Download pdf - Kaitlyn Minix Portfolio

Transcript
Page 1: Kaitlyn Minix Portfolio
Page 2: Kaitlyn Minix Portfolio

Kai

tlyn

Mini

x

ACADEMIC

01

URBAN INFILL02

DANCERS RETREAT03

HOUSE OF CONVERGING PATHS

04

LINK UP

05 ARCHAEOLOGICAL MUSEUM

06

PROJECTS

@N. 19th

Page 3: Kaitlyn Minix Portfolio

N. 19th St.

Zoned EZ-11 Vacant Lot

Zoned R-64 Vacant Structures

Zoned C-1Existing Apt. BuildingEX

IST.

NEW

Baird St.

Lytle St.

Portland Ave.

Bank

St.

N. 19th St.

Portland Promise Center

1.

The Table

2.

To Tim FaulknerGallery

5.

River WalkAccess

3.

West EndMarket

4.

10 Pop-Up Shops1 Public Roof Deck1 Open Market Park 2 Two Bed Apts.

8 Two Bed 21 c. Shotguns

3 Pop-Up Stores1 Private Roof Deck3 One Bed Apts.

8 Two Bed 21 c. Shotguns

Bar w/ Outdoor Seating4 Food Truck Stalls

Zoned R-61 Vacant Lots4 Vacant Structures

Zoned R-6Existing Auto Service

N

01 @N.19th Type: Residential/ CommercialLocation: Louisville, KYProgram Used: RevitIn collaboration with Mark Manczyk

Project Description:@N.19th Development is a mixed-use project located in the Portland Neighborhood of Louisville, Kentucky. The site was chosen based upon the Portland Investment Initiatives areas of redevelopment and the groupings of multiple abandoned properties and empty lots. The program includes 21st Century Shotgun Homes, Pop-Up Shops, and a Food Truck Hub to create a new social center for the community.

original shotgun typology and create a more usable flow within a narrow space. Multiple modules were created, including a kitchen/stair combination and a stacked bathroom/ utility space to allow for standardization within each unit.

The Pop-Up shops are rental spaces with flexibility in size and leasing duration. They are focused towards artists, designers, makers, DIY-ers, and entrepreneurs who are looking to start a new small business.

The Food Truck Hub is a reuse project, including a bar and rentable food truck parking spaces. This allows food truck owners to build a customer base and take advantage of the indoor amenities provided through the bar, including bathrooms, food prep areas, and seating.

The @N.19th Development was designed as a kit of parts that could be implemented on any site, in commu-nities that are looking for new economic and redevelop-ment opportunities.The 21st Century Shotguns were designed to rethink the

Page 4: Kaitlyn Minix Portfolio

SECOND FLOOR

FIRST FLOOR

N. 19TH ST. ELEVATION

Page 5: Kaitlyn Minix Portfolio

SECOND FLOOR FIRST FLOOR

BANK ST. SECTION

Page 6: Kaitlyn Minix Portfolio

02 URBAN INFILL

The program for this Urban Infill Project was to build ahome/studio space for an artist and her husband in New York. This included an art studio, gallery, offices, and general living spaces. I designed the house inorder to take advantage of the various views, includingthose looking out onto the street and those looking out onto the water in back. Thehouse is arranged so that as you move up in floorsthrough the atrium/staircase space, you progress from public to more private areas.

Type: ResidentialLocation: New YorkProgram Used: Revit

Project Description:

A HOUSE OF CONVERGING PATHS KAITLYN MINIXDESIGN STUDIO 354ELEVATIONS

Page 7: Kaitlyn Minix Portfolio

UP

DNUP

DN

1

Level 10' - 0"

Level 210' - 0"

Level 320' - 0"

Level 430' - 0"

40' - 0"

Level 10' - 0"

Level 210' - 0"

Level 320' - 0"

Level 430' - 0"

Level 540' - 0"

Level 650' - 0"

