeightFilled
Kg
HS001 White 1.5 9 100 1.5 289 180 335 7.0 10.0
HS003 White 3.0 18 100 1.5 289 180 431 8.0 12.5
HS005 White 5.0 30 140 2.4 318 198 465 9.5 16.5
HS105 s/steel 5.0 30 140 2.4 318 198 465 9.5 16.5
HS007 White 7.5 45 180 2.4 318 198 578 11.0 20.5
HS107 s/steel 7.5 45 180 2.4 318 198 578 11.0 20.5Water Inlet Pressure: 0.07MPa(0.7bar)minimum/0.7MPa(7bar)maximum. Protection class IP23
WARNING: Situations that could cause injury to yourself or others.
CAUTION: Situationsthatcouldcausedamagetoyourapplianceorotherequipment.
NOTE: Notes,usagetipsoradditionalinformation.
IMPORTANT:
PLEASE READ THESE INSTRUCTIONS CAREFULLY. NOTE THE SAFE OPERATIONAL REQUIREMENTS, WARNINGS AND CAUTIONS. USE THIS PRODUCT CORRECTLY AND WITH CARE FOR THE PURPOSE FOR WHICH IT IS INTENDED. FAILURE TO DO SO MAY CAUSE DAMAGE AND/OR PERSONAL INJURY, AND WILL INVALIDATE THE WARRANTY. RETAIN THESE INSTRUCTIONS FOR FUTURE USE.
Page 5 of 12 Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01
Installation Requirements
Beforeinstalling,ensurethatthefollowingareavailable:
a. Sufficientspacetopositiontheheatersothereisatleast150mmclearanceabovetheheaterforserviceaccess,65mmtoitsleftand20mmtoitsrightthetapoutletusuallyshouldbepositionedatleast200mmaboveadrainingboard or drip tray.
Read These Warnings First Continued
SafetyThisapplianceisnotintendedforusebypersons(includingchildren)withreducedphysicalsensoryormentalcapabilities,orlackofexperienceandknowledgeunlesstheyhavebeengivensupervisionorinstruction concerning use of the appliance by a person responsible for their safety. Children should be supervisedtoensurethattheydonotplaywiththeappliance.
Pleasereadallinstallationrequirements,installationproceduresandprecautionsbeforeinstallinganyZipHydroboilinstantboilingwaterheater.
NeverattempttoinstallanyZipHydroboilinstantboilingwaterheaterwithoutreadingalloftheapplicableinstructions.
Careshouldbetakentoavoidtouchingthemetalbodyofthetapwhichcanbecomeveryhot.
InsomehardwaterareaswheremineralscaleaccumulationintheboilingchamberoftheZipHydroboilmaybecomeaproblem,considerationshouldbegiventothemaintenancerequired.Asuitableformofwatertreatmentmaybenecessary.
Astheinstaller,itisyourresponsibilitytosupply(ifnecessary)andinstallallvalvesasrequiredbylocalregulationsandrelevant standards.
TheplumbinginstallationmustbedoneinaccordancewithlocalWaterAuthorityregulationsandtheseInstallationInstructions.
This appliance must be earthed.Ifthepowercableisdamageditmustberepairedonlybyaqualifiedtechnician.Toavoidhazards,allinstallationproceduresmustbecarriedoutbyasuitablyqualifiedtradesperson.Thepowercableandpoweroutletmustbeinasafevisible position for connection.
Thepowercablemustbeadequatelysecured.
Donotremovethecoveroftheheaterunderanycircumstanceswithoutfirstisolatingtheheaterfromthepowersupply.
Theappliance,itswiringandpipingmustnotbemodifiedinanyway.
Theappliancemustbecompletelyfilledwithwaterbeforebeingswitchedon.Incaseofmalfunctionisolatethepowersupplyimmediately.Incaseofleaksalsoisolatethewatersupply.RepairsmustonlybecarriedoutbyZipHeaters(UK)LtdoranauthorisedZipserviceengineer.
LiftingTakecarewhenliftingtheZipHydroboilunit.Someunitsmayexceedsafeliftinglimits.Ifyoufeelthisisbeyondyourpersonalcapabilities,pleaseseekassistancewiththelift.Seespecificationsonpage4forweights.Operating Conditions:Theambienttemperaturesthisunitshouldoperatewithinis5ºC-50ºC.Frostprotection:Ifthisheaterislocatedwhereambientairtemperaturecouldfallbelow5ºC;whentheheaterisnotinuse,donotturnofftheapplianceelectrically.Thissafeguardwillprotecttheunitfromfrostdamagebutdoesnotofferthesameprotectiontotheconnectingpipeworkandfittings.Thisheaterisintendedonlyforindooruseandshouldneverbeinstalledoutdoorsorbeexposedtotheelementsofnature.
