Transcript
Page 1: Geary Corridor Bus Rapid Transit

SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY

Geary Corridor Bus Rapid TransitConceptual Engineering and Environmental Analysis

Merchant SurveyPreliminary Results

Geary Citizens Advisory CommitteeJuly 11, 2013

Page 2: Geary Corridor Bus Rapid Transit

Methodology

Door-to-door merchant outreach from Gough to 33rd Ave.• Outreach on weekdays and a Saturday in May• All businesses visited at least twice• Fact sheets distributed, owners/managers surveyed• Also visited Clement St. businesses

SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY 2

Extent of survey areas

Page 3: Geary Corridor Bus Rapid Transit

Survey responses

• Geary: 569 businesses visited202 survey responses (35%)

• Clement: 295 businesses visited58 survey responses (19%) - not included in analysis

• Compared with previous customer survey (Arguello –26th)

SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY 3

Number of surveys collected by corridor segment

Page 4: Geary Corridor Bus Rapid Transit

Characteristics of Geary businesses

GEARY CORRIDOR BUS RAPID TRANSIT | PROJECT UPDATE 4

0%

10%

20%

30%

40%

1 to 20 21 to 50 51 to 100 101 to 200 More than 200

Percen

t of Total Respo

nses

How many customers visit your business location on an average day?

• Over 70% employ 5 or fewer people

• Most have 50 or fewer daily customers

Page 5: Geary Corridor Bus Rapid Transit

How customers travel to Geary: customer and merchant responses

GEARY CORRIDOR BUS RAPID TRANSIT | PROJECT UPDATE 5

18% 25% 54%

Walk or Bike Transit Auto

49% 28% 22%

Customers surveyed arrived at the corridor by:

Merchants surveyed estimated that their customers arrive by:

Page 6: Geary Corridor Bus Rapid Transit

Perceptions of parking difficulty

GEARY CORRIDOR BUS RAPID TRANSIT | PROJECT UPDATE 6

46%

28%

26%

Merchants said parking for customers arriving by car is…

…usually difficult.

…sometimes difficult.

…usually available. Over 70% of auto customers said…

• They parked less than 2 blocks from their destinations

• It took less than 5 minutes to find a spot

Page 7: Geary Corridor Bus Rapid Transit

Improvements to Geary Boulevard: merchant priorities

GEARY CORRIDOR BUS RAPID TRANSIT | PROJECT UPDATE 7

0%

10%

20%

30%

40%

50%

Preserveparking

Faster,MoreReliable

Muni

PedestrianSafety

Somethingelse

Sidewalkamenities

Landscaping

Per

cent

of R

espo

nses

What would be your highest priority change for Geary Boulevard?

Merchants

Page 8: Geary Corridor Bus Rapid Transit

Improvements to Geary Boulevard: merchant and customer priorities

GEARY CORRIDOR BUS RAPID TRANSIT | PROJECT UPDATE 8

0%

10%

20%

30%

40%

50%

Preserveparking

Faster,MoreReliable

Muni

PedestrianSafety

Somethingelse

Sidewalkamenities

Landscaping

Per

cent

of R

espo

nses

What would be your highest priority change for Geary Boulevard?

Merchants

Customers

Page 9: Geary Corridor Bus Rapid Transit

Effect of BRT on businesses: merchants’ views

GEARY CORRIDOR BUS RAPID TRANSIT | PROJECT UPDATE 9

0%

10%

20%

30%

40%

50%

Good Bad Little or No Effect Not Sure

Per

cent

of R

espo

nses

Merchants

Would faster and more reliable transit service with pedestrian and streetscape enhancements but some parking removal be good or bad for your business?

Page 10: Geary Corridor Bus Rapid Transit

Effect of BRT on businesses: merchants’ and customers’ views

GEARY CORRIDOR BUS RAPID TRANSIT | PROJECT UPDATE 10

0%

10%

20%

30%

40%

50%

Good / More Likely Bad / Less Likely Little or No Effect Not Sure

Per

cent

of R

espo

nses

Merchants

Customers

Customers: Would you be more or less likely to visit Geary businesses if Muni were faster and more reliable and some parking were removed?

Page 11: Geary Corridor Bus Rapid Transit

Survey conclusions

Merchants consider parking critical to their success• Many think BRT with a parking trade-off would hurt

businesses

Yet…• Survey results indicate a disconnect between merchants

and customers regarding how many customers are driving to Geary businesses

• Customers say they would be at least as likely visit Geary businesses with BRT (even with some parking loss)

Next Steps: Incorporate findings into merchant and public outreach in the fall

SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY 11

Page 12: Geary Corridor Bus Rapid Transit

SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY

Questions?


Recommended