1A106

BUILDINGSECTIONS

CYL

DE

CA R

P EN

T ER

'S S

T UD

I O

1/8" = 1'-0"1 SECTION 1

1/8" = 1'-0"2 SECTION 2 1/8" = 1'-0"WALL SECTION

4" CONCRETE

3" RIGID INSULATION

1" GYPSUM BOARD

4" CONCRETE

2"x4" BLOCKING

3/4" OAK FLOORING3/4" PLYWOOD SHEATHING10 1/2" WOOD JOIST STRUCTURE

CONCRETE FOOTING

5" ALUMINUM MULLIONCURTAIN WALL

SHORT STREET ELEVATION1/16”=1’-0”

WRENN COURT ELEVATION1/8”=1’-0”

THE FAYETTE BUILDING T TRUS123 WEST MAIN

127

MAIN STREET ELEVATION1/16”=1’-0”

A HOUSE OF CONVERGING PATHS KAITLYN MINIXDESIGN STUDIO 354ELEVATIONS

BASEMENT FLOOR PLAN1/32”=1’0”

SECOND FLOOR PLAN1/32”=1’0”

FIRST FLOOR PLAN1/32”=1’0”

THIRD FLOOR PLAN1/32”=1’0”

ROOF PLAN1/32”=1’0”

Page 8: Kaitlyn Minix Portfolio

Level 10' - 0"

10' - 0"

A104

BUILDINGELEVATIONS

CYL

DE

CA R

P EN

T ER

'S S

T UD

I O

UR

BAN

INFI

LL P

RO

JEC

T

NEW

YO

RK,

NEW

YO

RK

Level 430' - 0"

Level 540' - 0"

Level 650' - 0"

1A106 Level 2

10' - 0"

Level 320' - 0"

AR

C 4

0 5 F

AL L

201

4

KA

ITLY

N M

INIX

E C

AR

PE

NT E

R'S

ST U

DI O

UR

BA

N IN

FILL

PR

OJE

CT

NE

W Y

OR

K, N

EW

YO

RK

4" CONCRETE

3" RIGID INSULATION

1" GYPSUM BOARD

4" CONCRETE

2"x4" BLOCKING

5" ALUMINUM MULLION

CURTAIN WALL

SECTION1/32”=1’0”

EAST ELEVATION1/32”=1’0”

Page 9: Kaitlyn Minix Portfolio

03 DANCERS RETREATType: Living Learning CommunityLocation: North CarolinaProgram Used: Rhino

Project Description:The Dancers Retreat was designed as an aggregated living learning community for aspiring dancers in the hills of North Carolina. The public spaces were located in the top three buildings, and the private spaces in the bottom two buildings. Within the private spaces are dorm style apartments featuring a loft. In the public spaces there are dance studios, classrooms, an auditorium, gym, lounge and cafe. The buildings in the community are curved inwards to create a more exclusive environment and better views of the lake.

FIRST FLOOR PLAN1/8”=1’-0”

SECOND FLOOR PLAN1/8”=1’-0”

ROOF PLAN1/8”=1’-0”

A

B

A HOUSE OF CONVERGING PATHS

2 Person Dorm Style Housing UnitsOne Bedroom Housing Units

O ce, Retail & Performance AreaPractice Spaces

Dining/Lounge & Classroom Space

Public Space

Private Space

Page 10: Kaitlyn Minix Portfolio

Perspective Wall SectionNTS1

Glass

Wood slats

Roof garden

Concrete footing

Gypsum board

Exterior Wall Section1/2” = 1’-0”2

plywood on concrete slab

6” wood slats on 3/4”plywood on 2x6” woodstuds

Sealed concrete

2 layers of 5/8” gypsum board

Insulation

Glass

SECTION B1/8”=1’-0”

SITE SECTION 1/32”= 1’-0”

SECTION A1/8”=1’-0”

SHORT STREET ELEVATION1/16”=1’-0”

WRENN COURT ELEVATION1/8”=1’-0”

THE FAYETTE BUILDING T TRUS123 WEST MAIN

127

MAIN STREET ELEVATION1/16”=1’-0”

A HOUSE OF CONVERGING PATHS KAITLYN MINIXDESIGN STUDIO 354ELEVATIONS

SHORT STREET ELEVATION1/16”=1’-0”

WRENN COURT ELEVATION1/8”=1’-0”

THE FAYETTE BUILDING T TRUS123 WEST MAIN

127

MAIN STREET ELEVATION1/16”=1’-0”