Thisunitmustnotbepositionedinanareathatmaybecleanedbyawaterjet.Thisunitmustnotbecleanedbyawaterjet.
Cleaning: Hydroboil should only be wiped clean with a damp cloth. Never use abrasive cleaning agents or solvents on any part of the Hydroboil, particularly the tap.
Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01 Page 6 of 12
Before You BeginLocatethepapermounting-holetemplatepackedwiththeheater.
Readtheinstallationandoperatinginstructionscompletely.
Decidewhethertoinstallwithconcealedorexposedplumbingand/orelectricalconnections. Concealed connections are preferred for superior appearance.
Step 1 – PositioningPositiontheheatersothetapwilldrainontoadrainingboardordriptray.
Positionthebaseofthetaptobenotlessthan200mmabovethedrainingboard(heightshouldbeincreasedonlyifessentialforfillinglargervessels).
Provideclearanceforserviceaccessofnotlessthan150mmtop,65mmleft,20mmright.
Markcornerpositionsfortheheateronthewallsoastopositionthepapermounting-holetemplate.
Step 2 – FasteningPositionmounting-holetemplateonwallanddrillholeswhereshown.
Drillholesforwaterinlet,ventoutletandwiringifrearaccessisintended.
Removecoverfasteningscrews(asshownbelow)fromheaterandliftwholecover off heater.
Installplumbingandwiringandpreparepipeendsandwiringendsasshown.
Screwheaterchassistothewallusingthesuppliedfixings,ensurethefixingsaresuitableforthesubstrate.Ifnotsupplyyourownsuitablefixings.
Ensurethemountingsurfaceiscapableofsupportingtheweightofthefilledunit,fixingsmustbecapableofsupportingtheheaterweightwhenfilled.SeeProductspecificationsforfilledweights.
Installation Procedures
COLD INLET
VENTOUTLET
INLET POSITION
VENT POSITION
MinimumClearanceinmmb. Electrical supply.
Astandard13ampdoublepolefusedspuronthewallwithin1500mmofthe heater. Isolationswitchesmusthaveacontactseparationofatleast3mminallpoles.The circuit should be protected by a suitably rated RCD. TheelectricalinstallationshouldcomplywithcurrentIEEregulationsandanyLocalAuthorityrequirements.
c. Apotablecoldwatersupplywithaminimumworkingpressureof0.07MPa(0.7bar)andamaximumworkingpressureof0.7MPa(7bar)connected via an isolation valve.
d. Outletdrainagetoasinkdrainingboardortoadriptray.
e. Accesstodrainagefromaventsituatedatthebaseoftheheater.
f. Ifthewaterpressureislikelytoexceed0.7MPa(7bar),a0.35MPa (3.5bar)pressurereducingvalvemustbeinstalledinthecoldwatersupply line.
g. Inallinstallationinstancesthewallsoftheheatermustbeverticalandthebasehorizontal,therecanbenoexceptionstothisrule.
Installation Requirements Continued
Size Kw Amps1.5 Ltr 1.5kW 13 A3.0 Ltr 2.4kW 13 A5.0 Ltr 2.4kW 13 A7.5 Ltr 2.4kW 13 A
Concealed Services
ExposedServices
Front View
Page 7 of 12 Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01
Installation Procedures Continued
Step 3 – Connecting
a) PlumbingForexposedplumbingconnection,connectthecoldwaterinletpipefromthebaseoftheheaterdirectlytothe15mm(1/2”)compressionfittingswiththenutsand olives provided.
Forconcealedplumbingconnections,connectthecoldwaterpipethroughtherearofthechassisusinga15mm(1/2”)capillaryelbow.
Coldwaterpipesmustbeflushedbeforeconnectiontotheinlet.Anycloggingduetosedimentorfineswilladverselyaffecttheoperationoftheheater.
Theheatermustbeinstalledwithanisolatingvalvewhichallowsittobeisolatedfromthemainssupplyforservicing.
Water pressure requirements:Minimum-0.07MPa(0.7bar)Maximum-0.7MPa(7bar).
Caution:Ifpressureislikelytoexceed0.7MPa(7bar),apressurelimitingvalvemustbeinstalledinthecoldwatersupplyline.Ziprecommendsavalveratedat3.5bar(0.35MPa)forthisapplication(ZippartNo.AQ3).
b) VentingAventatthebaseoftheheatermustbeplumbedtoasafevisiblelocationas,undercertainconditions,itmaydischargecoldorboilingwaterand/orsteam.
