7/27/2019 fds pengabuan medco
http://slidepdf.com/reader/full/fds-pengabuan-medco 1/9
FUNCTION DESIGN SPECIFICATIONS
SSE SCADA UPGRADING
PENGABUAN STATION
2 SEP 28, 2012 FOR REVIEW NM HT HH
3 NOV 13, 2012 FOR REVIEW NM HT HH
REV DATE ISSUE TYPE PREP’D
BYREV’D BY APP’D
BY
CLIENT
APP’D
PT. Integra Automasi
7/27/2019 fds pengabuan medco
http://slidepdf.com/reader/full/fds-pengabuan-medco 2/9
SSE SCADA UPGRADING
TITLE DOCUMENT NUMBER REV DATE PAGE
Functional Design Specification MEP-SCUP-ENG-02.7 3 13-11-12 2 of 9
Pengabuan Station Function Design Specification 2 OF 9
REVISION CONTROL SHEET
Latest
RevDATE ISSUED
PRE’D
BY
REV’D
BYAPP’D BY
CLIENT
APP’D COMMENTS
0 FEB 19, 2012 AT HT HH
1 SEP 4, 2012 NM HT HH
2 SEP 28, 2012 NM HT HH
3 NOV 13, 2012 NM HT HH
7/27/2019 fds pengabuan medco
http://slidepdf.com/reader/full/fds-pengabuan-medco 3/9
SSE SCADA UPGRADING
TITLE DOCUMENT NUMBER REV DATE PAGE
Functional Design Specification MEP-SCUP-ENG-02.7 3 13-11-12 3 of 9
Pengabuan Station Function Design Specification 3 OF 9
TABLE OF CONTENT
1 SYSTEM ARCHITECTURE 4 1.1 SCADA System Architecture 4 1.2 Pengabuan Station Existing System Architecture 4 1.3 Pengabuan Station Proposed System Architecture 5 1.4 Bandwidth Requirement 6 2 SCADA/HMI DESIGN 7 2.1 Overview Pengabuan Station 7 2.2 Alarms 7 2.3 Trending 8 3 BILL OF MATERIALS 9
7/27/2019 fds pengabuan medco
http://slidepdf.com/reader/full/fds-pengabuan-medco 4/9
SSE SCADA UPGRADING
TITLE DOCUMENT NUMBER REV DATE PAGE
Functional Design Specification MEP-SCUP-ENG-02.7 3 13-11-12 4 of 9
Pengabuan Station Function Design Specification 4 OF 9
1 SYSTEM ARCHITECTURE
The Operator Station shall be based on standard off-the-shelf workstation hardware running on a
Windows based operating system. Vijeo Citect is using full 32 bit (65 million) colors. For
integration with existing Historian we use Matrikon OPC Server client for ODBC. This OPC server
is using for logging data to SQL Server.
1.1 SCADA System Architecture
SCADA System centralizes in Soka Office. All parameter in all stations can be monitor in Central
Monitoring room SCADA at Soka Office.
1.2 Pengabuan Station Existing System Architecture
An Existing HMI runtime is Experion HS. and set of redundant PLC system using Honeywell PLC
MasterLogic 200.
7/27/2019 fds pengabuan medco
http://slidepdf.com/reader/full/fds-pengabuan-medco 5/9
SSE SCADA UPGRADING
TITLE DOCUMENT NUMBER REV DATE PAGE
Functional Design Specification MEP-SCUP-ENG-02.7 3 13-11-12 5 of 9
Pengabuan Station Function Design Specification 5 OF 9
1.3 Pengabuan Station Proposed System Architecture
7/27/2019 fds pengabuan medco
http://slidepdf.com/reader/full/fds-pengabuan-medco 6/9
SSE SCADA UPGRADING
TITLE DOCUMENT NUMBER REV DATE PAGE
Functional Design Specification MEP-SCUP-ENG-02.7 3 13-11-12 6 of 9
Pengabuan Station Function Design Specification 6 OF 9
1.4 Bandwidth Requirement
Bandwidth requirement for SCADA is less than 32 Kbps. Please find this example below. This
example is for bandwidth calculation.
Status Register
The 128 Status Register will be retrieve every 250 ms and using Modbus Function code 2
This results is 23 bytes every 250 ms = 92 bytes per second or 736 bits per second = 0.7 kbps
Input Register
The 64 Input Register will be retrieve every 250 ms and using Modbus Function code 4
This results is 141 bytes every 250 ms = 564 bytes per second or 4512 bits per second = 4.5 kbps
Request
8 bytes
Response
15 bytes
Request
8 bytes
Response
133 bytes
7/27/2019 fds pengabuan medco
http://slidepdf.com/reader/full/fds-pengabuan-medco 7/9
SSE SCADA UPGRADING
TITLE DOCUMENT NUMBER REV DATE PAGE
Functional Design Specification MEP-SCUP-ENG-02.7 3 13-11-12 7 of 9
Pengabuan Station Function Design Specification 7 OF 9
2 SCADA/HMI DESIGN
2.1 Overview Pengabuan Station
2.2 Alarms
7/27/2019 fds pengabuan medco
http://slidepdf.com/reader/full/fds-pengabuan-medco 8/9
SSE SCADA UPGRADING
TITLE DOCUMENT NUMBER REV DATE PAGE
Functional Design Specification MEP-SCUP-ENG-02.7 3 13-11-12 8 of 9
Pengabuan Station Function Design Specification 8 OF 9
2.3 Trending
7/27/2019 fds pengabuan medco
http://slidepdf.com/reader/full/fds-pengabuan-medco 9/9
SSE SCADA UPGRADING
TITLE DOCUMENT NUMBER REV DATE PAGE
Functional Design Specification MEP-SCUP-ENG-02.7 3 13-11-12 9 of 9
Pengabuan Station Function Design Specification 9 OF 9
3 BILL OF MATERIALS
ITEM NO. DESCRIPTION Manufacture Model Qty Unit
Hardware & Software
Pengabuan Station
1 SCADA
1.1 Hardware
Wall Mounted Panel Fortuna 12 U 1 Ea
Cable and Accessories 1 Lot
2Engineering and Services
Pengabuan Station
1 Lot
Engineering
Documents