A HOUSE OF CONVERGING PATHS KAITLYN MINIXDESIGN STUDIO 354ELEVATIONS

PERSPECTIVE WALL SECTIONNTS

Page 11: Kaitlyn Minix Portfolio

NSITE PLAN

Page 12: Kaitlyn Minix Portfolio

Level 10' - 0"

Level 210' - 0"

Level 10' - 0"

A106

BUILDINGSECTIONS

CY

LD UR

BA

N IN

FILL

PR

OJE

CT

NE

W Y

OR

K, N

EW

YO

RK

1/8" = 1'-0"2 SECTION 2 1/2" = 1'-0"3 WALL SECTION

3/4" PLYWOOD SHEATHING

10 1/2" WOOD JOIST STRUCTURE

CONCRETE FOOTING

ATRIUM

VISITORS CENTER

COFFEE BAR

BIKE SHOP/LEGACY TRAIL

ATRIUM

VISITORS CENTER RETAIL

ATRIUM

VISITORS CENTER

ART GALLERY

PRINTMAKERS CO-OP

FIRST FLOOR PLAN1/32”=1’-0”

SECOND FLOOR PLAN1/32”=1’-0”

THIRD FLOOR PLAN1/32”=1’-0”

UP

EXISTING

NEW

UP

UP

EXISTING

NEW

UP

UP

UP

100’-0”FIRST FLOOR

115’-0”SECOND FLOOR

124’-0”AUDITORIUM

134’-0”THIRD FLOOR

EXISTING

NEW

SECTION

97’-0”FIRST FLOOR

ROOF PLAN1/32”=1’-0”

UP

156’-0” ROOF

EXISTING

NEW

DN D

N

97’-0”FIRST FLOOR

COURTYARD

04 HOUSE OF CONVERGING PATHSType: Mixed UseLocation: Lexington, KYProgram Used: Rhino

Project Description:This Office Building was an adaptive reuse project incorporating several programs and functions. Its design aims to bring the outside in with the use of glass curtain walls and it also offers an escape from the busy city street through its side pocket park. This project was a mix between the old and new, creating a central gathering place in the downtown area.

Page 13: Kaitlyn Minix Portfolio

MAIN ST.

W. SHORT ST.N. UPPER ST.

S. LIM

ESTONE ST.

Limesto

ne

Main

Upper

Legacy TrailProposed RouteParkingSite

POPULATION: 749

White: 44.8% Black: 55.2%

Males: 40.3% Females: 59.7%

HOUSEHOLDS: 671

Family: 20.7% Non-Family: 79.3%

MEDIAN AGE: 48

MAIN ST.

W. VINE ST.

W. SHORT ST.N. UPPER ST.

S. LIMESTONE ST.

S. MILL ST.

B-2B Downtown Center BuisnessSite

1/64”=1’-0”Site Plan

STREETSCAPE

Walking TrafficBiker Traffic

SHORT STREET ELEVATION1/16”=1’-0”

WRENN COURT ELEVATION1/8”=1’-0”

THE FAYETTE BUILDING T TRUS123 WEST MAIN

127

MAIN STREET ELEVATION1/16”=1’-0”

A HOUSE OF CONVERGING PATHS KAITLYN MINIXDESIGN STUDIO 354ELEVATIONS

Page 14: Kaitlyn Minix Portfolio

AWNING SECTION1/8” = 1’-0”

GLASS/BRICK CONNECTION 1/8” = 1’-0”

SHORT STREET ELEVATION1/16”=1’-0”

WRENN COURT ELEVATION1/8”=1’-0”

THE FAYETTE BUILDING T TRUS123 WEST MAIN

127

MAIN STREET ELEVATION1/16”=1’-0”

A HOUSE OF CONVERGING PATHS KAITLYN MINIXDESIGN STUDIO 354ELEVATIONS

SECTION1/32”=1’0”

SHORT STREET ELEVATION1/16”=1’-0”

WRENN COURT ELEVATION1/8”=1’-0”

THE FAYETTE BUILDING T TRUS123 WEST MAIN

127

MAIN STREET ELEVATION1/16”=1’-0”

A HOUSE OF CONVERGING PATHS KAITLYN MINIXDESIGN STUDIO 354ELEVATIONS

SECTION1/32”=1’-0”