Forexposedventplumbing,connectventoutletfromthebaseofheatertoa 15mmorhalfinchODpipewhichhasacontinuousfall,isnomorethan3metreslong,hasnomorethan3rightanglebends,anddischargestoawastewaterdrain.
Forconcealedventplumbing(Fig.a),connectplumbingtotheventoutletfromtheheaterrearusingacapillaryelbowprotruding45mmfromthewall.Theplumbingmustthenbedirectedtoatundishthatmustbeinavisiblelocationbeforebeingplumbedawaytowaste.
Alternativelyattachthetundishtothewall(Fig.b)andplumbawaytowaste.
c) ElectricalForconcealedelectricalconnection,runthepowercablethroughtherearaccessopeningoftheheatertotheterminalblockwithintheheater.
Forsurfacemountinstallationrunthepowercablethroughthecableentryglandatthebottomoftheunittotheterminalblockwithintheheater.Ensurethecableisfirmlysecured.
Isolationswitchesmusthaveacontactseparationofatleast3mminallpoles.
Do not turn the power ONuntilwaterflowsfromthetap.
250mmWiringFig. a
Concealed VentConcealed
Inlet
45mm
Fig. b
VisibleTundishVentline
Surfacemountcable entry
TerminalBlock
Concealed cable entry
Approximate Weights When Filled
1.5Litremodels 10kg
3.0Litremodels 12.5kg
5.0Litremodels 16.5kg
7.5Litremodels 20.5kg
Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01 Page 8 of 12
Installation Procedures Continued
Step 4 – AssemblingPositionthecasingbackontotheheaterandsecurewiththetwotopandtwobottomTorxscrews.
Tap Fitting
Caution! To ensure correct fitment of the tap assembly, follow the instruction a to c below carefully.
Removetheblackplasticcapfromthehotoutlettube.PTFEtapehasbeen pre-appliedtothehotoutlettube(checkitisingoodconditionbeforeproceeding). IfnotremovethedamagedPTFEtapeandcarefullyapplytwotothreecompleteturnsofnewPTFEtapeontothethreadsinaclockwisedirectionasshownalongside.
a. Screwthetapassemblyclockwiseontothetapoutlettube.
b. Continueturningclockwiseuntilthetapassemblyjusttouchesthefasciawithoutpressure.
c. Continuetoturnthetapuptoonefullturnmaximumuntilthetapleverisintheuprightposition.(Donotforcethetapupright;ifyoucannotgetthetaptotheuprightpositionwithoutapplyingundueforce,removethetap,startthethreadinanewpositionorapplyafewmoreturnsofPTFEandrepeat the procedure.
Step 5 – Commissioning
Checkprevioussteps.TurnwatersupplyON.Waterisnowflowingintotheheater,checkallconnectionsforleaks.Waitapproximately5minutesandcheckoutlettapforwater.Thisisachievedbypullingthetaphandleforward.
Do Not turnonthepoweratthisstage.Ensurethetaphandleiscorrectlyadjustedtoitsoptimumposition.
• Screwtheredknurledcapclockwiseuntilhandtightwithoutusingexcessiveforceoratoolofanykind.
• Slowlyunscrewtheknurledcapanti-clockwiseuntilthetapstartstodrip.
• Tightentheknurledcapahalfaturnclockwise.Thedrippingwillstopandthetapwillbesetattheoptimumposition.
Whenthetaphasbeenadjustedandtheunitisfullofwaterturnthepoweron.Thelightinthetapfasciawilllighttoshowpowerison.
Afterashortperiod,boilingwaterwillbeavailableandwillbemaintainedclosetoboilingpointthereafter.Initialheatingperiodsareshowninthetableontheleft.
Tap Operation
ZipHydroboilisfittedwithatwo-waytapforinstantboilingwater.
Care should be taken not to touch the metal body of the tap which can become very hot.
Forinstantboilingwater,gentlypullthetapleverforward.Boilingwaterwillflowuntilthetaphandleisreleased.
Thisoperationgivesfingertipflowcontrolforsafefillingofcupsandmugs.
To fill larger vessels such as teapots and saucepans, rotate the lever 180 degreesanddepressituntilitlocksintoahorizontalposition.
Boilingwaterwillflowuntiltheleverisreturnedtoitsnormalverticalposition.Thisoperationallowsthevesseltobefilledwithoutholdingyourhandwhereitmaybeaffectedbysteam.