FRONT ELEVATION1/32”=1’0”

SIDE ELEVATION1/32”=1’0”

Page 15: Kaitlyn Minix Portfolio

05 ARCHAEOLOGICAL MUSEUMType: MuseumLocation: Program Used: RhinoProject Description:This Archaeological Museum is based on the idea of avertical garden structure sited within the city of Rome. The plan was influenced by the overlooking spaces present in gardens such as those at Villa d’Este and the idea of bringing more green space into the city.In an effort to do this, the walls are covered in live plants on the interior and exterior, offering a beautiful backdrop for the pieces displayed here and for passerbuyers in the community. The garden walls are also curved to help turn the focus away from the fast paced city life and towards the calmness of nature and history. After entering the museum on the main level, visitors are meant to ride the elevator to the third floor, where the museum begins. The roof top and lower level have separate entrances for public use.

Via delle Botteghe Oscure, Rome, Italy

Page 16: Kaitlyn Minix Portfolio

Section ASouth Elevation

Lower Level Floor Plan

Ground Level Floor Plan1/32”=1’0”

First Floor Plan

Section B

Section A

UP

DN

UP

DN

FRONT DESK& GIFT SHOP

100’-0”GROUND FLOOR

RESTRAUANT 80’-0”

LOWER LEVEL

83’-0”LOWER LEVEL

84’-0”LOWER LEVEL

MUSEUM109’-0”

FIRST FLOOR

UP

Via

Cel

sa

UP

81’-0”LOWER LEVEL

82’-0”LOWER LEVEL

Via delle Botteghe Oscure

Second Floor Plan

Third Floor Plan

Roof Plan

DN

UP

DN

MUSEUM118’-0”

SECOND FLOOR

MUSEUM127’-0”

THIRD FLOOR

OUTDOOR SPACE

136’-0”ROOF TOP

BAR

Paris, France

1/32”=1’0”

1/32”=1’0”

1/32”=1’0”

1/32”=1’0”

1/32”=1’0”

1/32”=1’0” 1/32”=1’0”

Page 17: Kaitlyn Minix Portfolio

Section B

East Elevation

Ground Floor

First Floor

Second Floor

Third Floor

Lower Level

Paris, France

1/32”=1’0”

1/32”=1’0”

DIAGRAM

Page 18: Kaitlyn Minix Portfolio

Link Up was designed for Hospice,as a modular unit that could be transported to patients or their families homes for them to live in during their time of care. It can be connected to the original house so that all the medical equipment is located in one safe area. Link Up meets not only the needs of the patient, but also the family and caregivers. It is divided into three areas specific for each user group. The patient area is located at the connection point, so that they can be linked to those who are there to support them.

Type: Modular UnitProgram Used: Rhino

Project Description:

06 LINK UP

Page 19: Kaitlyn Minix Portfolio

ROOF PLAN

FLOOR PLAN1’0” = 1/8”

1’0” = 1/8”

12.50’

14.50’

25.00’

12.50’

14.50’

SECTION A1’0” = 1/8”

SECTION B1’0” = 1/8”

SECTION A

SECTION B

Page 20: Kaitlyn Minix Portfolio

INTERIOR/ HVAC/ PLUMBING

LOW - E GLASS WINDOWS

STRUCTURAL INSULATED PANELS (SIPs)

RECLAIMED WOOD SIDING

PAINTED ALUMINUM PANELS

HYDRAULIC JACKS

RAMPS/ RAIN WATER COLLECTORS

SLOPED ROOF

PHOTOVOLTAIC PANELS

SHADING DEVICES

PRIMARY VIEW

NATURE

VIEW

NATURE VIEW

FAMILY/PUBLIC PATIENTCAREGIVER/PRIVATE

HVAC

WATER HEATER

PROGRAM DIAGRAM

RAMP

LINK 1

LINK 2

WATER CATCHER

WATER CATCHER

CONNECTION DIAGRAM

VIEWS DIAGRAM

Page 21: Kaitlyn Minix Portfolio

RIGHT ELEVATION FRONT ELEVATIONLEFT ELEVATION BACK ELEVATION1’0” = 1/16”1’0” = 1/16” 1’0” = 1/16” 1’0” = 1/16”