Operating Procedures
Inletwatertemperature
15°C 10°C
1.5Litremodels 10min 11min
3.0Litremodels 16min 17min
5.0Litremodels 16min 17min
7.5Litremodels 23min 24min
o-ring
Page 9 of 12 Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01
Template Dimensions
38mm 1.5-3.0L53mm
5.0-7.5L
65mmClearance
56mmPOSITIONING PIN
ELECTRICAL WIRING POSITIONCOLD INLET POSITION
CONCEALEDVENTPOSITION
72mm
15
25
35mm 42mm
COLDINLET VENT
BENCH TOP
38mm 1.5-3.OL53mm
5.0-7.5L
19mm
20mmClearance200mmClearance
150mmClearance
274mm(1.5&3.0L)304mm(5.0&7.5L)
318mm1.5L 416mm3.0L 448mm5.0L 561mm7.5L
Warning:Thisappliancemustbeearthed.Followingremedialservicetheearthingcontinuityoftheheatermustbecheckedbyaqualifiedtechnicianusinganappliancetester,orcontinuitytesterofaccuracyClass5 or better. Class 5 denotes an accuracy of 5% full scale deflection.1. Isolatepowersupply.2. Setmeterto0ohmwithleadsconnectedtogether.3. Connect one test lead to the earth pin on the three pin plug.4. Connect the other test lead to a bare patch of metal (preferably on the
edge) of the top of the cover, then to the front cover of the unit, andthen to the tap top under the plastic paddle. This can be achieved by inserting the probe up from behind the paddle without losing water. Warning:Thewatermaybeboiling-showextracare.
5. Testthatineveryinstancetheelectricalresistancedoesnotexceed1ohm.
Earthing Continuity Verification & Electrical DiagramIf required, an earth continuity testcanbeperformedbytestingbetweenthe earth pin on the products lead and aexposedpieceofmetalonthecaseand the tap body.
Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01 Page 10 of 12
Problem Solving
Maintenance / Cleaning
SINGLE ELEMENT UPTO 3kWWITH 1 POLE THERMAL O/LOAD THERMOSTAT CONTROLLED
RESETT.O.L.
T. STAT.
ELEMENTASSY.
LIGHTFASCIA
T.O.L.
85741
BLACK
WHITE
BROWN
BLA
CK
N
WHITE
BLU
EB
LUE
Neutral wiremust be connected at Terminal blockas shown.
10-5-07: 2.4kW was originally 3.6kW. Change was as per B.C.'s mark-up.
L N
SINGLE ELEMENT UPTO 3kWWITH 1 POLE THERMAL O/LOAD THERMOSTAT CONTROLLED
RESETT.O.L.
T. STAT.
ELEMENTASSY.
LIGHTFASCIA
T.O.L.
85741
BLACK
WHITE
BROWN
BLA
CK
N
WHITE
BLU
EB
LUE
Wiring DiagramSingleElementupto3kWwith1Pole.T.O/L:ThermalOverLoad. ThermostatControlled
Symptom Possible Cause Solution
Failstodispensewater.
Water isolating valve turned off. Checkisolationvalveisturnedon.Blockedfilterormetertube.
Contact Zip authorised agent.Blockedstrainer.
Jammedballvalveassembly.Airlockintransfertube.
Water not boiling.Nopower. Checkpowersupply.
Faultythermostat,elementorcutout. Contact Zip authorised agent.Runsoutofboilingwaterandfailstorefill.
Internaladjustment. Contact Zip authorised agent.
Outlet tap drips.Overflowfromvent.Excessivesteamfromvent.Power“on”butnoheat.Overloadrepeatedlytrippingwithexcessivesteam.
Overloadrepeatedlytrippingwithoutexcessivesteam
Formaintenanceandsixmonthlysafetychecks,pleaserefertothePreventativeMaintenancesheetNo.85695includedwiththeHydroboil.
Maintenance should be carried out by a Zip authorised technician.
Cleaning Case: Do not use strong, corrosive, spray or abrasive cleaners. Cleanthecasewithasoftclothorbrushandmildsoapandwater.
T.O/L
T.O/L
Page 11 of 12 Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01
Spare Parts
Key Part No Description
1 SP90487 Cisternlidclampkit
2 SP90488 Cisternlidgasketkit
3 SP90490 Gasketkit
4 SP90083 Floatvalvekit,withfloat
5 SP90069 Jumpervalvekit,withseals
6 SP90102 Cistern float
7 SP90493 Transfertubekit–1.5kW
7 SP90494 Transfertubekit–2.4kW
7 SP90531 Transfertubekit–3kW
8 SP90495 Banjoscrew
9 SP90496 O-ringkitcomplete
10 SP90517 Fascia&lenskit
11 SP90110 Fascialightkit
12 SP90081 Thermostatkit1.5–25litres
13 SP90127 Overloadkit,otherHSmodels
14 SP90501 Taptopkit
15 SP90502 Tapassemblycomplete
16 SP90503 Strap&keykit1.5–3litres
Key Part No Description
16 SP90504 Strap&keykit5&7.5litres
17 SP90505 Tapnutkit
18 SP90506 Tapextension
19 SP80563 Elementkit1.5kW110v1.5&3litres
19 SP90485 Elementkit1.5kW240v1.5&3litres
19 SP90486 Elementkit2.4kW240v5.0&7.5litres
20 SP90491 Cleaningholecoverkit
21 SP90492 Draincap&sealkit
SP90522 Cisternjetnozzlekit
SP90132 Hottanklid&gasketsfor5&7.5litres
SP90131 Hottanklid&gasketsfor1.5&3.0litres
SP90130 Lid clips
SP81230 TapFlowrestrictor
SP88296 Cisterntank1.5–7.5litres
SP88490 CisternTankGrommetKit
SP88394 3LMaintankcomplete
SP88264 5LMaintankcomplete
SP88381 7.5LMaintankcomplete
Page 12 of 12 Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01
Head Office
ZipHeaters(UK)Ltd14 Bertie Ward WayDerehamNorfolkNR191TE
Website:[email protected]: 0870 6 005 005Facsimile:01362692448
CertainwarrantiesmaybeimpliedbylawintoyourcontractwithZip.Thewarrantyprovidedbelowisadditionaltotheseimpliedwarrantiesandnothingsetoutbelowshalllimityourstatutoryrightsorrightsatlaw.ZipHeaters(UK)Ltdwarrantsthat,shouldanypartfailwithin24calendarmonthsofinstallation,thatpartwillberepairedorreplacedfreeofchargebyZiporitsDistributororServiceProvider,exceptassetoutbelow,providedtheapplianceisinstalledandusedstrictlyinaccordancewiththeinstructionssupplied,andthatfailureisnotduetoaccident,misuse,abuse,unsuitablewaterconditions,ortoanyalteration,modificationorrepairbyanypartynotexpresslynominatedbyZip.
Nocostsarepayablebythecustomerotherthananymileageortravelling-timechargesincurredbyaZipServiceProviderorthecostofremoval,cartageandre-installationofanycomponentoftheapplianceifitneedstobereturnedforrepair to Zip or its Distributor.
Thiswarrantydoesnotcoverdamageresultingfromnon-operationoftheappliance,theuseofnonauthorisedpartsorconsequentialdamagetoanyother goods, furnishings or property.
Nowarrantyappliestothelifeofanyfiltrationcartridgeinstalledwiththeapplianceascartridgelifemayvaryaccordingtowaterqualityandtherateofwaterconsumption.
Zipdoesnotexclude,restrictormodifyanyliabilitythatcannotbeexcluded,restrictedormodifiedorwhichcannot,excepttoalimitedextent,beexcluded,restrictedormodifiedasbetweentheowneroruserandZipunderthelawsapplicable.
Furthermore,thiswarrantydoesnotdisplaceanystatutorywarranty,but,totheextenttowhichZipisentitledtodoso,theliabilityofZipunderanystatutorywarrantywillbelimitedatZip’soptiontothereplacementoftheapplianceorsupplyofequivalentappliance,thepaymentofthecostofreplacingtheapplianceoracquiringanequivalentappliance,orthepaymentofthecostofhaving the appliance repaired or the repair of the appliance.
Registering Your Purchase
RegisteringyourZipinstallationontheZipwebsitemayhelptoestablishdateofinstallationshoulditbecomenecessarytoservicetheapplianceundertermsoftheZipwarranty.Toregisteryourinstallationgotowww.zipheaters.co.ukandlookundertheheading“Warranty”.
As Zip policy is one of continuous product improvement, changes tospecificationsmaybemadewithoutpriornotice.Imagesinthisbooklethavebeenmodifiedandmaynotbetruerepresentationsofthefinishedgoods.
End of life disposal
Warranty Information
Theuseofthiscrossedoutwheeledbinlogoindicatesthatthisproductneedstobedisposedofseparatelytoanyotherhouseholdwaste.WithineachoftheEuropeanUnionmembercountries,provisionshavebeenmadeforthecollectionandrecyclingofunwantedelectricalandelectronicequipment.Inordertopreserveourenvironmentweaskthatyoudisposeofthisproductcorrectly.PleasecontactZipCustomerServiceforadviceon08456005005.